Xander Resources Commences Maiden Drilling Program at the Timmins Nickel Project

Xander Resources Commences Maiden Drilling Program at the Timmins Nickel Project

(TheNewswire)

Xander Resources Inc. ("Xander" or the "Company") (TSXV: XND) (OTCQB: XNDRF) (FSX: 1XI) a North American mineral acquisition and exploration company focused on the development of drill-ready battery and precious metal projects, is pleased to announce that it has commenced drilling at its Timmins Nickel Project (the "Project") in located in Timmins, Ontario

Highlights

  • The maiden diamond drilling program focuses on the conductors and/or magnetic trends identified by airborne electromagnetic surveys (VTEM and UAV-borne magnetic surveys), particularly those near Canada Nickel Company's ("CNC") recently identified Reid Discovery, which has already been tested by drilling, to have a mineralized footprint 90% as large as CNC's Crawford Project . CNC's Crawford Project has completed a preliminary economic assessment only 20 months after the commencement of exploration drilling that indicates 25-year mine with an after-tax NPV 8% of $1.2 billion.

  • The targeted conductors coincide with favourable geometries for sulphide accumulation within a mineralized ultramafic intrusion, as interpreted by a 3D magnetic inversion.

  • Forage DCB Drilling of Rouyn-Noranda will carry out the drilling operations. One drill rig has been mobilized onto the Property.

The drill program is anticipated to comprise between 2,500 and 4,000 metres (NQ) with a focus on the Company's "North Block" of claims. The objective of the program will be to drill a series of high-priority geophysical anomalies within the Property, supplemented by soil sampling results, with a particular focus on the targets near Canada Nickel Company's ("CNC") recently identified Reid Discovery.


Click Image To View Full Size

Figure 1 - Summary of hole locations with respect to the folded magnetic body where Canada Nickel Company's Reid Discovery (bottom right). Holes F and G are planned to be drilled approximately 500 and 1,000 metres to the west and are a primary target for the drilling program. Xander's claim boundaries are enclosed in red.

Deepak Varshney, CEO of Xander Resources stated: "We are very excited to commence our maiden program in Timmins. Commencing exploratory drilling is an important milestone and we believe that this project is part of the journey we will need to take in North America to secure a domestic supply of nickel."

The Property

The Property consists of two (2) separate mineral claim blocks and is located within the Timmins mining camp in Ontario, Canada, a highly prolific mining complex with over 100 hundred years of history and well supported by major infrastructure including highways, rail, and relatively inexpensive hydroelectric power.

The "North Block" consists of 343 claims located approximately 45 kilometres west of Canada Nickel Company's (CNC's) Crawford Project (as shown in Figure 2 below) where CNC has completed a preliminary economic assessment only 20 months after the commencement of exploration drilling that indicates 25-year mine with an after-tax NPV 8% of $1.2 billion i . It is also situated southwest of Kingsmill, Mahaffy-Aubin, and Nesbitt North, properties acquired from Noble Mineral Exploration by Canada Nickel through option agreements earlier in 2021 ii .

The "South Block" consists of 50 claims contiguous to Canada Nickel's MacDiarmid Project (as shown in Figure 3 below) where in May 2021, Canada Nickel announced a secondary discovery through the identification of significant intersections of mineralized dunite similar to the average mineralization initially discovered at Crawford. Geophysical surveys reveal that the MacDiarmid target to be approximately 1.8 kilometres long indicating a structural footprint averaging 400 meters in width – 15% larger than Canada Nickel's original Crawford's Main Zone discovery iii .


Click Image To View Full Size

Figure 2 - Location of Xander's Claims with respect to Canada Nickel Company's projects in the vicinity.

Qualified Person

The technical content of this news release has been reviewed and approved by Mr. Andrew Tims, P.Geo., a qualified person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects (" NI 43-101 ").

About Xander Resources Inc.

Xander Resources Inc. is a Canadian mineral acquisition and exploration company based in Vancouver, BC, Canada focused on developing accretive gold and battery metal properties within Canada. The company currently has a focus on projects located within the Provinces of Ontario and Quebec.

Xander is exploring for commercially exploitable mineral deposits and is currently focused on deposits located in Val-d'Or, Quebec, including the Senneville Claim Group which comprises over 100 sq. km and is contiguous in the south to Probe Metals' new discovery, and contiguous in the north to Monarch Mining, in close proximity to Eldorado Gold's (formerly QMX Gold) projects, and east of the North American Lithium Deposit, Great Thunder Gold's Chubb Lithium property and East of the Sayona Quebec's Authier Lithium Deposit, all in the Val-d'Or Mining Camp, plus its newly acquired nickel-sulphide project in Timmins, Ontario near Canada Nickel's MacDiarmid and Crawford Projects.

ON BEHALF OF THE BOARD OF DIRECTORS

Deepak Varshney, P.Geo., President and CEO
For more information, please email ir@xanderresources.ca , or visit www.xanderresources.ca .

