Cartier Starts Metallurgical Testwork Program at Cadillac

Cartier Starts Metallurgical Testwork Program at Cadillac

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce it has awarded the contract to Soutex, a firm specializing in mineral processing and metallurgy, to carry out the first advanced and comprehensive metallurgical sampling and testwork program for the Main Sector of its Cadillac Project.

Key Objectives of the Program

  • Defining expected gold recovery rates and improving upon historical results from the Chimo deposit.
  • Establishing first-time metallurgical recovery data for the East Chimo and West Nordeau satellite deposits, where no previous data exists.
  • Supporting the development of an integrated process flowsheet .
  • Providing critical data for future trade-off studies to guide project development.

" The metallurgical program represents a critical de-risking milestone to advance the development of the Cadillac Project. By understanding how the mineralized material responds to conventional processing methods, we can define the most efficient and cost-effective flowsheet. This has the potential to significantly reduce both capital and operating costs, while also improving our environmental footprint. The data generated will directly support optimized project development and enhance our economic models. In short, these test results will strengthen the technical foundation of the project and help unlock greater shareholder value . " – Philippe Cloutier, President and CEO of Cartier.

" Following the recent launch of baseline environmental studies, we're pleased to advance the Cadillac Project with the initiation of our first modern metallurgical test program. With historical data now nearly 30 years old, it was essential for Cartier to generate updated, high-quality data that reflects current standards. This comprehensive program will characterize the mineralized material, gold recovery potential, and validate optimal grind size (key inputs for future engineering and economic studies). Combined with our ongoing 100,000-metre drill program, these initiatives position us to unlock the full value of the Cadillac Project. " – Ronan Deroff, Vice President Exploration of Cartier.

Historical Production Recovery (source: MRNF DV 85-05 to DV 97-01 + internal company reports)

The mineralized material from the Chimo mine (Chimo deposit) was processed by 3 different producers: Chimo Gold Mines (1966-67), Louvem (1984-1989) and Cambior (1989-1997). The flowsheet was focused on gravity separation, flotation and cyanidation of flotation concentrate. Records show that from 1966 through 1997, approximatively 2.4 million tonnes of mineralized material have been processed. During the 15-year period production, the historical average recovery was 90.6% of the contained gold. These numbers appear to underestimate the deposit and should be able to improve, since the first two operators of the Chimo mine (Chimo Gold Mines and Louvem) had good extraction results, around 94%, while the last production period by Cambior showed a significant drop in recoveries with only 89% of the contained gold.

There is no metallurgical information available for the other deposits of the Main Sector like East Chimo and West Nordeau deposits.

Methodology of the Metallurgical Testwork Program

To achieve the program objectives, the testwork will be conducted on NQ-size half-drill core intervals spatially selected to be representative of both the type of mineralization and the average head grade of the resource. A total of 6 composites for 300 kg from the three deposits (Chimo, East Chimo and West Nordeau) will be generated including two 50 kg-composites for each deposit. The composites will be assembled by Cartier geologists.

All composites of the three deposits will be subject to cyanidation tests at three different grind sizes. After these tests, gravimetric concentration separation followed by a cyanide destruction tests of the gravity tails will be done at the grind size showing the best results. In addition to the metallurgical program, comminution test, as well as chemical and mineralogical characterization, will also be performed to define the grindability of the mineralized material and predict his behaviour in the process.

Qualified Person

The scientific and technical content of this press release has been prepared, reviewed and approved by Mr. Ronan Déroff, P.Geo., M.Sc., Vice President Exploration, who is a ″Qualified Person″ as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (″NI 43-101″).

About Soutex

Soutex is a consulting firm in mineral processing and metallurgy that offers specialized services, from the initial stages of development on paper to the daily operations of the processing plant. Their designs stem from their solid experience in providing plant operations support. This support is based on their knowledge of fundamental ore processing principles and their in-plant experience. Founded in 2000 and having offices in Canada (Quebec and Longueuil) and Germany (Munich), Soutex comprises more than 40 metallurgists, process engineers, and technicians, making it one of the largest groupings of specialists in the field in Canada. Services have been offered to clients located across Canada and abroad (West Africa, United States, Finland, New Caledonia, Suriname, and Madagascar).

About Cadillac Project

The Cadillac Project, covering 14,000 hectares along a 15-kilometre stretch of the Cadillac Fault, is one of the largest consolidated land packages in the Val-d'Or mining camp. Cartier's flagship asset integrates the historic Chimo Mine and East Cadillac projects, creating a dominant position in a world class gold mining district. With excellent road access, year-round infrastructure and nearby milling capacity, the project is ideally positioned for rapid advancement and value creation.

Using a gold price of US$1,750/oz, a Preliminary Economic Assessment demonstrated the economic viability of a 2-km segment, compared to the 15 km that will be the subject of the 100,000 m drilling program, with an average annual gold production of 116,900 oz over a 9.7-year mine life. Indicated resources are estimated at 720,000 ounces (7.1 million tonnes at 3.1 g/t Au) and inferred resources at 1,633,000 ounces (18.5 million tonnes at 2.8 g/t Au). Please see the NI 43-101 ″Technical Report and Preliminary Economic Assessment for Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R. Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions″ effective May 29, 2023.

About Cartier Resources Inc.

Cartier Resources Inc., founded in 2006 and headquartered in Val-d'Or (Quebec) is a gold exploration company focused on building shareholder value through discovery and development in one of Canada's most prolific mining camps. The Company combines strong technical expertise, a track record of successful exploration, and a fully funded program to advance its flagship Cadillac Project. Cartier's strategy is clear: unlock the full potential of one of the largest undeveloped gold landholdings in Quebec.

