Avalon Reports Drill Results from 2022-2023 Exploration Program at Separation Rapids

Avalon Reports Drill Results from 2022-2023 Exploration Program at Separation Rapids

Avalon Advanced Materials Inc. (TSX: AVL) (OTCQX: AVLNF) ("Avalon" or the "Company") is pleased to announce final assays from the 2022-2023 drilling program at the Company's flagship Separation Rapids Lithium Project, confirming potential to significantly expand its lithium resource at depth. New significant intercepts shown below are from three of the four final drill holes.

  • SR23-85: 1.56% Li2O over 47.71 metres ("m")
  • SR23-91: 1.06% Li2O over 10.38m and 1.66% Li2O over 7.01m and 1.36% Li2O over 10.61m
  • SR23-92: 1.47% Li2O over 3.42m and 1.14% Li2O over 4.35m and 1.49% Li2O over 4.52m

The assays for drill hole SR23-93 (the fourth hole) have confirmed the petalite mineralization to 566-metre depth increasing the potential depth of the deposit by 80%. The drilling has also confirmed that the deposit is open to the east and west, and to depth, over a 300-strike length, with similar grades to the current mineral resource estimate, supporting a conceptual target to double the size of the deposit through future drilling.

"These drill results truly demonstrate what our team has always believed - the resource at Separation Rapids is potentially much larger than what is currently understood," commented Rickardo Welyhorsky, Chief Operating Officer at Avalon. "I am extremely excited to begin the next drilling program to reveal its true potential."

Drilling Program Final Assay Details

The 2022-2023 drill program consisted of 12 drill holes on the existing resource and one vertical drill hole on the centre of the deposit; all 13 holes totalled 4,179m and was designed to examine the potential to expand mineralization to the east and west as well as the depth extent.

Hole SR23-85 (see Figure 1) was one of six targeting either gaps in existing drilling (for 85) or below the current mineral resource estimate, with hole SR23-85 intercepting 1.56% Li2O over 47.7m (estimated true width). As a result, all six holes (SR23-81 to SR23-86) confirm that the deposit is open to depth. All drill holes will be used to update the existing mineral resource estimate, which is currently underway.

Drill hole SR23-93 was drilled vertically to test the depth extent of the deposit (see Figure 2). This hole was terminated at 570m due to weather constraint and the start of early spring breakup. SR23-93 assays returned 1.51% Li2O over 565m (drilled width) confirming the previous report of visual petalite mineralization to depth. This extends the depth of the deposit by 249m from the previously reported deepest intercept at 315m (drilled in 2017) below surface. The grade of the lower half of hole SR23-93 returned 1.48% Li2O over 244.45m (from 321.6m to 566.10m) (see Table 1), which indicates that the mineralization continues at a virtually identical grade to the current mineral resource estimate.

The two holes (SR23-91 and SR23-92) that were drilled in a gap on the western part of the deposit have confirmed the extension and openness of the deposit to the west with intercepts of cumulative about 27m (estimated true width) in hole SR23-91 and cumulative 12 metres in hole SR23-92. They have also, similar to hole SR23-85, potentially improved and expanded the mineralized area.

All drill hole data has been brought into Avalon's database and resource block model in order to develop an independent updated resource estimate for the deposit.

"As a consequence of our refreshed strategic plan, we are delivering on key milestones and accelerating developments at Separation Rapids," noted Zeeshan Syed, President of Avalon. "Ontario continues to be well positioned as an international economic hub within the critical minerals value chain and Avalon is poised for growth to help support that important mandate."

Future Drilling at Separation Rapids

The recent drill program indicating the significant resource expansion potential is an encouragement for very significant future drilling program in order to both increase the inferred resources and upgrade inferred and indicated resources to indicated and measured categories. Such a program may be between 10,000m and 30,000m. The results of the recent program suggest a conceptual exploration target of doubling the existing resource estimate at similar lithium grades. This may be between 15 and 20 million tonnes at 1.2 to 1.6% Li2O. At present there is insufficient drilling below the recent holes SR23-81 to SR23-92 to delineate a resource and it is uncertain that a deeper resource will be delineated.

