Gunnison Copper Attends the American Mining Industry and Critical Minerals Roundtable in Washington D.C. Focused on Strengthening Domestic Supply Chains

Gunnison Copper Corp. (TSX: GCU,OTC:GCUMF) (OTCQB: GCUMF) (FSE: 3XS0) ("Gunnison" or the "Company"), an Arizona copper producer and developer, is pleased to announce that President and Chief Executive Officer Craig Hallworth attended the American Mining Industry and Critical Minerals Roundtable hosted by President Donald Trump at the Department of State on August 7, 2026, in Washington, D.C.

The roundtable brought together important top officials such as President Donald Trump, Secretary of State Marco Rubio, Interior Secretary Doug Burgum, and Commerce Secretary Howard Lutnick as well as American mining CEOs and academic leaders to discuss strengthening America's domestic critical mineral supply chains, supporting national security, expanding domestic mining and processing capacity, and reducing reliance on foreign sources of critical minerals.

"We are in the midst of the most important transformation of the US industrial base to ever occur thanks to President Trump and the critical minerals policies of his administration," said Craig Hallworth, President and CEO of Gunnison Copper. "This is a great, powerful, and long overdue transformation that aligns perfectly with our mission here at Gunnison Copper, which is to produce and reliably supply pure American copper to the nation's defense, energy, technology, and manufacturing sectors. We are working hard today, and in the future, to make President Trump's vision a great success and for the prosperity of all current and future generations in our country."

The roundtable featured remarks from President Trump, who announced approximately US$3 billion in new investments and financing initiatives to support domestic critical minerals and battery supply chains. The Administration also highlighted new investments in critical mineral production, advanced manufacturing and mining education as part of its broader strategy to strengthen domestic supply chains and accelerate development of the U.S. critical minerals sector.

ABOUT GUNNISON COPPER

Gunnison Copper Corp. is a multi-asset pure-play copper developer and producer that controls the Cochise Mining District (the district), containing 12 known deposits within an 8 km economic radius, in the Southern Arizona Copper Belt.

Its flagship asset, the Gunnison Copper Project, has a main pit Measured and Indicated Mineral Resource containing over 846 million tons with a total copper grade of 0.33% containing 5.19 billion pounds of copper (Measured Mineral Resource of 192 million tons at 0.37% containing 1.42 billion pounds of copper and Indicated Mineral Resource of 655 million tons at 0.31% containing 3.77 billion pounds of copper).

The Strong & Harris satellite deposit, located approximately 1.9 miles from the Gunnison processing facilities, is also included in the mine plan and hosts an Inferred Mineral Resource of 76 million tons grading 0.49% total copper (0.32% CuOx) at a 0.07% cutoff, 0.56% zinc and 0.12% silver, containing approximately 740 million pounds of copper, including 483 million pounds of oxide copper, as well as zinc (856 million pounds) and silver (9.0 million ounces).

A preliminary economic assessment ("PEA") was completed in March 2026 for the Gunnison Project yielding robust economics including an NPV8% of $2 billion, IRR of 23%, and payback period of 3.9 years. It is being developed as a conventional operation with open pit mining, heap leach, and SX/EW refinery to produce finished copper cathode on-site with direct rail link. The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the PEA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

In addition, Gunnison's Johnson Camp Asset, which is now in production, is fully funded by Nuton LLC, a Rio Tinto Venture, with a production capacity of up to 25 million lbs of finished copper cathode annually.

Other significant deposits controlled by Gunnison in the district, with potential to be economic satellite feeder deposits for Gunnison Project infrastructure, include South Star, and eight other deposits.

For more information on the Company, please visit our website at www.GunnisonCopper.com.

For additional information on the Gunnison Project please refer to the technical report titled "Gunnison Project NI 43-101 Technical Report, Preliminary Economic Assessment, Cochise County, Arizona, USA" with an effective date of March 18, 2026 filed on SEDAR+ at www.sedarplus.ca.

For additional information on the Johnson Camp Mine please refer to the technical report titled "Johnson Camp Mine NI 43-101 Technical Report, Cochise County, Arizona, USA" with an effective date of March 18, 2026 filed on SEDAR+ at www.sedarplus.ca.

Dr. Roland Goodgame, Senior VP of Project Development of the Company is a Qualified Person as defined by NI 43-101. Dr. Goodgame has reviewed and is responsible for the technical information contained in this news release.

For further information regarding this press release, please contact:

Gunnison Copper Corp.
Concord Place, Suite 300, 2999 North 44th Street, Phoenix, AZ, 85018

Melissa Mackie
T: 647.533.4536
E: info@GunnisonCopper.com
www.GunnisonCopper.com

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" concerning anticipated developments and events that may occur in the future. Forward looking information contained in this news release includes, but is not limited to, statements with respect to: (i) the intention to deploy the Nuton® technology at the Johnson Camp mine and future production therefrom; (ii) the continued funding of the stage 2 work program by Nuton; (iii) the details and expected results of the stage two work program; (iv) future production and production capacity from the Company's mineral projects; (v) the results of the preliminary economic assessment on the Gunnison Project; (vi) the exploration and development of the Company's mineral projects; (vii) the details and timelines associated with the Company's PFS work program; (viii) and the expected results of the Company's PFS work program.

