Fortune Bay

FORTUNE BAY COMMENCES PRELIMINARY ECONOMIC ASSESSMENT FOR GOLDFIELDS PROJECT, SASKATCHEWAN

Fortune Bay Corp. (TSXV:FOR) (FWB:5QN) ("Fortune Bay" or the "Company") is pleased to announce commencement of a Preliminary Economic Assessment(" PEA" or the "Study") for its 100% owned Goldfields Gold Project ("Goldfields" or the "Project") located in northern Saskatchewan . The Company has appointed Ausenco Engineering Canada Inc. ("Ausenco") to lead the Study, with SRK Consulting ( Canada ) Inc. ("SRK") to complete an updated Mineral Resource Estimate ("MRE") and Moose Mountain Technical Services ("MMTS") to undertake mine design and mine planning. The PEA is expected to be completed in early Q4 2022.

Fortune Bay Corp. Logo (CNW Group/Fortune Bay Corp.)

Dale Verran , CEO for Fortune Bay, commented, "The Board approved decision to complete a PEA for Goldfields aligns with our strategy to unlock the true potential of the Project, and represents a significant milestone toward a potential mine construction decision, given continued positive results. The PEA will aim to optimize mining and processing design aspects, building an important foundation for the future development of the Project. We believe Ausenco to be an ideal partner to work alongside our management team to deliver the PEA in accordance with industry-leading standards due to their engagement and successful completion of gold PEA studies in Canada such as Skeena Resources' Eskay Creek , Anaconda Mining's Goldboro , Probe Metals' Val d'Or East and O3 Mining's Marban projects."

Preliminary Economic Assessment

The scope of work to be undertaken by Ausenco, together with MMTS, comprises two Phases:

  • Phase 1: Mine to Mill Optimization incorporating mine scheduling, process plant engineering and financial modelling. The objectives of this Phase are to optimize mining and processing parameters by evaluating various business cases for the Project before proceeding to the PEA.
  • Phase 2: Preliminary Economic Assessment which will cover all aspects of such studies, including mining and recovery methods, project infrastructure, capital and operating costs and financial analysis. The results of the Study are expected in early Q4 2022 and will be compiled into an NI 43-101 Technical Report.

A previous Pre-Feasibility Study was completed for Goldfields in October 2011 , which is considered historical in accordance with NI 43-101. The planned PEA is expected to incorporate mining and processing scenarios for which Pre-Feasibility Study ("PFS") level data do not yet exist and will be based upon an updated Mineral Resource Estimate, inclusive of Indicated and Inferred Mineral Resources. The PEA aims to define the optimal development path for the Project before initiating further resource delineation drilling and/or development work in support of a possible future PFS.

Updated Mineral Resource Estimate

The current MRE for Goldfields completed by SRK, effective date March 15, 2021 , includes Indicated Mineral Resources of 975,000 oz of gold (22.6 million tonnes at an average grade of 1.34 g/t) and Inferred Mineral Resources of 176,000 oz of gold (6.0 million tonnes at an average grade of 0.92 g/t). A Phase 1 drilling program was completed in 2021 to commence expansion of the mineral resources at the Box and Athona gold deposits, which included highlights of 13.22 g/t Au over 8.0 metres, 8.74 g/t Au over 5.0 metres, 8.00 g/t Au over 12.0 metres, and 8.00 g/t Au over 4.0 metres (see News Releases dated March 7, 2022 and September 14, 2021 ). As part of the PEA, SRK has been appointed to complete an updated MRE, in accordance with NI 43-101, based on the Phase 1 drilling results.

Goldfields Technical Disclosure

Details regarding the current 2021 Mineral Resource Estimate ("2021 MRE") are provided within the National Instrument 43-101 ("NI 43-101") Technical Report titled "Technical Report: Resource Estimate for the Goldfields Project" with an effective date of May 4, 2021 . The Technical Report was authored by Mr. Cliff Revering , P. Eng., and Dr. Ron Uken , PhD, P. Geo. of SRK Consulting ( Canada ) Inc., both of whom are Independent Qualified Persons in accordance with the requirements of NI 43-101. The Technical Report supports the 2021 MRE for Goldfields, which includes the Box and Athona gold deposits, and is available on SEDAR and the Company's website.

The technical information contained in this news release has been reviewed and approved by Mr. Dale Verran , MSc, P.Geo., Fortune Bay's Chief Executive Officer, who is also a Qualified Person in accordance with the requirements of NI 43-101.

