Nickel Creek Platinum Announces Filing of Pre-Feasibility Study Technical Report for its Nickel Shäw Project

Nickel Creek Platinum Announces Filing of Pre-Feasibility Study Technical Report for its Nickel Shäw Project

Nickel Creek Platinum Corp. (TSX: NCP) (OTCQB: NCPCF) ("Nickel Creek" or the "Company") is pleased to announce that further to its news release dated August 24, 2023 the Company has filed a Technical Report titled "Nickel Shäw Ni-Cu-PGM Project PreFeasibility Study for the Nickel Shäw Ni-Cu-PGM Project, Yukon, Canada " ("Technical Report").

Nickel Creek Platinum Corp. Logo (CNW Group/Nickel Creek Platinum Corp.)

The Technical Report, with an effective date of September 20, 2023 , was independently prepared by AGP Consultants Inc. The Technical Report was prepared in accordance with the Canadian Securities Administrator's National Instrument 43-101 - Standards of Disclosure for Mineral Projects and has been filed on SEDAR+ at www.sedarplus.ca and on Nickel Creek's website at www.nickelcreekplatinum.com .

Nickel Creek Platinum Corp. (TSX: NCP; OTCQB: NCPCF) is a Canadian mining exploration and development company advancing its 100%-owned Nickel Shäw Project ("Project"). The Project has exceptional access to infrastructure, located three hours west of Whitehorse via the paved Alaska Highway, which further offers year-round access to deep-sea shipping ports in southern Alaska.

The Company is led by a management team with a proven track record of successful discovery, development, financing and operation of large-scale projects. Our vision is to create value for our shareholders by becoming a leading North American nickel, copper, cobalt and PGM producer.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/nickel-creek-platinum-announces-filing-of-pre-feasibility-study-technical-report-for-its-nickel-shaw-project-301949747.html

SOURCE Nickel Creek Platinum Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/October2023/06/c5182.html

News Provided by Canada Newswire via QuoteMedia

NCP:CA
The Conversation (0)
NICKEL CREEK PLATINUM ANNOUNCES CLOSE OF NON-BROKERED PRIVATE PLACEMENT

NICKEL CREEK PLATINUM ANNOUNCES CLOSE OF NON-BROKERED PRIVATE PLACEMENT

/NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES /

Nickel Creek Platinum Corp. (TSX: NCP) (" Nickel Creek " or the " Company ") is pleased to announce that it has closed on its previously announced non-brokered private placement (the " Private Placement ") pursuant to which the Company has issued a total of 41,666,667 common shares of the Company (each, a " Common Share ") at a price of $0.015 per Common Share for gross proceeds of approximately $0.6 million . The Company's largest shareholder, Electrum Strategic Opportunities Fund L.P. (" Electrum "), acquired all of the Common Shares issued in the Private Placement.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Nickel Creek Platinum Announces Positive PFS for its Nickel Shäw Project

Nickel Creek Platinum Announces Positive PFS for its Nickel Shäw Project

 Nickel Creek Platinum Corp. (TSX: NCP) (OTCQB: NCPCF) ("Nickel Creek" or the "Company") is pleased to announce the results of a positive pre-feasibility study ("PFS") at its 100%-owned Nickel Shäw Project (the "Project") located in the Yukon Canada. The PFS has been prepared by AGP Consultants Inc. ("AGP"). The estimated Project after-tax net present value ("NPV") at a 5% discount rate is $143 million with an after-tax internal rate of return ("IRR") of 5.8%. All dollars are expressed in Canadian dollars unless otherwise stated.

Nickel Creek Platinum Corp. logo (CNW Group/Nickel Creek Platinum Corp.)

Stuart Harshaw , President and CEO of Nickel Creek commented: "The PFS is an important milestone in realizing the opportunity the Nickel Shäw Project represents in the critical mineral space where it can provide nickel and copper to take advantage of the strong nickel market for EV batteries. The sensitivity to energy costs illustrates how working with the different levels of government can lead to a significant improvement in value, especially when combined with the previously announced intention of the Federal government to provide a tax incentive for critical mineral projects such as Nickel Shäw.  Moving forward, our focus will be to continue to add value to the project through work on identified key economic areas of opportunity and continued mineral exploration success while advancing towards a feasibility study."