This news release was reviewed by the Dr. Bill Mercer, P. Geo. (ON). Dr. Mercer is a qualified person for the purposes of National Instrument 43-101, who has reviewed and approved the technical information included in this news release.

About Avalon Advanced Materials Inc.

Avalon Advanced Materials Inc. is a Canadian mineral development company specializing in niche market metals and minerals with growing demand in new technology. The Company has three advanced stage projects, all 100%-owned, providing investors with exposure to lithium, tin and indium, as well as rare earth elements, tantalum, niobium, and zirconium. Avalon is currently focusing on its Separation Rapids Lithium Project, Kenora, ON and its East Kemptville Tin-Indium Project, Yarmouth, NS. Social responsibility and environmental stewardship are corporate cornerstones.

For questions and feedback, please e-mail the Company at ir@AvalonAM.com, or phone Zeeshan Syed, President at 416-364-4938.

This news release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, that there is potential to significantly expand its lithium resource at depth, that there is support for a conceptual target to double the size of the deposit through future drilling, that the resource at Separation Rapids has the potentially to be much larger than what is currently understood, that certain drill holes will be used to update the existing mineral resource estimate, that the recent drill program indicating the significant resource expansion potential is an encouragement for very significant future drilling program in order to both increase the inferred resources and upgrade inferred and indicated resources to indicated and measured categories, that such a program may be between 10,000 to 30,000 metres, that the results of the recent program suggest a conceptual exploration target of doubling the existing resource estimate at similar lithium grades, that this may be between 15 and 20 million tonnes at 1.2 to 1.6% Li2O. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "potential", "scheduled", "anticipates", "continues", "expects" or "does not expect", "is expected", "scheduled", "targeted", "planned", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be" or "will not be" taken, reached or result, "will occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Avalon to be materially different from those expressed or implied by such forward-looking statements. Forward-looking statements are based on assumptions management believes to be reasonable at the time such statements are made. Although Avalon has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Factors that may cause actual results to differ materially from expected results described in forward-looking statements include, but are not limited to market conditions, and the possibility of cost overruns or unanticipated costs and expenses as well as those risk factors set out in the Company's current Annual Information Form, Management's Discussion and Analysis and other disclosure documents available under the Company's profile at www.SEDAR.com. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Such forward-looking statements have been provided for the purpose of assisting investors in understanding the Company's plans and objectives and may not be appropriate for other purposes. Accordingly, readers should not place undue reliance on forward-looking statements. Avalon does not undertake to update any forward-looking statements that are contained herein, except in accordance with applicable securities laws.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3386/168339_33b26edfa46ecbbc_002.jpg

Figure 1: North-South Drill Section, Separation Rapids Lithium Deposit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3386/168339_33b26edfa46ecbbc_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3386/168339_33b26edfa46ecbbc_003.jpg

Figure 2: West-East Long Section, Separation Rapids Lithium Deposit

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3386/168339_33b26edfa46ecbbc_003full.jpg

Table 1: Significant drill intersections

Drill hole From (m) To (m)

Drilled Width

(m)

Estimated True
Width (m)

Li2O %
SR-22-81 325.00 371.50 46.50 19.65 1.69
SR-23-82 336.00 367.70 31.70 11.36 1.50
and 378.10 390.80 12.70 4.55 1.66
and 397.35 412.75 15.40 5.52 1.10
SR-23-83 269.45 321.80 52.35 17.90 1.35
and 357.75 380.60 22.85 7.82 0.99
SR-23-84 187.00 410.00 223.00 76.27 0.96
including 203.00 321.25 118.25 40.44 1.46
SR-23-85 158.00 275.30 117.30 47.71 1.56
SR-23-86 167.25 300.00 132.75 45.40 1.01
and 216.00 248.90 32.90 11.25 1.53
and 274.40 300.00 25.60 8.76 1.92
SR-23-87 40.10 54.80 14.70 7.35 1.16
and 62.30 72.00 9.70 4.85 0.95
SR-23-88 84.25 93.00 8.75 4.38 1.13
SR-23-89 7.00 17.00 10.00 5.74 1.69
and 47.55 52.05 4.50 2.58 1.44
SR23-90 13.15 36.35 23.20 9.80 1.76
and 69.00 73.35 4.35 1.84 1.54
SR23-91 67.40 83.55 16.15 10.38 1.06
and 91.10 102.00 10.90 7.01 1.66
and 110.50 127.00 16.50 10.61 1.36
SR23-92 42.80 50.90 8.10 3.42 1.47
and 61.00 71.30 10.30 4.35 1.14
and 77.10 87.80 10.70 4.52 1.49
SR23-93 1.25 566.10 564.85 NA 1.51
Including321.65 566.10 244.45 NA1.48

