CleanTech Lithium (AIM:CTL)

Interim Results for Six-Month Period Ending 30 June 2024


CleanTech Lithium PLC (AIM:CTL, Frankfurt:T2N, OTCQX:CTLHF), an exploration and development company advancing sustainable lithium projects in Chile for the clean energy transition, is pleased to announce its unaudited Interim Results for the six-month period ended 30 June 2024 ("1H 2024" or "the Period").

The Company has made significant progress with the Pre-Feasibility Study ("PFS") at the flagship project, Laguna Verde, and seen encouraging results from the Direct Lithium Extraction ("DLE") pilot plant in Chile and will be producing battery-grade lithium carbonate for potential strategic partners to evaluate. The Company is also pursuing a dual listing on the Australian Stock Exchange ("ASX") and aims to be trading on the ASX in Q4 2024.

Highlights of the Period:

Operational:

· Health & Safety:

o Zero-harm safety culture focused on continuous improvement to achieve an injury free and healthy work environment - no LTIs, major incidents or near misses recorded in 1H 2024.

· Laguna Verde Drilling Programme:

o Five-well resource drilling programme commenced. Work designed in collaboration with Montgomery & Associates, a leading hydrogeology and resource evaluation consultancy.

o Programme aims to produce a maiden reserves estimate using modifying factors from the Pre-Feasibility Study ("PFS") which is underway and targeted for completion by the end of 2024.

· DLE Pilot Plant:

o Operational and producing high quality lithium chloride eluate with low impurities.

o Eluate is being converted to produce batches of battery-grade lithium carbonate which will be made available to potential strategic partners in Q4 2024 to start product qualification.

o Inauguration event was held in May 2024 where local communities and government officials were in attendance.

· Project Licences:

o CTL entered into a sale and purchase agreement ("SPA"), now taking full ownership of certain Laguna Verde licences that were previously held by way of an option agreement

o The licences held in the Salar de Atacama basin, which we understand are located outside the salar area defined as strategic by the Government and have been re-named the 'Arenas Blancas' project, are a potentially very promising opportunity.

· CEOL Contracts:

o Expressions of Interest ("RFIs") for a total of five lithium projects have been submitted to the Chilean Government. CTL is very well positioned as the most advanced exploration stage company progressing DLE based projects in Chile.

o Francisco Basin project has been renamed Viento Andino, in line with the RFI submission, to highlight the project area is outside a national park of a similar name located in the basin.

Corporate:

· Board changes:

o Executive Chairman Steve Kesler assumed the duties of CEO on an interim basis, following the resignation of CEO, Aldo Boitano in April.

o The search for a new CEO is well underway and the chosen candidate will be announced in due course.

· Cash position:

o The Company's cash position at the period end, including proceeds received from Loan Notes shortly after period end, was £2.1 million.

Post-period Highlights:

Operational:

o Pump tests and a reinjection well at Laguna Verde, planned to be undertaken in Q4 2024, will help define the brine extraction and reinjection wellfield design and the sustainable production rate required for the PFS.

o A plant location study was completed by Worley for the Laguna Verde project and concluded that the DLE and eluate concentration should be undertaken at project site and the purification and carbonation close to Copiapo which is at a lower elevation with good technical support locally available. This latter plant would be expanded in the future to also process concentrated eluate from the Viento Andino project.

o Completion of the first stage of production of concentrated eluate from the Company´s DLE pilot plant which has been shipped for conversion to battery-grade lithium carbonate by process partners in North America.

Corporate:

· ASX Listing:

o The Company is seeking to dual-list on the Australian Securities Exchange ("ASX"). Although the Company announced an extension to the ASX IPO timetable on 20 September 2024, to allow it to address some procedural matters raised by ASX, the intention remains to complete the IPO before the year end. An associated capital raise is planned to enable completion of the PFS and continuance of other work programmes. Notwithstanding, the Company continues to consider its funding options on an ongoing basis as a part of its normal practice.

· CEOL Process:

o The Government has streamlined the CEOL process, announcing an update at the end of September prioritising six salt flats for lithium development including Laguna Verde, the Company's flagship project, as having the most favourable conditions to advance lithium exploration and extraction. CEOL applications to be submitted by 31st December 2024.

