Talon Metals Reports Results for the Quarter Ended September 30, 2020

Talon Metals Corp. (TSX: TLO) ("Talon" or the "Company") reported a net loss for the three months ended September 30, 2020 of $0.5 million or $nil per share (basic and diluted), which was primarily the result of administration expenses.

This compares to a net loss for the three months ended September 30, 2019 of $0.5 million or $nil per share (basic and diluted), which was primarily the result of administration expenses offset by a reduction in contingencies and the fair value revaluation of a royalty put option held by 10782343 Canada Limited, a subsidiary of Triple Flag Mining Finance Bermuda Ltd.

The Company's net loss for the nine month period ended September 30, 2020 was $1.3 million or $nil per share (basic and diluted). This compares to a net loss of $4.2 million or $0.01 per share (basic and diluted) for the same period in the prior year.

Capitalized exploration costs and deferred expenditures on the Tamarack Nickel-Copper-Cobalt Project for the three months ended September 30, 2020 amounted to $2.3 million. This compares to $0.8 million for the three months ended September 30, 2019. The total capitalized exploration cost on the Tamarack Nickel-Copper-Cobalt Project to September 30, 2020 amounts to $60.7 million (or US$45.5 million).

Condensed Interim Consolidated Financial Statements for the three and nine months ended September 30, 2020 and 2019, together with Management's Discussion and Analysis have been filed on SEDAR and are available at www.sedar.com.

About Talon

Talon is a TSX-listed base metals company in a joint venture with Rio Tinto on the high-grade Tamarack Nickel-Copper-Cobalt Project located in Minnesota, USA, comprised of the Tamarack North Project and the Tamarack South Project. Talon has an earn-in to acquire up to 60% of the Tamarack Project. The Tamarack Project comprises a large land position (18km of strike length) with numerous high-grade intercepts outside the current resource area. Talon is focused on expanding its current high-grade nickel mineralization resource prepared in accordance with NI 43-101; identifying additional high-grade nickel mineralization; and developing a process to potentially produce nickel sulphates responsibly for batteries for the electric vehicles industry. Talon has a well-qualified exploration and mine management team with extensive experience in project management.

For additional information on Talon, please visit the Company's website at www.talonmetals.com or contact:

Sean Werger
President
Talon Metals Corp.
Tel: (416) 361-9636 x102
Email: werger@talonmetals.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/68201

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Aerial view of excavators and trucks at a construction site.

Oregon: America’s Premier Domestic Nickel Opportunity

The global race for critical minerals has begun. As the US stares down a future of massive industrial shifts, the strategy is clear: secure the supply chain or get left behind. Demand for nickel is hitting overdrive, fueled by its role in electric vehicle (EV) batteries, high-strength stainless... Keep Reading...
Fathon Nickel (CSE:FNI)

Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Nickel Inc. (CSE: FNI) (FSE: 6Q5) (OTCQB: FNICF) ('Fathom", or the "Company") is pleased to announce the completion of the winter trail, and mobilization of drilling and ancillary equipment to the Gochager Lake project. Drilling of the 3,000-to-4,000-meter program is expected to begin... Keep Reading...
Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Nickel Inc. (CSE: FNI,OTC:FNICF) (FSE: 6Q5) (OTCQB: FNICF) ('Fathom", or the "Company") is pleased to announce the completion of the winter trail, and mobilization of drilling and ancillary equipment to the Gochager Lake project. Drilling of the 3,000-to-4,000-meter program is expected to... Keep Reading...
Ni-Co Energy

Ni-Co Energy Inc. Files Preliminary Prospectus for Proposed Initial Public Offering

Ni-Co Energy Inc. (“Ni-Co Energy” or the “Company”) is pleased to announce that it has filed a preliminary prospectus (the “Preliminary Prospectus”) with the securities regulatory authorities in the provinces of Québec, Ontario, Alberta, and British Columbia in connection with its proposed... Keep Reading...
Bahia Metals (CSE:BMT)

Bahia Metals Corp. Completes Initial Public Offering of $5,750,000, with Full Exercise of Over-Allotment Option

Bahia Metals Corp. (CSE: BMT) ("Bahia" or the "Company") is pleased to announce that it has successfully completed its initial public offering (the "IPO") of 11,500,000 units of the Company (the "Units") at a price of $0.50 per Unit, inclusive of the full exercise of the 15% over-allotment... Keep Reading...
FPX Nickel (TSXV:FPX)

FPX Nickel Reports Confirmatory Results from Geotechnical Drilling at the Baptiste Nickel Project

FPX Nickel Corp. (TSX-V: FPX, OTCQX: FPOCF) ("FPX" or the "Company") is pleased to report assay results from select drill holes completed during its 2025 engineering field investigation program at the Baptiste Nickel Project ("Baptiste" or the "Project") in central British Columbia.As previously... Keep Reading...

Interactive Chart

Latest Press Releases

Related News