Antler Gold Commences Gold Exploration Program at Paresis Gold Project in Namibia

Antler Gold Commences Gold Exploration Program at Paresis Gold Project in Namibia

 Antler Gold Inc. (TSXV: ANTL) ("Antler" or "Company") is pleased to announce the commencement of exploration work at the Paresis Gold Project in north central Namibia.

Highlights

  • The Paresis Project area covers approximately 21,000 ha within the highly prospective "gold corridor" of Namibia that hosts the Otjikoto Gold Mine (B2Gold) and the Ondundu and Eureka Gold Projects (Osino Resources).
  • A conceptual project in an area with a complex deformation and magmatic history provides structural complexity and lithological variations, presenting potential for both intrusion-related and orogenic-style gold deposits.
  • Prioritized Target Areas: Review of historical data (geochemical and airborne geophysical surveys), regional government data, and satellite imagery has allowed for the identification and prioritization of lithological and structural target areas.

"I am excited to share an update on our exploration efforts at the Paresis Gold Project, a key initiative in Namibia's renowned 'gold corridor'. In line with Antler's core strategy, the Company intends on finding a suitable partner to progress the project through an earn-in or similar agreement, aimed at maximizing future discovery benefits for our shareholders. I am grateful for our team's dedication and I look forward to sharing additional progress in the near future," said Christopher Drysdale, CEO of Antler Gold Inc.

Exploration Strategy

The exploration program will roll out in phases, starting with geological mapping and grab rock chip sampling as phase one, followed by a geochemical sampling program in the second phase, depending on initial rock chip assay results. Prospective lithological units of the Okonguarri and Karibib Formations (both Swakop Group) underlie the license area, however, the majority of the area is covered by soil and calcrete.

The Okonguarri Formation is the hosting stratigraphic unit at the Otjikoto Gold Mine (B2Gold) and at the Eureka Gold Project (Osino Resources), while the Karibib Formation is host to gold mineralization at various gold occurrences (Onguati, Goldkuppe, Erindi) in the Central Zone of the Damara Belt, including the Navachab Gold Mine (QKR) (along with the Arandis Formation) (Figures 1, 2 and 3).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/196488_b3e524a804a01a21_001.jpg


Figure 1: Antler's Paresis Gold Project license EPL 8711 relative to in-country peers B2Gold Namibia (pink), Osino Resources Namibia (blue), and WIA Gold (green).

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/196488_b3e524a804a01a21_001full.jpg

The Paresis Gold Project

The Paresis Gold Project is currently made up of Exclusive Prospecting License ("EPL") 8711 of approx. 21,000 hectares and another EPL application situated between the towns of Otjiwarongo and Outjo, ~290 km from the capital Windhoek, in north central Namibia, within the Northern Zone (NZ) of the Damara Orogenic Belt. The NZ is host to numerous mineral deposits, including the Otjikoto Gold Mine (B2Gold), the Ondundu and Eureka Gold Projects (Osino Resources), the Okanjande Graphite deposit (Northern Graphite) and the Okorusu Fluospar Mine to name a few, evidencing this geological environment's fertile nature (Figures 1 and 2).

Outcrop on the license area is moderately to well-exposed, comprising rocks from the pre-Damara Basement, Nosib Group and Swakop Group (lower Damara Supergroup) (Figure 3, Table 1). The pre-Damara Basement has been tightly folded into km-scale upright folds striking roughly east-west. The Damara sequence has been intruded by younger Karoo-aged dolerite dykes and the Jurassic to Cretaceous-aged Paresis Igneous Complex (PIC).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/196488_b3e524a804a01a21_002.jpg


Figure 2: Overview map of the Paresis Gold Project license EPL 8711 relative to other mineral deposits in north central Namibia. Relevant geological units (250K Geology Source: Geological Survey of Namibia) overlain on ESRI Earth natural colour satellite imagery.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/196488_b3e524a804a01a21_002full.jpg

Table 1: NZ stratigraphy of the Paresis tenement.

