Atico Mining Reports Results on Brownfield Drilling Campaign to Extend Mine Life at El Roble High Grade Copper/Gold Mine in Colombia, Continues to Expand Tonnage with Intercepts up to 24.7m of 4.19% Cu, 3.11g/t Au, and 5.0m of 4.84% Cu and 12.26 g/t Au

Atico Mining Reports Results on Brownfield Drilling Campaign to Extend Mine Life at El Roble High Grade Copper/Gold Mine in Colombia, Continues to Expand Tonnage with Intercepts up to 24.7m of 4.19% Cu, 3.11g/t Au, and 5.0m of 4.84% Cu and 12.26 g/t Au

Atico Mining Corporation (TSX.V: ATY | OTCQX: ATCMF) ("Atico" or the "Company") is pleased to announce that the brownfield exploration program being carried out in an area of historical mining to expand tonnage and extend mine life at the El Roble mine has continued to returned positive results. In addition, the Company reports the results for five diamond drill core holes targeting the main massive sulfide body Cuerpo Principal (ATD-0182, ATD-0190, ATD-0193, ATD-0194, ATD-0195) and several adjacent lenses called Cuerpos Norte (ADT-0197 through ADT-0200 and ADT-0203 through ADT-0207). Results included 24.7m of 4.19% Cu, 3.11gt Au, and 5.0m of 4.84% Cu and 12.26 gt Au.

"We are pleased to report that our mine vicinity drill campaign continues to successfully intercept new mineralization and extensions of the main historic massive sulphide bodies at the El Roble deposit. These areas were mined by operators previous to Atico obtaining control of the mine on November 22, 2013," said Fernando E. Ganoza, CEO. "These results from the drill program in this vicinity completed in the second half of this year continue to increase confidence in our view that additional high-grade copper and gold mineralization remains both within the historically defined bodies and beyond the previously outlined mineralized shell. These strong assay results are open at depth and along strike. Final results for four more drill holes will be received before year end at which time the Company plans to update the resource estimate."

Exploration Drilling Results Include:

Hole From (m) To (m) Interval (m) Cu (%) Au (g/t)
ATD-0182 29.7 32 2.30 2.27 21.23
ATD-0182 45.8 51.7 5.90 7.82 1.79
ATD-0190 79.8 104.5 24.70 4.19 5.68
ATD-0193 106.7 108.8 2.10 8.47 1.50
ATD-0194 20 23.5 3.50 5.78 9.09
ATD-0194 29.4 32.4 3.00 6.09 0.70
ATD-0198 139.9 145.6 5.70 6.16 2.42
ATD-0198 148.6 152.8 4.20 3.12 0.80
ATD-0199 171.70 180.80 9.10 0.97 5.27
ATD-0199 183.8 188.6 4.80 1.61 3.17
ATD-0200 200.80 205.00 4.20 1.29 2.48
ATD-0204 199.3 204.3 5.00 4.84 12.26
ATD-0205 205.8 212.75 6.95 2.21 1.18

True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 90% and 95% of the drill intercept.

Image 1.

Image 1

Exploration Drilling Program

The goal of the current surface and underground drilling program at the El Roble mine is to define zones of mineralization within the extent of main historic massive sulphide body that were not exploited by previous operators and also to expand the historically identified resource. During the first quarter of 2023, the Company began a drill program to test the main mineralized body and the immediately adjacent area. A total of 3,765 meters of drilling are planned for 2023, of which final results for thirty four drill holes have been received.

El Roble Mine

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

El Roble has Proven and Probable reserves of 1.00 million tonnes grading 3.02% copper and 1.76 g/t gold, at a cut-off grade of 1.3% copper equivalent with an effective date of September 30, 2020. Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit.

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

Qualified Person

Garth Graves, P. Geo.

Garth Graves, P. Geo., consultant geologist for Atico Mining Corporation and a qualified person in accordance with National Instrument 43-101 has reviewed and approved the technical information contained in this news release.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit www.aticomining.com .

ON BEHALF OF THE BOARD

Fernando E. Ganoza
CEO
Atico Mining Corporation

Trading symbols: TSX.V: ATY | OTCQX: ATCMF

Investor Relations
Igor Dutina
Tel: +1.604.633.9022

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the ‘‘U.S. Securities Act''), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.
Cautionary Note Regarding Forward Looking Statements

This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-looking statements. Forward- looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company's mineral projects; uncertainty of meeting anticipated program milestones for the Company's mineral projects; and other risks and uncertainties disclosed under the heading "Risk Factors" in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/6e7227e8-9d72-408b-b6e1-6a563cd3617a


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

ATY:CA
The Conversation (0)
Atico Mining

Atico Mining

Developing Highly Prospective Gold-Copper VMS Assets in Latin America

Developing Highly Prospective Gold-Copper VMS Assets in Latin America Keep Reading...
Atico Mining Announces Completion NI 43-101 Feasibility Study for the La Plata Project in Ecuador

