Drilling Has Started at Prismo Metals' Palos Verdes Project

Drilling Has Started at Prismo Metals' Palos Verdes Project

Prismo Metals Inc. (CSE:PRIZ)(OTCQB:PMOMF)(FSE:7KU) ("Prismo" or the "Company") is pleased to announce that drilling at its Palos Verdes project in Mexico has started. Hole PV-24-34 of this collaborative drilling program with Vizsla Silver Corp's (TSXV:VZLA) ("Vizsla") was collared on Vizsla's property. The planned length of the first hole is 250 meters out of a total expected 1,250 meters in the first phase of the program now underway

Dr. Craig Gibson, Co-Founder and Chief Exploration Officer of the Company explained: "The goal of the first phase of drilling is designed to explore the vein system to the west of the fault below the zone of bonanza grade intercepts from the previous campaigns. We expect the first hole to cut both the Palos Verdes vein as well as the higher gold-silver vein about 50 meters downdip from the previous intersections. Assays reported from last year's drilling include hole PV-23-25 with 102 g/t gold, 3,100 g/t silver and 0.26% zinc over 0.5 meters, or 11,520 g/t silver equivalent - the highest-grade intercept recorded at the project to date (see News Release of July 27, 2023)."

As announced on July 31st, 2024, Prismo's team mobilized at Palos Verdes in early August and immediately began preparation for the drill program with strategic partner Vizsla. The plan as designed will allow to test targets on the Palos Verdes concession with greater efficiency by utilizing drill pads located on Vizsla's concessions adjacent to Palos Verdes.

"Getting to this stage is the result of joint efforts from both the Prismo and Vizsla teams in Mexico," said Alain Lambert, CEO of Prismo. "The planning and preparation effort included our team and our driller's team learning Vizsla's safety, work and environmental protocols before work could begin as the drill pads are located on their ground. Also, the type of drill permit obtained by Vizsla allows for sites to be accessed by man-portable equipment. Furthermore, the rugged nature of the terrain required that the access to the site and the site itself be done by hand, lengthening the team's preparation time. We have now reached the drilling phase."

Lambert added: "We are very excited to resume drilling the Palos Verdes vein system which has already returned outstanding results. Combined with our fully permitted Hot Breccia copper project in the heart of the Arizona copper belt, Prismo expects a very active second half of 2024 with multiple drill results from these two world class exploration projects." For more information about the drill campaign, please watch Prismo's latest video at: https://www.youtube.com/watch?v=FX116H1a2qA

Figure 1: Location and orientation of the proposed drill holes
 
 
 
 
 
 
 
 
 
Photo 1. Drill pad preparation at Palos Verdes
 
 
 
 
 
 
 
 
Photo 2. Drill installed on drill pad at Palos Verdes
 
 
 
 
 
 
 
 

"We are eager to resume tracing the high-grade mineralization we've cut previously in the Palos Verdes vein by taking advantage of better hole geometry created by drilling from our Strategic Partner Vizsla Silver's ground," said Dr. Craig Gibson, Co-Founder and Chief Exploration Officer of the Company.

"Drilling farther from the vein outcrops will let us drill Palos Verdes well below the limited depths we could reach from our claims. We deeply appreciate Vizsla's willingness to allow the drilling from their ground and the collaboration from their team down in Mexico."

He commented further on the second hole and expected timing: "The second hole is planned to test a further 50 to 70 meters downdip and may be completed from the same site as the first hole or may be drilled from a second site 100 meters farther from the vein. These holes are expected to take three to four weeks to complete."

Geologic modelling completed after that drilling shows that the Palos Verdes vein system is apparently comprised of at least three discrete structures:

  1. The main Palos Verdes vein with a steep southeast dip located on the west side of the northwest-southeast fault.

  2. A steeply southeast dipping hanging wall vein; and

  3. A relatively flat lying vein that has high gold-silver ratios, similar to those in the western part of the Panuco district where Vizsla Silver has found the Napoleon and Copala resource areas.

Figure 2. Geologic and drill hole map of the Palos Verdes and adjacent concessions showing the surface projection of interpreted mineralized shoots based on surface assays and the location of an interpreted high-level alteration assemblage identified in core. Note NW-SE fault in the center of the claim is believed to have dropped-down the NE extension of the vein system. Drill pads for holes to be collared on Vizsla Silver ground are shown in purple and will test target areas indicated on the surface by the red ellipses. The location of new hole PV-24-34 is also shown.
 