 

Notes to TABLE 1:

  1. True widths are estimated assuming the mineralized zones are vertical and true width is horizontal. The near vertical nature is clearly apparent in drill sections. "NA" indicates for the vertical hole that the mineralization width is not known.
  2. For interval calculations a cutoff grade of 0.50% Li2O was utilized which is similar to that used in previous resource estimates. Mineralized intervals with overall grades considerably below 1% Li2O are not quoted.
  3. All drill core was split by Avalon staff on site near Kenora and shipped to ALS Global in Thunder Bay for preparation and on to ALS Vancouver for analysis by methods ME-MS81, ICP-06, and ME-4ACD81for multielement analysis including Li, Ta, Cs and Rb.
  4. Some drill core samples had lithium values overlimits for the initial analytical method (>10.000ppm Li) and were reanalysed utilizing ALS method ME-ICP82b. As a result, some intervals increased in grade from those announced in News Release 23-04.
  5. Avalon inserted company certified lithium standards and blanks into the sample stream for QAQC purposes. The results of the Avalon and laboratory standards and blanks were reviewed for acceptance by the QP, Dr. Bill Mercer, P. Geo. (ON), qualified person for the purposes of National Instrument 43-101, prior to accepting the laboratory results.
  6. Lithium (Li) analyses in ppm were converted to Li2O values by multiplying by 2.1527.
  7. The drill program was supervised in the field by J.C.Pedersen (P.Geo) and A. Meek (P.Geo).

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/168339

News Provided by Newsfile via QuoteMedia

AVL:CA
The Conversation (0)
Avalon Completes Purchase of Industrial Site in Thunder Bay as Key Next Step in Becoming Ontario's First Vertically Integrated Lithium Producer

Avalon Completes Purchase of Industrial Site in Thunder Bay as Key Next Step in Becoming Ontario's First Vertically Integrated Lithium Producer

Avalon Advanced Materials Inc. Logo (CNW Group/Avalon Advanced Materials Inc.)

As part of its strategic transformation to become a vertically integrated lithium producer, Avalon Advanced Materials Inc. (TSX: AVL) and (OTCQB: AVLNF) ("Avalon" or the "Company") is pleased to announce the successful acquisition of an industrial site in Thunder Bay, Ontario (965 Strathcona Avenue) which has existing road, rail, deep-water port, and utilities services for its planned midstream lithium-hydroxide (LiOH) processing facility.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Avalon Announces C$63M Strategic Investment by Sibelco to Create a Vertically Integrated Lithium Strategic Partnership in Ontario

Avalon Announces C$63M Strategic Investment by Sibelco to Create a Vertically Integrated Lithium Strategic Partnership in Ontario

As part of its strategic transformation to become a leading North American vertically integrated lithium producer, Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) ("Avalon" or the "Company") is pleased to announce the signing of a binding term sheet to create a new joint venture with SCR-Sibelco NV ("Sibelco"), a global leader in materials solutions. Avalon has issued to Sibelco, on a non-brokered private placement basis, 109,692,764 common shares of Avalon ("Common Shares") for aggregate proceeds of C$10,000,000 and a secured convertible debenture in the principal amount of C$3,000,000 (the "Debenture") (collectively, the "Private Placement").

