Fireweed Metals Commences 2025 Field Program

Fireweed Metals Commences 2025 Field Program

 
 

  TSXV: FWZ  
OTCQX: FWEDF  
FSE: M0G  

 

Fireweed Metals CORP. ("Fireweed" or the Company") (TSXV: FWZ) (OTCQX: FWEDF) is pleased to announce the launch of its 2025 Field Program, with planned project advancement and exploration activities across its Mactung, Macpass, Gayna, and North Canol Infrastructure Improvement (NCIIP) projects.

 
 

  Fireweed Logo (CNW Group/Fireweed Metals Corp.) 

 
 

The 2025 Program includes up to 26,000 m of combined diamond drilling across the three critical metals projects, including up to 12,000 m at Macpass, up to 11,000 m at Mactung, and approximately 3,000 m at Gayna. At Macpass, additional regional work will also be conducted to refine target areas and build upon historical exploration efforts across the broader district. Fieldwork is now underway at Macpass, with work at Mactung and Gayna expected to follow.

 

  Ian Gibbs , President and Chief Executive Officer stated "we are very excited to have commenced field operations across multiple critical metals projects. The Mactung field program and engineering studies will inform an updated Feasibility Study, scheduled to commence this year, on our 100% owned strategic tungsten project. A potentially high-impact inaugural exploration drilling campaign will be undertaken at Gayna, guided by an updated exploration model for mineralization. Exploration efforts will continue across the Macpass district aimed at expanding discovered deposits, drilling priority regional prospects, including our first intrusion related gold prospects, and continuing regional exploration efforts. The team has kicked off our important NCIIP work and are actively expanding our collaboration with the federal and territorial governments, as well as local Indigenous groups. Collectively this marks Fireweed's most ambitious field season to date and a major step forward in advancing our district-scale projects."

 

  2025 Mactung Program  

 

As part of the US Defense Production Act (DPA) Title III-supported program announced in December 2024 , Fireweed is progressing a major 11,000 m drill program at Mactung, as well as ongoing environmental baseline field work. These activities will support an updated Feasibility Study, which is expected to commence this year and establish the foundation for future licensing and permitting efforts. Activities will include the following:

 
  1.   Resource Update – Targeting the conversion of portions of the unclassified and Inferred Underground Mineral Resource 1 to the Indicated category.

  2.  
  3.   Geometallurgical Sampling – Provide large diameter (HQ) core for a geometallurgical sampling program that will characterize the mineralogy, grain size, comminution and metallurgical characteristics of defined geometallurgical domains throughout the mineral resource.

  4.  
  5.   Hydrogeological Studies – Installing instrumentation to enhance the hydrogeological model for both the deposit and planned infrastructure areas.

  6.  
  7.   Geomechanical Logging – Providing critical data to optimize underground excavation design.

  8.  
  9.   Geotechnical Site Investigation – Providing geotechnical and permafrost information in areas of planned infrastructure and mine areas.

  10.  
  11.   Expanded Gold Assay Coverage – Increase the coverage of gold assays across the deposit, focusing on areas where historical drilling did not test samples for gold and trace values were assumed in the 2023 Mineral Resource.
  12.  

Additionally, Fireweed plans to scan available historical drill core using advanced core scanning technology. This will generate super-high-resolution imagery, XRF, short-wave ultra-violet, and hyperspectral data, which will be integrated into the geological model to refine the Mineral Resource Estimate and support the development of a comprehensive geometallurgical model.

 

  2025 Macpass Field Program  

 

At Macpass, Fireweed has initiated a large-scale exploration drilling program targeting both high-priority regional prospects and step-outs around known zinc-lead-silver-gallium-germanium deposits. The Company also plans to drill-test intrusion-related gold targets identified through previous fieldwork. The program is guided by a comprehensive foundation of geological, geochemical, and geophysical data collected through and including the 2024 season, supporting drill testing of newly developed targets across the district.

 

  2025 Macpass Drill Program  

 
  1.   Tom South – Step out drilling at Tom South to follow up on high-grade intercepts from 2023 and 2024, both up and down dip and along strike of the defined resource. Notable intercepts from 2024 include 15.12 m ( 10 m true width 2 ) of 10.39% zinc, 18.10% lead, and 296.9 g/t silver in hole TS24-002 and 18.15 m ( 11 m true width 2 ) of 9.02% zinc, 7.46% lead, and 148.3 g/t silver in hole TS24-001.

