
February 19, 2023
QX Resources Limited (ASX: QXR, ‘QXR’ of the ‘Company’) is pleased to advise that it has recommenced RC drilling at the Company’s 100%-owned Turner River hard rock lithium project, located 15 km to south-east of Mineral Resources’ Wodgina lithium mine, located within the Pilbara lithium province of Western Australia (Figures 1 & 2).
- ~1,500m follow-up RC drilling program underway at QXR’s Turner River hard rock lithium project
- Continuation of drilling aimed to extend the areas of known mineralisation over an increased strike length
- Maiden drilling in December 2022 highlighted the presence of pegmatites and potential lithium rich micas, based on visual observations
- Encouraging indications of significant areas of pegmatites were observed in drill pads and drill chips, extending beyond the previously sampled area of high grade lithium rock chip results
- Assay results from the first phase drill program are anticipated in late-February, with the second program results expected in April 2023
- Yule River tenement, which has pegmatite occurrences, has been granted for an initial 5-year term
In December 2022, QXR undertook a ~1,200m maiden RC drill program at Turner River. The maiden program produced encouraging indications of significant areas of potential lithium bearing pegmatites observed in drill pads and drill chips at QXR’s 100%-owned Turner River hard rock lithium project (Carbonate Hill prospect). These indications extend beyond the area with previously reported high grade rock chip samples of 1.6% Li2O, 1.1% Li2O and 4.9% Li2O (refer QXR ASX announcements 8 Nov, 10 Nov, 12 Dec and 30 June 2022).
Pegmatites and potential lithium rich micas were intersected in the maiden drilling, based on visual observations, which achieved the aim of the maiden drill program. Drilling targeted the potential for either lithium mica and spodumene bearing pegmatites, or a new style of large tonnage hard rock lithium deposit hosted near the top of a large granite body rich in lithium micas.
Assay results from the first phase of the program are anticipated in mid-February. Results from the follow-up program are expected ~6 weeks after completion of the program.


Grant of Yule River Project (E45/6159)
The Yule River project (140km2) has been granted for an initial 5-year term. The Yule River project is an exploration stage package which lies wholly within the Yule Granitoid Complex, which has interpreted pegmatite occurrences (Figure 5). From initial due diligence, the Company understands the granite within the tenement has been intruded by the Split Rock Supersuite with which the Wodgina, Pilgangoora and Global Lithium deposits are associated.
All of the tenements applied for by the Company are now fully granted in the highly-prospective Pilbara lithium region, following the grant of Yule River.
Click here for the full ASX Release
This article includes content from QX Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
QXR:AU
The Conversation (0)
07 February 2024
QX Resources
Copper/Moly/Gold assets in Queensland
Copper/Moly/Gold assets in Queensland Keep Reading...
30 January 2025
Quarterly Activities/Appendix 5B Cash Flow Report
QX Resources (QXR:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
15h
California Lithium Developer CTR to Go Public in US$4.7 Billion SPAC Deal
Lithium developer Controlled Thermal Resources (CTR) plans to go public through a US$4.7 billion merger with special purpose acquisition company Plum Acquisition in a deal aimed at accelerating development of a major geothermal and lithium project in California.The companies said the transaction... Keep Reading...
22h
Snow Lake Announces Name Change to Frontier Nuclear and Minerals Inc. and Trading Symbol Change to "FNUC"
Name Change and New Trading Symbol to be effective on March 16, 2026Snow Lake Resources Ltd., dba Snow Lake Energy (NASDAQ: LITM) ("Snow Lake" or the "Company"), a nuclear fuel cycle company, announces that it will change its name to "Frontier Nuclear and Minerals Inc.", and will change its... Keep Reading...
12 March
LFP Batteries Claim 60 Percent of Global Market as North America Scrambles to Build Supply Chain
The rise of lithium-iron-phosphate (LFP) batteries was a popular theme at the Benchmark Week Summit in Toronto, where industry executives said the chemistry’s combination of safety, versatility and lower costs is driving explosive growth across electric vehicles and grid storage.According to... Keep Reading...
12 March
Lake Johnston drill program testing extensions to Xmas Gold Discovery and Medcalf Lithium Resource
Charger Metals NL (ASX: CHR, “Charger” or the “Company”) is pleased to provide a drilling progress update at its 100%-owned Lake Johnston Lithium and Gold Project (“Lake Johnston”) in the Yilgarn, Western Australia. Charger has completed a total of 3,054m drilling this quarter to date, including... Keep Reading...
10 March
Laguna Verde CEOL Terms Agreed with Chilean Government
CleanTech Lithium (AIM: CTL, Frankfurt:T2N), an exploration and development company advancing sustainable lithium projects in Chile, is delighted to announce that the Company and the Mining Ministry in Chile have formally agreed the contractual terms on which the Special Lithium Operating... Keep Reading...
27 February
UK Enters Commercial Lithium Production with Geothermal Plant Launch
The UK has entered commercial lithium production for the first time as Geothermal Engineering Ltd (GEL) began operations in its plant at Cornwall, anchoring the government's hopes of a domestic battery metals supply chain.The Redruth-based facility marks the country’s first commercial-scale... Keep Reading...
Latest News
Interactive Chart
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00





