Update on Drilling on Chibougamau's Berrigan Mine Asset

Update on Drilling on Chibougamau's Berrigan Mine Asset

Chibougamau Independent Mines Inc. (CBG-TSX-V in Canada, CLL1-Frankfurt, Stuttgart, Berlin and Lang & Schwarz Stock Exchanges in Germany, CMAUF-OTC in the US), herein called Chibougamau, is pleased to report that TomaGold Corporation (LOT-TSXV, TOGOF-OTCPK) has provided an update as regards recent drilling on the Berrigan Mine claims in the Chibougamau area of Quebec. The Berrigan Mine claims and a large number of others are under option from Chibougamau Independent Mines Inc. as updated in a CBG press release dated 2025-09-30.

Previous Phase 1 drilling intersected the historical Berrigan Mine mineralization but also in two drill hole TOM-25-015 and Tom-25-014 intersected 5.08 ZnEq (1.19 g/t AuEq over 98.5 m including 23.20% ZnEq over 4.90 m from the new lower zone and 24.85% ZnEq (5.83 AuEq) over 2.1 m in the Berrigan zone and 13.68 ZnEq (3.17 g/t AuEq) in the new lower zone respectively as reported in TomaGold's. See "Notes" below for basis of grades calculation.

Table 1: Results from drill holes TOM-025-14 and TOM-025-15 on the Berrigan Mine project


Hole ID
From
(m)
To
(m)
Length
(m)
ZnEq
(%)
AuEq
(g/t)
Au
(g/t)
Ag
(g/t)
Cu
(ppm)
Zn
(ppm)
TOM-
25-014
185.00 187.10 2.10 28.69 6.73 4.94 56.44 545 45509
  238.70 239.85 1.15 23.29 5.43 2.63 22.20 1590 104000
  251.20 252.60 1.40 41.79 9.80 7.44 37.30 552 80400
  405.30 406.70 1.40 14.99 3.48 1.13 13.15 655 92514
  423.30 426.30 3.00 2.34 0.54 0.07 5.45 493 15700
  451.50 457.50 6.00 1.34 0.31 0.08 3.45 77 7882
TOM-
25-015
132.55 141.00 8.45 4.22 0.99 0.51 5.51 338 16610
  155.70 157.70 2.00 31.75 7.42 4.66 26.90 684 102850
  182.10 202.20 20.10 2.55 0.60 0.36 3.20 265 7687
  451.20 549.70 98.50 5.75 1.34 0.82 3.21 386 19751
including 452.20 457.10 4.90 26.67 6.26 4.69 18.80 2897 47876
         and                  
including 500.35 549.70 49.35 7.26 1.69 0.90 3.48 310 31250
Including 521.00 535.60 14.60 10.26 2.39 1.34 5.91 420 41158
Including 537.85 541.10 3.25 9.94 2.31 0.88 3.85 529 58200
Including 542.00 548.20 6.20 14.82 3.45 1.63 5.26 511 74276


Notes: The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles.

Phase 2 drilling was focused upon extending 5 drill holes TOM-25-009 to TOM 25-013 inclusive in order to intersect the new zone as the previous drilling was focused upon the historical shallower mineralization.

In TomaGold's press release dated 2026-05-28, TomaGold reports: " The program, which focused on extending drill holes TOM-25-009 through TOM-25-013, was designed to test the core of modelled conductive plates at depth and evaluate the potential of the Berrigan Deep zone, discovered just before Christmas (see Figure further below).

The Company is encouraged by the systematic mineralization observed in the recovered drill core. Holes TOM-25-009EXT and TOM-25-011EXT have been logged and cut, and the samples have been shipped to the laboratory; assay results for these holes are expected shortly. Holes TOM-25-010EXT, TOM-25-012EXT and TOM-25-013EXT are currently being logged and cut.

Concurrently, encouraged by these positive geological indicators, TomaGold is launching a large-scale ground prospecting and exploration campaign. The program will cover all of the strategic option properties acquired from Chibougamau Independent Mines, Globex and SOQUEM. This cohesive package of claims forms a true consolidated mining camp in the heart of the Chibougamau mining district. Several high-priority historical mineralized showings that have never been subject to rigorous follow-up work will be evaluated and sampled over the coming weeks.

In addition, in order to optimize the structural understanding of the area and map the continuity of mineralized zones at depth, the Company will soon initiate a borehole electromagnetic (BHEM) survey in drill holes TOM-25-010, TOM-25-012 and TOM-25-015 to detect off-hole conductors and identify potential deep extensions of mineralized zones already intersected by drilling. The Company also plans to conduct a large-scale surface geophysical (UTEM) survey over a corridor measuring approximately 4 km by 2 km to identify new regional conductors and prioritize high-potential drill targets along the area's main mineralized structures. Finally, an audio-frequency magnetotelluric (AMT) geophysical program is also planned to map deep resistivity contrasts, better define the district's structural architecture and identify corridors potentially associated with regional mineralized systems. Importantly, both the UTEM and AMT surveys have the capacity to investigate depths of up to 2 km, enabling the identification of major structural corridors and potential concealed massive sulphide lenses."