  2.  
  3.   Boundary Zone – Drill testing of density anomalies generated through the combined Muon and Gravity surveys. This drilling will test targets along strike of the high-grade massive sulphide lens of Boundary Zone Prime Zone, as well as density anomalies adjacent to the Boundary Zone trend. For more information please visit the 2025 news release on muon targets: https://fireweedmetals.com/fireweed-metals-identifies-targets-using-muon-tomography/  

  4.  
  5.   Regional Exploration – Several high-potential targets for sediment hosted zinc-lead-silver have been identified and are ready for drill testing in 2025.

  6.  
  7.   Intrusion Related Gold – Following up on targets identified through the 2023 and 2024 seasons, Fireweed intends to drill test one or more of these coincident geophysical and geochemical anomalies that are highly prospective for intrusion related gold systems.

  8.  
  9.   Focused Muon Survey – Following the successful imaging of Boundary Zone during the 2024 Muon Survey, Fireweed intends to leverage this technology in a greenfields exploration program targeting the David, Goliath, Sling and Harvest areas. Drill holes will be dual-purpose: first, to test geophysical and geochemical targets through core logging and analysis; and second, to host muon detectors post-drilling to generate a comprehensive density image of the subsurface.
  10.  

  2025 Macpass Regional Program  

 

Fireweed intends to continue regional exploration efforts on our vast underexplored (~948 km 2 ) land package, including high-definition ground gravity surveying over previously identified targets to enhance resolution, regional gravity surveying to identify new anomalies, soil sampling to provide geochemistry around both zinc-lead-silver as well as intrusion related gold targets, and prospecting to identify near target mineralization.

 

  Gayna Field Program  

 

Fireweed is planning to drill approximately 3,000 m to test several targets along reef margins identified by ground gravity, soil geochemistry, and airborne geophysics efforts. High-grade rock and soil samples have confirmed the presence at surface of massive sulfide mineralization, containing elevated levels of critical metals zinc, germanium and gallium. The program is designed to test a new mineralization model related to carbonate reef margin deposition. Camp and materials were mobilized to site in February.

 

  North Canol Infrastructure Improvement Project (NCIIP)  

 

Fireweed has initiated key project activities associated with NCIIP, for which it was conditionally awarded C$12.9 million in funding under the Canadian Critical Minerals Infrastructure Fund in December 2024 (subject to due diligence). The conditional award enables Fireweed to lead planning efforts for infrastructure improvements that would serve the critical minerals district at Macmillan Pass.

 

Key engineering and environmental vendors supporting the NCIIP have been retained and the company is facilitating their mobilization for important field-based efforts in 2025, including roadway surveying and biophysical data collection. The company continues to actively engage with federal and territorial regulatory bodies as well as Indigenous groups to ensure alignment of objectives and progress the project in advance of an anticipated definitive Contribution Agreement with Canada .

 

   Qualified Person Statement   

 

Technical information in this news release has been approved by Fireweed Metals Senior Geologist, Ian Carr , P.Geo. (BC), a 'Qualified Person' as defined under National Instrument 43-101. Mr. Carr is not independent of Fireweed for purposes of NI 43-101.

 

   About Fireweed Metals Corp.   Fireweed is an exploration company focused on unlocking value in a new critical metals district located in Northern Canada . Fireweed is 100% owner of the Macpass District, a large and highly prospective 985 km 2 land package. The Macpass District includes the Macpass zinc-lead-silver project and the Mactung tungsten project. A Lundin Group company, Fireweed is strongly positioned to create meaningful value.

 

Fireweed trades on the TSX Venture Exchange under the trading symbol "FWZ", on the OTCQX Best Market under the symbol "FWEDF", and on the Frankfurt Stock Exchange under the trading symbol "M0G".

 

Additional information about Fireweed and its projects can be found on the Company's website at FireweedMetals.com and at www.sedarplus.com  

 

ON BEHALF OF Fireweed Metals CORP.

