Maximus Resources

Strong Drill Results At Golden Orb/S5 Expand Wattle Dam Gold Project

Maximus Resources Limited (‘Maximus’ or the ‘Company’, ASX:MXR) is pleased to announce results from a ~4,100m Reverse Circulation (RC) programme at Wattle Dam Gold Project (“Wattle Dam”) targeting the Golden Orb/S5 trend.


  • The 26-hole drill programme was designed to test mineralisation controls and gaps in legacy drilling south of Wattle Dam Gold Mine, along the S5/Golden Orb corridor and following up previous mineralised zones.
  • Significant gold mineralisation intersected with high-grade intervals within broad zones of mineralisation. Results include:
    • 11m @ 3.8 g/t Au from 37m; incl. 1m @ 11.5 g/t Au from 38m, 1m @ 9.0 g/t Au from 42m and 1m @ 4.3 g/t Au from 44m (RBRC039)
    • 20m @ 1.3 g/t Au from 160m; incl. 8m @ 2.5 g/t Au from 166m and 3m @ 4.4 g/t Au from 170m (WDSRC010)
    • 3m @ 4.2 g/t Au from 20m; incl. 1m @ 9.6 g/t Au from 21m (GORC068)
    • 100m @ 0.8 g/t Au from 90m; incl. 5m @ 2.3 g/t Au from 94m and 7m @ 3.5 g/t Au from 156m (GORC064)
    • 22m @ 1.1 g/t Au from 38m; incl. 2m @ 4.5 g/t Au from 38m incl. 1m @ 7.6 g/t Au from 38m and 1m @ 1.5 g/t Au from 59m (RBRC037)
    • 19m @ 0.9 g/t Au from 20m; incl. 4m @ 1.4 g/t Au from 27m and 3m @ 2.0 g/t Au from 36m and 2m @ 2.4 g/t Au from 36m (S05RC011)
    • 21m @ 1.0 g/t Au from 100m; incl. 4m @ 3.0 g/t Au from 117m and 1m @ 0.7 g/t Au from 120m (RBRC036A)
  • The completed drill programme demonstrates the potential to significantly increase the scale of Wattle Dam.
  • Due to the proximity of the Golden Orb/S5 mineralisation to the Redback Deposit, the scope of Mineral Resource Estimate work has been expanded to include a new larger pit design.

Managing Director Tim Wither commented, “These results from the recent RC drill programme which successfully intersected gold mineralisation across the ~800m Golden Orb / S5 trend, confirm the continuity of mineralisation from Wattle Dam Stockwork through S5 Prospect and Golden Orb, demonstrating the potential for Mineral Resource growth across the Wattle Dam Gold Project.”

“Gold mineralisation across the Golden Orb/S5 trend is similar to the stockwork mineralisation observed immediately adjacent to the Wattle Dam Gold Mine high-grade shoot and provides assurance that the completed drilling is narrowing the search for the potential discovery of another Wattle Dam. With several holes intersecting the broad zones of stockwork mineralisation, it is evident that any follow-up drilling requires several holes to be positioned further to the east of the initial target corridor to investigate potential high-grade shoots. With the receipt of the drill results, the Company is focused on completing a Mineral Resource Estimate for the Wattle Dam Gold Project southern mineralisation, incorporating Redback, Golden Orb and S5."

About Wattle Dam Gold Project

Wattle Dam represents a near-term gold production opportunity for Maximus, strategically located within short trucking distance to several regional gold processing plants. Gold mineralisation at Wattle Dam including the Redback Deposit, Golden Orb and S5 are all considered to be part of a much larger interconnecting mineralised system.

The geological observation along the S5 / Golden Orb corridor drilling is analogous to the Wattle Dam Gold Mine, which is not unexpected, with previous drilling passing through the Western Shear Zone and into variably altered and veined ultramafics in the footwall of the shear zone.

Wattle Dam - Forward Plan

With the positive drill results, the Company will incorporate the Golden Orb, S5 and Redback gold mineralisation for a combined Wattle Dam South Mineral Resource Estimate. The Company expects the Resource Estimate to be completed during December 2022.

The Company has commenced metallurgical test work on representative composite samples across the Wattle Dam, focusing on replicating typical gold processing conditions found in the Western Australian goldfields. Results from the metallurgical test work will define processing requirements for the ores as a precursor to negotiating toll-treating agreements with several gold processing plants within ~70km of the Wattle Dam.


Click here for the full ASX Release

This article includes content from Maximus Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

MXR:AU
The Conversation (0)
Augustus Minerals

Airborne EM over Multiple Targets on Ti-Tree Project

Augustus Minerals (ASX: AUG; “Augustus” or the “Company”) is pleased to announce that an airborne Versatile Time Domain Electromagnetic (VTEM) Max survey will be undertaken at three areas within the 3,600km2 Ti-Tree Project in the Gascoyne Region. The survey is scheduled for August.

Keep reading...Show less
Mount Burgess Mining NL

Kihabe-Nxuu Polymetallic Project Silver/Gallium Potential

In response to recent enquiries, Mount Burgess Mining Ltd (MTB:ASX, the “Company”) is pleased to update the silver potential of the Kihabe-Nxuu Project (“Project”) in Botswana. With the recent increase in silver prices and multiple forecasts predicting a structural deficit over the coming years, the importance of the silver content of the Project has increased substantially.

Keep reading...Show less
IMARC

Registration Opens for the Inaugural Mining, Metals and the Circular Economy Conference

Early bird delegate passes are now on sale for the inaugural Mining, Metals and the Circular Economy conference, scheduled to take place at the ICC Sydney on 29 & 30 October 2024.

The launch of this event is timely, as circularity in the mining and metals industry is important for reaching net-zero goals and global decarbonisation, while also addressing the rising demand for minerals required for future technologies and other vital materials.

Organised by Beacon Events, the Mining, Metals and the Circular Economy conference will be co-located with the International Mining and Resources Conference (IMARC), providing attendees with unprecedented access to industry experts and thought leaders in the mining sector, fostering a dynamic exchange of innovative ideas and best practices. What sets this conference apart is that it is the world’s first and only event to explore the global context of process and product circularity throughout the mining industry’s value chain.

Keep reading...Show less
Aldoro Resources

Latest Kameelburg Assays Up To 10.38% Nb2o5 and 9.89% TREO

Aldoro Resources Ltd (“Aldoro”, “The Company”) (ASX: ARN) is pleased to provide an update on the large-scale geological mapping campaign at the Kameelburg Carbonatite Project, targeting priority areas across the southern and eastern margins of the large carbonatite plug.

Keep reading...Show less
Firetail Resources

Firetail Resources

Keep reading...Show less
Aura Energy

Aura Increases Tiris’ Mineral Resources by 55% to 91.3 Mlbs U3O8

Resource growth adds confidence in future expansion and scale opportunities

Aura Energy Limited (ASX: AEE, AIM: AURA) (“Aura” or “the Company”) is pleased to provide an update on the Mineral Resource Estimate (“MRE”) for the Tiris Uranium Project (“Tiris” or the “Project”) in Mauritania.

Keep reading...Show less

Latest Press Releases

Related News

×