· Local stakeholders:

o CTL attended a seminar organised by CESCO alongside local indigenous communities. The President of the Colla Pai-Ote community publicly endorsed CTL's Laguna Verde project as the way forward for the lithium industry in Chile, which was widely reported in the Chilean media.

o CTL's DLE carousel equipment is now installed at the University of Atacama as part of an ongoing partnership. The DLE equipment will be available for research programmes. The long-term collaboration between the University and CTL will help nurture the skills required for fostering the lithium industry in the Atacama region.

Steve Kesler, Executive Chairman and Interim CEO, CleanTech Lithium said:

"The first half of 2024 has seen significant operational and strategic progress on our lithium projects in Chile. This includes the production of high quality lithium chloride eluate with low impurities from our DLE pilot plant, which has a capacity to produce one tonne per month of lithium carbonate equivalent. A drilling, pump testing and reinjection programme was started at Laguna Verde aimed at updating the JORC resource estimate, providing data for the PFS and developing of a maiden reserve estimate.

"The Company is also in the process of listing on the ASX exchange, which will support its future development, as it enters potential strategic partner discussions and progresses towards production. Whilst this process has been delayed, the ASX market is well versed in the lithium sector and a meaningful number of the Company's existing shareholders have Australian links.

"With the PFS well underway and project development ongoing, backed by the strong support from local indigenous communities and aligned with the objectives of Government's National Lithium Strategy, we look forward to the future with confidence."

CHAIRMAN AND INTERIM CEO REVIEW

The following review is a look back at the highlights from the first half of 2024:

Business Strategy

CleanTech Lithium continues to make great strides in meeting the objective of becoming a leading supplier of battery-grade lithium carbonate to support the world's transition to clean energy. The progress made towards building sustainable lithium projects in Chile where the Company is planning to use Direct Lithium Extraction ("DLE") powered by renewable energy directly addresses the Chilean Government's ambition to drive positive change in sustainability and social and economic development.

The 'National Lithium Strategy', proposed by the President of Chile in late April 2023, aims to ensure Chile remains a top producer and supplier of lithium - a critical component for batteries in Electric Vehicles and energy storage systems ("ESS"). The established mining jurisdiction is currently the largest supplier of copper in the world and one of the largest suppliers of battery grade lithium. To move to a world run on clean energy, new lithium projects are needed, and Chile has the established infrastructure, industry expertise and workforce to bring projects like CleanTech Lithium's into production in the next few years.

New projects must be built in the right way and the Government has prescribed the use of DLE (or similar sustainable technologies) for all new lithium development projects going forward. CleanTech Lithium's strategy is to play a significant role in assisting the Chilean government to achieve this ambition. The Company believes it is most the advanced development stage DLE company operating in Chile and the achievements made in the first half of 2024 is evidence of this. It is very encouraging to see the Company's DLE Pilot Plant producing samples of battery-grade lithium carbonate which will soon be tested by potential strategic partners.

The Company's business strategy is focused on delivering long-term sustainable growth and returns for all stakeholders, built on four pillars:

· develop the Company's advanced lithium projects (Laguna Verde, Viento Andino) and progress the early-stage exploration projects (Arenas Blancas and Llamara) in Chile;

· utilise innovative technologies, including DLE and, where possible, renewable energy to sustainably produce lithium carbonate;

· produce commercial battery-grade lithium carbonate with high lithium recoveries and short production time; and

· supply directly into the EV and battery storage market via strategic partners and offtake agreements.