Avalon Advanced Materials Inc. Logo (CNW Group/Avalon Advanced Materials Inc.)

The C$63-million transaction results in Antwerp -based Sibelco owning approximately 19.9% of the issued and outstanding Common Shares, and provides Avalon with a first tranche of funding to advance the Company's lithium production and processing goals across its suite of lithium mineral assets, led by Separation Rapids in northwestern Ontario . This new joint venture is expected to accelerate Avalon's core business objective of building a mid-stream lithium-hydroxide processing facility in Ontario .

"This strategic partnership represents a significant step forward in scaling our business towards full vertical integration of our lithium production," said Scott Monteith , Chief Executive of Avalon. "Sibelco's investment is a major vote of confidence in our vision, resources and capabilities by a respected and established international operator—and now partner."

"Our partnership with Avalon will focus both on the clean energy growth agenda and the technical glass and ceramics markets in which Sibelco has deep and time-tested expertise" Hilmar Rode , Sibelco Chief Executive Officer, said. "This dual-market strategy combined with a cash-generative business plan will lay the foundation for accelerated growth, and ultimately the venture's sustained success going forward."

Overview of Transactions

Strategic Financing

Pursuant to the terms of the Private Placement, Sibelco purchased: (i) 109,692,764 Common Shares at a price of approximately $0.091164 per Common Share (the "Per Share Price") for gross proceeds of C$10,000,000 which resulted in Sibelco owning approximately 19.9% of the issued and outstanding Common Shares; and (ii) the Debenture, which is a secured convertible debenture, providing for two advances to Avalon: (i) C$500,000 on the date hereof; and (ii) C$2,500,000 subject to the satisfaction of certain conditions precedent. The Debenture bears interest at 7.115% per annum and the principal and interest are payable on maturity, being two years from the date of the Debenture (the "Maturity"). To the extent not repaid at Maturity by Avalon, Sibelco will have the right to convert the outstanding principal amount of the Debenture and all accrued and unpaid interest thereon into either additional Common Shares at a conversion price equal to the Per Share Price, or an additional 5% interest in the joint venture corporation (the "JV Election"), as more particularly described below. The Debenture is a secured obligation, secured by a pledge of the shares of a subsidiary of Avalon subject to replacement security at defined milestones.

Avalon also granted to Sibelco, for so long as Sibelco holds not less than 10% of the issued and outstanding Common Shares on a non-diluted basis, the right to nominate one member to the board of directors of Avalon ("Board") (or up to two nominees if the size of the Board is increased to nine directors or more), and the right to participate in future equity offerings so that it can maintain its pro rata percentage ownership in Avalon. Sibelco also agreed to a 12-month standstill and certain resale restrictions placed on its holdings in Avalon.

The proceeds from the Private Placement will be used by Avalon to fund the acquisition of industrial land for a lithium-hydroxide processing facility in Thunder Bay, Ontario , and repayment of up to C$1.9 million of existing debt, and for working capital and general corporate purposes.

Joint Venture

Subject to the terms and conditions of the binding joint venture term sheet, Avalon and Sibelco have agreed to establish a joint venture with respect to Avalon's lithium projects, including Separation Rapids and Lilypad in northwestern Ontario . Sibelco, which will act as operator of the joint venture, has committed to invest €35 million (approximately C$50.4 million ) into the joint venture. Of this amount, €5 million is to be advanced concurrently with the contribution by Avalon of its interests in the Separation Rapids and Lilypad projects, with an additional €30 million to be advanced in tranches to fund the development of the joint venture mineral projects, including facilities and related infrastructure. After total cash contributions of €35 million by Sibelco, each of the parties will make any further cash contributions on a pro-rata basis (with dilution to a non-contributing party's interest). While the initial participating interests to be held on the formation date of the joint venture by Sibelco and Avalon will be 60% and 40%, respectively, such participating interests may change to 65% and 35%, respectively, if on the Maturity date of the Debenture Avalon fails to pay the full principal and accrued interest and Sibelco elects to exercise the JV Election.