About Goldfields

The 100% owned Goldfields Project ("Goldfields" or the "Project") is the Company's most advanced asset located in northern Saskatchewan , approximately 13 kilometres from Uranium City . The Project is host to the Box and Athona gold deposits which contain combined Indicated Mineral Resources of 975,000 oz of gold (22.6 million tonnes at an average grade of 1.34 g/t) and Inferred Mineral Resources of 176,000 oz of gold (6.0 million tonnes at an average grade of 0.92 g/t). Goldfields is endowed with established infrastructure including existing roads, a powerline to site, and nearby facilities and an airport at Uranium City . The Project has a history of gold production (64,000 oz Au produced between 1939 to 1942), numerous exploration drilling campaigns and various historical mining studies. The Box open-pit mine and mill development is permitted having received Ministerial approval under the Environmental Assessment Act in May 2008 . The ~5,000 hectare Goldfields property presents numerous exploration opportunities, including the potential to expand the Box and Athona deposits and discover additional resources at several other gold prospects and occurrences.

Fortune Bay Corp. (TSXV:FOR, FWB: 5QN) is an exploration and development company with 100% ownership in two advanced gold exploration projects in Canada , Saskatchewan (Goldfields Project) and Mexico , Chiapas (Ixhuatán Project), both with exploration and development potential. The Company is also advancing the 100% owned Strike and Murmac uranium exploration projects, located near the Goldfields Project, which have high-grade potential typical of the Athabasca Basin. The Company has a goal of building a mid-tier exploration and development Company through the advancement of its existing projects and the strategic acquisition of new projects to create a pipeline of growth opportunities. The Company's corporate strategy is driven by a Board and Management team with a proven track record of discovery, project development and value creation. Further information on Fortune Bay and its assets can be found on the Company's website at www.fortunebaycorp.com or by contacting us as info@fortunebaycorp.com or by telephone at 902-334-1919.

On behalf of Fortune Bay Corp.

"Dale Verran"
Chief Executive Officer
902-334-1919

Cautionary Statement Regarding Forward-Looking Information

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions, and expectations. They are not guarantees of future performance. Words such as "expects", "aims", "anticipates", "targets", "goals", "projects", "intends", "plans", "believes", "seeks", "estimates", "continues", "may", variations of such words, and similar expressions and references to future periods, are intended to identify such forward-looking statements. Fortune Bay Corp. ("Fortune Bay" or the "Company") cautions that all forward-looking statements are inherently uncertain, and that actual performance may be affected by a number of material factors, many of which are beyond Fortune Bay's control. Such factors include, among other things: risks and uncertainties relating to metal prices, changes in planned work resulting from weather, COVID-19 restrictions, availability of contractors, logistical, technical or other factors, the possibility that results of work will not fulfill expectations and realize the perceived potential of Fortune Bay's mineral properties, uncertainties involved in the interpretation of drilling results and other tests, the possibility that required permits may not be obtained in a timely manner or at all, risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, the possibility of cost overruns or unanticipated expenses in work programs, the risk of environmental contamination or damage resulting from the exploration operations, the need to comply with environmental and governmental regulations and the lack of availability of necessary capital, which may not be available to Fortune Bay, acceptable to it or at all. Fortune Bay is subject to the specific risks inherent in the mining business as well as general economic and business conditions. Accordingly, actual, and future events, conditions and results may differ materially from the estimates, beliefs, intentions, and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, Fortune Bay undertakes no obligation to publicly update or revise forward-looking information. Fortune Bay does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation. For more information on Fortune Bay, readers should refer to Fortune Bay's website at www.fortunebaycorp.com .

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Fortune Bay Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/April2022/11/c0095.html

News Provided by Canada Newswire via QuoteMedia

FOR:CA
The Conversation (0)
FORTUNE BAY ANNOUNCES ADDITIONAL URANIUM STAKING AND PROVIDES UPDATE FOR MURMAC AND STRIKE URANIUM PROJECTS

FORTUNE BAY ANNOUNCES ADDITIONAL URANIUM STAKING AND PROVIDES UPDATE FOR MURMAC AND STRIKE URANIUM PROJECTS

Fortune Bay Corp. (TSXV: FOR) (FWB: 5QN) (OTCQB: FTBYF) ("Fortune Bay" or the "Company") is pleased to announce the acquisition of two additional uranium projects through staking on the north-central margin of the Athabasca Basin, in proximity to the Company's recently announced Spruce Pine and Aspen Uranium Projects (Figure 1).

