World Copper Announces Results from Mancha Amarilla Drilling, Confirms Extension of Mineralization at Escalones Project in Chile

World Copper Announces Results from Mancha Amarilla Drilling, Confirms Extension of Mineralization at Escalones Project in Chile

World Copper Ltd.  (TSXV: WCU) (OTCQC: WCUFF) (FSE: 7LY0) ("World Copper") announces drill results from the Mancha Amarilla target at the Company's Escalones Copper project in Central Chile ("Escalones" or the "Escalones Project"). The Escalones Project has estimated Inferred Mineral Resources of 426 million tonnes of 0.367% copper, based on nearly 25,000 metres of drill core from 53 holes (see news release dated August 23, 2021). World Copper has now completed 1,676 metres of additional drilling along the western-most, road accessible edge of the Mancha Amarilla zone, with the following highlights:

  • Successful completion of first target of Mancha Amarilla drilling, confirming copper oxide mineralization extends at least 150 metres south from previous drilling
  • Oxidation extends to depths of 280 metres below the ridge, as predicted by modeling
  • Confirmation of western flank of Mancha Amarilla mineralized zone with indications that the mineralization should improve eastward into the central areas of the zone

CEO Nolan Peterson commented, "Since restarting work on the Escalones project, World Copper has focused on completing the preliminary economic assessment with respect to the existing Escalones resource, which was completed in February 2022 (see news release dated February 15, 2022), as well as expanding the Escalones' mineral resource south into the adjacent previously untested Mancha Amarilla zone. With the completion of the first phase of the drill programme we have now confirmed what initial reviews indicated - that the Escalones resource has the potential to be significantly larger than its current definition, with oxide mineralization to similar depths as the main deposit. With the western edge of the Mancha Amarilla footprint defined, we now have clear targets for the next phase of drilling, aiming to increase the grade of the overall resource as we test the flanking skarn targets which exhibit some of the highest grades on the property."

Mancha Amarilla Results

The aim of the Mancha Amarilla drill programme was to confirm and delineate continuous oxide copper mineralization in the Mancha Amarilla lithocap, which is located adjacent to and located immediately south of the existing mineral resource. Early drilling focused on the western edge and the East Skarn (Figure 1). The Mancha Amarilla lithocap has alteration mineralogy and geochemistry consistent with the weathered top of a porphyry system and extends one kilometre south from the area of the main Escalones deposit (Figure 1). The geology encountered in the recent drilling indicates the Mancha Amarilla lithocap is as deeply oxidized as the existing resource but thins southward as topography drops in elevation where calcareous lithologies dominate over intrusive units. The increase in grade eastward from hole ES-57 to ES-56 suggests the central area is more highly mineralized than the western flank. The last hole of the programme (ES-60) was collared in the East Skarn zone but was shut down early due to bad weather with the onset of winter. Table 1 summarizes the significant drill intersections from the programme and Figure 1 shows their locations within the Mancha Amarilla zone.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3653/138505_3e46ad2a842069b8_002.jpg

Figure 1: Escalones Mancha Amarilla drill results, interval with >0.1% Cu.

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/3653/138505_3e46ad2a842069b8_002full.jpg

 

Table 1. Significant Drill results (total Cu) from the Mancha Amarilla Target; intervals over 0.1% Cu are bolded; all widths are true

HoleFromToWidthCu %Ag (ppm)Au (ppm)Mo (ppm)
ES-54386830.04880.770.0210.0012
ES-5486221135.00.15440.820.0180.0019
ES-54221245.424.40.05610.540.0040.0013
ES-54245.40280.6035.20.11850.840.0090.0016
ES-54280.6287.56.90.08231.000.0060.0008
ES-552.7141138.30.03990.750.0020.0006
ES-55141148.857.850.14510.630.0020.0009
ES-55148.85281.55132.70.02540.580.0010.0006
ES-56073.173.10.02430.610.0020.0005
ES-5673.112349.90.10610.810.0050.0005
ES-56123272.4149.20.03820.630.0020.0005
ES-577.89890.20.02550.860.0010.0005
ES-579810680.12751.250.0110.0005
ES-57106120140.03540.710.0020.0005
ES-57120125.55.50.20721.360.0050.0005
ES-57125.5257.25131.750.02381.050.0010.0005
ES-5812.6207.40.02891.740.0030.0006
ES-582034140.18103.140.0030.0005
ES-5834287.65253.650.01080.840.0040.0005
ES-592.8261.2258.40.01650.610.0020.0005