 
 
 
 
 
 
Figure 3. 3D view of the sub-surface at Palos Verdes looking westerly showing veins in the southwestern Palos Verdes concession and planned holes in light blue and green. For clarity, the veins in the NE and the NW shear are not shown.
 
 
 
 
 
 
 

Prismo's 3,000-meter drill program follows three main target recommendations made by the Panuco Joint Technical Committee comprised of Prismo's Chief Exploration Officer Dr. Craig Gibson, Vizsla Silver's VP Exploration Dr. Jesus Velador and Advisor Dr. Peter Megaw. The three main goals (See Figs. 2 & 3 below) are:

  1. Trace the down dip extension of the mineralized shoot defined by previous drilling on the southwest portion of the vein.

  2. Seek continuation of the vein on the northeast extension of the vein across a cross-fault believed to have offset the vein downward.

  3. Test the extreme northeasterly extension of the Palos Verdes vein system near the concession limit adjacent to the historical Jesusita mine.

For more information about this news release, please watch Prismo's latest In The News video at: https://www.youtube.com/watch?v=FX116H1a2qA

Present during the In The News interview were: Alain Lambert CEO, Steve Robertson President, Dr. Craig Gibson Co-Founder and Chief Exploration Officer.

Qualified Person
Dr. Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations has reviewed and approved the technical disclosures in this news release. Dr. Gibson is also Chief Exploration Officer and a director of the Company.

About Palos Verdes
The Palos Verdes project is located in the historic Panuco-Copala silver-gold district in southern Sinaloa, Mexico, approximately 65 kilometers NE of Mazatlán, Sinaloa, in the Municipality of Concordia. The Palos Verdes concession (claim) covers 700 meters of strike length of the Palos Verdes vein, a member of the north-easterly trending vein family located in the eastern part of the district outside of the area of modern exploration. Shallow drilling (

About Prismo
Prismo (CSE:PRIZ) is mining exploration company focused on two precious metal projects in Mexico (Palos Verdes and Los Pavitos) and a copper project in Arizona (Hot Breccia).

Please follow @PrismoMetals on Twitter, Facebook, LinkedIn, Instagram, and YouTube

Prismo Metals Inc.
1100 - 1111 Melville St., Vancouver, British Columbia V6E 3V6

Contact:
Alain Lambert, Chief Executive Officer

Steve Robertson, President steve.robertson@prismometals.com

Jason Frame, Manager of Communications jason.frame@prismometals.com

Neither the Canadian Securities Exchange accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information
This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to, among other things: the timing, costs and results of drilling at Palos Verdes and Hot Breccia. The current drill program is being conducted from a concession not owned by the Company and a change in Vizsla's business plan in the drilling area could negatively impact Prismo.

These forward‐looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, notably delays in obtaining or failure to obtain appropriate funding to finance the exploration program at Hot Breccia.

In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that: Vizsla will continue to work with Prismo to allow for drilling at Palos Verdes, the ability to raise capital to fund the drilling campaign at Hot Breccia and the timing of such drilling campaign.

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial outlook that are incorporated by reference herein, except in accordance with applicable securities laws.

SOURCE: Prismo Metals Inc.



View the original press release on accesswire.com

News Provided by ACCESSWIRE via QuoteMedia

PRIZ:CNX
Prismo Metals

Prismo Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Prismo Metals (CSE:PRIZ)

Prismo Metals


Keep reading...Show less

Targeting high-grade silver, gold and copper in historic districts in Mexico and Arizona.

[VIDEO ENHANCED] Prismo Metals Options Two High-Grade Silver-Gold Mines in the Arizona Copper Belt - Immediate Exploration Planned

[VIDEO ENHANCED] Prismo Metals Options Two High-Grade Silver-Gold Mines in the Arizona Copper Belt - Immediate Exploration Planned

 

(TheNewswire)

 
       
  Prismo Metals Inc. 
                
