Base Metals

NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Fireweed Zinc LTD. (" Fireweed " or the " Company ") (TSXV: FWZ) is pleased to announce a non-brokered private placement (the " Offering ") for gross proceeds of up to CAD$3.60 million. The Offering will consist of up to 4,000,000 flow through common shares of the Company at a price of CAD$0.90 per share.

The proceeds from the Offering will be used for exploration and development of the Company's Macmillan Pass Project in Yukon, Canada. The gross proceeds from the issuance of the Flow-Through Shares will be used to incur Canadian Exploration Expenses (" CEE "), and will qualify as "flow-through mining expenditures" under the Income Tax Act (Canada), which will be renounced to the purchasers of Flow-Through Shares with an effective date no later than December 31, 2021 in an aggregate amount no less than the proceeds raised from the issue of the Flow-Through Shares.

Closing of the Offering is subject to certain customary conditions, including, but not limited to, the receipt of all necessary regulatory approvals and acceptance of the TSX Venture Exchange. All securities issued under the Offering will be subject to a statutory hold period of four months plus a day following the date of closing. The Company may pay finder's fees on a portion of the Offering, subject to compliance with the policies of the TSX Venture Exchange and applicable securities legislation.

About Fireweed Zinc Ltd. (TSXV: FWZ): Fireweed Zinc is a public mineral exploration company focused on zinc-lead-silver and managed by a veteran team of mining industry professionals. The Company is advancing its district-scale 940 km 2 Macmillan Pass Project in Yukon, Canada, which is host to the 100% owned Tom and Jason zinc-lead-silver deposits with current Mineral Resources and a PEA economic study (see Fireweed news releases dated January 10, 2018, and May 23, 2018, respectively, and reports filed on www.sedar.com for details) as well as the Boundary Zone, Tom North Zone and End Zone which have significant zinc-lead-silver mineralization drilled but not yet classified as mineral resources. The project also includes large blocks of adjacent claims (MAC, MC, MP, Jerry, BR, NS, Oro, Sol, Ben, and Stump) which cover exploration targets in the district where previous and recent work identified zinc, lead and silver prospects, and geophysical and geochemical anomalies in prospective host geology.

Additional information about Fireweed Zinc and its Macmillan Pass Zinc Project including maps and drill sections can be found on the Company's website at www.FireweedZinc.com and at www.sedar.com .

ON BEHALF OF Fireweed Zinc LTD.

" Brandon Macdonald "

CEO & Director

Contact
Brandon MacDonald
Phone: (604) 646-8361

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements

Offering Disclosure Statements
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933 , as amended (the "U.S. Securities Act"), or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Forward Looking Statements
This news release may contain "forward-looking" statements and information relating to the Company and the Macmillan Pass Project that are based on the beliefs of Company management, as well as assumptions made by and information currently available to Company management. There is no assurance the Company will be able to complete the Offering on the terms as outlined above, or at all. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

Fireweed Metals

Fireweed Metals


Keep reading...Show less
Fabled Surface Sampling on PJ 100, 105 Copper Occurrences Reports 4.60% and 22.90% Copper, Respectively

Fabled Surface Sampling on PJ 100, 105 Copper Occurrences Reports 4.60% and 22.90% Copper, Respectively

Fabled Copper Corp. ("Fabled Copper" or the "Company") (CSE:FABL)(FSE:XZ7) announces additional results of 2021 surface field work on its Muskwa Copper Project. See Figure 1 below

Figure 1 - General Property Location

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Pan Global Reports Additional Drilling Success at La Romana Target, Escacena Project, Spain

Pan Global Reports Additional Drilling Success at La Romana Target, Escacena Project, Spain

  • 26.9m at 0.5% Cu, 0.13% Sn, including 1.6m at 1.6% Cu, 0.08% Sn and 1.3m at 1.0% Cu, 0.53% Sn in LRD120
  • 10.1m at 0.8% Cu, 0.18% Sn, 3.1g/t Ag, including 0.3m at 17.3% Cu, 0.56% Sn, 59.3g/t Ag in LRD125
  • Follow-up drilling underway and plans include testing 6 new targets

Pan Global Resources Inc. (TSXV: PGZ) (OTC Pink: PGNRF) ("Pan Global" or the "Company") is pleased to announce new drill results at the Company's 100%-owned Escacena Project in the Iberian Pyrite Belt, southern Spain. Reported results comprise eleven drill holes at the La Romana target and two drill holes on geophysics targets at La Romana North.