To this end, the Company's immediate objectives are as follows:

· update the JORC resource estimate for Laguna Verde on completion of the 2024 drilling campaigns and declare a maiden reserves estimate;

· complete planned hydrogeological studies and metallurgical tests at Laguna Verde, including completing a new reinjection well and pump tests to provide the data required to further advance modelling of the sub-surface aquifer and design the extraction and reinjection wellfields;

· deliver a Pre-Feasibility Study ("PFS") at the Laguna Verde Project and commence the Definitive Feasibility Study ("DFS") soon afterwards;

· complete the process test work at the DLE Pilot Plant and make battery grade lithium carbonate available for supply to potential offtake and strategic partners to start product qualification;

· continue the required work to complete the environmental baseline studies that commenced in 2022 and undertake the studies required to enable submission of the EIA in 1H 2025;

· enter into a Special Lithium Operation Contract (CEOL) with the Chilean State in relation to the Laguna Verde and Viento Andino Projects to commercially sell lithium;

· continue to collaborate with the local indigenous communities, universities and other local stakeholders to ensure long-term support for the projects, and

· enter into substantive discussions with potential offtake and strategic partners with a view to reaching agreement on a future business relationship, including establishing a funding package for the construction phases of the Laguna Verde Project, including equity participation, debt and other structures, to bring the project on stream and start selling lithium carbonate at the earliest possible opportunity.

Summary of Company Activity

In the first six months of the year, CleanTech Lithium made further progress toward delivering its PFS. This included commencing a five-well drilling programme at Laguna Verde, the commissioning of its DLE pilot plant and first production of highly concentrated eluate for further processing to make battery-grade lithium carbonate. The PFS is instrumental to support discussions with potential strategic partners. The Company is also seeking to dual-list on the Australian Securities Exchange ("ASX"). Although the Company announced an extension to the ASX IPO timetable on 20 September 2024, to allow it to address some procedural matters raised by ASX, the intention remains to complete the IPO before the year end. Notwithstanding, the Company continues to consider its funding options on an ongoing basis as a part of its normal practice.

Operations

Health and Safety

The Company maintains a zero-harm safety culture focused on continuous improvement to achieve an injury free and healthy work environment, with no lost time incidents ("LTIs"), major incidents, or near misses reported in the first half of 2024.

Five-Well Drilling Programme at Laguna Verde

The Company commenced a five well drilling programme at Laguna Verde largely aimed at converting Inferred resource to additional Measured & Indicated resource which will then have technical and economic modifying factors applied from the PFS to determine a maiden reserve. The programme was designed in collaboration with Montgomery & Associates, a leading international hydrogeology and resource evaluation consultancy.

The drill programme began in Q1 2024, with the commencement of wells LV07 and LV11 and suspended in May on the onset of the winter shut-down period, with the plan to recommence in October. The programme will also include additional pump testing and reinjection testing in Q4 2024 with results helping to calibrate the hydrogeological model of the basin. This model will help further define the brine extraction and reinjection wellfield design and the sustainable production rate from Laguna Verde. Montgomery & Associates have been engaged to manage the drill programme, JORC resource and reserves reporting and design of the extraction and reinjection wellfields.

Laguna Verde is the Company's most advanced project and has a total JORC resource of 1.8 million tonnes LCE, of which 1.1 million is in the Measured and Indicated category. Laguna Verde's Scoping Study, announced in January 2023, highlighted robust economics, with an NPV8 of US$1.8bn, an IRR of 45.1%, net cashflows of US$6.3 billion and a low operating costs of US$3,875/t for 30 years of production at 20,000 tpa LCE.

A map of a lake Description automatically generated
Drilling programmes at Laguna Verde since 2022

DLE Pilot Plant Commissioning and Production

The Company´s one-tonne per month DLE pilot plant (supplied by Sunresin) is located in Copiapó, Chile, approximately 250km from Laguna Verde, and finished commissioning in late March. At the R&D centre where the pilot plant is located, brine from the Laguna Verde project is stored in a large 243,000 litre vessel outside the pilot plant and then fed into an indoor tank having passed through filtration to remove suspended solids. It is then fed into the DLE columns shown in the image below, which are filled with adsorbent designed to be selective for lithium molecules. Lithium, as lithium chloride, is adsorbed from the brine, before desorption with water to create a purified lithium chloride eluate.