Project PFS Highlights
  • $143 million after-tax NPV using a 5% discount rate and an IRR of 5.8% at the following commodity prices: nickel - US$11.00 /pound ("lb"); copper – US$4.00 /lb; palladium – US$2,100 /troy ounce ("troy oz"); platinum – US$1,000 /troy oz; cobalt – US$23 /lb; and gold – US$1,800 /troy oz, each using a 0.75 Canadian to US exchange rate.
  • Life of mine ("LOM") after-tax cash flow of approximately $1.7 billion with an after-tax payback period of 12.7 years.
  • Pre-production capital cost of approximately $1.7 billion , with a construction period of 3.0 years.
Project Opportunities
  • If paying Yukon grid rates of $0.11 /kWhr, the after-tax NPV at a 5% discount rate increases by $324 million to $467 million (see NPV sensitivities section below for additional information).
  • The Company's after-tax NPV at a 5% discount rate increases from $143 million to $336 million if the Canadian tax incentive for critical mineral companies is enacted (see Investment Tax Credit for Clean Technology Manufacturing section below for additional information).
  • The Company plans to further investigate the opportunity of carbon tax offsets associated with carbon sequestration in the tailings facility with ongoing testwork and analysis.
Mineral Resource

On June 1, 2023 , the Company announced an updated mineral resource estimate with an effective date of April 3, 2023 :



Metal Grades



Ni

Cu

Co

Pd

Pt

Au

Mg

S

Class

Ktonnes

%

%

%

g/t

g/t

g/t

%

%

Measured

122,363

0.25

0.15

0.014

0.23

0.24

0.05

16.03

0.78

Indicated

314,332

0.26

0.13

0.014

0.24

0.22

0.04

17.26

0.64

Total M+I

436,695

0.26

0.13

0.014

0.23

0.22

0.04

16.92

0.68

Inferred

114,016

0.27

0.13

0.015

0.25

0.20

0.04

17.46

0.69



Contained Metal





Ni

Cu

Co

Pd

Pt

Au



Class

Ktonnes

M Lbs

M Lbs

M Lbs

k Ozs

k Ozs

k Ozs



Measured

122,363

679

411

38

905

944

184



Indicated

314,332

1,792

871

99

2,385

2,197

361



Total M+I

436,695

2,471

1,281

137

3,290

3,141

545



Inferred

114,016

668

339

37

916

733

128




Notes:

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Summation errors may occur due to rounding.

Effective Date is April 3, 2023.

Mineral Resources amenable to open pit extraction are reported within an optimized containing shell.

Average grade calculations on this table are impacted by rounding.

Tonnages are reported in units of 1,000 metric tonnes (Ktonnes).

Contained Base Metal reported in units of 1,000,000 lbs, M Lbs.

Contained Precious Metal reported in units of 1,000 troy ounces, K Ozs.

Metal Prices for Resource Determination in US$

Nickel: $12.10/lb; Copper: $4.45/lb; Cobalt: $25.30/lb; Palladium: $2,415/troy oz; Platinum: $1,150/troy oz; Gold: $2,015/troy oz.

Net Smelter Return (NSR) cut-off grades range from $17.30 to $17.61 Canadian dollars depending on Bulk Con and Split Con

Mining costs, vary by bench, separately for ore and waste:


Base waste mining cost @1330m = C$2.26/t, 10 m bench incremental cost above = C$0.004/t, 10 m bench incremental cost below = C$0.02/t


Base ore mining cost @1330m = C$1.99/t, 10 m bench incremental cost above = C$0.019/t, 10 m bench incremental cost below = C$0.015/t

Process and G&A costs: Bulk con – C$17.30/t; Split con = C$17.61/t

Calculated process recoveries by concentrate type:












Ni

Cu

Co

Pd

Pt

Au







Bulk con:

Eq1

Eq2

57.0 %

54.0 %

47.8 %

74.4 %







Cu con:

Eq3

Eq4

3.36 %

3.19 %

0.91 %

23.58 %







Ni con:

Eq5

Eq6

53.64 %

50.81 %

46.89 %

50.82 %








where:

Eq1 = Ni recovery to Bulk Con = MIN (23.21*LN(X)+30.362,88)








where

X = (%S-%Cu)/%Ni Capped at 12.0%








Eq2 = Cu recovery to Bulk Con = ((Cu-0.06)/Cu)) *100, Constant tail at 0.06% Cu




Eq3 = Ni recovery to Cu Con=Ni recovery to achieve 25.6% Cu and 1.1% Ni grades in Cu Con




Eq4 = Cu recovery to Cu Con = Cu recovery to Bulk Con * 0.623




Eq5 = Ni recovery to Bulk Con – Ni recovery to Cu Con




Eq6 = Cu recovery to Bulk Con – Cu recovery to Cu Con


Capping of grades varies based on lithology for each metal.