Tim Moody, Pan Global President and CEO states: "The latest results add to the down-dip extent of the main copper and tin zone with hole LRD120 intercepting approximately 27m thickness with grades of 0.5% Cu and 0.13% Sn within a 40m wide copper mineralized interval, and 10.1m at 0.8% Cu and 0.18% Sn in hole LRD125. The results include narrow intervals with some exceptionally high grades, including 17.3% Cu, 0.56% Sn and 59.3g/t Ag over 0.25m. The new drill results continue to show potential for the near surface high grade mineralization to continue west for several hundred meters in the direction of the historic La Romana mine workings. Drilling has also successfully defined the southern margin of the La Romana mineralization and shows supergene copper mineralization extending over the footwall to the main copper zone. Assay results are pending for an additional fourteen drill holes from La Romana."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Smokey Lithium Ground Sample Program Results Deliver Clearer Target Areas for Drill Hole Locations

Smokey Lithium Ground Sample Program Results Deliver Clearer Target Areas for Drill Hole Locations

  • 116 hand samples taken by Victory's Exploration Team benefit the comprehensive effort to delineate significant lithium mineralization on the Smokey Lithium Property
  • Lithium bearing claystones at surface measured as high as 630 ppm, helping to develop a clear picture of the best potential drill locations for the next round of drilling
  • Based on results from its overall exploration efforts, the Company anticipates a beneficial revision to its drilling application with the relocation of several holes, which will be an expedited process once undertaken

Victory Resources Corporation (CSE:VR)(FWB:VR61)(OTC PINK:VRCFF) ("Victory" or the "Company") is pleased to announce that the Company's exploration team has received results from its extensive ground sampling program, building upon favourable drill results, aimed at guiding prime drill locations for its next round of drilling on the Company's Smokey Lithium Property in Nevada

As noted on June 28th, the ground sampling program focused on sampling the Esmeralda Formation on and throughout the surrounding grounds of the Smokey Lithium property and has led to the Company locating a zone of higher values to the south and southwest. Mapping was done to locate controls on lithium clay deposition and locate clay beds, which have informed additional staking to protect the interests of Company.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
WESTERN COPPER AND GOLD FILES FEASIBILITY STUDY ON CASINO PROJECT

WESTERN COPPER AND GOLD FILES FEASIBILITY STUDY ON CASINO PROJECT

Western Copper and Gold Corporation (the "Company") (TSX: WRN) (NYSE American: WRN) is pleased to announce that it has filed a technical report titled "Casino Project, Form NI 43-101F1 Technical Report Feasibility, Yukon, Canada " with an effective date of June 13, 2022 (the "Report").

Western Copper and Gold Corporation logo (CNW Group/Western Copper and Gold Corporation)

The Report summarizes the results of a feasibility study on the Casino copper-gold project, which results were first reported by the Company in a news release dated June 28, 2022 .

The Report is available on SEDAR ( www.sedar.com ) and EDGAR ( www.sec.gov/edgar.shtml ) and is also posted on the Company's website ( www.westerncopperandgold.com ).

Western Copper and Gold Corporation is developing the Casino Project, Canada's premier copper-gold mine in the Yukon Territory and one of the most economic greenfield copper-gold mining projects in the world.  For more information, visit www.westerncopperandgold.com .

The Company is committed to working collaboratively with our First Nations and local communities to progress the Casino project, using internationally recognized responsible mining technologies and practices.

On behalf of the board,

"Paul West-Sells"

Dr. Paul West-Sells
President and CEO
Western Copper and Gold Corporation

SOURCE Western Copper and Gold Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/August2022/09/c1575.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Goldplay Appoints Chris Osterman as CEO and Catalin Kilofliski as Executive Chair

Goldplay Appoints Chris Osterman as CEO and Catalin Kilofliski as Executive Chair

TSXV: AUC) (OTCQB:AUCCF), (Frankfurt:9FY), (the "Company" or "Goldplay"), is pleased to announce that in order to further advance Company's existing portfolio of projects in Portugal and beyond, Mr. Christopher Osterman has been appointed as the Company's Chief Executive Officer effective August 4, 2022. Mr. Catalin Kilofliski, has been appointed as Goldplay's Executive Chairman and will continue to lead Company's strategy. Goldplay's current Chair of the Board, Dr. Deepak Malhotra has been appointed as Lead Independent Director

Chris Osterman, PhD Geologist, Chief Executive Officer

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×