Atico Mining Announces Completion NI 43-101 Feasibility Study for the La Plata Project in Ecuador

Atico Mining Corporation (the "Company" or "Atico") (TSX.V: ATY | OTC: ATCMF) is pleased to announce the results of the Definitive Feasibility Study (the "DFS" or the "Study") for its 100% owned La Plata Project ("La Plata") located in Ecuador. The DFS was prepared in accordance with the... Keep Reading...
Atico Reports Consolidated Financial Results for First Quarter of 2024

Atico Reports Consolidated Financial Results for First Quarter of 2024

Atico Mining Corporation (the "Company" or "Atico") (TSX.V: ATY | OTC: ATCMF) today announced its financial results for the three months ended March 31, 2024, posting income from mining operations of $2.8 million and a net loss of $0.4 million. Production for the period at Atico's El Roble mine... Keep Reading...
Atico Produces 3.34 Million Pounds of Cu and 2,156 Ounces of Au in First Quarter 2024

Atico Produces 3.34 Million Pounds of Cu and 2,156 Ounces of Au in First Quarter 2024

Atico Mining Corporation (the "Company" or "Atico") (TSX.V: ATY | OTCQX: ATCMF) announces its operating results for the three months ended March 31, 2024 from its El Roble mine. Production for the quarter totaled 3.34 million pounds of copper and 2,156 ounces of gold in concentrates, an increase... Keep Reading...
Atico Reports Consolidated Financial Results for 2023

Atico Reports Consolidated Financial Results for 2023

(All amounts expressed in US dollars, unless otherwise stated) Atico Mining Corporation (the "Company" or "Atico") (TSX.V: ATY | OTC: ATCMF) today announced its financial results for the year ended December 31, 2023, posting income from mining operations of $7.4 million and a net loss of $5.8... Keep Reading...
Atico Reports Multiple High Grade Intercepts up to 20.70m of 5.76% Cu, 4.46 g/t Au and 11.50m of 8.16% Cu, 8.09 g/t Au and Continues to Extend the Ore Body at El Roble Mine in Colombia

Atico Reports Multiple High Grade Intercepts up to 20.70m of 5.76% Cu, 4.46 g/t Au and 11.50m of 8.16% Cu, 8.09 g/t Au and Continues to Extend the Ore Body at El Roble Mine in Colombia

Atico Mining Corporation (TSX.V: ATY | OTCQX: ATCMF) ("Atico" or the "Company") is pleased to announce positive results for the latest 49 drill holes being carried out in an area of historical mining to expand tonnage at the El Roble mine. In addition, the Company reports the results for sixteen... Keep Reading...
Transformational Appointment to Drive Gold & Copper Growth

Transformational Appointment to Drive Gold & Copper Growth

Adavale Resources (ADD:AU) has announced Transformational Appointment to Drive Gold & Copper GrowthDownload the PDF here. Keep Reading...
Quarterly Activities/Appendix 5B Cash Flow Report

Quarterly Activities/Appendix 5B Cash Flow Report

Blackstone Minerals (BSX:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
Sun Summit Minerals to Present at the 51st Annual New Orleans Investment Conference, November 2-5, 2025

Sun Summit Minerals to Present at the 51st Annual New Orleans Investment Conference, November 2-5, 2025

Sun Summit Minerals Corp. (TSXV: SMN,OTC:SMREF) (OTCQB: SMREF) ("Sun Summit" or the "Company") is pleased to announce that it will be attending and presenting at the 51st Annual New Orleans Investment Conference, taking place November 2–5, 2025 at the Hilton New Orleans Riverside.Niel Marotta,... Keep Reading...
Sinomine Becomes a Substantial Shareholder in Cobre

Sinomine Becomes a Substantial Shareholder in Cobre

Cobre Limited (CBE:AU) has announced Sinomine Becomes a Substantial Shareholder in CobreDownload the PDF here. Keep Reading...
Canada One Provides Exploration Review of Combination Creek Zone, Copper Dome Project

Canada One Provides Exploration Review of Combination Creek Zone, Copper Dome Project

Canada One Mining Corp. (TSXV: CONE) (OTC Pink: COMCF) (FSE: AU31) ("Canada One" or the "Company") is pleased to provide an exploration review of the Combination Creek Zone at its 100% owned Copper Dome Project, ("Copper Dome", "Project" or "Property"), Princeton B.C.COMBINATION CREEK ZONE... Keep Reading...
Sun Summit Announces the Completion of the Inaugural 2025 Exploration Program at the Theory Project, Toodoggone Mining District

Sun Summit Announces the Completion of the Inaugural 2025 Exploration Program at the Theory Project, Toodoggone Mining District

Sun Summit Minerals Corp. (TSXV: SMN,OTC:SMREF) (OTCQB: SMREF) ("Sun Summit" or the "Company") is pleased to announce the 2025 exploration program has been completed at the Theory Project, Toodoggone Mining District, north-central British Columbia (the "Theory Project").The Theory Project... Keep Reading...

Latest Press Releases

Related News