 

Vancouver, British Columbia, July 3rd, 2025 TheNewswire - Prismo Metals Inc. (the " Company ") (CSE: PRIZ) (OTCQB: PMOMF) is pleased to announce that it has signed option agreements to acquire 100% interest in two historic high-grade precious and base metal mines — the Silver King and Ripsey mines — both located in Arizona's prolific Copper Belt near its flagship Hot Breccia project.

 

Additional information on the Silver King and Ripsey mines as well as Prismo's other projects (Hot Breccia and Palos Verdes) is available on Prismo's Youtube channel at:   

  

 

  Exceptional Grades and Untapped Potential  

 

Discovered in 1875, the Silver King mine is one of Arizona's most important historic producers, yielding nearly 6 million ounces of silver at grades of up to 61 oz/t. Remarkably, selected samples from small-scale production in the late 1990s returned grades as high as 644 oz/t silver (18,250 g/t) and 0.53 oz/t gold (15 g/t), indicating that high-grade mineralization remains. Additionally, the presence of freibergite (AgCuSbS) suggests a potential for antimony, a critical mineral with growing strategic demand.

 

The Ripsey mine, located 20 km west of Hot Breccia, is also an historic gold-silver-copper producer with significant upside. Historic sampling has returned up to 15.85 g/t gold and 276 g/t silver, yet no modern exploration has been conducted.

 

  Strategic Location — World-Class Neighbors  

 

The Silver King mine sits only 3 km from the main shaft of the Resolution Copper project — a joint venture between Rio Tinto and BHP and one of the world's largest unmined copper deposits with an estimated copper resource of 1.787 billion metric tonnes at an average grade of 1.5% copper (1) . This unique land position is fully surrounded by Resolution Copper's claim block, offering strategic upside.

 

"The Silver King and Ripsey mine projects are exciting additions to our Arizona portfolio. We see an opportunity to create near term value through immediate exploration on a historic high-grade silver producer with antimony potential that has seen limited modern exploration by drilling both laterally and at depth into a prospective source formation, said Gordon Aldcorn, President of Prismo. "We look forward to getting our exploration team back in the field, advancing our exciting projects and revitalizing investor interest in the Company."

 

The Silver King mine was discovered in 1875 and produced ore with as much as 10,000 ounces per ton silver in near surface workings (2) . Underground production through 1889 is estimated at almost 6 million ounces of silver at grades of between 61 and 21 ounces per ton. During a second period of production from 1918 to 1928, 230,000 ounces were produced at a grade of 18.7 ounces per ton.  No significant production has occurred after 1928.

 

The orebody at Silver King is a steeply west-dipping pipelike stockwork and breccia zone that was mined on eight levels to about 300 meters depth below a glory hole at the surface. The pipe is described as a dense stockwork with local breccia zones and a quartz core (3) .  Records indicate that due to variations in mineralogy, much of the upper portion of the body was evidently not mined. The current owners (the " Optionor ") rehabilitated the main shaft in the late 1990s, opened the upper levels of the mine and produced a small tonnage. Assay certificates from this period show selected samples with 400 to 600 ounces per ton silver with 0.2-0.5 oz/t gold and some base metals. Virtually no modern exploration has been carried out at the mine providing significant exploration upside and multiple drill targets.

 

The Ripsey mine is a historic gold-silver-copper producer located about 20 km west of the Hot Breccia project. Historic mine workings consisting of tunnels and shafts on several levels were developed along a vein over about 400 meters of strike length and 160 meters vertically. A small tonnage of mineral was produced by the Optionor in the late 1990's. Sampling by Dr. Craig Gibson from the mine workings has yielded 15.9 g/t gold and 275 g/t silver over 0.75 meters and 8.7 g/t gold, 181 g/t silver, 3% copper and 9% zinc over 1 meter. No modern exploration has been carried out at the project, providing significant exploration upside and multiple drill targets.

 

The Company plans to conduct a detailed mapping and sampling program at both projects at surface exposures and in accessible workings.  A drill program is planned for Silver King, with about 1,000 meters initially. The Silver King drill program is designed to test the mineralized body at four elevations as well as lateral to the pipelike body. De-watering of the Silver King shaft to gain access to the upper levels may also be undertaken as submersible pumps are in place.