The density is assigned based on lithology and varies between 2.76 g/cm 3 and 3.38 g/cm 3 .

Project Description

The Company's flagship asset is its 100%-owned Nickel Shäw Ni-Cu-Co-PGM Project, located in southwestern Yukon, Canada . The Nickel Shäw Project contains the Company's core Ni-Cu-Co-PGM Wellgreen deposit, as well as the Arch, Burwash, Formula, Musk and Quill claims. The Wellgreen deposit is a polymetallic deposit with mineralization that includes the significant co-occurrence of nickel, copper, cobalt, platinum group metals ("PGMs") and gold.

The Nickel Shäw property contains an extensive Ni-Cu-Co-PGM mineralized system hosted by mafic/ultramafic intrusions related to Triassic-age flood basalts. With over 2.4 billion pounds of nickel, 1.2 billion pounds of copper, 6.9 million ounces of PGMs and 137 million pounds of cobalt in the measured and indicated mineral resource categories, Nickel Shäw is one of the largest undeveloped nickel projects in North America not controlled by a major mining company.

The PFS contemplates that the Nickel Shäw open pit would be mined using conventional open pit methods, with a LOM of over 19 years. From the open pit the ore would be trucked to a primary crusher located adjacent to the pit and conveyed out of the valley to a concentrator designed to process 45,000 tonnes per day ("tpd") of ore. The ore would be fed into a conventional Ni-Cu-PGM flotation concentrator designed to produce a bulk Ni-Cu-PGM concentrate "Bulk conc" or alternatively into split concentrates. The split concentrates would be a Ni concentrate "Ni conc" and a Cu concentrate "Cu conc", as economics dictate. Average annual LOM concentrates production ("dmt") is expected to be 103,100 dmt of Bulk conc, 95,000 dmt of Ni conc and 19,600 of dmt Cu conc. Total LOM payable metal production includes the following:

  • 614.3M lbs nickel;
  • 281.5M lbs copper;
  • 21.5 M lbs cobalt;
  • 626,500 troy ounces platinum;
  • 743,400 troy ounces palladium; and
  • 174,400 troy ounces gold.

The tailings would be stored in a tailings storage facility adjacent to the concentrator. Concentrate would be transported by truck 480 km to the Port of Skagway Ore Terminal. Power will be primarily sourced from a liquified natural gas ("LNG") power plant.

Social & Environmental

The Nickel Shäw Project lies within the Kluane First Nation ("KFN") core area as defined under the Umbrella Final Agreement between the Government of Canada , Government of Yukon and the Council of Yukon First Nations. Effective August 1, 2012 , an Exploration Cooperation Agreement was signed between the KFN and the Company. The KFN and the government of the Yukon Territory have provided very good support for the Nickel Shäw Project.

Ultramafic rocks from the project (in the form of tailings and waste rock) are being assessed for their ability to capture and store carbon. Test work conducted in 2022 confirmed the presence of brucite (a magnesium-rich mineral known to react quickly with CO2 in air) in a subset of samples. On a mass basis, from the achieved reactivity in the testwork, this may enable maximum sequestration of 2.1 kt CO2 per Mt tailings. The Company is evaluating further work which will include the creation of a mineralogy model based on the project's geochemical database to assess the spatial distribution of rocks within the Wellgreen deposit that have high potential to sequester carbon (see news release dated December 15, 2022 for additional details).

Summary of PFS Results

Pre-Tax NPV (5%), IRR

$547 million, 7.7%

After-Tax NPV (5%), IRR

$143 million, 5.8%

Undiscounted After-Tax Cash Flow (LOM)

$1.65 billion

After-Tax Payback Period

12.7 years

Life of Mine (LOM)

19.1 years

Capital Cost

- Initial

- Sustaining

- Total LOM

$1.7 billion

$0.6 billion

$2.3 billion

Operating Cost

$30.22 /mt milled

Mill Throughput

45,000 tpd

Initial 5 Year Annual Average Metal
Production

- Nickel

- Copper

- Cobalt

- Platinum

- Palladium

- Gold


29.1 M lbs

9.1 M lbs

1.1 M lbs

27,400 troy oz

36,200 troy oz

7,700 troy oz

Life of Mine Strip Ratio (W:O)

1.93

Based on the assumed commodity prices noted above, the LOM revenue by metal is as follows: nickel – 62%; palladium – 14%; copper – 10%; platinum 6%; cobalt – 5% and gold – 3%.