The joint venture term sheet is binding on the parties. Avalon and Sibelco will work together to enter into a long-form joint venture agreement as soon as practicable with a view to execution on or before August 31, 2023 , but in any event not later than September 30, 2023 .

New Strategy, New Vision

Avalon's new strategic goals are focused on both organic growth of its lithium portfolio, consisting of a suite of critical-mineral mining projects across Canada , as well as developing new related opportunities. The Company's mission is to vertically integrate lithium processing in Ontario , positioning the province as an integral part of a North American supply chain for EV batteries.

"We are thrilled to execute on a plan to reliably produce a key resource required for North America's clean-energy transition—and, in so doing, deepen ties between Canada and the European Union in this geo-politically sensitive sector," noted Zeeshan Syed , President of Avalon. "We are keenly attuned to the strategic imperative among G7 economies to build domestic critical-mineral processing capacity, and we intend to do just that."

The joint venture will facilitate Phase 1 of Avalon's new strategic growth plan, which includes:

  1. The purchase of industrial land for a lithium-hydroxide processing facility in Thunder Bay, Ontario .
  2. Funding to advance upstream lithium production operations across Avalon's various projects, led by the Separation Rapids and Lilypad sites, as well as further the development of the promising Snowbank discovery.
  3. Enabling the Avalon-Sibelco joint venture to execute on a dual-market strategy targeting significant growth in both the glass and ceramics market and the EV clean energy market.

"Avalon's vision for an integrated lithium play is exciting and will enable Sibelco to play an important role in this business segment" Ian Sedgman , Sibelco Chief Strategy and Business Development Officer, said. "We see a tremendous opportunity to complement our core business by partnering with a proven lithium asset holder led by an experienced management team."

About SCR-Sibelco NV

Headquartered in Antwerp, Belgium , Sibelco is a global leader in material solutions. Sibelco mines, processes and sells specialty industrial minerals – particularly silica, clays, feldspathics and olivine – and is a leader in glass recycling. Sibelco's solutions serve a diverse range of industries including semi-conductors, solar photovoltaic, glass, ceramics, construction, coatings, polymers and water purification. The Sibelco Group has production facilities in more than 30 countries and a team of more than 5,000 people worldwide.

Avalon Advanced Materials Inc. is a Canadian mineral development company aimed at vertically integrating North America's lithium supply chain. The Company is currently focusing on developing its Separation Rapids Lithium Project near Kenora, Ontario while continuing to advance other projects, including its 100%-owned Lilypad Spodumene-Cesium-Tantalum Project located near Fort Hope, Ontario . Social responsibility and environmental stewardship are corporate cornerstones.

For investor relations and media inquiries, please e-mail the Company at ir@AvalonAM.com , or phone Zeeshan Syed , President, at (647) 300-4706.

Forward-Looking Statements

Statements included in this news release, including any with respect to the Company's future financial or operating performance and other statements that express management's expectations or estimates of future performance, including statements in respect of the completion of the joint venture, the use of proceeds of the Private Placement, prospects and/or development of the Company's projects, other than statements of historical fact, constitute forward-looking information or forward-looking statements within the meaning of applicable securities laws (collectively referred to herein as "forward-looking statements") and such forward-looking statements are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements in this news release include, but are not limited to, statements with respect to: the Company's strategic review of certain of its assets; the development of the Company's material lithium projects, the Company's plans with respect to the exploration and development of its properties, costs of production, expected capital expenditures, operations outlook, expected benefits from the joint venture, the expected receipt of permits; permitting timelines, the future price of commodities; foreign exchange rates and currency fluctuations; requirements for additional capital; the Company's capital allocation; the estimation of mineral reserves and mineral resources; the realization of mineral reserve and mineral resource estimates, and government regulation of mining operations. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans relating to the future. Forward-looking statements are generally identifiable by the use of words such as "may", "will", "should", "continue", "expect", "budget", "forecast", "anticipate", "estimate", "believe", "intend", "plan", "schedule", "guidance", "outlook", "potential", "seek", "targets", "suspended", "strategy", or "project" or the negative of these words or other variations on these words or comparable terminology.

