Firefly Aerospace Receives $10 Million NASA Contract Addendum for Blue Ghost Mission 1 Lunar Data

Lunar PlanetVac instrument on Blue Ghost

Firefly Aerospace (Nasdaq: FLY), a market leading space and defense technology company, today announced a $10 million contract addendum under NASA's Commercial Lunar Payload Services (CLPS) initiative for acquisition of additional science and operational data collected beyond the initial contractual requirements for Blue Ghost Mission 1 - the first commercial mission to successfully land on the Moon. In total, Firefly collected nearly 120 gigabytes of data during transit, landing, and operations on the lunar surface.

"Firefly's Blue Ghost mission operated on the Moon longer than any commercial mission, which allowed us to capture first-of-its-kind data during multiple phenomena on the Moon's surface, including everything from sunrise to sunset and even a solar eclipse," said Will Coogan, Blue Ghost Chief Engineer at Firefly Aerospace. "We look forward to sharing this wealth of data with NASA and the larger scientific community to better inform future robotic and human missions that enable NASA's Artemis campaign."

The scope of this data buy encompasses images captured by Firefly's Blue Ghost lunar lander during its 45-day transit to the Moon and more than 14 days of surface operations. This includes the first high-definition images of a solar eclipse and sunset captured from the Moon's surface, that could provide insight into outstanding questions regarding lunar dust levitation and the horizon glow phenomenon.

The data buy also includes communications data and transmit speeds from Blue Ghost's S-band and X-band antennas, propulsion data from Firefly's Spectre thrusters during critical burns and the final lunar descent, and other lander performance data. Firefly will also provide NASA with additional payload science data as well as lander and payload temperature data captured during a 500°F temperature delta on the Moon.

During Blue Ghost operations within the Moon's Mare Crisium, temperatures peaked at 230°F during lunar noon, the hottest part of the lunar day, and quickly dropped to -275°F during a five-hour solar eclipse, which included two hours of totality when the Earth blocked the sun and cast a shadow on the lunar surface.

"Blue Ghost survived extreme temperature variations on the Moon that pushed us past our thermal models due to newly observed surface effects," said Coogan. "The Firefly team demonstrated its ingenuity in operating through these extremes, developing creative solutions such as ‘operation parasol' where we gimbaled our antenna to use it as a sunshade until temperatures dropped."

These innovative solutions allowed the Firefly team to complete all mission objectives and gather critical data about the effects of lunar terrain along the way, including how sunlight reflections from nearby craters alter a lander's thermal state and how lunar dust buildup affects component performance.

"This data is critical as our nation works towards building a sustainable human presence on the Moon," said Coogan. "It can significantly improve thermal models and better prepare infrastructure, habitats, and humans for the challenging lunar environment."

About Firefly Aerospace
Firefly Aerospace is a space and defense technology company that enables government and commercial customers to launch, land, and operate in space – anywhere, anytime. As the partner of choice for responsive space missions, Firefly is the only commercial company to launch a satellite to orbit with approximately 24-hour notice. Firefly is also the only company to achieve a fully successful landing on the Moon. Established in 2017, Firefly's engineering, manufacturing, and test facilities are co-located in central Texas to enable rapid innovation. The company's small- to medium-lift launch vehicles, lunar landers, and orbital vehicles are built with common flight-proven technologies to enable speed, reliability, and cost efficiencies for each mission from low Earth orbit to the Moon and beyond. For more information, visit www.fireflyspace.com .

Media Contact
press@fireflyspace.com

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/3aa7b497-f15a-44e5-8df0-15ac87aa3f9a


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

FLY
The Conversation (0)
Cygnus reports a 78% increase in M&I resource at its Chibougamau Copper-Gold Project

Cygnus reports a 78% increase in M&I resource at its Chibougamau Copper-Gold Project

HIGHLIGHTS:

