Decklar Resources Inc. Announces Trucking of Crude Oil to Market From Oza Oil Field in Nigeria

Decklar Resources Inc. Announces Trucking of Crude Oil to Market From Oza Oil Field in Nigeria

Decklar Resources Inc. (TSX-V: DKL) (OTCQX: DKLRF) (FSE: A1U1) ( the "Company" or "Decklar") is pleased to announce the initial successful shipments of crude oil via trucks from the Oza Oil Field to the Umugini Pipeline Infrastructure Limited ("UPIL") crude handling facilities.

Decklar and its co-venturer Millenium Oil & Gas Company Limited ("Millenium") have successfully trucked approximately 4,000 barrels of crude oil from storage tanks at the Oza Oil Field to the UPIL crude handling facilities, from which the oil will then be transferred to the Shell Petroleum Development Company of Nigeria Limited ("SPDC") Joint Venture Forcados Oil Export Terminal via the Umugini Pipeline.

The trucks continue to be loaded from crude oil storage tanks at the Oza site that hold approximately 22,000 barrels of oil. During an initial trial trucking period, a reduced volume of crude oil was shipped by a small convoy of trucks to evaluate possible logistics and security issues and to determine optimum routes and infrastructure requirements. The initial trial period for trucking activities was successful, and the number of trucks to be used is now being increased and optimized. When sufficient shipment of crude oil volume from storage tanks has been completed, production from the Oza-1 well will be re-started to supply continued shipments by truck to UPIL.

Duncan Blount, CEO of Decklar Resources, said "We are very pleased to announce the Company's first delivery of oil to the export facilities. This represents a significant milestone for the Company achieving full-time commercial production, transforming Decklar into a producing company with cash flow to follow in the very near future. We continue to look forward positively to future development drilling activities at the Oza Field and continued progress on development activities at the Company's other fields."

For further information:

Duncan T. Blount
Chief Executive Officer Telephone: +1 305 890 6516
Email: dblount@decklarresources.com

David Halpin
Chief Financial Officer Telephone: +1 403 816 3029
Email: david.halpin@decklarresources.com

Investor Relations: info@decklarresources.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Language

Certain statements made and information contained herein constitute "forward-looking information" (within the meaning of applicable Canadian securities legislation), including, but not limited to, statements regarding: restarting production at the Oza-1 well and the timing thereof, the timing for export or sale of barrels of oil being held in storage, the future commercial production of the Oza-1 well, the use of additional trucks for the transport of oil to the export facilities, the timing for cash flow and future development drilling activities at the Oza Field . All statements in this news release, other than statements of historical facts, are forward-looking statements. Such statements and information (together, "forward looking statements") relate to future events or the Company's future performance, business prospects or opportunities. There is no certainty that definitive agreements in respect of the Transaction will be entered into, or that any conditions precedent contained therein will be satisfied on terms satisfactory to the parties or at all.

All statements other than statements of historical fact may be forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect, "may", "will", "project", "predict", "potential", "targeting", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward-looking statements". Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. The Company believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements should not be unduly relied upon. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws. These forward-looking statements involve risks and uncertainties relating to, among other things, counterparty risk, changes in oil prices, results of exploration and development activities, competition in the oil and gas industry, uninsured risks, energy transition risks, regulatory changes, defects in title, availability of materials and equipment, timeliness of government or other regulatory approvals, actual performance of facilities, availability of financing on reasonable terms, availability of third party service providers, equipment and processes relative to specifications and expectations and unanticipated environmental impacts on operations. Actual results may differ materially from those expressed or implied by such forward-looking statements.

The Company provides no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not assume the obligation to revise or update these forward-looking statements after the date of this document or to revise them to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

DKL:CA
The Conversation (0)
Baselode Discovers New Zone of Radioactivity Six Kilometres Northeast of ACKIO

Baselode Discovers New Zone of Radioactivity Six Kilometres Northeast of ACKIO

  • Intersected over 30 metres of continuous radioactivity within a massive hydrothermal alteration system
  • New zone discovered on the second drill hole of Hook's regional exploration program, 6 km from ACKIO discovery
  • Demonstrates the fertility of the uranium corridor along Baselode's Hook Project

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce the discovery of a new uranium prospect on the Hook project ("Hook") in the Athabasca Basin area of northern Saskatchewan (Figure 1).