The Company cautions the reader that forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, financial, operational and other risks, uncertainties, contingencies and other factors, including those described below, which could cause actual results, performance or achievements of the Company to be materially different from results, performance or achievements expressed or implied by such forward-looking statements and, as such, undue reliance must not be placed on them. Forward-looking statements are also based on numerous material factors and assumptions, including as described in this news release, including with respect to: the completion of the joint venture, use of proceeds from the Private Placement, the Company's present and future business strategies, operations performance within expected ranges, local and global economic conditions and the economic environment in which the Company will operate in the future, legal and political developments in the jurisdictions in which the Company operates, the price of lithium and other key commodities; projected mineral grades; international exchanges rates; anticipated capital and operating costs; the availability and timing of required governmental and other approvals for the Company's projects.

Risks, uncertainties, contingencies and other factors that could cause actual results, performance or achievements of the Company to be materially different from results, performance or achievements expressed or implied by such forward-looking statements include, without limitation: the Company's business strategies and its ability to execute thereon, including the ongoing strategic review of certain of the Company's assets; political and legal risks; risks associate with the estimation of mineral reserves and mineral resources; the ongoing impacts of the Ukraine war, the availability of labour and contractors; the volatility of the Company's securities; management of certain of the Company's assets by other companies or joint venture partners; the lack of availability of insurance covering all of the risks associated with a mining company's operations; business risks, including pandemics, adverse environmental conditions and hazards; unexpected geological conditions; potential shareholder dilution; increasing competition in the mining sector; changes in the global prices for lithium and certain other commodities; consolidation in the lithium mining industry; legal, litigation, legislative, political or economic risks; government actions taken in response to potential future public health emergencies and pandemics, including new variants of COVID-19, and any worsening thereof; changes in taxes, including mining tax regimes; the failure to obtain in a timely manner from authorities key permits, authorizations or approvals necessary for exploration, development or operations; the availability of capital; the level of liquidity and capital resources; access to capital markets and financing; the Company's level of indebtedness; the Company's ability to satisfy covenants under its outstanding debt instruments; changes in interest rates; the Company's choices in capital allocation; risks related to third-party contractors; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; the fact that reserves and resources, expected metallurgical recoveries, capital and operating costs are estimates which may require revision; failure to meet operational targets; equipment malfunctions; laws and regulations governing the protection of the environment; physical and regulatory risks related to climate change; the potential direct or indirect operational impacts resulting from external factors, including infectious diseases, public health emergencies or pandemics, such as COVID-19, unpredictable weather patterns and challenging weather conditions; attraction and retention of key employees and other qualified personnel; availability and increasing costs associated with mining inputs and labour; the availability of qualified contractors and the ability of contractors to timely complete projects on acceptable terms; the relationship with the communities surrounding the Company's operations and projects; indigenous rights or claims; and the inherent risks involved in the exploration, development and mining industry generally. Please see the Company's current annual information form available on www.sedar.com or for a comprehensive discussion of the risks faced by the Company and which may cause actual results, performance or achievements of the Company to be materially different from results, performance or achievements expressed or implied by forward-looking statements.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as required by applicable law.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/avalon-announces-c63m-strategic-investment-by-sibelco-to-create-a-vertically-integrated-lithium-strategic-partnership-in-ontario-301851903.html

SOURCE Avalon Advanced Materials Inc.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/June2023/15/c1570.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Avalon Overhauls Leadership Team to Compete in Global Lithium Race

Avalon Overhauls Leadership Team to Compete in Global Lithium Race

As part of its strategic transformation to become a leading North American vertically integrated lithium producer, Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) ("Avalon" or the "Company") is pleased to announce the appointment of three veteran executives to its leadership team, a key milestone as the Company executes on an ambitious growth plan.

