Altura Energy Commences Pipeline Replacement Program at Saddle Horse Draw Producing Helium Field

New pipeline to set the stage for scalable development across a prospective land package

Altura Energy Corp. (TSXV: ALTU,OTC:ALTUF) (FSE: Y020) ("Altura" or the "Company") is pleased to announce the commencement of the previously announced (see March 19, 2026 news release) pipeline replacement and infrastructure upgrade program at the Saddle Horse Draw target within the Pinta South Helium Field (PSHF) in the Holbrook Basin of Arizona.

After pipeline completion, it is expected the recompleted wells from last year, which flowed 123 mcfd and 118 mcfd respectively, will be returned to production, workovers will begin on the remaining four wells, and Supervisory Control and Data Acquisition (SCADA) systems will be added to real time monitoring across the pipeline infrastructure.

"Advancing this pipeline replacement and infrastructure upgrade program marks an important step in strengthening the long-term reliability and efficiency of our operations at Saddle Horse Draw," said Altura CEO Ashley Lastinger. "As global helium markets face increasing supply uncertainty, we are focused on positioning Altura as a dependable North American source by investing in critical infrastructure that supports sustainable production, enhanced monitoring, and operational resilience."

The infrastructure upgrade program is expected to be completed in tandem with additional well work. This includes the installation of a new pipeline connecting the wells to the processing plant, along with additional operational enhancements designed to improve field monitoring, reliability, and ongoing maintenance.

Helium Market Context

Recent geopolitical developments have underscored the vulnerability of global helium supply chains. Qatar, which represents a significant portion of the world's helium production, has experienced disruptions to natural gas processing operations amid escalating tensions in the Middle East. Because helium is produced as a by-product of natural gas processing, interruptions to LNG production and export logistics can materially impact global helium availability. These events highlight the importance of developing diversified and geopolitically secure sources of helium supply, particularly in North America, to support industries such as medical imaging, semiconductor manufacturing, aerospace and advanced technology that rely on consistent access to the gas.

ABOUT Altura Energy CORP.

Altura Energy Corp. is an exploration and production company with interests in the Holbrook basin of Arizona. For more information, please visit SEDAR+ (www.sedarplus.ca).

FOR FURTHER INFORMATION

Robert Johnston
Chairman
604-609-6110

Investor Relations
KIN Communications Inc
604-684-6730
altu@kincommunications.com

Forward-Looking Statements

Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, "forward-looking statements". Forward-looking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions. The Company cautions readers that forward-looking statements, including, without limitation those relating to the Company's business plans, objectives and strategies of operations; the completion of the pipeline replacement and infrastructure upgrade program, including, without limitation, the return of the recompleted wells to production, the workovers being completed for the remaining four wells and the integration and performance of the SCADA systems, including the related benefits therefrom; the completion of additional well work, including, without limitation, the installation of a new pipeline connecting the wells to a processing plant and additional operational enhancements to improve field monitoring, reliability and ongoing maintenance; and the global helium market and related supply chains, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/290598

News Provided by TMX Newsfile via QuoteMedia

ALTU:CC
The Conversation (0)
Alvopetro Announces Q1 2026 Financial Results and Details for Our Upcoming AGM

Alvopetro Announces Q1 2026 Financial Results and Details for Our Upcoming AGM

Alvopetro Energy Ltd. (TSXV: ALV,OTC:ALVOF) (OTCQX: ALVOF) ("Alvopetro" or the "Company") announces an operational update, our financial results for the three months ended March 31, 2026, and details for both our Q1 2026 earnings call and our upcoming annual general and special meeting. All... Keep Reading...
American Uranium Commences Drilling at its Lo Herma ISR Uranium Project in Wyoming's Powder River Basin

American Uranium Commences Drilling at its Lo Herma ISR Uranium Project in Wyoming's Powder River Basin

American Uranium Ltd. (ASX: AMU; OTCQB: AMUIF) announced it has started drilling at its Lo Herma Uranium ISR project located in Wyoming's Powder River Basin. The program underway will include drilling of up to 55 holes with infill drilling within Mine Unit 1 and expansion drilling into highly... Keep Reading...
Standard Uranium Returns to Flagship Project; Locks in Drill-Ready Targets at Davidson River

Standard Uranium Returns to Flagship Project; Locks in Drill-Ready Targets at Davidson River

Standard Uranium Ltd. (TSXV: STND,OTC:STTDF) (OTCQB: STTDF) (FSE: 9SU0) ("Standard Uranium" or the "Company") is pleased to announce that it is in the final stages of planning for the 2026 drill program across the Warrior, Bronco, and Thunderbird conductor corridors at its flagship Davidson... Keep Reading...
Drilling Commences at Lo Herma ISR Uranium Project

Drilling Commences at Lo Herma ISR Uranium Project

American Uranium (AMU:AU) has announced Drilling Commences at Lo Herma ISR Uranium ProjectDownload the PDF here. Keep Reading...
Coelacanth Energy Announces Completion of its $80 Million Bought Deal Financing

Coelacanth Energy Announces Completion of its $80 Million Bought Deal Financing

/THIS PRESS RELEASE IS NOT FOR PUBLICATION OR DISSEMINATION IN THE UNITED STATES. FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF UNITED STATES SECURITIES LAW./ Coelacanth Energy Inc. (the "Company" or "Coelacanth") (TSXV: CEI) is pleased to announce that, further to its... Keep Reading...
Standard Uranium Intersects Anomalous Radioactivity and Graphitic Reactivated Structure at Rocas Uranium Project; Initial Drill Program Complete

Standard Uranium Intersects Anomalous Radioactivity and Graphitic Reactivated Structure at Rocas Uranium Project; Initial Drill Program Complete

Standard Uranium Ltd. (TSXV: STND,OTC:STTDF) (OTCQB: STTDF) (FSE: 9SU0) ("Standard Uranium" or the "Company") is pleased to announce that drilling activities have been completed at the Company's Rocas Uranium Project ("Rocas", or the "Project") located 75 kilometers southwest of the Key Lake... Keep Reading...

Interactive Chart

Latest Press Releases

Related News