Gareth Garlick , Technical Director for Fortune Bay, commented "The acquisition of the Birch and Fir projects adds to our growing uranium portfolio of newly acquired, 100% owned projects on the north-central margin of the Athabasca Basin. This extensive portfolio now totals five new uranium projects covering over 40,000 hectares and provides Fortune Bay with further opportunity to create value through exploration and/or transactional success. The Birch and Fir projects have known uranium endowment with historical occurrences of up to 55.1% U 3 O 8 , in addition to Rare Earth Element potential with historical outcrop grades of up to 2.4% Total Rare Earth Elements."

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
FORTUNE BAY ACQUIRES THE ASPEN URANIUM PROJECT IN NORTHERN SASKATCHEWAN

FORTUNE BAY ACQUIRES THE ASPEN URANIUM PROJECT IN NORTHERN SASKATCHEWAN

Fortune Bay Corp. (TSXV: FOR) (FWB: 5QN) (OTCQB: FTBYF) ("Fortune Bay" or the "Company") is pleased to announce the acquisition of the Aspen Uranium Project ("Aspen" or the "Project"). The Project is located within the north-central margin of the Athabasca Basin, proximal to the Company's recently announced Spruce Uranium Project and Pine Uranium Project .

Aspen Uranium Project Highlights:
  • Large-scale land package covering 9,869 hectares located in proximity to the northern rim of the Athabasca Basin (Figure 1).
  • Includes extensive anomalous uranium results from historical surface sampling, including;
    • The highest regional lake sediment uranium anomaly in Saskatchewan of 989 ppm U, within the Geological Survey of Canada data compilation.
    • Historical exploration samples collected during the late 1970's identified extensive lake sediment anomalies within the Property, with values averaging 302 ppm U from 439 samples collected, including seven samples with values exceeding 1,000 ppm U (maximum 1,870 ppm U).
    • Historical muskeg samples within the Property averaged 2,007 ppm U from 24 samples collected, including a maximum value of 10,400 ppm U.
  • Historical surface prospecting, limited to areas of outcrop, failed to identify a bedrock source of this uranium anomalism and no drilling has been completed on the Project to date despite compelling support for the possible presence of a uranium deposit/s within the Project area.
  • The application of modern exploration methods, including high-resolution airborne electromagnetic ("EM") survey, presents an opportunity for discovery in an area where overburden and small lakes cover prospective graphitic lithologies (softer) and structural corridors.

" The surface endowment of uranium across the Aspen Project is extraordinary with values in surface sample media equivalent to, or greater than, uranium ore grades elsewhere in the world. We are excited to apply our team's extensive uranium skill set, together with a modern, systematic exploration approach to unravel the nature, extent and cause of this exceptionally high anomalism with the potential to deliver a near-surface uranium discovery." commented Dale Verran , CEO for Fortune Bay.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
FORTUNE BAY ANNOUNCES ACQUISITION OF THE PINE URANIUM PROJECT IN NORTHERN SASKATCHEWAN

FORTUNE BAY ANNOUNCES ACQUISITION OF THE PINE URANIUM PROJECT IN NORTHERN SASKATCHEWAN

Fortune Bay Corp. (TSXV: FOR) (FWB: 5QN) (OTCQB: FTBYF) ("Fortune Bay" or the "Company") is pleased to announce the acquisition of the Pine Uranium Project ("Pine" or the "Project") through staking over the past several months. The Project is located within the north-central margin of the Athabasca Basin, proximal to the Company's recently announced Spruce Uranium Project .

Pine Uranium Project Highlights:
  • Large-scale land package covering 17,688 hectares located in proximity to the northern rim of the Athabasca Basin ("Basin") (Figure 1).
  • Potential for high-grade, basement-hosted uranium deposits along approximately thirteen (13) kilometres of the Grease River Shear Zone ("GRSZ"), a major structural corridor that hosts the historical Fond du Lac uranium deposit.
  • Additional potential for bulk tonnage Rössing-style uranium deposits associated with abundant, historically recognized, uranium-bearing leucogranites and pegmatites. Limited historical prospecting yielded Rössing-style surface uranium showings of 0.17% U 3 O 8 (1,442 ppm U) and 0.10% U 3 O 8 (848 ppm U), and a trenching result of 509 ppm U over 24.7 metres.
  • No modern airborne radiometric surveying completed over approximately 60% of the Project, and no modern airborne electromagnetic surveying.
  • Regionally, the area is characterized by the highest lake sediment uranium anomalies in Saskatchewan , including values up to 435 ppm U within the Project area.
  • No drilling conducted on the property to date.