NPV Sensitivities

The discount rate sensitivity is as follows:

Discount Rate

After-tax NPV

0 %

$1.7 billion

5% - base case

$143 million

10 %

($459) million

Sensitivity to Nickel and Copper Prices

The after-tax NPV ($Million's) at a 5% discount rate:


Nickel Price (US$)

Copper (US$)

$8.00

$9.00

$10.00

$11.00

$12.00

$13.00

$14.00

$              3.00

(1,003)

(633)

(306)

14

325

628

925

$              3.25

(961)

(599)

(273)

47

357

658

955

$              3.50

(918)

(566)

(240)

79

388

689

985

$              3.75

(876)

(532)

(207)

111

419

720

1,015

$              4.00

(834)

(498)

(174)

143

450

751

1,045

$              4.25

(796)

(465)

(141)

175

481

781

1,075

$              4.50

(762)

(431)

(108)

207

512

811

1,105

Sensitivity to Energy Power Costs

The pre-tax and after-tax NPV ($Million's) at a 5% discount rate:



Power Cost ($kWhr)








Base
case




$0.09

$0.11

$0.13

$0.15

$0.17

$0.194

$0.21

Pre-tax NPV
($Million's)

1,106

998

891

784

676

547

461

After-tax NPV
($Million's)

543

467

391

314

237

143

80

Pre-tax IRR

10.4 %

9.9 %

9.4 %

8.9 %

8.4 %

7.7 %

7.3 %

After-tax IRR

8.2 %

7.7 %

7.3 %

6.8 %

6.4 %

5.8 %

5.5 %

Investment Tax Credit for Clean Technology Manufacturing

The Canadian 2023 federal budget proposed the introduction of a 30% refundable investment tax credit for investments in eligible property associated with eligible activities for clean technology manufacturing and processing, as well as critical mineral extraction and processing (the "Clean ITC"). The Clean ITC would apply to investments in certain depreciable property that is used all or substantially all for eligible activities. This would generally include machinery and equipment, including certain industrial vehicles and related control systems used in manufacturing, processing or critical mineral extraction. A portion of the Clean ITC would be recovered if eligible property is subject to a change in use or sold within a certain period of time.

As of this date, there are no specific details regarding the proposed Clean ITC and has not been legislated. Based on assumptions on the capital that could be eligible for the ITC, if the Company was able to utilize the 30% Clean ITC, the Company estimates that the after-tax NPV for the Project at a 5% discount rate would improve from $143 million to $336 million and the after-tax IRR would improve from 5.8% to 7.2%.

CAPEX and OPEX

The initial capital expenditure contemplated in the PFS, to be incurred over the three-year pre-production period of the Project, amounts to approximately $1.7 billion , with the sustaining capital over the remainder of LOM amounts to approximately $0.6 billion . The LOM capital expenditure is summarized as follows:

Capital ($Million's)


Pre-Production

Sustaining

Total LOM

Open Pit

399

205

604

Processing

510

5

515

Infrastructure

353

258

611

Indirects

245

58

303

Environmental

-

52

52

Contingency

180

60

240

Total

1,687

638

2,325

Operating Costs

The LOM operating costs are summarized as follows:


$/mt Milled

Processing

17.32

Mining

7.30

G&A

2.43

Sub-total

27.05

Concentrate Trucking

2.34

Carbon Tax

0.83

Total

30.22

Future Opportunities and Value Enhancements

The PFS also identified a number of potential optimizations to the Project. These include:

  • Working with energy providers and Yukon government and other stakeholders on an energy strategy to reduce the costs for the project;
  • Additional metallurgical testwork to improve overall recoveries of all payable metals where a 1% recovery improvement represents approximately an after-tax $111 M improvement to the NPV at a 5% discount rate; and
  • Continue drilling on the Arch target to define the potential resource which could provide the opportunity for an early project higher grade feed that may improve overall financial results.