 

"This is a fabulous opportunity for the Company. Both projects are high-grade and are easily accessible and may be associated with porphyry copper mineralization. We also look forward to evaluating the potential for antimony at Silver King. We're excited to begin exploration immediately to test the Silver King's pipelike mineralized body at multiple depths and laterally," said Dr. Craig Gibson , Chief Exploration Officer. "This region is world-class for porphyry systems and base and precious metals, and we believe these mines have significant untapped potential."

 

    
Click Image To View Full Size
 

 

Location of the Company's projects withing the Arizona Copper Belt

 

    
Click Image To View Full Size
 

 

Land map of the Silver King mine.

 

    
Click Image To View Full Size
 

 

Drone view of the Silver King mine.

 

     

 

The Silver King mine in the late 1800's.

 

    
Click Image To View Full Size
    
Click Image To View Full Size
 

 

Small scale mining in the upper levels of the Silver King mine in the late 1990's.

 

  Deal description  

 

Prismo has the option to acquire a 100% interest in both the Silver King and Ripsey mines. Prismo can earn a 100% interest in the Ripsey mine by issuing one million shares to the Optionor, paying the Optionor US $10,000 within six months of the signing of the option agreement (the " Effective Date "), US $10,000 on each anniversary of the Effective Date and US $1 million to the Optionor within five years of the Effective Date. Prismo does not have minimum work commitments as part of the Ripsey option agreement.

 

Regarding the Silver King mine, Prismo can acquire a 100% interest in three stages. Prismo must issue one million shares to the Optionor, pay the Optionor US $10,000 within six months of the Effective Date, and US $10,000 on each anniversary of the Effective Date. To earn a first 50% interest, Prismo must incur no less than US $500,000 in expenditures on or before the first anniversary of the Effective Date, incur no less than an additional US $2.5 million expenditures on or before the third anniversary of the Effective Date and issue to the Optionor two million shares. Prismo can acquire an additional 30% interest by incurring no less than an additional US $3 million in expenditures, paying the Optionor US $1 million and issuing to the Optionor two million shares before the fifth anniversary of the Effective Date. Prismo can elect to form a joint venture at anytime after earning it initial 50% interest. The option agreement and joint venture agreement terms and conditions contain standard buyout and dilution terms regarding the final 20% interest.

 

  Private Placement  

 

Prismo is also pleased to announce a non-brokered private placement (the " Private Placement ") of five million units of the Company (" Units ") at an issue price of $0.05 per Unit for minimum gross proceeds of $250,000. Each Unit will consist of one common share in the capital of the Company (a " Share ") and one-half of one common share purchase warrant of the Company (each whole warrant, a " Warrant "). Each Warrant will entitle the holder to purchase one Share for a period of twenty-four (24) months from the date of issue at an exercise price of $0.10.

 

The Private Placement will also be made available to existing shareholders of the Company who, as of the close of business on July 1st, 2025, held Shares (and who continue to hold such Shares as of the closing date of the Private Placement), pursuant to the existing securityholder exemption set out in BC Instrument 45-534 – Exemption From Prospectus Requirement for Certain Trades to Existing Security Holders (the " Existing Securityholder Exemption "). The Existing Securityholder Exemption limits a shareholder to a maximum investment of CAD$15,000 in a 12-month period unless the shareholder has obtained advice regarding the suitability of the investment and, if the shareholder is resident in a jurisdiction of Canada, that advice has been obtained from a person that is registered as an investment dealer in the jurisdiction. If the Company receives subscriptions from investors relying on the Existing Securityholder Exemption exceeding the maximum amount of the Private Placement, the Company intends to adjust the subscriptions received on a pro-rata basis.

 

The Units issued pursuant to the Private Placement and the Existing Securityholder Exemption will be subject to a four-month hold period from the closing date of the Private Placement under applicable Canadian securities laws, in addition to such other restrictions as may apply under applicable securities laws of jurisdictions outside Canada.  

 

  The Company intends to use the net proceeds of the Private Placement for general corporate purposes. The Company may pay finder's fees to eligible finders in connection with the Private   Placement, subject to compliance with applicable securities laws and Canadian Securities Exchange policies.  

 

  The securities being offered have not been and will not be registered under the U.S. Securities Act and may not be offered or sold in the United States, or to, or for the account or benefit of, U.S. persons or persons in the United States, absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.  