Several large blue tanks with white pipes Description automatically generated with medium confidence
DLE Pilot Plant at R&D Centre in Copiapó, Chile (30 x approx. 3m columns to produce up to 1 tonne per month of LCE)

Testing of a wide range of commercially available adsorbents identified that the adsorbent supplied by Lanshen performed the best on the Laguna Verde brine resulting in the selection of this adsorbent. The DLE Pilot Plant commenced operation in Q2 2024, producing high quality concentrated eluate. In May, the Company reported the key DLE performance metrics for the first batch of 24m3 of concentrated eluate produced at the pilot plant. The recovery of lithium from the brine was 94% in the adsorption stage and 88% into the eluate. The lithium grade in the feed brine of 197mg/L was concentrated to 710mg/L in the eluate, or a 3.6X concentration factor. These results exceeded the Company's expectations. The eluate was further concentrated by reverse osmosis to 2,194mg/l.

For the first stage of production, a total volume of 1,196m3 of brine from the Laguna Verde Project was processed at the DLE pilot plant with a total of 14 cycles completed. Each cycle represents a volume of brine being fed first through filtration to remove suspended solids, then into DLE columns which are filled with adsorbent designed to be selective for lithium molecules. Lithium, as lithium chloride, is adsorbed from the brine, before desorption with water to create a purified lithium eluate.

Averaged across the 14 cycles, the recovery rate achieved by adsorption of lithium from the brine was 95% and the recovery rate of desorption from the adsorbent was 93%. The total recovery rate into eluate averaged 88% and was highly consistent as shown in the figure below. The temperature of the brine and desorption water, using the average ambient temperature in Copiapó during the March to June period of operation, was in the range of 20oC to 25oC indicating that good performance was achieved without the need to heat solutions in either adsorption or desorption.

A graph showing the growth of a company Description automatically generated with medium confidence
Pilot Plant Total Recovery Rate

The eluate production rate was relatively stable after the initial ramp up period achieving an average of 2.8 kg LCE per hour demonstrating that the design capacity of the pilot plant of 1 tonne LCE per month was comfortably achieved. Selectivity of the adsorbent is another key performance parameter for a DLE operation. DLE primarily acts as a purification stage, recovering lithium chloride from the brine whilst rejecting other impurities. For all the major ions in the brine, apart from boron, the rejection rate was very high, exceeding 99%.

A graph of different sizes and colors Description automatically generated
DLE Performance - Rejection of Major Impurities

The downstream conversion of lithium chloride solution to battery grade lithium carbonate is well established in the lithium industry. Rather than spending capital on constructing a lithium carbonate conversion plant, the Company decided to partner with Conductive Energy, an Alberta, Canada company to undertake this conversion at its existing facility in Chicago.

An initial 200L batch of concentrated eluate, was shipped to Conductive Energy in May. This batch was used as a trial before setting up the conversion process that would be used for processing larger volumes of eluate produced by our DLE pilot plant into battery grade lithium carbonate. Conductive Energy completed the set-up test-work producing lithium carbonate of 99.75% purity which is battery grade. This process comprises concentration of the concentrated eluate to 18,000mg/l Li by forward osmosis followed by ion exchange to remove the trace impurities of calcium, magnesium and boron and then carbonation with sodium carbonate to produce battery grade lithium carbonate.

On completion of this trial, the Company subsequently shipped batches of concentrated eluate from the pilot plant, with a total of 88m3 shipped by late July, which is equivalent to approximately one tonne of lithium carbonate.

The downstream plant is being commissioned with lithium carbonate production expected in October 2024. This will provide the Company with the capacity to supply significant quantities of battery-grade lithium carbonate samples to potential strategic partners and offtakers to commence product qualification.

Pilot Plant Inauguration

In May, the DLE pilot plant was officially inaugurated in Copiapó with a ceremony attended by various regional authorities, indigenous community leaders, academics, and business representatives. Attendees at the ceremony included the Presidential Delegate of the Atacama Region, Luis Pino, Regional Councillor Javier Castillo; CORFO Director Rosa Roman, CORPROA President Andres Rubilar; miners' union president Joel Carrizo; indigenous community representatives Christian Milla and Ercillia Araya.