Nickel Creek Platinum Corp. (TSX: NCP; OTCQB: NCPCF) is a Canadian mining exploration and development company advancing its 100%-owned Nickel Shäw Project ("Project"). The Project has exceptional access to infrastructure, located three hours west of Whitehorse via the paved Alaska Highway, which further offers year-round access to deep-sea shipping ports in southern Alaska.

The Company is led by a management team with a proven track record of successful discovery, development, financing and operation of large-scale projects. Our vision is to create value for our shareholders by becoming a leading North American nickel, copper, cobalt and PGM producer.

Qualified Persons

The PFS was overseen by AGP and the technical information disclosed in this news release was reviewed and approved by Gordon Zurowski of AGP. Mr. Zurowski is a "qualified person" as defined in NI 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and an independent consultant to the Company. The scientific and technical information disclosed in this news release in relation to metallurgical testing, including with respect to 2022-23 variability testwork, was reviewed and approved by Gordon Marrs , P. Eng., of XPS who is a "qualified person" as defined in NI 43-101 and an independent consultant to the Company.

All other scientific and technical information disclosed in this news release was reviewed and approved by Cameron Bell , Nickel Creek's Geological Consultant and a "qualified person" as defined in NI 43-101. Please see the technical report ( September 2018 ) filed under the Company's profile at www.sedar.com , for a description of the Company's data verification and QA/QC procedures.

Cautionary Note Regarding Forward-Looking Information

This news release includes certain information that may be deemed "forward-looking information". Forward-looking information can generally be identified by the use of forward-looking terminology such as "may", "will", "expect", "intend", "believe", "continue", "plans" or similar terminology, or negative connotations thereof. All information in this release, other than information of historical facts, including, without limitation, regarding the results of  technical test work, the estimated mineral resource, the prospect of any future potential economic viability of the Project, future commodity prices and the potential for them to improve, that a feasibility study will ever be commenced and completed, the potential to identify additional mineralization beyond the known resource, timing of  further work on the Project, future demand for nickel and copper concentrates, future demand for battery products, statements concerning the availability and impact of the Clean ITC, the ability of the Company to identify additional opportunities to create shareholder value, and general future plans and objectives for the Company and the Project, are forward-looking information that involve various risks and uncertainties. Although the Company believes that the expectations expressed in such forward-looking information are based on reasonable assumptions, such expectations are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking information.

This news release also contains references to estimates of mineral resources. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral resource estimates may have to be re-estimated based on, among other things: (i) fluctuations in nickel, copper or other mineral prices; (ii) results of drilling; (iii) results of metallurgical testing and other studies; (iv) changes to proposed mining operations, including dilution; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible failure to receive or maintain required permits, approvals and licences.

For more information on the Company and the key assumptions, risks and challenges with respect to the forward-looking information discussed herein, and about our business in general, investors should review the Company's most recently filed annual information form, and other continuous disclosure filings which are available at www.sedar.com . Readers are cautioned not to place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/nickel-creek-platinum-announces-positive-pfs-for-its-nickel-shaw-project-301909571.html

SOURCE Nickel Creek Platinum Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/August2023/24/c1203.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Nickel Creek Platinum Corp Announces Participation in THE Mining Investment Event of the North, Canada's First Tier I Mining Conference, June 19-21 Quebec City

Nickel Creek Platinum Corp Announces Participation in THE Mining Investment Event of the North, Canada's First Tier I Mining Conference, June 19-21 Quebec City

Featuring Critical Metals Day on June 20, 2023

Nickel Creek Platinum Corp (TSX: NCP) is a Canadian mining exploration and development company focused on advancing its 100%-owned Nickel Shäw Project towards becoming Canada's next world-class nickel sulphide mine. Located in the Yukon, the Company's asset is host to over 2.5 billion pounds of nickel, 1.3 billion pounds of copper, 7.0 million ounces of platinum group metals ("PGM's") and 137 million pounds of cobalt in the measured and indicated categories positioning the Company well for the rapidly growing demand for these urbanization commodities. The Company is pleased to announce that it will be participating in THE Mining Investment Event of the North, June 19-21, 2023, ("THE Event") at the Fairmont Chateau Frontenac and Voltigeurs de Quebec Armoury in Quebec City, Canada.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Nickel Creek Platinum Announces Updated Mineral Resource Estimate at Nickel Shäw Project

Nickel Creek Platinum Announces Updated Mineral Resource Estimate at Nickel Shäw Project