SequenceGroupSubgroupFormationLithology
Paresis Igneous Complex (PIC)bimodal volcanics/extrusives, acidic and alkaline intrusives
Karoo Supergroupdolerite dykes
Damara SupergroupSwakopNavachabKaribibmarble
limestone, schist, quartzite
UsakosOkonguarri (Arandis equivalent)schist, greywacke, limestone
Chuosdiamictite, iron-formation
Nosib
Etusis or equivalentarkosic quartzite, meta-arkose, conglomerate, limestone, shale, gneiss
Pre-Damara Basement - Huab Metamorphic Complexgneiss, minor amphibolite

 

The Okonguarri Formation comprises a rhythmically interbedded sequence of limestone and meta-pelitic sediments (greywackes, schists, shales). This interbedded sequence of compositionally varying rocks introduces rheological contrasts (the way different rocks react to deformation) between lithologies or along lithological contacts which present favourable sites for potential mineralization (Figures 2 and 3).

The post-tectonic intrusion of the PIC rupturing through the Damara Supergroup that has already undergone multiple deformation and metamorphic events provides lithological variation and structural complexity, defining characteristics of gold deposits seen in Namibia. The PIC appears to be situated at a zone of structural discontinuity indicated by the different regional fabric orientations of the Damaran stratigraphic units surrounding the complex as postulated by Siedner (1965)[i].

For more background information on the project, refer to News Release dated September 14, 2023.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/196488_pr_paresis_projectoverviewmap_insert_20240130_550.jpg

Figure 3: Close-up of EPL 8711 with geological units over satellite imagery. Areas with no colour overlying the satellite imagery are covered by soil and/or calcrete. Coordinate System: WGS 84 UTM Zone 33 South; Units: Meters

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/196488_pr_paresis_projectoverviewmap_insert_20240130.jpg

About Antler Gold Inc.

Antler Gold Inc. is a Canadian listed mineral exploration company focused on organic royalty creation in Africa's Top-Ranked Jurisdictions. The Company continues to assess new regional opportunities with the aim of building a risk diversified business model that allows the Company to generate short and long-term income whilst providing stakeholders with exposure to potential multiple returns that are generated from the discovery process.

Qualified Person

The technical and scientific information in this presentation has been reviewed and approved by Oliver Tors, B.Sc (Hons)., Exploration Manager of the Company, who is a registered Professional Natural Scientist (Pr.Sci.Nat. No. 120660) with the South African Council for Natural Scientific Professions (SACNASP) and a Qualified Person as defined by NI 43-101. Mr. Tors is an employee of Antler Gold Inc. and is not independent of the Company under NI 43-101.

Cautionary Statements

This press release may contain forward-looking information. This information is based on current expectations and assumptions (including assumptions relating to general economic and market conditions) that are subject to significant risks and uncertainties that are difficult to predict. Actual results may differ materially from results suggested in any forward-looking information. Antler Gold does not assume any obligation to update forward-looking information in this release, or to update the reasons why actual results could differ from those reflected in the forward-looking information unless and until required by securities laws applicable to Antler Gold. Additional information identifying risks and uncertainties is contained in the filings made by Antler Gold with Canadian securities regulators, which filings are available at www.sedarplus.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, please contact Christopher Drysdale, CEO of Antler Gold Inc., at +264 81 220 2439


[i]

Siedner, G., 1965. Structure and Evolution of the Paresis Igneous Complex, South West Africa. Transactions of the Geological Society of South Africa, pp. 177-206.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/196488

News Provided by Newsfile via QuoteMedia

ANTL:CC
The Conversation (0)
Antler Gold Finalizes the Erongo Gold Project Agreement

Antler Gold Finalizes the Erongo Gold Project Agreement

Antler Gold Inc. (TSXV: ANTL) ("Antler" or the "Company") is pleased to announce that it has entered the definitive agreement (the "Definitive Agreement") with Fortress Asset Management LLC ("Fortress") for the Erongo Central Gold Project (the "Project") in Namibia.

The previously announced binding letter of intent has now been superseded by the Definitive Agreement, under which Fortress can acquire from Antler Gold Namibia (Proprietary) Limited up to a 100% interest in the Project (the "Transaction"). Under the terms of the Definitive Agreement, Fortress will provide total consideration of US$5.5 million and an additional US$6.0 million for exploration expenditures on the Project over the term of the Definitive Agreement. Additionally, Antler will retain a 2% net smelter return royalty on the entirety of the Project, with no buyback provisions. Antler will act as the operator for the Project during the term.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Antler Gold Provides Update on the Erongo Gold Project Option Agreement

Antler Gold Provides Update on the Erongo Gold Project Option Agreement

Antler Gold Inc. (TSXV: ANTL) ("Antler" or the "Company") is pleased to provide an update on the expected execution date of the previously announced option agreement with Fortress Asset Management LLC ("Fortress") regarding the Erongo Central Gold Project (the "Project") in Namibia.