 

  "   Ian Gibbs   "  

 

President, CEO, and Director

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

  Cautionary Statements  

 

Forward Looking Statements

 

This news release contains "forward-looking" statements and information ("forward-looking statements"). All statements, other than statements of historical facts, included herein, including, without limitation, statements relating to interpretation of drill results, targets for exploration, potential extensions of mineralized zones, future work plans, the use of funds, and the potential of the Company's projects, are forward looking statements. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", and similar expressions, or statements that events, conditions, or results "will", "may", "could", or "should" occur or be achieved. Forward-looking statements are based on the beliefs of Company management, as well as assumptions made by and information currently available to Company management and reflect the beliefs, opinions, and projections on the date the statements are made. Forward-looking statements involve various risks and uncertainties and accordingly, readers are advised not to place undue reliance on forward-looking statements. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include but are not limited to, exploration and development risks, unanticipated reclamation expenses, expenditure and financing requirements, general economic conditions, changes in financial markets, the ability to properly and efficiently staff the Company's operations, the sufficiency of working capital and funding for continued operations, title matters, First Nations relations, operating hazards, political and economic factors, competitive factors, metal prices, relationships with vendors and strategic partners, governmental regulations and oversight, permitting, seasonality and weather, technological change, industry practices, uncertainties involved in the interpretation of drilling results and laboratory tests, and one-time events. The Company assumes no obligation to update forward‐looking statements or beliefs, opinions, projections or other factors, except as required by law.

 

  1 For Mactung Mineral Resources, see Fireweed news release dated June 13, 2023 "Fireweed Metals Announces Mineral Resources for the Mactung Project: the Largest High-Grade Tungsten Deposit in the World" and the technical report entitled "NI 43-101 Technical Report, Mactung Project, Yukon Territory, Canada ," with effective date July 28, 2023 filed on https://www.sedarplus.ca/ . Garth Kirkham , P.Geo. is considered independent of the Company, and a 'Qualified Person' as defined under NI 43-101. Garth Kirkham , of Kirkham Geosystems Limited., is responsible for the Mactung Mineral Resource Estimate.

 

  2 True widths for primary intervals are estimated by measuring perpendicular to strike within the short axis of a stratiform wireframe that has been constructed in 3D around the mineralized intercepts at Tom based on assay results, geological logging, stratigraphic correlation, and bedding measurements from oriented core. The massive sulphide mineralization and laminated mineralization at Tom are stratiform (oriented parallel to bedding), therefore the true width, or thickness, of the zone is estimated perpendicular to both the strike and dip direction of bedding. True widths are rounded to the nearest metre for widths over 10 m and to the nearest 0.1 m for widths less than 10 m , as this better reflects the precision of the estimates. True widths should be regarded as approximate as these are derived from an estimation that uses a preliminary interpretation of the geological model.

 

SOURCE Fireweed Metals Corp.

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/June2025/04/c5310.html  

 
 

 

News Provided by Canada Newswire via QuoteMedia

FWZ:CA
The Conversation (0)
Fireweed Metals (TSXV:FWZ)

Fireweed Metals


Keep reading...Show less

Developing a world-class critical minerals district in Yukon, Canada

Fireweed Announces Management Change and Adds Strength to its Leadership

Fireweed Announces Management Change and Adds Strength to its Leadership

 

Fireweed Metals CORP. (" Fireweed " or the " Company ") (TSXV: FWZ; OTCQX: FWEDF; FSE: M0G) announces the appointment of Peter Hemstead, Director of Fireweed, as Interim President and Chief Executive Officer, replacing Brandon Macdonald, effective immediately.

 

The Company also announces the appointment of Adam Lundin as Strategic Advisor, the appointment of Paul Harbidge as independent Director, and the intention to nominate Jamie Beck for election to the Board at the Company's upcoming annual general meeting of shareholders.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Fireweed Engages ICP Securities Inc. for Automated Market Making Services

Fireweed Engages ICP Securities Inc. for Automated Market Making Services

 

Fireweed Metals CORP. (" Fireweed " or the " Company ") (TSXV: FWZ; OTCQX: FWEDF; FSE: M0G) is pleased to announce that it has engaged the services of ICP Securities Inc. (" ICP ") to provide automated market making services, including use of its proprietary algorithm, ICP Premium™, in compliance with the policies and guidelines of the TSX Venture Exchange and other applicable legislation. ICP will receive a fee of C$7,500 plus applicable taxes per month, payable monthly in advance. There are no performance factors contained in the agreement and no stock options or other compensation are being granted in connection with the engagement. ICP and its clients may acquire an interest in the securities of the Company in the future.