 Nickel Creek Platinum Corp. (TSX: NCP) (OTCQB: NCPCF) ("Nickel Creek" or the "Company") is pleased to announce an updated mineral resource estimate at its 100%-owned Nickel Shäw Project located in the Yukon Canada. Under the revised estimate, measured mineral resource tonnage has increased by 31% to 122,363 kt and indicated mineral resource tonnage has increased by 37% to 314,332 kt. Contained Ni in measured and indicated mineral resource categories have increased 31% to 2.47 billion lbs. Grades are largely unchanged with the measured and indicated mineral resource grades at 0.26% Ni, 0.13% Cu, 0.014% Co, 0.23 gt Pd, 0.22 gt Pt and 0.04 gt Au. A complete tabulation of tonnage and grade by category is listed in the table below along with metal prices, recovery information, net smelter return ("NSR") cut-off grades and mining parameters.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Nickel Creek Platinum Announces Results of 2023 Annual General Meeting

Nickel Creek Platinum Announces Results of 2023 Annual General Meeting

Nickel Creek Platinum Corp. (TSX: NCP) ("Nickel Creek" or the "Company") is pleased to announce the results of its annual general meeting of shareholders (the "AGM") that was held on May 31, 2023 .

Nickel Creek Platinum Corp. logo (CNW Group/Nickel Creek Platinum Corp.)

All of the following business items were approved at the AGM by the requisite majority of shareholder votes cast at the meeting:

  • setting the size of the Board of Directors at seven;
  • electing each management-nominated director; and
  • appointing PricewaterhouseCoopers LLP as Nickel Creek's auditor

The seven directors of Nickel Creek elected at the AGM are: Michele S. Darling , Mark Fields , Stuart Harshaw , Wayne Kirk , Myron G. Manternach , David Peat and Michel (Mike) Sylvestre .  Votes for the directors were cast as follows:

Director

Votes For

Votes Withheld

Percent For

Percent Withheld

Michele S. Darling

217,525,825

1,794,599

99.18 %

0.82 %

Mark Fields

217,504,684

1,815,740

99.17 %

0.83 %

Stuart Harshaw

217,324,250

1,996,174

99.09 %

0.91 %

Wayne Kirk

193,819,051

25,501,373

88.37 %

11.63 %

Myron G. Manternach

214,837,710

4,482,714

97.96 %

2.04 %

David Peat

217,440,755

1,879,669

99.14 %

0.86 %

Michel (Mike) Sylvestre

214,513,275

4,807,149

97.81 %

2.19 %


About Nickel Creek Platinum Corp
.

Nickel Creek Platinum Corp. (TSX: NCP; OTCQB: NCPCF) is a Canadian mining exploration and development company and its flagship asset is its 100%-owned Nickel Shäw Project. The Nickel Shäw Project is a large undeveloped nickel sulphide project with a unique mix of metals including copper, cobalt and platinum group metals, located in the Yukon, Canada , one of the most favourable jurisdictions in the world. The Nickel Shäw Project has exceptional access to infrastructure, located three hours west of Whitehorse via the paved Alaska Highway, which further offers year-round access to deep-sea shipping ports in southern Alaska .

The Company is led by a management team with a proven track record of successful discovery, development, financing and operation of large-scale projects. Our vision is to create value for our shareholders by becoming a leading North American nickel, copper, cobalt and PGM producer.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/nickel-creek-platinum-announces-results-of-2023-annual-general-meeting-301839236.html

SOURCE Nickel Creek Platinum Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/May2023/31/c5265.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Red Metal Resources Engages German Investor Awareness and Digital Marketing Consultants

Red Metal Resources Engages German Investor Awareness and Digital Marketing Consultants

Red Metal Resources Ltd. (CSE: RMES) (OTC Pink: RMESF) (FSE: I660) ("Red Metal" or the "Company") The Company has engaged Investment-Zirkel-München ("IZM") that offers several services for German language investor awareness including news dissemination, conference calls, real-time investor forums and an active investors network throughout Europe. IZM has a select investor following that participate in both financings and open market buying. The IZM contract is for a two-year term at a cost of CAD$25,000.