As announced on May 23 and 24, 2024, the Company's subsidiary, Antler Gold Namibia (Proprietary) Limited entered into a binding letter of intent dated May 23, 2024 with Fortress (the "LOI"), which allows Fortress to acquire up to a 100% interest in the Project for total consideration of US$5.5 million and incurring US$6.0 million in exploration expenditures, with Antler retaining a 2% net smelter return royalty and acting as the operator for the Project during the three option periods (the "Transaction").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Antler Gold Announces Option Agreement for the Erongo Gold Project in Namibia Is Subject to TSX-V and Shareholder Approval

Antler Gold Announces Option Agreement for the Erongo Gold Project in Namibia Is Subject to TSX-V and Shareholder Approval

Further to Antler Gold Inc.'s (TSXV: ANTL) ("Antler" or the "Company") News Release dated May 23, 2024 (the "Erongo Gold News Release"), the transaction contemplated in the Letter of Intent between the Company and Fortress Asset Management LLC, as described in the Erongo Gold News Release, is subject to TSX-V and shareholder approval.

For further details please see News Releases dated April 22, 2020, May 14, 2020, May 27, 2020, June 23, 2020, May 3, 2021, August 4, 2021 and the Erongo Gold News Release.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Antler Gold Announces Option Agreement for the Erongo Gold Project in Namibia

Antler Gold Announces Option Agreement for the Erongo Gold Project in Namibia

Antler Gold Inc. (TSXV: ANTL) ("Antler" or the "Company") is pleased to announce that its subsidiary, Antler Gold Namibia (Pty) Ltd ("Antler Nam"), has signed a binding Letter Of Intent ("LOI") with Fortress Asset Management LLC ("Fortress" or the "Optionee"), an arms-length private company. Pursuant to the Agreement, the Optionee will be granted the right to acquire up to 100% interest in the Company's Erongo Central Gold Project (the "Project") over a three-year period for total consideration of US$ 5.5 million and incurring US$ 6.0 million of exploration expenditures and issuing Antler a 2% net smelter return ("NSR") across the entire Project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Antler Gold Further Consolidates Land Holdings in the Namibian 'Gold Corridor'

Antler Gold Further Consolidates Land Holdings in the Namibian 'Gold Corridor'

Antler Gold Inc. (TSXV: ANTL) ("Antler" or "Company") is pleased to announce the expansion of its land holding in Namibia. Two additional exploration licenses have been awarded to Antler by the Ministry of Mines and Energy of Namibia, pending issuance of environmental clearance, as well as the renewal of Exclusive Prospecting Licenses EPL-8010 and EPL-6408 (Erongo Central Gold Project).

Highlights

  • Two newly-awarded licenses, EPL-9134 and EPL-9135, expand the Paresis Gold Project land package to ~812 km2 (81,189 ha) within the highly prospective 'gold corridor' of Namibia (Figure 1 and Figure 2).
  • A gold project with high potential to host gold deposits similar to the Otjikoto Gold Mine (B2Gold), the Ondundu Gold deposit, as well as recent discoveries such as the Eureka Gold Project (Osino Resources) (Figure 1).
  • Additional potential on EPL-9134 for a Carlin-style gold deposit, referred to as the Victory Gold Target, an area with a large regional-scale thrust fault and numerous base metal (copper, lead and zinc) occurrences indicating a fertile mineral system (Figure 4).
  • The Erongo Gold Project, EPL-8010 and EPL-6408, bordering the Twin Hills Gold Project (Osino Resources-Yintai Gold Corp.[i]), has been granted renewal for another two years.