  • Global Measured & Indicated Mineral Resource ("M&I") estimate of 6.4 Mt at 3.0% CuEq for 193kt CuEq and Inferred Mineral Resource of 8.5 Mt at 3.5% CuEq for 295 kt CuEq in accordance with JORC 2012 and CIM Definition Standards (CIM, 2014)
  • Total contained metal is exclusively Copper, Gold and Silver:
    • M&I: 149kt Cu, 167 koz Au & 1.6 Moz Ag (for 193 kt CuEq or 884 koz AuEq)
    • Inferred: 182 kt Cu, 454 koz Au & 2.2 Moz Ag (for 295 kt CuEq or 1.3 Moz AuEq)
  • This update includes an initial Mineral Resource Estimate ("MRE") for the new Golden Eye deposit and the other existing hub-and-spoke deposits of Corner Bay, Cedar Bay, Devlin, and Joe Mann
  • The initial high-grade Golden Eye resource contains:
    • Indicated: 91 koz @ 5.6 g/t AuEq
    • Inferred: 182 koz @ 4.6 g/t AuEq
  • The 78% tonnage increase in M&I Resources will underpin an updated Scoping Study / Preliminary Economic Assessment ("PEA"), which will also reflect the significant increase in commodity prices on the economics of the Project since the 2022 PEA completed by Doré Copper 1
  • Today's announcement demonstrates proven upside at the Chibougamau Project with two diamond drill rigs still turning and additional potential to add to the resource base
  • Chibougamau Project is a premier near-term development copper-gold opportunity with established infrastructure including a 900 ktpa processing facility, sealed highway, airport, regional rail infrastructure, and 25 kV hydro power to the processing site
  • The Project has excellent metallurgy with test work recoveries of up to 98.2% producing a high-quality clean copper concentrate of up to 29.6% 2
  • Cygnus is continuing to generate an exciting pipeline of exploration targets using its in-house AI-driven solution for the compilation of historic drill logs and maps; This work has proven highly successful and has helped deliver the initial Golden Eye MRE
  • The Company remains fully funded to drive further growth and the ongoing study work with A$23M cash at 30 June 2025
  • A new fly through video and resource presentation will be available in the coming week, given the finalisation of the MRE as announced today

Cygnus Executive Chairman David Southam said: "Within just nine months of acquiring the Chibougamau Project, we have been able to deliver a significant resource upgrade with substantial scope for further growth.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Drill Program Planning at Flagship Mosseau Project in Quebec is Complete: Regional Exploration Plans at Labelle and Urban Barry Properties Commissioned

Drill Program Planning at Flagship Mosseau Project in Quebec is Complete: Regional Exploration Plans at Labelle and Urban Barry Properties Commissioned

(TheNewswire)

Harvest Gold Corporation

Vancouver, British Columbia TheNewswire - July 24, 2025 ‑ Harvest Gold Corporation (TSXV: HVG,OTC:HVGDF) (" Harvest Gold " or the " Company ") is pleased to announce that it has completed all aspects of preparation for a diamond drilling program slated to begin in early August 2025 at its 100%-owned Mosseau Gold Project in the Abitibi Greenstone Belt, Quebec (Figure 1). This follows an extensive regional data compilation, high-resolution magnetic survey, and encouraging results from recent fieldwork, including reconnaissance mapping, prospecting, soil sampling.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Blue Lagoon Announces Major Steps Toward Production: Fully Funded, Government Inspections Passed, and Water Treatment Plant Completed

Blue Lagoon Announces Major Steps Toward Production: Fully Funded, Government Inspections Passed, and Water Treatment Plant Completed

(TheNewswire)

June 30, 2025 TheNewswire - Vancouver, British Columbia Blue Lagoon Resources Inc. (the " Company ") (CSE: BLLG; OTCQB: BLAGF; FSE: 7BL) is pleased to provide a corporate update highlighting significant progress at its Dome Mountain Gold Project as it prepares to enter production in a strong gold market.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Aston Bay (TSXV:BAY)

Aston Bay and American West Metals Announce Drilling Preparations Underway at the Storm Project, Nunavut, Canada

Camp opening and logistics have commenced with geophysics and drilling to follow in the coming weeks

Aston Bay Holdings Ltd. (TSXV:BAY)(OTCQB:ATBHF) ("Aston Bay" or the "Company") is pleased to announce the commencement of activities at the Storm Copper Project ("Storm" or the "Project") on Somerset Island, Nunavut. American West Metals Limited ("American West"), the Project operator, is conducting the exploration program. Aston Bay and American West have formed a 20/80 unincorporated joint venture with respect to the Storm Project property, with Aston Bay maintaining a free carried interest until a decision to mine is made upon completion of a bankable feasibility study.

Keep reading...Show less
Great Divide Mining

Second LiDAR interpretation identifies additional compelling targets at GDM’s Devils Mountain Gold Project

Emerging gold producer and exploration company Great Divide Mining Ltd (the Company or GDM) (ASX:GDM), is pleased to announce the completion of a second LiDAR interpretation over EPM 26135 Kilkivan, Devil’s Mountain Gold Project, SE Queensland.

Keep reading...Show less

Latest Press Releases

Related News