Steppe Gold Amends EPC Agreement for ATO Phase 2 Project

Steppe Gold Amends EPC Agreement for ATO Phase 2 Project

Steppe Gold Ltd. (TSX: STGO,OTC:STPGF) (OTCQX: STPGF) (FSE: 2J9) ("Steppe Gold" or the "Company") announces that Steppe Gold LLC ("Steppe Mongolia"), its wholly owned subsidiary, has entered into an amendment (the "EPC Amendment") to its engineering, procurement and construction agreement (the "EPC Agreement") with Hexagon Build Engineering LLC ("Hexagon") for Phase 2 at the ATO Mine (the "Project"), increasing the contract value from US$148.8 million to approximately US$238.2 million.

Following a review of the EPC Agreement and the Project's development plan, the Company's management determined that certain additional infrastructure and supporting facilities are required for Phase 2 development and were therefore added to the scope of work under the EPC Agreement. These additions include a tailings management facility, power transmission and water supply infrastructure, concentrate transportation roads and the construction of warehousing, maintenance shop and camp facilities. These items are necessary for the Project but were not fully contemplated in the EPC Agreement in terms of responsibility, or method of execution.

Financing

The Company intends to pursue debt financing in connection with the revised project scope of the Project. Financing arrangements have not yet been determined or finalized, and there can be no assurance that the Company will be able to obtain the required financing on acceptable terms, or at all. Accordingly, there can be no assurance that the Project will proceed as currently contemplated.

Outlook

The revised feasibility study is expected to be completed in the second half of 2026 and to reflect the Company's decision to increase the Project's planned annual throughput capacity. The timing of further Project development remains subject to, among other things, completion of the revised feasibility study, securing the required financing, receipt of all necessary permits and approvals, and ongoing project execution planning. As the Project advances, additional works, infrastructure requirements or scope modifications may be identified through engineering, permitting and optimization activities, which could affect the Project's capital costs, development schedule and overall execution strategy.

About ATO Mine

ATO Mine is a multi-stage precious metals project, located in Dornod Province, Mongolia. The project is owned and operated by Steppe Mongolia, a wholly owned subsidiary of Steppe Gold Ltd.

About Steppe Gold Ltd.

Steppe Gold is Mongolia's premier precious metals company.

For further information, please contact:

Tserenbadam Dugeree, Chief Executive Officer

Ariuntsetseg Batsaikhan, Interim Chief Financial Officer

Elisa Tagarvaa, Investor Relations Manager

7th floor, Blue Sky Tower, Peace Avenue 17
Sukhbaatar District 1, Ulaanbaatar 14241, Mongolia
Tel: +976 7732 1914

Cautionary Note Regarding Forward-Looking Statements

This news release contains certain statements or disclosures relating to the Company that are based on the expectations of its management as well as assumptions made by and information currently available to the Company which may constitute forward-looking statements or information ("forward-looking statements") under applicable securities laws. All such statements and disclosures, other than those of historical fact, which address activities, events, outcomes, results, or developments that the Company anticipates or expects may, or will, occur in the future (in whole or in part) should be considered forward-looking statements. In some cases, forward-looking statements can be identified by the use of the words "continued", "focus", "scheduled", "will", "planned", "anticipated", "approximately" and similar expressions. In particular, but without limiting the foregoing, this news release contains forward-looking statements pertaining to the following: the scope, cost and benefits of the EPC Amendment with Hexagon; the advancement, timing and completion of the Phase 2 development of the ATO Project; the Company's ability to obtain debt financing on acceptable terms; the timing and completion of the revised feasibility study; receipt of necessary permits and approvals; anticipated growth in production; and the Company's ability to execute its long-term strategy. The forward-looking statements contained in this news release are based on a number of assumptions which may prove to be incorrect, and actual results, performance or achievements may differ materially from those expressed or implied by such statements due to known and unknown risks, uncertainties and other factors, including risks relating to gold and silver prices, the ability of the parties to perform their obligations under the EPC agreement, the availability of financing, the development and operation of the ATO mine, and general economic, market and regulatory conditions. The Company undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/303004

News Provided by TMX Newsfile via QuoteMedia

STGO:CC
The Conversation (0)
Steppe Gold

Steppe Gold

Mongolia’s Premiere Precious Metals Company

Mongolia’s Premiere Precious Metals Company Keep Reading...
New Found Gold Announces Results of 2026 Annual General Meeting

New Found Gold Announces Results of 2026 Annual General Meeting

Hires ICP as Market MakerNew Found Gold Corp. (TSXV: NFG) (NYSE American: NFGC) ("New Found Gold" or the "Company") is pleased to announce the results of the 2026 Annual General Meeting of its shareholders held in Toronto, ON, on June 25, 2026 (the "Meeting"). The Company's Board of Directors... Keep Reading...
MAYFAIR ANNOUNCES RESULTS OF 2026 ANNUAL GENERAL AND SPECIAL MEETING AND GRANT OF STOCK OPTIONS

MAYFAIR ANNOUNCES RESULTS OF 2026 ANNUAL GENERAL AND SPECIAL MEETING AND GRANT OF STOCK OPTIONS

Mayfair Gold Corp. ("Mayfair", "Mayfair Gold", or the "Company") (TSXV: MFG,OTC:MFGCF) (NYSE American: MINE) is pleased to announce that Mayfair Gold shareholders approved all matters voted on at the Annual General and Special Meeting of Shareholders held on Thursday, June 25, 2026, including:... Keep Reading...
Silverco Mobilizes Underground Mining Contractors at Cusi Property

Silverco Mobilizes Underground Mining Contractors at Cusi Property

Silverco Mining Ltd. (TSXV: SICO,OTC:SICOF) ("Silverco" or the "Company") is pleased to report that underground contractors have begun mobilization at its 100% owned Cusi Property ("Cusi") in Chihuahua, Mexico.Silverco has engaged Mafrissa Transportes y Maquinaria S.A. de C.V ("Mafrissa") and... Keep Reading...
Heliostar Expands Expansion Zone and Drills 99.8 Metres Grading 10.9 g/t Gold at Ana Paula

Heliostar Expands Expansion Zone and Drills 99.8 Metres Grading 10.9 g/t Gold at Ana Paula

HIGHLIGHTS: High Grade Panel 99.8 m grading 10.90 g/t gold from 50.5 m 37.0 m grading 6.95 g/t gold from 16.8 m Expansion Zone 49.6 m grading 2.88 g/t gold from 539.4 m, including 9.05 m grading 9.49 g/t gold 16.95 m grading 3.49 g/t gold from 613.2 m North Zone Linkage21.6 m grading 10.38 g/t... Keep Reading...
Second Gold Pour from White Dam Project

Second Gold Pour from White Dam Project

Pacgold (PGO:AU) has announced Second Gold Pour from White Dam ProjectDownload the PDF here. Keep Reading...
Maritana Commences Resources Conversion Drilling

Maritana Commences Resources Conversion Drilling

Maritana Minerals (MRT:AU) has announced Maritana Commences Resources Conversion DrillingDownload the PDF here. Keep Reading...

Interactive Chart

Latest Press Releases

Related News