Dale Verran , CEO for Fortune Bay, commented, " Combined, our Spruce and Pine Uranium Projects cover approximately 20 kilometres of the Grease River Shear Zone, providing Fortune Bay with a dominant land position of this major structural corridor within 25 kilometres of the Athabasca Basin margin. The corridor is significantly underexplored relative to other major, Basin-margin structural corridors that have yielded significant Athabasca Basin-style, basement-hosted uranium discoveries. Historical exploration has demonstrated the corridor to be prospective for basement-hosted mineralization, evidenced by the Fond du Lac uranium deposit and numerous historical uranium occurrences. The potential for Rössing-style uranium deposits adds an additional dimension to the Pine Uranium Project. Average uranium ore grades for the Rössing and Husab open-pit mines in Namibia are in the order of 350 ppm and 500 ppm, respectively. There is a precedent for these grades, and greater, associated with similar rock types historically identified within the Project area. The promising results from regional reconnaissance-style exploration by historical operators, and the extensive nature of the uranium mineralization in lake sediments, highlight the potential for future discovery."

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
FORTUNE BAY ANNOUNCES ACQUISITION OF THE SPRUCE URANIUM PROJECT IN NORTHERN SASKATCHEWAN

FORTUNE BAY ANNOUNCES ACQUISITION OF THE SPRUCE URANIUM PROJECT IN NORTHERN SASKATCHEWAN

 Fortune Bay Corp. (TSXV: FOR) (FWB: 5QN) (OTCQX: FTBYF) ("Fortune Bay" or the "Company") is pleased to announce the acquisition of the Spruce Uranium Project ("Spruce" or the "Project") through staking over the past several months. The Project is located within the north-central margin of the Athabasca Basin, near the community of Fond du Lac and comprises four mineral claims covering 6,855 hectares (Figure 1).

Highlights:
  • Located in proximity to the northern rim of the Athabasca Basin ("Basin") with potential for high-grade, basement-hosted uranium deposits.
  • Covers over six (6) kilometres of prospective strike length along the Grease River Shear Zone ("GRSZ"), a major structural corridor that hosts the historical Fond du Lac uranium deposit.
  • The GRSZ is significantly underexplored relative to other major, Basin-margin structural corridors that have yielded significant basement-hosted uranium discoveries (e.g. Arrow, Triple R and Eagle Point).
  • Historical surface uranium showings of 1.60% U 3 O 8 and 0.65% U 3 O 8 from limited prospecting.
  • Additional Rare Earth Element ("REE") potential, including historical surface REE showings of 3.13% total rare earth element ("TREE"), 1.23% TREE, 0.88% TREE and 0.85% TREE.
  • Adjacent to properties held by IsoEnergy Ltd., and Forum Energy Metals Corp. (under option to Traction Uranium Inc.) that recently highlighted prospective conductive trends on the Project through airborne electromagnetic ("EM") surveying.

Dale Verran , CEO for Fortune Bay, commented, " As the uranium market continues to strengthen, with spot prices recently topping US$90 /lb U 3 O 8 , investment in uranium exploration in Saskatchewan's prolific Athabasca Basin is on the rise as explorers search for resources to meet the growing future supply deficit. This timely acquisition provides Fortune Bay with another uranium project to create value for our stakeholders. The Spruce Uranium Project hosts the hallmarks for a high-grade basement-hosted discovery; located on a major structural zone in proximity to the Basin margin with a precedent for mineralization, and limited exploration to date."