 

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Fireweed Upgrades to Trade Shares on the OTCQX Best Market

Fireweed Upgrades to Trade Shares on the OTCQX Best Market

 

Fireweed Metals CORP. ("Fireweed" or the "Company") (TSXV: FWZ; OTCQX: FWEDF; FSE: M0G) is pleased to announce its upgrade from the OTCQB® Venture Market to the OTCQX® Best Market ("OTCQX"), a top-tier public market in the United States. As of today, Fireweed's common shares are actively trading on OTCQX under the trading symbol "FWEDF." This significant step underscores the Company's commitment to accessibility for U.S. investors, aligning with the high standards set by OTCQX.

 

  CEO Statement  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
OTC Markets Group Welcomes Fireweed Metals Corp. to OTCQX

OTC Markets Group Welcomes Fireweed Metals Corp. to OTCQX

 

OTC Markets Group Inc. (OTCQX: OTCM), operator of regulated markets for trading 12,000 U.S. and international securities, today announced Fireweed Metals Corp. (TSX-V: FWZ; OTCQX: FWEDF; FSE: M0G), a mineral exploration company, has qualified to trade on the OTCQX® Best Market. Fireweed Metals Corp. upgraded to OTCQX from the OTCQB® Venture Market.

 

 Fireweed Metals Corp. begins trading today on OTCQX under the symbol "FWEDF." U.S. investors can find current financial disclosure and Real-Time Level 2 quotes for the company on www.otcmarkets.com .

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Fireweed Makes Complete Drill Database Available and Launches New Website

Fireweed Makes Complete Drill Database Available and Launches New Website

 

Fireweed Metals CORP. ("Fireweed" or the "Company") (TSXV: FWZ; OTCQB: FWEDF; FSE: M0G) is pleased to report that an integrated dataset containing all previously released Fireweed and historical drilling data from the Macmillan Pass ("Macpass") Project, Yukon, Canada, is now available on a newly launched website.

 

  Highlights  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
FPX Nickel Announces Share-Based Compensation Grant

FPX Nickel Announces Share-Based Compensation Grant

 
 

FPX Nickel Corp. (TSXV: FPX) (OTCQB: FPOCF) (" FPX " or the " Company ") announces that the board of directors of the Company has approved the grant of 5,305,000 stock options (the " Options ") to directors, officers and employees of the Company pursuant to the Company's Share Compensation Plan. The Options have an exercise price of $0.30 per share, with a five-year term and are fully vested on the grant date, July 10, 2025 .

 
 

  FPX Nickel logo (CNW Group/FPX Nickel Corp.) 

 

The Company also granted an aggregate 750,000 restricted share units (the " RSUs ") to certain officers of the Company. The RSUs vest in three equal installments on the annual anniversaries of the grant date and each vested RSU will entitle the holder to receive one common share of the Company or the equivalent cash value upon settlement.

 

  About FPX Nickel Corp.  

 

 FPX Nickel Corp. is focused on the exploration and development of the Decar Nickel District, located in central British Columbia , and other occurrences of the same unique style of naturally occurring nickel-iron alloy mineralization known as awaruite. For more information, please view the Company's website at https://fpxnickel.com/ or contact Martin Turenne , President and CEO, at (604) 681-8600 or ceo@fpxnickel.com .

 

On behalf of FPX Nickel Corp.

 

"Martin Turenne"
Martin Turenne , President, CEO and Director

 

   Forward-Looking Statements   

 

  Certain of the statements made and information contained herein is considered "forward-looking information" within the meaning of applicable Canadian securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed in the Company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.  

 

  Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.  

 

SOURCE FPX Nickel Corp.

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2025/11/c5569.html  

 
 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Cygnus Metals Limited: Issue of Performance Rights

Cygnus Metals Limited: Issue of Performance Rights

 

Cygnus Metals Limited ("Cygnus" or the "Company") advises that it has issued an aggregate of 67,050,000 performance rights ("Performance Rights") to directors, and key employees and consultants, under the Company's Omnibus Equity Incentive Plan ("Plan").

 

Shareholders approved the Plan and the issue of Performance Rights to directors at the Company's annual general meeting held on May 14, 2025. The Performance Rights to key personnel were issued on the same terms and conditions as the director Performance Rights, as set out in the notice of annual general meeting released to ASX on April 14, 2025.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Exploration Corp. (TSXV: AGA,OTC:AAGAF) (OTCQB: AAGAF) ("Silver47" or the "Company") is pleased to announce the 2025 exploration program is nearing completion at its wholly-owned Adams Plateau Project (the "Project") in southern British Columbia, a silver-zinc-copper-gold-lead SEDEX project.