"We are pleased to announce the granting of new licenses, further strengthening Antler's presence in the emerging Damara Gold Province, referred to as the gold corridor of Namibia. With access to roughly 2,000 km2 in the Central and Northern Zones of the Damara Belt, Antler is strategically positioned to explore the significant potential of this region. Additionally, the renewal of EPL-8010 and EPL-6408 solidifies our Erongo Gold Project, providing contiguous land adjacent to the Twin Hills Gold Project recently acquired by Yintai Gold Corp. for C$368 million in an all-cash deali. Our commitment remains in maximizing shareholder value through strategic partnerships and ongoing exploration efforts," said Christopher Drysdale, CEO of Antler Gold Inc.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_001.jpg

Figure 1: Antler's land holding relative to in-country peers B2Gold Namibia (pink), Osino Resources Namibia (blue), and WIA Gold (green). Background image: ESRI Earth natural colour satellite imagery.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_001full.jpg

Paresis Gold Project

The Paresis Gold Project is now made up of EPL-8711 (approx. 21,000 ha) and EPL-9135 (approx. 23,700 ha) situated between the towns of Otjiwarongo and Outjo, and EPL-9134 (approx. 36,400 ha) situated ~7km west of the town Outjo (Figure 2 and Figure 3). The project area is ~300 km from the capital Windhoek, in north central Namibia. Refer to News Releases dated February 5, 2024, and September 14, 2023, for more background on the Paresis Gold Project.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_002.jpg

Figure 2: Paresis Gold Project area comprising EPL-8711, EPL-9135 and EPL-9134 (Victory Gold Target) relative to in-country peers B2Gold Namibia (pink), Osino Resources Namibia (blue), and WIA Gold (green).

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_003.jpg

Figure 3: Overview map of the Paresis Gold Project license EPL-8711 and new EPL-9135. Relevant geological units (250K Geology Source: Geological Survey of Namibia) overlain on ESRI Earth natural colour satellite imagery.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_003full.jpg

Victory Gold Target

The Victory Gold Target is located within the new EPL-9134 (approx. 33,472 ha), situated 7 km west of the town Outjo, in north central Namibia, within the Northern Zone (NZ) and Northern Margin Zone (NMZ) of the Damara Orogenic Belt (Figure 2 and Figure 4). With this conceptual project, Antler is targeting Carlin-type/sediment-hosted disseminated gold in an area that has strong mineralization potential - regional-scale thrust, faults, layered and folded permeable carbonate host rocks, and existing base metal occurrences indicating hydrothermal activity.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_004.jpg

Figure 4: Overview map of the new Victory Gold Target on license EPL-9134. Relevant geological units (250K Geology Source: Geological Survey of Namibia) overlain on ESRI Earth natural colour satellite imagery.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_004full.jpg

The EPL includes two of the tectonostratigraphic zones of the Damara Orogen, namely the NZ, and the NMZ, a narrow zone between the southern edge of the Northern Platform (NP) and the northern edge of the NZ (Miller, 2008)[ii] (Figure 5). The NZ comprises carbonates, schists and siliciclastics of the Swakop Group, whereas the NMZ comprises deep-water carbonates of the coeval Otavi Group, and siliciclastic rocks of the Mulden Group (Table 1), the highest stratigraphic unit of the Damara Supergroup. Two glacial horizons, i.e. the Chuos and Ghaub diamictites, subdivide the Swakop and Otavi Groups into subgroups (Table 1), providing distinct lithological and geochronological markers, but outcrops of the Chuos within the EPL are poor.

The sequences have been multiply folded and faulted (local and regional-scale) during the Pan-African Damara Orogeny during which the NZ has been thrust northwards onto Otavi, Mulden (NMZ) and pre-Damara rocks along the NE-trending, km-scale, deep-seated regional Khorixas-Gaseneirob Thrust (KGT), marking the edge of the NZ (Miller, 2008).

This deformation history provides ample structural pathways, the right plumbing for superheated gold-bearing hydrothermal fluid channelization up through the crust and into the highly-permeable carbonate host rocks where it is potentially deposited as microscopic gold within pyrite. Gold-bearing hydrothermal fluids also carry arsenic, mercury, antimony and thallium that are important pathfinder elements that will guide exploration.

Both the NZ and NMZ are host to numerous mineral deposits, including in the NZ the Otjikoto Gold Mine (B2Gold), the Ondundu and Eureka Gold Projects (Osino Resources) (Figure 1), the Okanjande Graphite deposit (Northern Graphite), the Okorusu Fluospar Mine, and in the NMZ, the Kombat and Berg Aukas polymetallic deposits, evidencing this geological environment's fertile nature.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_005.jpg

Figure 5: Tectonostratigraphic zones of the Damara Orogen (Miller, 2008).

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5124/202401_99169bb444ff5808_005full.jpg

Table 1: Stratigraphy of the Victory Gold Project tenement.