 

  Debt Settlements  

 

  Prismo also announces that it has entered into debt settlement agreements (the "   Settlement Agreements   ") with certain creditors of the Company (the "   Creditors   ") pursuant to which the Company agreed to issue to the Creditors, and the Creditors agreed to accept, an aggregate of 160,000  shares of the Company (each, a "   Share   ") in full and final settlement of accrued and outstanding indebtedness in the aggregate amount of $11,000 (the "   Debt Settlement   ").   All securities issued pursuant to the Debt Settlement will be subject to a statutory hold period of four months from the date of issuance, in accordance with applicable policies of the Canadian Securities Exchange.  

 

  Share and Warrants Issuance  

 

  A private company dealing at arms' length with Prismo, its officers and directors, had certain rights into the Silver King and Ripsey mines ("   PrivateCo   "). In consideration for PrivateCo relinquishing its rights in the Silver King and Ripsey mines in favor of the Company, Prismo has agreed, subject to regulatory approval, to issue PrivateCo five million units (the "   Units   "). Each Unit is comprised of one common share (a "   Share   ") and one share purchase warrant (a "   Warrant   "). The Shares will become free trading as to 25% every six months from the Effective Date. Two million of the Warrants will be exercisable at $0.10 ("   First Tranche   ") and three million Warrants will be exercisable at $0.15 ("   Second Tranche   "), all for a period of three years. The shares from the exercise of the Warrants will become free trading as to 25% every six months from the Effective Date. In addition, the exercise of the First Tranche is conditional on Prismo having raised $1.5 million from parties introduced to Prismo by the principals of PrivateCo and the exercise of the Second Tranche is conditional on Prismo having raised $3.0 million from parties introduced to Prismo by the principals of PrivateCo.  

 

  Qualified Person  

 

   Dr. Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations and Chief Exploration Officer and a director of the Company, has reviewed and approved the technical disclosures in this news release. Other than the sampling conducted by Dr. Craig Gibson as indicated herein, the data presented in this press release was obtained from public sources, should be considered incomplete and is not qualified under NI 43-101, but is believed to be accurate. The Company has not verified the historical data presented and it cannot be relied upon, and it is being used solely to aid in exploration plans.   

 

  1)     https://resolutioncopper.com/about-us/    

 

  2)   Galbraith, F, 1935, Geology of the Silver King area, Superior, Arizona, Univ. of Arizona thesis, 153p plus plates.  

 

  3)   Blake, W.P., 1883, Description of the Silver King Mine, Arizona, New Haven, 48p plus plates.  

 

  About Prismo Metals Inc.  

 

  Prismo (CSE: PRIZ) is a mining exploration company focused on advancing its Hot Breccia copper project in Arizona and its Palos Verdes silver project in Mexico.  

 

  Please follow @PrismoMetals on   ,   ,   ,    Instagram    , and  

 

  Prismo Metals Inc. ,   1100 - 1111 Melville St., Vancouver, British Columbia V6E 3V6  

 

  Contact:  

 

  Alain Lambert, Chief Executive Officer    alain.lambert@prismometals.com   

 

  Gordon Aldcorn, President    gordon.aldcorn@prismometals.com   

 

  Cautionary Note Regarding Forward-Looking Information  

 

  This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to, among other things: the timing, costs and results of drilling at Hot Breccia.  

 

  These forward‐looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things: delays in obtaining or failure to obtain appropriate funding to finance the exploration program at Silver King and Ripsey. In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that: the ability to raise capital to fund exploration and the timing of such exploration.  

 

  Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-   looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.  

 

  NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES
OR FOR DISSEMINATION IN THE UNITED STATES
 

 

Copyright (c) 2025 TheNewswire - All rights reserved.

 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Prismo Metals Appoints Gordon Aldcorn as President

Prismo Metals Appoints Gordon Aldcorn as President

 

(TheNewswire)

 
       
  Prismo Metals Inc. 
                
 

Vancouver, British Columbia TheNewswire - June 5th, 2025 Prismo Metals Inc. (the " Company ") (CSE: PRIZ) (OTCQB: PMOMF) is pleased to announce the appointment of Gordon Aldcorn as President, effective immediately.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Prismo Metals Announces Closing of Debt Settlement

Prismo Metals Announces Closing of Debt Settlement

 

(TheNewswire)

 
       
  Prismo Metals Inc. 
                
