Grit Metals Completes Debt Settlement

Grit Metals Corp. (TSXV: FIN,OTC:EUEMF) (FSE: K9T) ("Grit" or the "Company") announces further to its news release of November 25, 2025, the Company has received TSX Venture Exchange approval and has settled outstanding indebtedness totaling $75,000, owing to a certain arms-length creditor, through the issuance of 625,000 common shares at a deemed price of $0.12 per common share. All securities issued in connection with the debt settlement are subject to restrictions on resale until April 10, 2026, in accordance with applicable securities laws.

About Grit Metals Corp.

Grit Metals Corp. is a junior mining company currently focused on the Lithium-Cesium-Tantalum Finnish Pegmatite Project in central Finland. Governing bodies in Europe and Finland are legislating environmentally friendly and energy independent laws and policies. One of the key components is access to REE and, specifically, lithium. The company's exploration licenses are located within 1 kms of the Keliber mine and production complex, currently under construction and expected to begin production in H2 2025.

An estimated €600 million investment by Keliber's parent company Sibanye-Stillwater Limited in partnership with the Finnish Minerals Group (www.mineralsgroup.fi) is underway in the Kautinen Region and will see the development of open-pit and underground mining from several deposits, construction of a central spodumene concentrator plant and a lithium hydroxide chemical plant at tidewater in Kokkola. When completed, this complex will comprise a complete hard-rock spodumene pegmatite lithium supply chain (source: www.sibanyestillwater.com).

Grit Metals Corp. is a junior exploration company focused on lithium-cesium-tantalum pegmatites in central Finland. The Company's exploration licences are located within 1 km of Keliber's mine and production complex, a €600 million investment by Sibanye-Stillwater Limited in partnership with Finnish Minerals Group (www.mineralsgroup.fi). The Keliber complex, which is currently in commissioning, will comprise open-pit and underground mining, a central spodumene concentrator and a lithium hydroxide plant at tidewater in Kokkola, creating a complete hard-rock lithium supply chain in the region (source: www.sibanyestillwater.com).

On behalf of the board of directors of the Company:

Jeremy Poirier
Chief Executive Officer
Telephone: 604-722-9842

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements Regarding Forward-Looking Information

This new release contains forward-looking information within the meaning of applicable securities legislation. Forward-looking information is typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. Such statements include, without limitation, statements regarding the future results of operations, performance and achievements of the Company, including the presence of lithium mineralization at, and the exploration and development potential of, the Finland Pegmatite Project. Although the Company believes that such statements are reasonable, it can give no assurances that such expectations will prove to be correct. 

All such forward-looking information is based on certain assumptions and analyses made by the Company in light of their experience and factors management believes are appropriate in the circumstances. This information, however, is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Important factors that could cause actual results to differ from this forward-looking information include the costs of any anticipated work programs and the ability to fund such costs, required approvals in connection with any work programs and the ability to obtain such approvals, risks inherent in exploration as well as those described under the heading "Risks and Uncertainties" in the Company's most recently filed MD&A.

The Company does not intend, and expressly disclaims any obligation to, update or revise the forward-looking information contained in this news release, except as required by law. Readers are cautioned not to place undue reliance on forward-looking information.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/277608

News Provided by Newsfile via QuoteMedia

FIN:CC
The Conversation (0)
Spartan Metals - Reviewing 2025 and a Look Ahead to 2026

Spartan Metals - Reviewing 2025 and a Look Ahead to 2026

(TheNewswire) Vancouver, Canada, January 8, 2026 TheNewswire - Spartan Metals Corp. ("Spartan" or the "Company") (TSX-V: W | OTCQB: SPRMF | FSE: J03) is pleased to provide a summary of its key 2025 accomplishments and a review of its 2026 exploration strategy at its 100% owned Eagle... Keep Reading...
Brunswick Exploration Announces Inferred Mineral Resource of 52.2Mt at 1.08% Li2O at Mirage with Additional Exploration Target

Brunswick Exploration Announces Inferred Mineral Resource of 52.2Mt at 1.08% Li2O at Mirage with Additional Exploration Target

Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; "BRW" or the "Company") is very pleased to announce a maiden, open-pit Mineral Inferred Resource Estimate ("MRE") of 52.2 million tonnes ("Mt") grading 1.08% Li2O and 131ppm Ta2O5 for its wholly owned Mirage Project located in the Eeyou... Keep Reading...
EDC Extends LOI for Seymour Lithium Project of up to C$100m

EDC Extends LOI for Seymour Lithium Project of up to C$100m

Green Technology Metals(GT1:AU) has announced EDC Extends LOI for Seymour Lithium Project of up to C$100mDownload the PDF here. Keep Reading...
NextSource Materials Announces Arrival of First Equipment Shipment in UAE for its Battery Anode Facility and Significant Progress on Front-End Engineering and Design

NextSource Materials Announces Arrival of First Equipment Shipment in UAE for its Battery Anode Facility and Significant Progress on Front-End Engineering and Design

TORONTO, ON / ACCESS Newswire / January 7, 2026 / NextSource Materials Inc. (TSX:NEXT,OTC:NSRCF) ("NextSource" or the "Company") is pleased to announce that the first shipment of equipment for its proposed Battery Anode Facility ("BAF") has arrived in Abu Dhabi in the United Arab Emirates... Keep Reading...
Altech - CERENERGY Project Secures German Grant Approval

Altech - CERENERGY Project Secures German Grant Approval

Altech Batteries (ATC:AU) has announced Altech - CERENERGY Project Secures German Grant ApprovalDownload the PDF here. Keep Reading...
SAGA Metals Reports Strongest Critical Mineral Drill Results To-Date at Radar Ti-V-Fe Project in Labrador

SAGA Metals Reports Strongest Critical Mineral Drill Results To-Date at Radar Ti-V-Fe Project in Labrador

--First Assay Results Reported for the Trapper Zone Following Completion of the 2025 Phase of the Mineral Resource Estimate Drill Program-- Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA,OTC:SAGMF) (OTCQB: SAGMF) (FSE: 20H), a North American exploration company focused on critical... Keep Reading...

Interactive Chart

Latest Press Releases

Related News