SequenceGroupSubgroupFormationLithology
NamibBertramProto-Ugab terrace gravel
Karoo IntrusivesWolffsgrund Gabbro
Damara
Supergroup
Mulden
Navachab
Sandstone, greywacke, conglomerate
Swakop (NZ)KuisebSchist
KaribibMarble, limestone, schist, quartzite
Chuosdiamictite, iron-formation
UgabOrusewaSchist, phyllite
OkotjizeDolostone, schist, skarn
Otavi (NMZ)TsumebHuttenbergDolomite
ElandshoekMassive and laminated dolomite
GhaubDiamictite
AbenabAurosDolomite; minor shale and limestone
GaussMassive dolomicrite
Berg AukasDolostone
ChuosDiamictite; interbedded quartzite, schist and marble
Pre-Damara Basement - Huab Metamorphic ComplexQuartz-mica schist, quartzite, quartz-feldspar gneiss, migmatitic

 

About Antler Gold Inc.

Antler Gold Inc. (TSXV: ANTL) is a Canadian listed mineral exploration company focused on organic royalty creation in Africa's Top-Ranked Jurisdictions. The Company continues to assess new regional opportunities with the aim of building a risk diversified business model, that allows the Company to generate short and long-term income whilst providing stakeholders with exposure to potential multiple returns that are generated from the discovery process.

Qualified Person

The technical and scientific information in this presentation has been reviewed and approved by Oliver Tors, B.Sc (Hons)., Exploration Manager of the Company, who is a registered Professional Natural Scientist (Pr.Sci.Nat. No. 120660) with the South African Council for Natural Scientific Professions (SACNASP) and a Qualified Person as defined by NI 43-101. Mr. Tors is an employee of Antler Gold Inc. and is not independent of the Company under NI 43-101.

Cautionary Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions, and expectations. They are not guarantees of future performance. Words such as "expects", "aims", "anticipates", "targets", "goals", "projects", "intends", "plans", "believes", "seeks", "estimates", "continues", "may", variations of such words, and similar expressions and references to future periods, are intended to identify such forward-looking statements. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Futhermore, this information is based on current expectations and assumptions (including assumptions relating to general economic and market conditions) that are subject to significant risks and uncertainties that are difficult to predict. Actual results may differ materially from results suggested in any forward-looking information. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, Antler Gold does not assume any obligation to update forward-looking information in this release, or to update the reasons why actual results could differ from those reflected in the forward-looking information unless and until required by securities laws applicable to Antler Gold. Additional information identifying risks and uncertainties is contained in the filings made by Antler Gold with Canadian securities regulators, which filings are available at www.sedarplus.ca.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, please contact Christopher Drysdale, CEO of Antler Gold Inc., at +264 81 220 2439

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Grande Portage Announces Non-Brokered Private Placement Pursuant to the Listed Issuer Financing Exemption

Grande Portage Announces Non-Brokered Private Placement Pursuant to the Listed Issuer Financing Exemption

Not for distribution to United States newswire services or for dissemination in the United States.

Grande Portage Resources Ltd. (TSXV:GPG)(OTCQB:GPTRF)(FSE:GPB) ("Grande Portage" or the "Company") is pleased to announce a non-brokered private placement of up to 10,000,000 units (each, a "Unit") at a price of C$0.30 per Unit for aggregate gross proceeds of up to C$3,000,000 (the "Offering"). The Offering is being carried out pursuant to Part 5A of National Instrument 45-106 - Prospectus Exemptions (the "LIFE Exemption") to purchasers resident in Canada, and in jurisdictions outside of Canada in compliance with the applicable securities laws of those jurisdictions. The Company has an offering document (the "Offering Document") related to the Offering that can be accessed under Grande Portage's profile at www.sedarplus.ca and on the Company's website at https:grandeportage.com. Prospective investors should read the Offering Document before making an investment decision

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Element79 Gold Corp to Update Investors on the Emerging Growth Conference on October 31, 2024

Element79 Gold Corp to Update Investors on the Emerging Growth Conference on October 31, 2024

(TheNewswire)

Element79 Gold Corp.

Element79 Gold Corp invites individual and institutional investors as well as advisors and analysts, to attend its real-time, interactive presentation on the Emerging Growth Conference.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Presenting on the Emerging Growth Conference 76 Day 1 on October 30 Register Now

Presenting on the Emerging Growth Conference 76 Day 1 on October 30 Register Now

EmergingGrowth.com a leading independent small cap media portal announces the schedule of the 76 th Emerging Growth Conference on October 30 & 31, 2024.

