Belararox Limited

Massive Sulphide Intersections Extends Mineralisation At Native Bee

Belararox Limited (ASX:BRX) (“Belararox” or “the Company”), an advanced mineral explorer focused on high value clean energy metals, is pleased to announce that the first two diamonds drill holes in the recently commenced Phase 2 drill program have intersected visible massive sulphides, with the first drill hole results pictured below in Figure 1. Phase 2 drilling has commenced at the VMS Belara Project in central NSW (Belara). The extensional drilling is intended to build upon the recently announced Inferred Resources (see ASX announcement dated 3 November 2022) and determine the potential of the Belara and Native Bee Project to host commercial quantities of mineralisation.


Key Highlights

  • The first two diamond drill holes in Phase 2 drilling have intersected visible massive sulphides at Native Bee.
  • Results confirm the continuity of massive sulphide mineralisation at Native Bee and extends at least 70m to the south along strike and remains open to the south and at depth.
  • These holes add significant mineralisation potential to the resources at Native Bee.
  • The Phase 2 drill campaign continues.

Figure 1. Massive sulphides intersected from the first diamond drill hole of Phase 2 extensional drilling at Native Bee. Red inset shows massive sulphide interval from 151.50m to 155.80m, with visible copper sulphides (chalcopyrite, Cpy) and zinc sulphides (sphalerite, Sph).

Managing Director, Arvind Misra, commented:

“We are excited that the first two diamond drill holes in Phase 2 drilling at Native Bee indicate this is a highly prospective asset with more massive sulphide mineralisation discovered. Drilling of the southern extension at Native Bee continues.”

Phase 2 Drilling Campaign at Belara/Native Bee

Phase 2 drill program will see approximately 3,600m of diamond drilling occur at Belara and Native Bee. This resource extension focussed campaign aims to build on the previously announced maiden Mineral Resource Estimate (MRE) at Belara and Native Bee, comprised of an Inferred Resources of 5.0 million tonnes (Mt) at 3.41% Zinc equivalent (ZnEq) (see ASX announcement dated 3 November 2022). Specifically, the Phase 2 program is testing the exploration potential remaining along strike and at the depth of known sulphide resources at both Native Bee and Belara (see Figure 2).

The full program is expected to take around three months (concluding in the June 2023 quarter), with final assays expected 28 days after the end of the drilling.

Figure 2. Long section from the Belara historic mine through the Native Bee historic mine showing the 3D magnetic inversion data and open mineralisation

At Native Bee, Phase 2 drilling will aim to identify additional mineralisation along strike and in the vicinity of the old Native Bee mine area and assess further mineralisation potential identified in a coincident Gradient Array Induced Polarisation (GAIP) – airborne magnetics first derivative (1VD) – gravity anomaly, which extends from the area of the known mineral resource southwards (see Figures 2, 3 and 4).


Click here for the full ASX Release

This article includes content from Belararox Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

BRX:AU
The Conversation (0)
Alice Queen

Drilling Commenced at Viani in Fiji

Alice Queen Limited (ASX:AQX) (“Alice Queen” or the “Company”) is pleased to announce that drilling has commenced at its 100% owned Viani Project in Vanua Levu, Fiji (see Image 1). The initial planned three-hole diamond drilling program will test for high-grade epithermal gold-style mineralisation intersected at the Viani Project by historic drilling.

Keep reading...Show less
Firefly Metals logo

FireFly Drills its Best Hole Yet with Assay of 86.3m at 3.7% CuEq

Latest drilling returns very thick intersections with exceptional grades, outlining a rich area of mineralistion which will form part of the next Resource update

FireFly Metals Ltd (ASX: FFM) (“Company” or “Firefly”) is pleased to announce its best assays yet at the Green Bay copper-gold project.

Keep reading...Show less
Corazon Mining

Strategic Expansion of MacBride Base & Precious Metal Project in Canada

Acquired ground more than doubles Corazon’s prospective landholding / Aerial geophyical survey extended to test new tenure / Work underway defining priority targets for early 2025 drill program

Corazon Mining Limited (ASX: CZN) (Corazon or Company) is pleased to announce the strategic expansion of its MacBride Base and Precious Metals Project (MacBride or Project) in the Lynn Lake district, of Manitoba, Canada.

Keep reading...Show less
Global Lithium Resources Limited

Strategic Acquisition Consolidates Large Scale Gold and Base Metal Target Area

Acquisition of Octava Minerals’ Talga Project and Exploration Update

Established multi-asset Western Australian lithium company, Global Lithium Resources Limited (ASX: GL1, Global Lithium or the Company) is pleased to announce the acquisition of seven strategic tenements adjacent to the Company’s Marble Bar Gold Project to complete coverage of a large gold in soil geochemistry anomaly that is spatially associated with a highly altered granite (Figure 1).

Keep reading...Show less
  Ausquest limited

Maiden Drill Program Set to Commence at the High-Priority Cangallo Porphry Copper Project

AusQuest Limited (ASX: AQD) is pleased to advise that it is about to commence a reverse circulation (RC) drilling program to test a large-scale undrilled, porphyry copper target within its Cangallo Porphyry Copper Project (Cangallo) in southern Peru.

Keep reading...Show less

Latest Press Releases

Related News

×