 

Table 2. Drill collar details*

Hole IDEastingNorthingElevationDepth
ES-5441097262240213743.463287.5
ES-5541090662238903726.787281.55
ES-56410989.962237053685.559272.4
ES-57410787.662236993697.033257.25
ES-58410878.262233513637.947287.65
ES-59410889.462235693685.083264.4

 

*all holes are vertical, HQ diameter

Next Steps

With over 3,000 metres remaining in the Escalones drill permit, World Copper intends to restart drilling at the East Skarn target (Figure 1) as soon as conditions allow. The East Skarn target overlies the Mancha Amarilla zone to the northeast of the completed drilling and has only had sparse drilling along the south edge (see news release dated August 12, 2021). Surface sampling by the Company indicates the sandstone host rocks of the East Skarn target are strongly mineralized with copper oxides at surface. Once drilling at the East Skarn target is complete, World Copper would aim to to move to the west side of the Meseta ridge and test the depth potential of high-grade copper skarn mineralization exposed by roads on the west flank of the central Meseta intrusion (the West Zone; Figure 1).

Quality Control and Quality Assurance; Sampling and Assay Procedures

Drill core was transported at the end of each drill shift by pickup truck from the drill pad to a temporary logging, sampling and storage facility at the base camp at the south end of the ridge. The core was then logged, digitally photographed, and transported to the core-storage warehouse in the town of Romeral, where the core was split with a diamond saw and sampled with half the core placed in plastic poly bags and a sample tag. The core was photographed once again to record the sampling. After splitting, all samples were packed in rice sacks and sealed with uniquely numbered non-re-sealable security straps. The samples were trucked to ALS Laboratory ("ALS") in Santiago. World Copper implemented a standard QA/QC programme for Escalones, inserting 1-in-20 certified standard reference material ("SRM"), 1-in-20 field (two ¼ core samples) and 1-in-20 coarse duplicates, and 1-in-25 blanks into the sample stream. There were no issues noted with the SRMs and all plotted within acceptable limits for copper submitted for analysis from the same sample interval.

At ALS, multi-elements were assayed using the ME-ICP61a package, which includes 4-acid digestion and ICP-MS finish. Gold was done by method Au-ICP21, in which a 30g sample is fire-assayed and finished with ICP-AES. Intervals of greater than 10 metres grading greater than 0.1% Cu will be sent for sequential copper analysis.

About Escalones

The Escalones porphyry-skarn copper-gold project has estimated inferred resources of 426 million tonnes of 0.367% total copper within the oxidized zone, based on nearly 25,000 m of drill core from 53 holes. Preliminary metallurgy indicates the 3.45 billion pounds of copper should be amenable to heap leaching with an average recovery of 71%. The Company is focused on exploring the flanking skarn mineralization east and west of the existing resource. In addition, three significant hydrothermal alteration zones, each measuring between 2,000 m and 3,000m in diameter, lie 8-10 km to the north of the main discovery. One of these, Rio Negro, has confirmed porphyry mineralization at surface.

Mineral resources are not mineral reserves and do not have demonstrated economic viability as there is no certainty that all or any part of the resources will be converted into reserves. Inferred resources are that part of a mineral resource for which quantity and grade or quality are estimated based on limited geological evidence and sampling. It is reasonably expected that the inferred resources could be upgraded to indicated resources with continued exploration.