 

Vancouver, British Columbia TheNewswire - March 10 2025 Prismo Metals Inc. (CSE:PRIZ, OTCQB: PMOMF) ( " Prismo " or the " Company " ) is pleased to announce that it has completed its previously announced debt settlement transactions with certain creditors of the Company (the " Creditors "), pursuant to which the Company has issued to the Creditors an aggregate of 4,451,175 common shares of the Company (" Common Shares ") at issue prices ranging from $0.075 to $0.23 per Common Share in full and final settlement of accrued and outstanding indebtedness in the aggregate amount of approximately $464,409 (the " Debt Settlement ").

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Prismo Metals Updates Exploration at Hot Breccia

Prismo Metals Updates Exploration at Hot Breccia

 

(TheNewswire)

 
       
  Prismo Metals Inc. 
                
 

Vancouver, British Columbia, February 28th, 2025 TheNewswire - Prismo Metals Inc. (the " Company ") (CSE: PRIZ) (OTCQB: PMOMF) is pleased to announce an updated exploration model for its Hot Breccia project in Southern Arizona.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Prismo Provides Corporate Update

Prismo Provides Corporate Update

 

(TheNewswire)

 
       
  Prismo Metals Inc. 
                
 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
FPX Nickel Announces Share-Based Compensation Grant

FPX Nickel Announces Share-Based Compensation Grant

 
 

FPX Nickel Corp. (TSXV: FPX) (OTCQB: FPOCF) (" FPX " or the " Company ") announces that the board of directors of the Company has approved the grant of 5,305,000 stock options (the " Options ") to directors, officers and employees of the Company pursuant to the Company's Share Compensation Plan. The Options have an exercise price of $0.30 per share, with a five-year term and are fully vested on the grant date, July 10, 2025 .

 
 

  FPX Nickel logo (CNW Group/FPX Nickel Corp.) 

 

The Company also granted an aggregate 750,000 restricted share units (the " RSUs ") to certain officers of the Company. The RSUs vest in three equal installments on the annual anniversaries of the grant date and each vested RSU will entitle the holder to receive one common share of the Company or the equivalent cash value upon settlement.

 

  About FPX Nickel Corp.  

 

 FPX Nickel Corp. is focused on the exploration and development of the Decar Nickel District, located in central British Columbia , and other occurrences of the same unique style of naturally occurring nickel-iron alloy mineralization known as awaruite. For more information, please view the Company's website at https://fpxnickel.com/ or contact Martin Turenne , President and CEO, at (604) 681-8600 or ceo@fpxnickel.com .

 

On behalf of FPX Nickel Corp.

 

"Martin Turenne"
Martin Turenne , President, CEO and Director

 

   Forward-Looking Statements   

 

  Certain of the statements made and information contained herein is considered "forward-looking information" within the meaning of applicable Canadian securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed in the Company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.  

 

  Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.  

 

SOURCE FPX Nickel Corp.

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2025/11/c5569.html  

 
 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Cygnus Metals Limited: Issue of Performance Rights

Cygnus Metals Limited: Issue of Performance Rights

 

Cygnus Metals Limited ("Cygnus" or the "Company") advises that it has issued an aggregate of 67,050,000 performance rights ("Performance Rights") to directors, and key employees and consultants, under the Company's Omnibus Equity Incentive Plan ("Plan").

 

Shareholders approved the Plan and the issue of Performance Rights to directors at the Company's annual general meeting held on May 14, 2025. The Performance Rights to key personnel were issued on the same terms and conditions as the director Performance Rights, as set out in the notice of annual general meeting released to ASX on April 14, 2025.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Exploration Corp. (TSXV: AGA,OTC:AAGAF) (OTCQB: AAGAF) ("Silver47" or the "Company") is pleased to announce the 2025 exploration program is nearing completion at its wholly-owned Adams Plateau Project (the "Project") in southern British Columbia, a silver-zinc-copper-gold-lead SEDEX project.