IZM has a business address at Lena-Chris-Str 9, Nuebiberg, Germany. The services to be provided will be overseen by Mathias Voigt, President of the company, who can be contacted at mv@i-z-m.info. Mr. Voigt owns 150,000 shares of the Company.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Initiates Strategic Review Process and Engages Advisor

World Copper Initiates Strategic Review Process and Engages Advisor

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper " or the "Company") announces that the Company has initiated a strategic review process and has engaged Origin Merchant Partners (the "Advisor") to assist it in its review. The Advisor will work with World Copper's management and Board to evaluate a range of strategic alternatives that may be available to the Company to grow and maximize value for all shareholders (the "Engagement"). There can be no assurance that this process will result in any specific strategic plan or financial transaction and no timetable has been set for its completion. The Company does not plan to provide updates on the status of the review unless there are material developments to report.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Heritage Mining Further Expands Land Position and Provides Exploration Update

Heritage Mining Further Expands Land Position and Provides Exploration Update

(TheNewswire)

Heritage Mining Ltd.

VANCOUVER, BC TheNewswire - November 19, 2024 Heritage Mining Ltd. (CSE: HML FRA:Y66) (" Heritage " or the " Company ") is pleased to announce the claim package expansion at its flagship Drayton Black Lake (" DBL ")  based on experts recommendations Brett Davis and Dr. Gregg Morrison in addition to an update on the ongoing 2024 exploration program over the Ontario Project Portfolio. The Company believes the progress achieved to date represents important milestones for systematic exploration in one of the last underdevelopment greenstone belts in Northwestern Ontario.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Quetzal Copper Announces Brokered Private Placement Offering to Raise $3.0 Million

Quetzal Copper Announces Brokered Private Placement Offering to Raise $3.0 Million

Quetzal Copper Corp. (TSXV: Q) ("Quetzal" or the "Company") a North American focused copper exploration company is pleased to announce that it has entered into an agreement with Independent Trading Group ("ITG") to act as lead agent and sole bookrunner in connection with a "best efforts" private placement (the "Offering") for aggregate gross proceeds of up to $3,000,000 from the sale of the following:

  • up to 6,666,666 units of the Company (the "Units") at a price of $0.15 per Unit for gross proceeds of up to $1,000,000 from the sale of Units; and
  • up to 10,526,315 common shares of the Company (the "FT Shares", and together with the Units, the "Offered Securities") at a price of $0.19 per FT Share for gross proceeds of up to $2,000,000 from the sale of FT Shares. Each FT Share will be issued as a "flow-through share" within the meaning of the Income Tax Act (Canada).

Each Unit issued under the Offering shall consist of one common share in the capital of the Company (each, a "Common Share") and one-half of one Common Share purchase warrant (each whole warrant, a "Warrant"). Each Warrant will entitle the holder thereof to acquire one Common Share at an exercise price of $0.25 per Common Share for a period of 24 months from the Closing Date (as defined below).

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Bold Ventures Stakes Claims Near Joutel, Québec and Completes Second Phase of Fall Exploration at the Company's Properties in Northwestern Ontario

Bold Ventures Stakes Claims Near Joutel, Québec and Completes Second Phase of Fall Exploration at the Company's Properties in Northwestern Ontario

Bold Ventures Inc. (TSXV: BOL) (the "Company" or "Bold") announces that it has staked 26 claims near Joutel, Québec (with 4 claims pending), approximately 140 km northwest of the city of Val d'Or, Québec. The claims are situated in the vicinity of Bold's former Joutel property, over which Bold flew an airborne VTEM survey in 2012. The new claims cover geophysical anomalies from the 2012 survey. Historical diamond drilling in this area has identified anomalous nickel, silver, copper, zinc and gold associated with geophysical anomalies. Click here for more details about the property.

Additionally, senior management of Bold and prospectors from Emerald Geological Services ("EGS") have completed a second phase of fall fieldwork in the Atikokan, Ontario area, including prospecting, soil sampling, and lake sediment sampling. Work was carried out on the Wilcorp, Burchell, and Traxxin properties during the first half of November. A week-long first phase of fieldwork in September of this year resulted in assays up to 16.3 g/t Au at Bold's Wilcorp property (Oct. 31st news release). The purpose of the recent program was to define 2025 trenching and drilling targets in historical areas of interest, based on rock assays, soil geochemistry, and geological data.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Awalé Hits 2.7 g/t Gold Eq. over 27 Metres at the BBM Zone, Odienné Project

Awalé Hits 2.7 g/t Gold Eq. over 27 Metres at the BBM Zone, Odienné Project

HIGHLIGHTS

  • 27m @ 2.7 grams per tonne ("g/t") gold equivalent (AuEq.), including 12m @ 3.9 g/t AuEq. from 435m downhole in OEDD-98.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×