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking statements:

This news release may include "forward-looking information" under applicable Canadian securities legislation. Such forward-looking information reflects management's current beliefs and are based on a number of estimates and/or assumptions made by and information currently available to the Company that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors that may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information. Readers are cautioned that such forward-looking information are neither promises nor guarantees and are subject to known and unknown risks and uncertainties including, but not limited to, general business, economic, competitive, political and social uncertainties, uncertain and volatile equity and capital markets, lack of available capital, actual results of exploration activities, environmental risks, future prices of base and other metals, operating risks, accidents, labour issues, delays in obtaining governmental approvals and permits, and other risks in the mining industry.

The Company is presently an exploration stage company. Exploration is highly speculative in nature, involves many risks, requires substantial expenditures, and may not result in the discovery of mineral deposits that can be mined profitably. Furthermore, the Company currently has no reserves on any of its properties. As a result, there can be no assurance that such forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements.

i Preliminary Economic Assessment, titled "Crawford Nickel-Sulphide Project National Instrument 43-101 Technical Report and Preliminary Economic Assessment", Effective Date of May 21, 2021

ii https://canadanickel.com/wp-content/uploads/2021/04/20210422-Canada-Nickel-Acquires-Option-Properties-final.pdf

iii https://canadanickel.com/wp-content/uploads/2021/10/2021-10-26-East-Zone-High-Grade-vFinal2.pdf

Copyright (c) 2022 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

XND:CA
The Conversation (0)
Xander Resources (TSXV:XND)

Xander Resources


Keep reading...Show less

Gold Exploration in Canada’s Abitibi Greenstone Belt

Xander Resources Announces AGM Results, Appointment of New Director and Adoption of New Omnibus Incentive Plan

Xander Resources Announces AGM Results, Appointment of New Director and Adoption of New Omnibus Incentive Plan

(TheNewswire)

Vancouver, British Columbia TheNewswire - June 19, 2023 Xander Resources Inc. ("Xander" or the "Company") (TSXV:XND) (OTC:XNDRF) (FSX:1XI) is pleased to announce the results of its annual general and special meeting (the " Meeting ") held on June 16, 2023.  All resolutions presented to the shareholders were approved, as a result:

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Xander Resources Announces New CFO and Corporate Secretary

Xander Resources Announces New CFO and Corporate Secretary

(TheNewswire)

Xander Resources Inc. ("Xander" or the "Company") (TSXV:XND) (OTC:XNDRF) (FSX:1XI) is pleased to announce the appointment of Deepak Varshney, the Company's current President and CEO, as Corporate Secretary of the Company, and Khalid Naeem as CFO of the Company, effective May 1, 2023

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Xander Resources Completes Shares for Debt Transactions

Xander Resources Completes Shares for Debt Transactions

(TheNewswire)

Xander Resources Inc. ("Xander" or the "Company") (TSXV:XND) (OTC:XNDRF) (FSX:1XI) is pleased to announce that the Company has completed two shares for debt settlements that were previously announced on March 16, 2023 (the " Shares for Debt Settlements "), after being granted approval by the TSX Venture Exchange (" TSXV "). The outstanding debt was owed to consultants of the Company as part of their severance packages

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Xander Resources Completes Second Phase of Drilling Program for Timmins Nickel Project

Xander Resources Completes Second Phase of Drilling Program for Timmins Nickel Project

(TheNewswire)

Vancouver, British Columbia TheNewswire - March 20, 2023 Xander Resources Inc. ("Xander" or the "Company") (TSXV:XND) (OTC:XNDRF) (FSX:1XI) is pleased to announce that it has completed the second phase of its fully financed drill program at its Timmins Nickel Project (the " Property ") located in Timmins, Ontario.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Xander Resources Arranges Shares for Debt Transactions

Xander Resources Arranges Shares for Debt Transactions

(TheNewswire)

Xander Resources Inc. ("Xander" or the "Company") (TSXV:XND) (OTC:XNDRF) (FSX:1XI), a North American mineral acquisition and exploration company focused on the development of drill-ready battery and precious metal projects, is pleased to announce that it has entered into agreements to settle $77,357 of indebtedness by the issuance of 2,210,198 common shares of the Company at $0.035 per share. The outstanding debt was owed to two former officers andor directors of the Company as part of their severance packages. The settlements are subject to acceptance of the TSX Venture Exchange. All shares to be issued pursuant to the settlements will be subject to the applicable statutory, exchange and regulatory hold period of four months and any other required resale restrictions. The shares to be issued have not and will not be registered under the U.S. Securities Act of 1933, as amended, or any state securities laws

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Silver47 Exploration - OTC Markets Request

Silver47 Exploration - OTC Markets Request

Silver47 Exploration Corp. (TSXV: AGA,OTC:AAGAF) (OTCQB: AAGAF) ("Silver47" or the "Company") confirms that, as previously announced on September 4, 2025, it has engaged Sideways Frequency LLC ("SFLLC") as an arms-length, third party firm contractually retained by the Company in accordance with routine industry practices to provide investor relations services for a 12 month term.