  • Scott Monteith will assume control as interim Chief Executive Officer
  • Jim Jaques will serve as the Company's inaugural Chief Administrative Officer
  • Jan Holland will join the Board of Directors

"These appointments, and others to come, underscore the arrival of Avalon 2.0," Zeeshan Syed, Avalon President, said. "The commitment of our new leadership team is clear: reorient the Company towards full vertical integration of the lithium production cycle, and help establish Ontario, and Canada more broadly, as a strategic fulcrum in North America's clean energy transition."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Avalon Announces CEO Retirement

Avalon Announces CEO Retirement

Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) ("Avalon" or the "Company"), a lithium-focused mineral development company advancing critical mineral projects to support the North American battery supply chain, today announces the retirement of its long-standing CEO, Don Bubar. Don will continue to serve on Avalon's Board of Directors. Scott Monteith, who was appointed to Avalon's Board of Directors in May 2023, will assume the role of Interim CEO.

Mr. Monteith is an experienced clean tech executive, entrepreneur and business owner with a successful track record of moving inventions from concept to commercial success. Currently, he holds the position of Chair of Monteco Ltd., Cable House Capital Ltd. and Imtex Membranes Corporation. Mr. Monteith has extensive experience in the areas of chemical manufacturing, international businesses, M&A, government affairs and strategic planning.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Avalon Outlines Strategic Direction and Provides Update on 2023 Activities

Avalon Outlines Strategic Direction and Provides Update on 2023 Activities

Avalon Advanced Materials Inc. (TSX: AVL) (OTCQB: AVLNF) ("Avalon" or the "Company"), a lithium-focused mineral development company advancing critical mineral projects to support the North American clean technology supply chain, is pleased to outline Avalon's strategic direction and provide an update on key 2023 activities.

Recent Highlights

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. (CSE: EPR) ("E-Power" or the "Company") announces that it has closed a third and final tranche of the private placement previously announced on September 24, 2024 (the "Private Placement"). The oversubscribed private placement was originally announced for $420,000, but a total of $526,264 was raised in all three tranches.

An aggregate of 3,150,000 units (the " Units") of the Company were issued in the third and final tranche at a price of $0.05 per Unit for gross proceeds of $157,500, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date. (the "Offering").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
SAGA Metals Announces Assay Results from North Wind Iron Ore Project

SAGA Metals Announces Assay Results from North Wind Iron Ore Project

Saga Metals Corp. (" TSXV: SAGA ") (" FSE: 20H" ) (" SAGA " or the " Company "), a North American exploration company focused on discovering critical minerals, is pleased to announce the results from its initial field program at the North Wind High-Purity Iron Ore project in west central Labrador, Canada.

Key Field Program Highlights

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Mawson Finland Limited Presents Downhole EM  Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited Presents Downhole EM Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce results from downhole electro-magnetic "DHEM" geophysical surveys conducted at the Rajapalot gold-cobalt project in Finland

Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Canadian Investment Regulatory Organization Trade Resumption - EDDY

Canadian Investment Regulatory Organization Trade Resumption - EDDY

Trading resumes in:

Company: Edison Lithium Corp.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Corp. (TSXV: EDDY) (OTC Pink: EDDYF) (FSE: VV0) ("Edison" or the "Company") is pleased to announce that, effective November 12, 2024, it has accepted a non-binding purchase offer letter from Mava Gasoil LLC ("Mava"), a corporation based in Houston Texas, for the sale of 100% of the interest in the Company's Argentina subsidiary, Resource Ventures S.A. ("ReVe"), in consideration for USD$3,500,000. One of the LEXI claims owned by ReVe and the royalties on that mining property, and the PINAC mining properties owned by ReVe are excluded from the sale and will be retained by Edison.

ReVe controls the rights to prospective lithium brine claims in the province of Catamarca, Argentina. The claims are principally located in the two geologic basins known as the Antofalla Salar and the Pipanaco Salar. ReVe's assets on closing of the disposition to Mava will include 30 mining concessions covering approximately 104,538 hectares area in Catamarca Province, Argentina. The Company will retain and focus its Argentinian efforts on 8 mining concessions covering approximately 35,000 hectares area in Catamarca Province, Argentina, which are not subject to the sale and amount to approximately 25% of the claims currently held by ReVe.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

/NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×