Gary Thompson, CEO of Silver47, stated: "We are glad to continue our work on Adams Plateau toward defining drill targets on this road-accessible project. The abundance of surface mineralization on the Project is very encouraging for the potential of new and exciting discoveries. The Company has received a 5-year permit for drilling. This year is shaping up to be transformational for the Company with a full season of drilling at the flagship Red Mountain Project and the pending merger with Summa Silver."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

 

   New Expansion Hole Intersects    279    Metres Averaging    0.49    % Cu   

 

   Nine Drill Rigs Now Active on Site   

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Reward Gold Mine Project Update

Vertex Minerals Limited Reward Gold Mine Project Update

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX,VTXXF) (OTCMKTS:VTXXF) is pleased to announce that the underground mining operation is on track to be producing high grade gold feed to the recently commissioned gravity gold plant in the coming weeks.

HIGHLIGHTS:

- Operational Milestones

o VTX remains firmly on track to commence production of high-grade ore from the underground mine in the forthcoming weeks.

o Transformer and cabling for the installation of 11kV high voltage underground power system on site with installation commenced.

o Preparations for the underground mine startup up progressing as planned and stripping of the main access is completed.

o New Aramine L350D has departed France for the journey to Hill End. Arrival in Orange NSW expected in by 26th August where it will be fitted with an RCT remote control system for open stoping operations.

o Mining the Reward Gold Mine - Resource 225kozs at 16.7g/t (VTX ASX Announcement 21 June 2023).

o Weekly Gold production Oz's from Stockpiles improving with depth in the stockpiles, with coarser particle size and better process throughput experienced.

- Mine start up

o Fan chambers have been excavated to provide secondary ventilation for production activities, exploration drilling and the future southern access toward the Fosters' exploration target.

o Primary ventilation fan has been installed and bulkhead completed.

o High voltage surface substation has been installed.

o High voltage cabling installation commences next week, with power up of the system scheduled for 28 July 2025.

o Stripping of the main accessis completed with the final elements of ground support (approx. 30m) to be completed before power cable installation starts next week.

o Cable bolts installed for the intersection of Lady Belmore exploration drive with first cut drilled out and ready to charge.

o Development Jumbo #1 (Epiroc T1D) is exceeding performance expectations.

o Dewatered of declines well underway.

o Mine schedule for FY26 finalised.

o First airleg stope secondary vent installed and specialty equipment on site to start first air leg stope.

o First long hole stope planned for August. High grade from airleg and longhole stopes to complement larger tonnage from development ore headings.

- People that have been onboarded

o 2x Drill Fitters and Heavy diesel fitter.

o Process superintendent commences next week.

o Full Tech team started including mine surveyor this week.

o Have back-to-back airleg miners for stoping.

o Full underground and mill crews.

- Improvements to plant

o DSM screen installed to improve product delivery to Wilfley Table.

o Gemini table improvements with new tabletop and gearbox improving final concentrate grade to over 20% gold (suitable for direct smelting to Dore on site).

o Process water pump upgrade improving ore washing and Tomra performance.

- Revised mine plan and schedule completed and ready to implement

- Updated Reward Gold mine mining plan and mine schedule completed.

- Adding a high-grade long hole stope upfront to be mined concurrently with the high grade airleg stope.

Vertex Director Declan Franzmann commented: "It is great to see all the elements of re-developing the underground mine and processing facility coming together so rapidly. The most pleasing aspect is our success in employing an incredible team of people to run the operation and all credit to management for developing great "esprit de corps" and a single sense of purpose as we push to full production."

As previously announced, the startup mine schedule includes mining 2,075 tonnes at 17.8 g/t Au from a developed airleg stope block. The planned stope width is the same as the interpretation of the mineralisation. (Refer to Table 1 in Appendices 1) (VTX ASX announcement 26/06/23).

Given this stope will take some time to extract, the Vertex geology and Mining Team have additionally brought forward a very high-grade long hole stope to commence mining in August as well. Further optimisations to the mining schedule will continue to be made.

This stope can be exploited as soon as services have been established. The mining crews have done a great job in the access drive to make room for the services (11kV cable, water and air lines) while improving accessibility for the mobile mining equipment selected for the Project.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/OUQP5Z21

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX,VTXXF) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Prismo Metals

Prismo Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×