Source

Click here to connect with CleanTech Lithium PLC (AIM:CTL, OTCQX:CTLHF, Frankfurt:T2N), to receive an Investor Presentation

CTLHF
CleanTech Lithium

CleanTech Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
CleanTech Lithium

CleanTech Lithium


Keep reading...Show less
CleanTech Lithium PLC Announces Notice of AGM

CleanTech Lithium PLC Announces Notice of AGM

CleanTech Lithium PLC Notice of Annual General Meeting

CleanTech Lithium PLC (AIM:CTL)(Frankfurt:T2N)(OTCQX:CTLHF) ("CleanTech Lithium" or the "Company"), an exploration and development company advancing sustainable lithium projects in Chile, will hold its Annual General Meeting ("AGM") at the offices of the Company at de Carteret House, 7 Castle Street, St Helier JE2 3BT on 26 November 2024 at 11:00AM GMT

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CleanTech Lithium PLC Announces Interim Results

CleanTech Lithium PLC Announces Interim Results

Interim Results for six-month period ending 30 June 2024

CleanTech Lithium PLC (AIM:CTL)(Frankfurt:T2N)(OTCQX:CTLHF), an exploration and development companyadvancing sustainable lithium projects in Chile for the clean energy transition, is pleased to announce its unaudited Interim Results for the six-month period ended 30 June 2024 ("1H 2024" or "the Period").

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CleanTech Lithium PLC Announces CEOL Update

CleanTech Lithium PLC Announces CEOL Update

Chilean Government prioritises Laguna Verde for CEOL

CleanTech Lithium PLC (AIM:CTL)(Frankfurt:T2N)(OTCQX:CTLHF), an exploration and development company advancing lithium projects in Chile for the clean energy transition, reports an announcement by the Chilean Government on the Expressions of Interest ("RFIs") process under which the Company made submissions in June 2024. This is part of the process for the awarding of a Special Lithium Operating Contract ("CEOL") to enter production

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CleanTech Lithium PLC Announces Community Support for Laguna Verde Project

CleanTech Lithium PLC Announces Community Support for Laguna Verde Project

Indigenous community leader publicly endorses Laguna Verde project at key mining seminar in Santiago, Chile

CleanTech Lithium PLC (AIM:CTL)(Frankfurt:T2N)(OTCQX:CTLHF), an exploration and development company advancing sustainable lithium projects in Chile, participated in the Centre for Copper and Mining Studies ("CESCO") seminar in Santiago, a prominent annual seminar for the mining sector in Chile, and received public support from the local indigenous community for its Laguna Verde project. Executive Chairman and Interim CEO, Steve Kesler, presented and reinforced the Company is ready to begin project construction by 2026 upon the granting of a Special Lithium Operating Contract ("CEOL") by the Chilean Government

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CleanTech Lithium PLC Announces Transfer of Loan Notes at Regal Funds

CleanTech Lithium PLC Announces Transfer of Loan Notes at Regal Funds

CleanTech Lithium PLC (AIM:CTL)(Frankfurt:T2N)(OTCQX:CTLHF), an exploration and development company advancing sustainable lithium projects in Chile, announces the transfer of AUD Loan Notes (Loan Notes) from one Regal Funds1 associate to another Regal Funds associate

On 1 July 2024, the Company announced that Regal Tactical Credit Fund (RTCF), of which Regal Funds Management Pty Ltd (RFM) is a trustee, subscribed for A$3,000,000 of the Loan Notes. The Company has recently received a request by RFM to transfer the beneficial ownership of the Loan Notes and Warrants held by RTCF to Regal Emerging Companies Opportunities Fund Pty Ltd (RECOF), of which RFM is also a trustee, to which it has consented

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
White Cliff Minerals

Geophysical Anomalies Reveal New Copper Targets at Rae Project

Conductivity anomalies show link between surface showings and vein-system targets

White Cliff Minerals Limited (“the Company”) is pleased to announce further results of the first project scale geophysical survey at the Rae Copper Project (“Rae” or “the Project”), Nunavut, Canada.

Keep reading...Show less
Gina Rinehart, executive chairman of Hancock Prospecting, stands in front of cherry blossom trees.

Inside Billionaire Gina Rinehart's Key Mining Investments (Updated 2024)

Australian billionaire Gina Rinehart has become a formidable force in the global mining industry.

After taking the helm of her father’s iron ore mining firm Hancock Prospecting in 1993, Rinehart embarked upon a diversification strategy that has vastly expanded her resource empire. Today, Australia’s richest person has investments in many of the world’s most strategic commodities such as lithium, rare earths, copper, potash and natural gas.