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
FORTUNE BAY ANNOUNCES OPTION AGREEMENT FOR THE MURMAC AND STRIKE URANIUM PROJECTS

FORTUNE BAY ANNOUNCES OPTION AGREEMENT FOR THE MURMAC AND STRIKE URANIUM PROJECTS

Fortune Bay Corp. (TSXV: FOR) (FWB: 5QN) (OTCQX: FTBYF) ("Fortune Bay" or the "Company") is pleased to announce that it has entered into a definitive option agreement (the "Agreement"), dated December 15, 2023, with 1443904 B.C. Ltd. (the "Optionee"), an arms-length private company. Pursuant to the Agreement, the Optionee will be granted the right to acquire up to a 70% interest in the Company's wholly owned Murmac and Strike Uranium Projects (the "Projects") over a three-and-a-half-year period by funding C$6 million in exploration expenditures, making cash payments totalling C$1.35 million, and issuing C$2.15 million in common shares following completion of a going public transaction.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Newmont Appoints Mining Industry Veteran Francois Hardy as Chief Technology Officer

Newmont Corporation (NYSE: NEM, TSX: NGT, ASX: NEM, PNGX: NEM) today announced the appointment of Francois Hardy as Chief Technology Officer (CTO). Francois will join Newmont's Executive Leadership Team and lead the technical work across the business to improve operational performance and drive growth.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240419973025/en/

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Impact Minerals

Drilling Underway at the Hyperion REE Prospect, Arkun Project, WA

An aircore drill programme will commence this week at Impact Minerals Limited's (ASX:IPT) Hyperion REE prospect, which is part of the 100% owned Arkun Project, located 150km east of Perth in the emerging mineral province of southwest Western Australia (Figure 1, ASX Release April 16th 2024).

Keep reading...Show less

NOVAGOLD Releases 2023 Sustainability Report

  • Providing a comprehensive overview of NOVAGOLD's Environmental, Social and Governance (ESG) performance, emphasizing remarkable health and safety records, steadfast dedication to environmental protection, continuous community investment, extensive stakeholder engagement, and robust corporate governance.
  • Highlighting NOVAGOLD's investment in our partnerships with Donlin Gold LLC, Calista Corporation ("Calista"), and The Kuskokwim Corporation (TKC) to reinforce Donlin Gold's social license, while emphasizing ongoing community engagement and addressing specific needs.
  • Integrated NOVAGOLD's Task Force on Climate-Related Financial Disclosures Report (TCFD) into this year's Sustainability Report and reported in alignment with the Global Reporting Initiative framework (GRI).

NOVAGOLD RESOURCES INC. ("NOVAGOLD" or "the Company") (NYSE American, TSX: NG) is pleased to publish its 2023 Sustainability Report ("Sustainability Report") with a focus on our 2023 performance in the areas of environmental stewardship, health and safety, social responsibility and engagement, and corporate governance.

"Our 2023 achievements continue to build on the excellent work accomplished in the areas of environmental stewardship, health and safety, social engagement, and corporate governance, by the teams at Donlin Gold and NOVAGOLD over many years in advancing the Donlin Gold project for the benefit of our stakeholders and shareholders. The team's unwavering commitment to the Company and steadfast dedication to the project, the Yukon-Kuskokwim (Y-K) region, and Alaska, as well as our Sustainability Committee's and Board of Directors' guidance, have been instrumental in successfully advancing this extraordinary asset in western Alaska," said Greg Lang, President and Chief Executive Officer.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Impact Minerals

Impact Minerals Limited


Keep reading...Show less
Prospect Ridge hires Investing News for ad campaign

Prospect Ridge hires Investing News for ad campaign

Prospect Ridge Resources Corp. (the "Company" or "Prospect Ridge") (CSE:PRR | OTC:PRRSF | FRA:OED) is pleased to announce that it has entered into an agreement with Dig Media Inc. dba Investing News Network ("INN") to provide an advertising and investor awareness campaign. INN will provide advertising on its website to increase awareness of the Company for an initial 12 month term, in consideration of $30,000. INN does not provide Investor Relations or Market Making services. INN is a private company headquartered in Vancouver, BC, Canada, dedicated to providing independent news and education to investors since 2007. The Company and INN are at arm's length. INN can be reached at 604-688-8231 or info@investingnews.com.

Keep reading...Show less

Newmont Publishes 2023 Sustainability Report and 2023 Tax & Royalties Report

Recognizing 20 Years of Transparent Sustainability Reporting

Newmont Corporation (NYSE: NEM, TSX: NGT, ASX: NEM, PNGX: NEM) today published its 2023 Sustainability Report and its 2023 Taxes and Royalties Contributions Report . The reports highlight the company's material ESG and socio-economic contributions over the past year. This year marks the 20 th anniversary for Newmont's Annual Sustainability Report, representing a milestone for the company as a longstanding industry leader in sustainability.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×