Gary Thompson, CEO of Silver47, stated: "We are glad to continue our work on Adams Plateau toward defining drill targets on this road-accessible project. The abundance of surface mineralization on the Project is very encouraging for the potential of new and exciting discoveries. The Company has received a 5-year permit for drilling. This year is shaping up to be transformational for the Company with a full season of drilling at the flagship Red Mountain Project and the pending merger with Summa Silver."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

 

   New Expansion Hole Intersects    279    Metres Averaging    0.49    % Cu   

 

   Nine Drill Rigs Now Active on Site   

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Reward Gold Mine Project Update

Vertex Minerals Limited Reward Gold Mine Project Update

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX,VTXXF) (OTCMKTS:VTXXF) is pleased to announce that the underground mining operation is on track to be producing high grade gold feed to the recently commissioned gravity gold plant in the coming weeks.

HIGHLIGHTS:

- Operational Milestones

o VTX remains firmly on track to commence production of high-grade ore from the underground mine in the forthcoming weeks.

o Transformer and cabling for the installation of 11kV high voltage underground power system on site with installation commenced.

o Preparations for the underground mine startup up progressing as planned and stripping of the main access is completed.

o New Aramine L350D has departed France for the journey to Hill End. Arrival in Orange NSW expected in by 26th August where it will be fitted with an RCT remote control system for open stoping operations.

o Mining the Reward Gold Mine - Resource 225kozs at 16.7g/t (VTX ASX Announcement 21 June 2023).

o Weekly Gold production Oz's from Stockpiles improving with depth in the stockpiles, with coarser particle size and better process throughput experienced.

- Mine start up

o Fan chambers have been excavated to provide secondary ventilation for production activities, exploration drilling and the future southern access toward the Fosters' exploration target.

o Primary ventilation fan has been installed and bulkhead completed.

o High voltage surface substation has been installed.

o High voltage cabling installation commences next week, with power up of the system scheduled for 28 July 2025.

o Stripping of the main accessis completed with the final elements of ground support (approx. 30m) to be completed before power cable installation starts next week.

o Cable bolts installed for the intersection of Lady Belmore exploration drive with first cut drilled out and ready to charge.

o Development Jumbo #1 (Epiroc T1D) is exceeding performance expectations.

o Dewatered of declines well underway.

o Mine schedule for FY26 finalised.

o First airleg stope secondary vent installed and specialty equipment on site to start first air leg stope.

o First long hole stope planned for August. High grade from airleg and longhole stopes to complement larger tonnage from development ore headings.

- People that have been onboarded

o 2x Drill Fitters and Heavy diesel fitter.

o Process superintendent commences next week.

o Full Tech team started including mine surveyor this week.

o Have back-to-back airleg miners for stoping.

o Full underground and mill crews.

- Improvements to plant

o DSM screen installed to improve product delivery to Wilfley Table.

o Gemini table improvements with new tabletop and gearbox improving final concentrate grade to over 20% gold (suitable for direct smelting to Dore on site).

o Process water pump upgrade improving ore washing and Tomra performance.

- Revised mine plan and schedule completed and ready to implement

- Updated Reward Gold mine mining plan and mine schedule completed.

- Adding a high-grade long hole stope upfront to be mined concurrently with the high grade airleg stope.

Vertex Director Declan Franzmann commented: "It is great to see all the elements of re-developing the underground mine and processing facility coming together so rapidly. The most pleasing aspect is our success in employing an incredible team of people to run the operation and all credit to management for developing great "esprit de corps" and a single sense of purpose as we push to full production."

As previously announced, the startup mine schedule includes mining 2,075 tonnes at 17.8 g/t Au from a developed airleg stope block. The planned stope width is the same as the interpretation of the mineralisation. (Refer to Table 1 in Appendices 1) (VTX ASX announcement 26/06/23).

Given this stope will take some time to extract, the Vertex geology and Mining Team have additionally brought forward a very high-grade long hole stope to commence mining in August as well. Further optimisations to the mining schedule will continue to be made.

This stope can be exploited as soon as services have been established. The mining crews have done a great job in the access drive to make room for the services (11kV cable, water and air lines) while improving accessibility for the mobile mining equipment selected for the Project.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/OUQP5Z21

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX,VTXXF) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×