As part of the Company's efforts towards investor awareness, SFLLC organizes and facilitates the creation and distribution of promotional material concerning the Company and its common shares traded on the OTCQB marketplace (the "Promotional Material") on behalf of the Company. On September 10, 2025, the Company became aware that SFLLC had commenced distribution of Promotional Material which discussed the Company, its business and a general assessment of, and commentary on, the broader market for silver and silver exploration globally. The Promotional Material was available via email and online via click-through of digital media ads.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Corporate Presentation Mining Forum Americas

Vertex Minerals Limited Corporate Presentation Mining Forum Americas

Perth, Australia (ABN Newswire) - Flagship Project for Vertex Minerals Limited (ASX:VTX,OTC:VTXXF) (OTCMKTS:VTXXF) - Reward Gold Mine, Hill End Corporate Presentation to Mining Forum Americas.

- Commenced Gold processing with new Gekko Gravity Gold Plant

- 100% owned

- No hedge - No Secured debt - fully funded

- Low operating Cost

- High Grade Gold Resource and Reserve 225 ozs at 16.7g/t + more

- Inherited >AUD $50m of underground development

- 1.8M Au oz historically mined

- Reward sits below the Hawkins Hill Mine 435kozs at 309 g/t

- Up to 95% recovery by gravity processes only

- Big Gold System, ~21Miles (34km) with >3,000 old workings

*To view the presentation, please visit:
https://abnnewswire.net/lnk/484ZF4X8



About Vertex Minerals Limited:

Vertex Minerals Limited (ASX:VTX,OTC:VTXXF) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.



Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Canada One Commences 2025 Field Work Program at Flagship, Copper Dome Project

Canada One Commences 2025 Field Work Program at Flagship, Copper Dome Project

Canada One Mining Corp. (TSXV: CONE) (OTC Pink: COMCF) (FSE: AU31) ("Canada One" or the "Company") is pleased to announce the launch of its 2025 field exploration program at its flagship Copper Dome Project ("Copper Dome", "Property" or "Project"), located 18 km south of Princeton, British Columbia.

2025 FIELD WORK PROGRAM HIGHLIGHTS

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Cygnus reports a 78% increase in M&I resource at its Chibougamau Copper-Gold Project

Cygnus reports a 78% increase in M&I resource at its Chibougamau Copper-Gold Project

HIGHLIGHTS:

  • Global Measured & Indicated Mineral Resource ("M&I") estimate of 6.4 Mt at 3.0% CuEq for 193kt CuEq and Inferred Mineral Resource of 8.5 Mt at 3.5% CuEq for 295 kt CuEq in accordance with JORC 2012 and CIM Definition Standards (CIM, 2014)
  • Total contained metal is exclusively Copper, Gold and Silver:
    • M&I: 149kt Cu, 167 koz Au & 1.6 Moz Ag (for 193 kt CuEq or 884 koz AuEq)
    • Inferred: 182 kt Cu, 454 koz Au & 2.2 Moz Ag (for 295 kt CuEq or 1.3 Moz AuEq)
  • This update includes an initial Mineral Resource Estimate ("MRE") for the new Golden Eye deposit and the other existing hub-and-spoke deposits of Corner Bay, Cedar Bay, Devlin, and Joe Mann
  • The initial high-grade Golden Eye resource contains:
    • Indicated: 91 koz @ 5.6 g/t AuEq
    • Inferred: 182 koz @ 4.6 g/t AuEq
  • The 78% tonnage increase in M&I Resources will underpin an updated Scoping Study / Preliminary Economic Assessment ("PEA"), which will also reflect the significant increase in commodity prices on the economics of the Project since the 2022 PEA completed by Doré Copper 1
  • Today's announcement demonstrates proven upside at the Chibougamau Project with two diamond drill rigs still turning and additional potential to add to the resource base
  • Chibougamau Project is a premier near-term development copper-gold opportunity with established infrastructure including a 900 ktpa processing facility, sealed highway, airport, regional rail infrastructure, and 25 kV hydro power to the processing site
  • The Project has excellent metallurgy with test work recoveries of up to 98.2% producing a high-quality clean copper concentrate of up to 29.6% 2
  • Cygnus is continuing to generate an exciting pipeline of exploration targets using its in-house AI-driven solution for the compilation of historic drill logs and maps; This work has proven highly successful and has helped deliver the initial Golden Eye MRE
  • The Company remains fully funded to drive further growth and the ongoing study work with A$23M cash at 30 June 2025
  • A new fly through video and resource presentation will be available in the coming week, given the finalisation of the MRE as announced today

Cygnus Executive Chairman David Southam said: "Within just nine months of acquiring the Chibougamau Project, we have been able to deliver a significant resource upgrade with substantial scope for further growth.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Redstone Drilling at Tollu Intersects 10m at 1.37% Cu

Redstone Drilling at Tollu Intersects 10m at 1.37% Cu

Redstone Resources (RDS:AU) has announced Redstone Drilling at Tollu Intersects 10m at 1.37% Cu

Download the PDF here.

Latest Press Releases

Related News