The Emerging Growth Conference identifies companies in a wide range of growth sectors, with strong management teams, innovative products & services, focused strategy, execution, and the overall potential for long-term growth.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Pinnacle Signs Letter of Intent for Option to Acquire High-Grade Gold-Silver Project in Sierra Madre Trend of Mexico.

Pinnacle Signs Letter of Intent for Option to Acquire High-Grade Gold-Silver Project in Sierra Madre Trend of Mexico.

(TheNewswire)

Pinnacle Silver and Gold Corp.

Highlights:

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Pinnacle Signs Letter of Intent for Option to Acquire High-Grade Gold-Silver Project in Sierra Madre Trend of Mexico

Pinnacle Signs Letter of Intent for Option to Acquire High-Grade Gold-Silver Project in Sierra Madre Trend of Mexico

(TheNewswire)

Pinnacle Silver and Gold Corp.

Highlights:

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Lode Gold Submits Application for Exchange Approval to Form Spin Co, Gold Orogen - a Yukon  & New Brunswick Exploration Company

Lode Gold Submits Application for Exchange Approval to Form Spin Co, Gold Orogen - a Yukon & New Brunswick Exploration Company

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: SBMIF) ("Lode Gold " or the "Company") is pleased to announce that it has submitted application to the TSX Venture exchange for approval of the Spin-out of Gold Orogen, as described on its August 27, 2024 and October 22, 2024 news release. The details regarding the Lode Gold shareholder's meeting that is expected to be held in early December 2024 will follow with an information circular to be filed by early November 2024. Lode Gold will seek the approval from shareholders on the Plan of Arrangement, and upon Exchange approval, set the Record Date for distribution of the shares of the new company to shareholders of Lode Gold.

The Company also announces that pursuant to a director resolution passed on July 26, 2024, and a special resolution passed by shareholders of the Company on July 6, 2023, the Company has consolidated its capital on a ten for one (10:1) basis. Post-consolidation, the Company's capitalization composes of unlimited common shares with no par value, of which 38,032,970 shares are issued and outstanding.

Effective at the opening, Tuesday October 29, 2024, the common shares of Lode Gold Resources Inc. will commence trading on the TSX Venture Exchange on a consolidated basis. The Company is classified as a mining company.

Name of Company: No change.
Escrow shares: None
Transfer agent: Odyssey Trust Company.
Trading symbol: LOD (unchanged)
CUSIP number: 540196 20 1 (new)

"The Company has been contemplating share consolidation for sometime. With significant milestones achieved in the last 12 months and more upcoming catalysts, it makes strategic sense now to execute the consolidation. A key catalyst upcoming in a few months is share distribution of Gold Orogen to shareholders of Lode Gold, a significant step in unlocking value.

With a tight capital structure we can more effectively attract new investors. Of note, four shareholders hold over 60% shares of 38 million post-consolidated shares." states Wendy T. Chan, CEO and Director of Lode Gold.

About Lode Gold

Lode Gold (TSXV: LOD) is an exploration and development company with projects in highly prospective and safe mining jurisdictions in Canada and the United States.

Its Golden Culvert and WIN Projects in Yukon, covering 99.5 km2 across a 27-km strike length, are situated in a district-scale, high-grade-gold-mineralized trend within the southern portion of the Tombstone Gold Belt. Gold deposits and occurrences within the Belt include Fort Knox, Pogo, Brewery Creek and Dublin Gulch, and Snowline Gold. A NI 43-101 technical report entitled "Technical Report on the WIN-Golden Culvert Property for Lode Gold" with an effective date of May 15, 2024, summarizing the work to date on these properties is available on the Company's profile on SEDAR+ (www.sedarplus.ca) and on the Company's website (www.lode-gold.com).

In New Brunswick, Lode Gold has created one of the largest land packages with a 42km strike within 420km2. Its McIntyre Brook Project, New Brunswick, covering 111 km2 and a 17-km strike length in the emerging Appalachian/Iapetus Gold Belt, is surrounded by Puma Exploration's Williams Brook Project (5.55 g/t Au over 50m)1 and is hosted by orogenic rocks of similar age and structure as New Found Gold's Queensway Project. The Fancamp's Riley Brook is a 309 km2 package covering a 25 km strike of Wapske formation with its numerous felsic units. Previous exploration efforts have focused on just VMS-style mineralization hosted in the felsic intrusions, and mostly focused on the base metals - the Company is the first to focus on and assay for gold. This transaction will close upon Exchange's acceptance.