One of those investments is Arafura Rare Earths (ASX:ARU,OTC Pink:ARAFF), which even in a low price environment for rare earths has managed to secure nearly AU$1.5 billion in debt financing and is, as of November 2024, pursuing equity financing to advance its Nolans project in the Northern Territory. With a 10 percent equity stake, Rinehart’s Hancock Prospecting is Arafura's largest shareholder.

In addition to Arafura, entrepreneur Rinehart’s investment portfolio also contains other ex-China, green-transition-focused companies such as Australian lithium firm Liontown Resources (ASX:

LTR,OTC Pink:LINRF), as well as rare earths producers MP Materials (NYSE:MP) and Lynas Rare Earths (ASX:LYC,OTC Pink:LYSCF). Rinehart’s role in the acquisition of Azure Minerals’ Andover lithium project in Western Australia alongside lithium giant SQM (NYSE:SQM) also made headlines in May of this year.
Keep reading...Show less

SQM REPORTS EARNINGS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2024

Highlights


  • SQM reported total revenues for the nine months ended September 30, 2024 of US$3,455.0 million compared to total revenues of  US$6,155.9 million for the same period last year.

  • Net loss (1),(2) for the nine months ended September 30, 2024 of (US$524.5) million or (US$1.84) per share, compared to net income (2) of  US$1,809.5 million or US$6.33 per share for the same period last year.

  • Solid sales volumes in lithium, iodine, and fertilizer businesses.

  • SPN and Potassium businesses posted healthy growth showing market recovery.

  • Slight increase in iodine prices, due to strong market demand and limited supply.

  • First lithium sales from the SQM International lithium division.

SQM will hold a conference call to discuss these results on Wednesday, November 20, 2024 at 10:00am ET (12:00pm Chile time).

Participant Dial-In (Toll Free): 1-844-282-4852

Participant International Dial-In: 1-412-317-5626

Webcast: https://event.choruscall.com/mediaframe/webcast.html?webcastid=xdNdTppQ

SANTIAGO, Chile , Nov. 20, 2024 /PRNewswire/ -- Sociedad Química y Minera de Chile S.A. (SQM) (NYSE: SQM; Santiago Stock Exchange: SQM-B, SQM-A) reported today net loss ( [1] ),(2)   for the nine months ended September 30, 2024 , of (US$524.5) million or (US$1.84) per share, compared to US$1,809.5 million or US$6.33 per share reported for the same period last year.

(PRNewsfoto/Sociedad Quimica y Minera de Chile, S.A. (SQM))

Gross profit (3) reached US$1,033.3 million (29.9% of revenues) for the nine months ended September 30, 2024 , lower than US$2,674.3 million (43.4% of revenues) recorded for the nine months ended September 30, 2023 . Revenues totaled US$3,455.0 million for the nine months ended September 30, 2024 , representing a decrease of 43.9% compared to US$6,155.9 million reported for the nine months ended September 30, 2023 .

The Company also announced net income for the third quarter of 2024 of US$131.4 million or US$0.46 per share, a decrease of 72.6% compared to US$479.4 million or US$1.68 per share for the third quarter of 2023. Gross profit for the third quarter of 2024 reached US$280.8 million , 62.7% lower than the US$753.6 million reported for the third quarter of 2023. Revenues totaled US$1,076.9 million for the third quarter of 2024, a decrease of 41.5% compared to US$1,840.3 million for the third quarter of 2023.

SQM's Chief Executive Officer, Ricardo Ramos , stated, "We are publishing our third quarter 2024 financial results with positive volume growth in almost all of our business lines compared to last year. Fertilizer markets have shown solid market dynamics with a market size recovery. Our Specialty Plant Nutrition volumes grew more than 20% year-on-year while our revenues in this business line increased close to 12%."

He continued, "Iodine demand continued to be strong, leading to an increase in our sales volumes and revenues compared to last year. Prices continued to move up slightly quarter over quarter since the beginning of this year and we have used part of our inventories to answer market needs."