"We're very excited about this new discovery on Hook, on the second hole of our regional exploration program. HK24-010 intersected over 30 metres of continuous radioactivity at approximately 173 metres vertical depth. This new discovery is hosted within a massive alteration corridor similar in scale to what we have observed at our ACKIO zone 6 km to the southwest. We believe the alteration corridor has mobilized uranium from the host rocks and deposited it within a redox front, similar to what we interpret for HK24-010. We intend to follow-up drilling in this area in the coming weeks after completing exploration drilling in a logistically efficient order on other targets with stronger geophysical anomalisms. Hook's regional exploration aim was to discover new zones of uranium mineralization and we're well on our way with this new prospect," commented James Sykes, CEO, President, and Director of Baselode.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs

Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) (the "Company") is pleased to announce assay results from its 2024 winter diamond drilling program which totaled 2,864 metres in nine holes at its 100% owned, 35,705 hectare Moore Uranium Project. The project is located approximately 15 kilometres east of Denison Mine's Wheeler River project and proximal to regional infrastructure for Cameco's Key Lake and McArthur River operations in the Athabasca Basin, Saskatchewan. A highlight from this program was from hole ML24-08 which intersected 5.0 metres of 4.61% U 3 O 8 from a relatively shallow downhole depth of 265.5 metres to 270.5 metres including 10.19% U 3 O 8 over 1.0 metre at the Main Maverick Zone. Skyharbour plans to continue advancing Moore through additional drilling in 2024 in conjunction with a fully-funded summer drill program to follow-up on the recently reported Fork target uranium discovery at the Company's adjacent Russell Lake Uranium Project. The combined drill campaign this summer is planned to consist of approximately 7,000 - 8,000 metres with details forthcoming.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program

Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQB: SYHBF ) (Frankfurt: SC1P ) (the "Company") is pleased to announce initial results from Phase One of its 2024 winter drill program at the 73,294 hectare Russell Lake Uranium Project ("Russell" or the "Project"). The Project is strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan adjacent to regional infrastructure, including an all-weather road and powerline. Drilling at Russell was completed during two separate phases of drilling with a total of 3,094 metres drilled in six holes during Phase One with geochemical assays reported here. The second phase of the winter drill program at Russell consisted of 2,058 metres in four holes with the geochemical assays still pending and to be released at a later date. The Company also recently completed 2,864 metres of drilling in nine holes at its Moore Project with assays pending from that program.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Provides Exploration Update on Geophysical Programs at Russell South, Tabbernor, and Smart Lake Projects

Purepoint Uranium Provides Exploration Update on Geophysical Programs at Russell South, Tabbernor, and Smart Lake Projects

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") is pleased to announce the completion of two geophysical programs at its Russell South project, the commencement of a new geophysical survey at the Tabbernor project, and the rescheduled survey at the Smart Lake joint venture project. Additionally, Purepoint has released an updated Portfolio Handbook, now available on the Company's newly launched website.

"Our team has made significant strides in advancing our exploration efforts at both Russell South and Tabbernor," said Chris Frostad, President and CEO of Purepoint. "We are particularly excited about the upcoming completion of the Smart Lake survey, which will set the stage for our winter drilling program."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Baselode Reports High Levels of Radioactivity Over Wide Intercepts at ACKIO Uranium Project

Baselode Reports High Levels of Radioactivity Over Wide Intercepts at ACKIO Uranium Project

  • Over 30 metres of continuous radioactivity, such as 907 cps over 34 m, including 9,173 cps over 0.4 m
  • AK24-118 and AK24-119 returned the widest radioactivity levels in Pod 6
  • All three drill holes with over 20 metres of cumulative thickness of radioactivity
  • The second drill for regional exploration targets has now mobilized to site

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce radioactivity results from the first three diamond drill holes within the ACKIO ("ACKIO") uranium prospect of the Hook project ("Hook") in the Athabasca Basin area of northern Saskatchewan (Figure 1).

"AK24-119's results rank as one of the top 10 best drill hole radioactivity intersections at ACKIO, making this a unique drill hole. Previous drill hole AK22-035 intersected 0.54% U3O8 over 7.3 m (see Baselode News Release dated September 12, 2022) in Pod 6, and we are seeing similar levels of radioactivity within AK24-118 and AK24-119 but over broader widths within the same Pod, suggesting mineralization remains open in this area. ACKIO has continued to deliver encouraging results since the discovery in 2021, and we expect more promising results to follow.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project

Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has recently completed a geophysical program at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program included a ground electromagnetic survey (ML-TEM) and a ground gravity survey. Orano is now preparing for a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program that will take place this summer at the project.

Location Map of Preston Project:
https://www.skyharbourltd.com/_resources/maps/Sky_Preston_20211209.jpg

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×