In certain cases, forward-looking information can be identified by the use of words such as "plans", "expects" or "does not expect", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", "occur" or "be achieved" suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information contained in this news release is based on certain factors and assumptions regarding, among other things, Nuton will continue to fund the stage 2 work program, the availability of financing to continue as a going concern and implement the Company's operational plans, the allocation of the 48C tax credits between the Company and Nuton, the satisfaction of the requirements set forth in Section 48C of the Internal Revenue Code, the estimation of mineral resources, the realization of resource estimates, copper and other metal prices, the timing and amount of future development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs (including the price of acid), the availability of labour, material and acid supply, receipt of and compliance with necessary regulatory approvals and permits, the estimation of insurance coverage, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks related to the Company not obtaining adequate financing to continue operations, Nuton failing to continue to fund the stage 2 work program, the failure to satisfy the requirements set forth in Section 48C of the Internal Revenue Code, the breach of debt covenants, risks inherent in the construction and operation of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not be sustained at the Gunnison Copper Project, risks related to the delay in approval of work plans, variations in mineral resources and reserves, grade or recovery rates, risks relating to the ability to access infrastructure, risks relating to changes in copper and other commodity prices and the worldwide demand for and supply of copper and related products, risks related to increased competition in the market for copper and related products, risks related to current global financial conditions, risks related to current global financial conditions on the Company's business, uncertainties inherent in the estimation of mineral resources, access and supply risks, risks related to the ability to access acid supply on commercially reasonable terms, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the construction or mining process, regulatory risks including the risk that permits may not be obtained in a timely fashion or at all, financing, capitalization and liquidity risks, risks related to disputes concerning property titles and interests, environmental risks and the additional risks identified in the "Risk Factors" section of the Company's reports and filings with applicable Canadian securities regulators.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/308828

News Provided by TMX Newsfile via QuoteMedia

GCU:CC
The Conversation (0)
Red Metal Resources Reports First Ore Delivery from Farellon Ahead of Schedule, Launching Non-Dilutive Royalty Revenue

Red Metal Resources Reports First Ore Delivery from Farellon Ahead of Schedule, Launching Non-Dilutive Royalty Revenue

Red Metal Resources Ltd. (CSE: RMES,OTC:RMESF) (OTC Pink: RMESF) (FSE: I660) ("Red Metal" or the "Company") is pleased to provide an update on small-scale mining activities at its Farellon Project, part of the Carrizal Copper-Gold-Cobalt Property ("Carrizal" or the "Property") near Vallenar,... Keep Reading...
Getty Drills 68.5m of 0.81% Cu from 39.5m and 184m of 0.37% Cu in First Holes at Getty South

Getty Drills 68.5m of 0.81% Cu from 39.5m and 184m of 0.37% Cu in First Holes at Getty South

Highlights: Getty South delivers near-surface, high-grade copper mineralization, including 68.5m grading 0.81% Cu from 39.5m depth and 184m grading 0.37% Cu Copper mineralization extended 72m below historical intercepts and remains open within broader Induced Polarization (IP) geophysical... Keep Reading...
Copper Quest Provides 2026 Exploration Update

Copper Quest Provides 2026 Exploration Update

Copper Quest Exploration Inc. (CSE: CQX,OTC:IMIMF) (OTCQB: IMIMF) (FSE: 3MX0) ("Copper Quest" or the "Company") is pleased to provide an update from its 2026 exploration programs including an extensive 20 square kilometer geophysical program at its 100% owned Stars property, permitting and... Keep Reading...
Issue of Shares and Cleansing Notice

Issue of Shares and Cleansing Notice

Cygnus Metals Limited ("Cygnus" or the "Company") advises that it has today issued a total of 9,603,413 fully paid shares ("Shares") upon exercise of: 12,296 unlisted options exercisable at C$0.0574 each on or before 26 September 2029; 9,333,333 vested performance rights issued under the... Keep Reading...
Cygnus Metals Limited: Scheme Update - Independent Expert Confirmation

Cygnus Metals Limited: Scheme Update - Independent Expert Confirmation

Cygnus Metals Limited (ASX: CY5; TSXV: CYG,OTC:CYGGF; OTCQB: CYGGF) ("Cygnus" or the "Company") refers to the proposed transaction under which Central Asia Metals PLC (AIM: CAML) ("CAML") will acquire 100% of the shares in Cygnus pursuant to a scheme of arrangement under Part 5.1 of the... Keep Reading...
Oreterra Expands the Kinkaid, Nevada, Copper-Gold-Silver Project with 43 More Claims Encompassing Numerous New Showings

Oreterra Expands the Kinkaid, Nevada, Copper-Gold-Silver Project with 43 More Claims Encompassing Numerous New Showings

Oreterra Metals Corp. (TSXV: OTMC,OTC:OTMCF) (OTCQB: OTMCF) (FSE: D4R0) (WKN: A421RQ) ("Oreterra" or the "Company") is pleased to report a significant expansion in the size of the Kinkaid, Nevada porphyry copper-gold-silver project, located east of Hawthorne in Nevada's Walker Lane belt, as a... Keep Reading...

Interactive Chart

Latest Press Releases

Related News