The Company is also advancing its Fremont Gold development project in the historic Mother Lode Gold Belt of California where 50,000,000 oz of gold has been produced. Fremont, located 500km north of Equinox Gold's Castle Mountain and Mesquite mines, has a Preliminary Economic Assessment(" PEA") with an after-tax NPV (5%) of USD $217M, a 21% IRR, 11-year LOM, averaging 118,000 Oz per annum at USD $1,750 gold. A sensitivity to the March 31, 2023, PEA at USD $2,000/oz gold gives an after-tax NPV (5%) of USD $370M and a 31% IRR over an 11-year LOM. The project hosts an NI 43-101 resource of 1.16 MOz at 1.90 g/t Au within 19.0 MT Indicated and 2.02 MOz at 2.22 g/t Au within 28.3 MT Inferred. The MRE evaluates only 1.4 km of the 4 km strike length of the Fremont property which features five gold-mineralized zones. Significantly, three step-out holes at depth hit the mineralized structure, typical of orogenic deposits that often occur at depth. Fremont is located on 3,351 acres of 100% owned private land in Mariposa, the original Gold Rush County, and is 1.5 hours from Fresno, California. The property has year-round road access and is close to airports and rail.

Please refer to the Fremont Gold project NI 43-101 PEA technical report dated March 31, 2023, which is available on the Company's profile on SEDAR+ (www.sedarplus.ca) and on the Company's website (www.lode-gold.com). The PEA technical report has been reviewed and approved by independent "Qualified Persons" Eugene Puritch, P.Eng., FEC, CET, and Andrew Bradfield, P.Eng. both of P&E, and Travis Manning, P.E. of KCA.

QUALIFIED PERSON STATEMENT

The scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, Director, BSc (Hons) (Economic Geology - UCT), FAusIMM, and who is a "qualified person" as defined by NI-43-101.

ON BEHALF OF THE COMPANY

Wendy T. Chan, CEO & Director

Information Contact

Winfield Ding
CFO
info@lode-gold.com
+1-416-320-4388

Kevin Shum
Investor Relations
kevin@lode-gold.com
+1 (647) 725-3888 ext. 702

Cautionary Note Related to this News Release and Figures

This news release contains information about adjacent properties on which the Company has no right to explore or mine. Readers are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company's properties.

Cautionary Statement Regarding Forward-Looking Information

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

All statements, trend analysis and other information contained in this press release about anticipated future events or results constitute forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions. All statements, other than statements of historical fact, included herein, including, without limitation, statements regarding the anticipated use of proceeds from the Special Warrant financing, additional proceeds from the exercise of the warrants underlying the Special Warrants, and the receipt of final acceptance from the TSX Venture Exchange with respect to the transactions, are forward-looking statements. Although Lode Gold believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements since Lode Gold can give no assurance that such expectations will prove to be correct. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements, including the risks, uncertainties and other factors identified in Lode Gold's periodic filings with Canadian securities regulators, and assumptions made with regard to: the ability of Lode Gold to obtain final acceptance from the TSX Venture Exchange with respect to the transactions; that the Company will be able to use the proceeds of the Special Warrant financing as anticipated; and the ability of the Company to continue with its stated business objectives and its ability to obtain required approvals and raise additional capital to proceed. Forward-looking statements are subject to business and economic risks and uncertainties and other factors that could cause actual results of operations to differ materially from those contained in the forward-looking statements. Important factors that could cause actual results to differ materially from expectations include risks associated with the business of Lode Gold and Fancamp; risks related to the Company's ability to obtain final acceptance from the TSX Venture Exchange with respect to the transactions; the risk that the use of proceeds from the Special Warrant financing may differ from management's expectations; and other risk factors as detailed from time to time and additional risks identified in the Companies' filings with Canadian securities regulators on SEDAR+ in Canada (available at www.sedarplus.ca). Forward-looking statements are based on estimates and opinions of management at the date the statements are made. The Company does not undertake any obligation to update forward-looking statements except as required by applicable securities laws. Investors should not place undue reliance on forward-looking statements.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×