Mr. Ramos further stated, "In lithium, we reported sales volumes of more than 51 thousand metric tons of lithium products, an 18% growth year-on-year, demonstrating strong demand in the market. As anticipated, prices during the third quarter continued their downward trend, with average realized prices 24% lower than the second quarter this year. Although demand continues to grow at a strong pace, mainly driven by strong EV sales growth in China , we continue to see the prices pressured by an oversupply that persists despite the curtailment announcement we have seen over the past few weeks."

Mr. Ramos closed by saying, "Our more than 30-year track record in the lithium market has proved that we have a long-term view in this business. Despite current market prices, we strongly believe in the lithium market and its fundamentals which are highly related to the clean energy transition. SQM is in a strong competitive position and well prepared to continue developing our projects in Chile and abroad to harvest the benefits of this transition."

About SQM

SQM is a global company that is listed on the New York Stock Exchange and the Santiago Stock Exchange (NYSE: SQM; Santiago Stock Exchange: SQM-B, SQM-A). SQM develops and produces diverse products for several industries essential for human progress, such as health, nutrition, renewable energy and technology through innovation and technological development. We aim to maintain our leading world position in the lithium, potassium nitrate, iodine and thermo-solar salts markets.

For further information, contact:

Gerardo Illanes / gerardo.illanes@sqm.com
Isabel Bendeck / isabel.bendeck@sqm.com

For media inquiries, contact:

Maria Ignacia Lopez / ignacia.lopez@sqm.com
Pablo Pisani / pablo.pisani@sqm.com

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements can be identified by words such as: "anticipate," "plan," "believe," "estimate," "expect," "strategy," "should," "will" and similar references to future periods. Examples of forward-looking statements include, among others, statements we make concerning the completion and implementation of the proposed partnership with Codelco, the development of Salar Futuro Project, Company's capital expenditures, financing sources, Sustainable Development Plan, business and demand outlook, future economic performance, anticipated sales volumes and sales prices, profitability, revenues, expenses, or other financial items, anticipated cost synergies and product or service line growth.

Forward-looking statements are neither historical facts nor assurances of future performance. Instead, they are estimates that reflect the best judgment of SQM management based on currently available information. Because forward-looking statements relate to the future, they involve a number of risks, uncertainties and other factors that are outside of our control and could cause actual results to differ materially from those stated in such statements, including our ability to successfully implement the Sustainable Development Plan. Therefore, you should not rely on any of these forward-looking statements. Readers are referred to the documents filed by SQM with the United States Securities and Exchange Commission, including the most recent annual report on Form 20-F, which identifies other important risk factors that could cause actual results to differ from those contained in the forward-looking statements. All forward-looking statements are based on information available to SQM on the date hereof and SQM assumes no obligation to update such statements, whether as a result of new information, future developments or otherwise, except as required by law.

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Jindalee Lithium

Jindalee Lithium Limited (ASX: JLL) – Reinstatement to Quotation

Description

The suspension of trading in the securities of Jindalee Lithium Limited (‘JLL’) will be lifted immediately following the release by JLL of an announcement regarding a prefeasibility study and the receipt of a response to an ASX price query.

Keep reading...Show less
Lightning Minerals

Spodumene Pegmatite Discovery at Esperança Project in Brazil Yields LIBS Results up to 4.04% Li2O

Lightning Minerals (L1M or the Company) is delighted to announce the discovery of spodumene within a lithium bearing pegmatite at the Company’s recently acquired Esperança project. The discovery supports the Company’s approach to exploration in the district and its positive assessment of the prospectivity within the Lithium Valley region Minas Gerais, Brazil.

Keep reading...Show less
Forward Water Technologies CEO Howie Honeyman.

Exclusive Interview with Forward Water Technologies CEO Howie Honeyman

In a recent interview, Forward Water Technologies (TSXV:FWTC) CEO Howie Honeyman said the company plans to accelerate adoption of its water treatment technology through successful demonstrations and results from on-site projects.

Forward Water’s innovative approach to water treatment has the potential to fundamentally alter how industries manage wastewater with high brine content, offering a low-energy, cost-effective alternative, according to Honeyman.

Keep reading...Show less
CleanTech Lithium

CleanTech Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×