3D plan view showing drill holes TOM-25-009 to TOM-25-013 and their planned extensions (blue lines) targeting the modeled conductive plate at depth, along with significant intersections from holes TOM-25-014 and TOM-25-015 within the Berrigan Deep zone.

3D plan view showing drill holes TOM-25-009 to TOM-25-013 and their planned extensions (blue lines) targeting the modeled conductive plate at depth, along with significant intersections from holes TOM-25-014 and TOM-25-015 within the Berrigan Deep zone.

Notes:

  • AuEq calculation was based on US$4,150/oz Au, $51.34/oz Ag, US$5.023/lb Cu and $1.392/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023), applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.
  • ZnEq calculation was based on US$4,047/oz Au, $50.22/oz Ag, US$4.796/lb Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000, applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.

This press release was written by Jack Stoch, P. Geo., President and CEO of Chibougamau Independent Mines Inc. in his capacity as a Qualified Person (Q.P.) under NI 43-101. The technical content of this press release has been reviewed and approved by Jean Lafleur, P.Geo., Vice President of Exploration of the Company, and Suzie Tremblay, P.Geo., Vice President of Operations at Explo-Logik Inc. and a consultant to TomaGold, each acting as a Qualified Person under National Instrument 43-101.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.


We Seek Safe Harbour.
CUSIP Number 167101 203
LEI 529900GYUP9EBEF7U709

For further information, contact:
Jack Stoch, P.Geo., Acc.Dir.
President & CEO
Chibougamau Independent Mines Inc.
86, 14th Street
Rouyn-Noranda, Quebec Canada J9X 2J1
Tel.: 819.797.5242
Fax: 819.797.1470
info@chibougamaumines.com
www.chibougamaumines.com
   

Forward Looking Statements
Except for historical information this News Release may contain certain "forward looking statements". These statements may involve a number of known and unknown risks and uncertainties and other factors that may cause the actual results, level of activity and performance to be materially different from the Companies expectations and projections. A more detailed discussion of the risks is available under "disclaimer" on the Company's website.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/eaa475e4-7c56-4188-89fd-56c63c0926bd


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

LOT:CC
TomaGold

TomaGold Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
TomaGold (TSXV:LOT)

TomaGold

Advancing a district-scale gold and base metal portfolio in Québec’s Chibougamau Mining Camp

Advancing a district-scale gold and base metal portfolio in Québec’s Chibougamau Mining Camp Keep Reading...
Precious Metals & Critical Minerals Virtual Investor Conference Presentations Now Available for On-Demand Viewing

Precious Metals & Critical Minerals Virtual Investor Conference Presentations Now Available for On-Demand Viewing

Virtual Investor Conferences, the leading proprietary investor conference series, today announced that presentations from the Precious Metals & Critical Minerals Virtual Investor Conference, held October 13th –15th, 2026, are now available for on-demand viewing. The event was co-sponsored by... Keep Reading...
Aurum hits gold outside BST1 resource ahead of MRE update

Aurum hits gold outside BST1 resource ahead of MRE update

Aurum Resources (AUE:AU) has announced Aurum hits gold outside BST1 resource ahead of MRE updateDownload the PDF here. Keep Reading...
Blue Jay Gold Announces Results of Annual General Meeting

Blue Jay Gold Announces Results of Annual General Meeting

Blue Jay Gold Corp. (TSXV: JAY) (OTCQB: JAYGF) (FSE: JAY) ("Blue Jay" or the "Company"), announces the results of its annual general meeting of shareholders held on October 15, 2026 (the "Meeting"). A total of 6,947,489 common shares were represented in person or by proxy at the Meeting,... Keep Reading...
Goldconda Gold Releases Q3 2026 Production Update at Galaxy

Goldconda Gold Releases Q3 2026 Production Update at Galaxy

Golconda Gold Ltd. ("Golconda Gold" or the "Company") (TSX-V: GG; OTCQX: GGGOF) is pleased to announce record quarterly production of 4,301 ounces of gold for the third quarter of 2026 ("Q3 2026") at its Galaxy Gold Mine ("Galaxy"), an increase of 18% in gold production compared to Q2 2026 and... Keep Reading...
Freegold drills 1.24 g/t Au over 213m including 21m of 5.77 g/t Au at Golden Summit

Freegold drills 1.24 g/t Au over 213m including 21m of 5.77 g/t Au at Golden Summit

Drilling is defining a focused starting point for the 2027 pre-feasibility study, within one of North America's largest undeveloped gold resources. HIGHLIGHTS CONTINUITY AT DOLPHIN: Drilling continues to confirm a very large, growing and relatively continuous resource with long mineralized... Keep Reading...
Goldgroup Completes Strategic Investment in Luca Mining

Goldgroup Completes Strategic Investment in Luca Mining

Goldgroup Mining Inc. (TSXV: GORO) (NYSE American: GORO) (FSE: 55G) ("Goldgroup" or the "Company") is pleased to announce that it has completed its previously announced strategic investment in Luca Mining Corp. ("Luca") through the bought deal private placement offering of subscription receipts... Keep Reading...
TomaGold

TomaGold Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News