For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

ECR:CC
Cartier Resources

Cartier Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Cartier Resources

Cartier Resources

Advancing Cadillac Project: An emerging gold camp east of Val-d’Or in the prolific Abitibi Greenstone Belt

Advancing Cadillac Project: An emerging gold camp east of Val-d’Or in the prolific Abitibi Greenstone Belt Keep Reading...
Cartier Cuts 111.5 g/t Au over 2.0 m at Contact ; Confirms Multiple High-Grade Gold Zones; Extends Drilling at Surface

Cartier Cuts 111.5 g/t Au over 2.0 m at Contact ; Confirms Multiple High-Grade Gold Zones; Extends Drilling at Surface

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the fourth batch of results from the fully funded 100,000-m drilling program (2 drill rigs) for the Contact Sector and more precisely, the North Contact Zone (NCZ), on its 100%-owned... Keep Reading...
Cartier Cuts 11.0 g/t Au over 9.0 m including 30.2 g/t Au over 2.5 at Contact ; Continues to Expand High-Grade Gold North Contact Zone near Surface

Cartier Cuts 11.0 g/t Au over 9.0 m including 30.2 g/t Au over 2.5 at Contact ; Continues to Expand High-Grade Gold North Contact Zone near Surface

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the third batch of results from the fully funded 100,000-m drilling program (2 drill rigs) for the Contact Sector and more precisely, the North Contact Zone (NCZ), on its 100%-owned... Keep Reading...
Cartier Cuts 35.5 g/t Au over 0.5 m and 20.4 g/t Au over 0.5 m at Main ; Confirms Near-Surface High-Grade Gold Potential; Advances Toward VG10 Zone

Cartier Cuts 35.5 g/t Au over 0.5 m and 20.4 g/t Au over 0.5 m at Main ; Confirms Near-Surface High-Grade Gold Potential; Advances Toward VG10 Zone

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the second batch of results from Main Sector and more precisely, the VG9 Zone, from the fully funded 100,000-m drilling program (2 drill rigs) on its 100%-owned Cadillac Project,... Keep Reading...
Cartier Cuts 16.7 g/t Au over 2.1 m at Contact ; Strengthens Shallow High-Grade Gold Potential; Supports Expansion Drilling

Cartier Cuts 16.7 g/t Au over 2.1 m at Contact ; Strengthens Shallow High-Grade Gold Potential; Supports Expansion Drilling

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the first batch of results from Contact Sector and more precisely, the North Contact Zone (NCZ), from the fully funded 100,000-m drilling program (2 drill rigs) on its 100%-owned... Keep Reading...
Cartier Begins the Initial Environmental Baseline Studies at Cadillac

Cartier Begins the Initial Environmental Baseline Studies at Cadillac

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce it has awarded the contract for beginning the first environmental baseline studies for the Cadillac project and an initial evaluation of economic assessment of the past-producing Chimo... Keep Reading...
High Priority Target Defined at Alice River Kapok Prospect

High Priority Target Defined at Alice River Kapok Prospect

Pacgold (PGO:AU) has announced High Priority Target Defined at Alice River Kapok ProspectDownload the PDF here. Keep Reading...
Silver Added to USGS 2025 List of Critical Minerals

Silver Added to USGS 2025 List of Critical Minerals

Apollo Silver Corp. (" Apollo Silver " or the " Company ") (TSX.V:APGO, OTCQB:APGOF, Frankfurt:6ZF) is pleased to announce that the US Department of the Interior has added 10 minerals, including silver, to the US Geological Survey ("USGS") 2025 List of Critical Minerals. For the first time,... Keep Reading...
Aurum Hits 5m @ 11.07 g/t Gold from Outside BDT2 Resources

Aurum Hits 5m @ 11.07 g/t Gold from Outside BDT2 Resources

Aurum Resources (AUE:AU) has announced Aurum hits 5m @ 11.07 g/t gold from outside BDT2 resourcesDownload the PDF here. Keep Reading...
Canadian Investment Regulatory Organization Trade Resumption - NAU

Canadian Investment Regulatory Organization Trade Resumption - NAU

Trading resumes in: Company: Nevgold Corp. TSX-Venture Symbol: NAU All Issues: Yes Resumption (ET): 11:00 AM CIRO can make a decision to impose a temporary suspension (halt) of trading in a security of a publicly-listed company. Trading halts are implemented to ensure a fair and orderly market.... Keep Reading...
NevGold Announces C$10M Brokered Private Placement Financing

NevGold Announces C$10M Brokered Private Placement Financing

"NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES." Nevgold Corp. (" NevGold " or the " Company ") ( TSXV:NAU,OTC:NAUFF) (OTCQX:NAUFF) (Frankfurt:5E50 ) is pleased to announce that it has entered into an agreement with Clarus Securities Inc. (the... Keep Reading...
Sranan Gold Intersects 64 Metres Grading 3.0 g/t Including 33.5 g/t over 5 Metres at the Randy's Pit Target at Tapanahony Project, Suriname, as First Holes Intersect a Significant Gold System

Sranan Gold Intersects 64 Metres Grading 3.0 g/t Including 33.5 g/t over 5 Metres at the Randy's Pit Target at Tapanahony Project, Suriname, as First Holes Intersect a Significant Gold System

Sranan Gold Corp. (CSE: SRAN) (FSE: P84) (Tradegate: P84) ("Sranan" or the "Company") announces significant diamond drill results from the Randy's Pit target at its Tapanahony Gold Project in Suriname. These results are from the first four drill holes of an ongoing 10,000-metre drill program and... Keep Reading...
Cartier Resources

Cartier Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News