rock tech lithium

Rock Tech Provides Update on Converter Activities

 

(TheNewswire)

   

Vancouver, BC, Canada - TheNewswire February 11, 2021 Rock Tech Lithium Inc. (the "Company" or "Rock Tech") (TSXV:RCK ) ( Frankfurt:RJIB) (OTC: RCKTF ) wishes to provide an update on its downstream activities.

 

The Company is pleased to announce it has engaged Wave International ("Wave") to complete basic engineering work and cost estimation for its planned Lithium Hydroxide operations to a Class 4 level, according to the Association for the Advancement of Cost Engineering ("AACE"). Wave are an asset development consultant, with extensive experience in the Lithium ion battery supply chain, and specialist expertise in downstream lithium hydroxide production. Wave have worked extensively on various world class downstream lithium projects in Australia, Asia and Europe.

 

Wave will assist Rock Tech in providing process design, defining the optimal plant configuration, finalizing site selection, including infrastructure needs, and will also support Rock Tech in managing the upcoming pilot programs. The pilot programs will assess both the traditional sulphate route and the Company's innovative patent-pending Nitrate Process. Rock Tech aims to produce lithium hydroxide from these programs during the second quarter. In addition, Rock Tech is in the last due diligence phase on possible converter sites now including discussions with major stakeholders, locals and permitting agencies in Europe.

 

Rock Tech is in the process of incorporating a German subsidiary, has recently opened its first office in Munich and is scaling up its team in both Germany and Thunder Bay, including the mobilization of the integrated Wave and Rock Tech team into Germany during January this year. The Company is adding management, engineering, chemistry and marketing specialists to its team.

 

Furthermore, the Company has been made aware of a publication based partially on a technical report previously filed on November 9, 2020. As previously announced on December 18, 2020, the economic analyses disclosed in a news release dated November 4, 2020, and contained in this publication, are not currently supported by an NI 43-101 technical report. While this information remains in the public domain, the Company cannot monitor how the information is being used now or in the future. The Company reminds not to rely upon it until such time as the revised report has been filed.

 

On behalf of the Board of Directors,

 

  "Simon Bodensteiner"  
Simon Bodensteiner
Director, Chief Executive Officer

 

  For further information, please contact:  

 

Brad Barnett
Chief Financial Officer
Rock Tech Lithium Inc. 
777 Hornby Street, Suite 600
Vancouver, B.C., V6Z 1S4
Telephone: (778) 358-5200
Facsimile: (604) 670-0033
Email: bbarnett@rocktechlithium.com

 

  Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

 

  Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, "forward    looking statements".  Forward    looking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions.  The Company cautions readers that forward    looking statements, including without limitation those relating to the Company's future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward    looking statements.  

 

Copyright (c) 2021 TheNewswire - All rights reserved.

 

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
Brunswick Exploration Has Now Identified Four Major New Dykes in 2025 at Mirage

Brunswick Exploration Has Now Identified Four Major New Dykes in 2025 at Mirage

 

Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; " BRW " or the " Company ") is pleased to report the final set of results obtained as part of the 2025 Winter drill campaign conducted on its Mirage Project. The Mirage Project is located in the Eeyou Istchee–James Bay region of Quebec, approximately 40 kilometers south of the Trans-Taiga Road. This press release primarily focuses on the drilling work carried out in the eastern extension of the MR-6 dyke and the "Stacked Dyke" zone.

 

  Highlights include:  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
SAGA Metals Confirms Significant Oxide Layering in the Northwest of the 100% owned Radar Titanium Project in Labrador, Canada

SAGA Metals Confirms Significant Oxide Layering in the Northwest of the 100% owned Radar Titanium Project in Labrador, Canada

 

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, is pleased to announce SAGA's geophysics team has confirmed significant oxide mineralization in the northwest section of the 100% owned Radar Titanium Property (the "Property) over the site previously drilled back in 1996.

 

  Northwest Zone, Radar Property  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Interview with Executive Chairman

Lithium Universe Ltd Interview with Executive Chairman

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce an interview with Executive Chairman, Iggy Tan at the recent Lithium Supply & Battery Raw Materials Conference in Las Vegas. The interview was conducted by The Rock Stock Channel.

Interview Highlights

- Discussions with potential spodumene feedstock offtakers ongoing

- Further talks with potential OEMs on battery grade lithium carbonate offtake

- All work completed on Becancour Lithium Project - waiting for lithium market recovery

- Acquisition of global rights photovoltaic (PV) solar panel recycling technology

- "Microwave Joule Heating Technology" (MJHT) from Macquarie University

- Utilizes microwave technology to selectively heat and delaminate PV cells

- Today only 15% of waste solar cells are recycled, rest end up in land fill

- Difficult to recycle, high temperature furnace, toxic chemicals, low recovery

- To investigate further recovery of silver, silicon, gallium and indium

To Watch the Interview, please visit:
https://www.abnnewswire.net/lnk/S0S4T95N

 

About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.

 

 

Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×