About the Escalones February 2022 PEA study:

On February 15, 2022, the Company announced the following outstanding results of the Preliminary Economic Assessment ("PEA") for the Escalones Project:

  • $1,499.6 million post-tax NPV8 at $3.60 /lb. life-of-mine ("LOM") (20 years) copper price
  • $1,822.4 million post-tax NPV8 at $4.00 /lb. LOM copper price
  • First 5 years average annual Copper production of 124.7 Mlbs. (56,520 tonnes); LOM average 114.9 Mlbs. (52,131 tonnes)
  • First 5 years average C1 (Cash Operating) costs of $1.13 /lb. Cu; LOM average C1 costs $1.19 /lb. Cu
  • First 5 years average annual EBITDA $290.8 million; LOM average annual EBITDA $265.1 million
  • Initial Capital (CAPEX) cost of $438.4 million (from construction decision)
  • LOM Sustaining Capital of $192.5 million
  • Conventional heap leach, SX-EW processing facilities, targeting 50,000 tonnes of heap leach tonnes placed per day

The exceptional results of the Escalones PEA confirm what World Copper has always anticipated - that Escalones has the potential to be one of the most impressive copper properties in South America. Escalones now joins a peer group of large-scale, study backed, development stage assets. Escalones has several attributes that make it attractive for development including robust economics, strong value metrics and the potential of rapid returns for a comparably low capital investment. The results of the PEA, combined with Escalones large land package and resource expansion potential, make it a truly outstanding project.

The PEA is considered preliminary in nature, contains numerous assumptions and includes Inferred Mineral Resources that are considered too speculative, geologically, to have the economic considerations applied that would enable them to be classified as Mineral Reserves. There is no certainty that the results of the PEA will be realized. No Mineral Reserves have been estimated for Escalones. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Inferred Mineral Resources are that part of the Mineral Resource for which quantity and grade, or quality, are estimated based on limited geologic evidence and sampling, which is sufficient to imply but not verify grade or quality continuity. Inferred Mineral Resources may not be converted to Mineral Reserves. It is reasonably expected, though not guaranteed, that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. Mineral Resources are captured within an optimized pit shell and meet the test of reasonable prospects for economic extraction. All values are reported in US dollars unless otherwise noted.

The technical report prepared with respect to the PEA, which is available on the Company's SEDAR profile at www.sedar.com, is entitled "Preliminary Economic Assessment NI 43-101 Technical Report, Escalones Copper Project, Santiago Metropolitan Region, Chile" and is dated March 22, 2022, with an effective date of February 15, 2022, and it was prepared by Global Resource Engineering with contributions from other firms, including Hard Rock Consulting, LLC.

Qualified Person

John Drobe, P.Geo., a qualified person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), has reviewed the scientific and technical information that forms the basis for this news release and has approved the disclosure herein. Mr. Drobe is not independent of the Company as he is the Chief Geologist of World Copper.

ABOUT World Copper Ltd.

World Copper Ltd., headquartered in Vancouver, BC, is a Canadian resource company focused on the exploration and development of its two primary copper porphyry projects, Escalones and Cristal, both located in Chile. World Copper has laid claim to four copper porphyry targets, one with estimated resources, significant soluble copper mineralization, and exciting potential to expand the resource base.

The World Copper team has a unique skill in navigating the mining sector within Chile, with some members having worked in the country for more than 40 years and with discovery success.

Detailed information is available at the Company's website at www.worldcopperltd.com, and for general Company updates you may follow us on our social media pages via Facebook, Twitter & LinkedIn.

For further details on the Company readers are referred to the Company's website. To view the Company's Canadian regulatory filings, please visit SEDAR.

On Behalf of the Board of Directors of
World Copper Ltd.

"Nolan Peterson"
Nolan Peterson
Chief Executive Officer

For further information, or to schedule a Zoom meeting with Management, please contact:
Nolan Peterson or Michael Pound
Phone: 604-638-3287
E-mail: info@worldcopperltd.com

For all Investor Relations inquiries, please contact:
John Liviakis
Liviakis Financial Communications Inc.
Phone: 415-389-4670

For all Public Relations inquiries, please contact:
Nancy Thompson
Vorticom, Inc.
Office: 212-532-2208 | Mobile: 917-371-4053

Follow Us:

Twitter: https://twitter.com/WorldCopperLtd
Facebook: https://www.facebook.com/WorldCopperLtd
LinkedIn: https://www.linkedin.com/company/worldcopperltd

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements with respect to future work programmes involving the East Skarn targets and the western flank at Escalones, anticipated exploration program results from exploration activities, the discovery and delineation of mineral deposits/resources/reserves and the anticipated business plans and timing of future activities of World Copper are forward-looking statements. Although World Copper believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "would", "will", "potential", "scheduled" or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this news release, World Copper has applied several material assumptions, including without limitation, that market fundamentals will result in sustained copper demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future development of World Copper's projects in a timely manner, including the Escalones Project and the Cristal project, the availability of financing on suitable terms for the development, construction and continued operation of World Copper's projects and its ability to comply with environmental, health and safety laws.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of World Copper to differ materially from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks and other factors include, among others, operating and technical difficulties in connection with mineral exploration and development activities, actual results of exploration activities, including on the Escalones Project and the Cristal project, the estimation or realization of mineral reserves and mineral resources, the fact that World Copper's interests in the Cristal project and the Escalones exploitation concessions are options only and there is no guarantee that such interests, if earned, will be certain, the timing and amount of estimated future production, the costs of production, capital expenditures, the costs and timing of the development of new deposits, requirements for additional capital, future prices of copper, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, lack of investor interest in future financings, accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental approvals (including of the TSX Venture Exchange), permits or financing or in the completion of development or construction activities, risks relating to epidemics or pandemics such as COVID-19, including the impact of COVID-19 on World Copper's business, financial condition and results of operations, changes in laws, regulations and policies affecting mining operations, title disputes, the inability of World Copper to obtain any necessary permits, consents, approvals or authorizations, the timing and possible outcome of any pending litigation, environmental issues and liabilities, and risks related to joint venture operations, and other risks and uncertainties disclosed in World Copper's continuous disclosure documents. All of World Copper's Canadian public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials.

Readers are cautioned not to place undue reliance on forward-looking statements. World Copper does not undertake any obligation to update any of the forward-looking statements in this news release or incorporated by reference herein, except as otherwise required by law.

Cautionary Note to United States Investors

World Copper prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to mineral resources in this news release are defined in accordance with NI 43-101 under the guidelines set out in CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the Canadian Institute of Mining, Metallurgy and Petroleum Council on May 19, 2014, as amended ("CIM Standards"). The U.S. Securities and Exchange Commission (the "SEC") has adopted amendments effective February 25, 2019 (the "SEC Modernization Rules") to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the U.S. Securities Exchange Act of 1934.

As a result of the adoption of the SEC Modernization Rules, the SEC will now recognize estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources", which are defined in substantially similar terms to the corresponding CIM Standards. In addition, the SEC has amended its definitions of "proven mineral reserves" and "probable mineral reserves" to be substantially similar to the corresponding CIM Standards.

U.S. investors are cautioned that while the foregoing terms are "substantially similar" to corresponding definitions under the CIM Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. Accordingly, there is no assurance any mineral resources that World Copper may report as "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had World Copper prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

In accordance with Canadian securities laws, estimates of "inferred mineral resources" cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/138505

News Provided by Newsfile via QuoteMedia

WCU:CA
World Copper

World Copper Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
World Copper

World Copper


Keep reading...Show less
World Copper Initiates Strategic Review Process and Engages Advisor

World Copper Initiates Strategic Review Process and Engages Advisor

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper " or the "Company") announces that the Company has initiated a strategic review process and has engaged Origin Merchant Partners (the "Advisor") to assist it in its review. The Advisor will work with World Copper's management and Board to evaluate a range of strategic alternatives that may be available to the Company to grow and maximize value for all shareholders (the "Engagement"). There can be no assurance that this process will result in any specific strategic plan or financial transaction and no timetable has been set for its completion. The Company does not plan to provide updates on the status of the review unless there are material developments to report.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Files Amended Resource Estimate and Technical Report for Updated Resource Estimate for the Zonia Project

World Copper Files Amended Resource Estimate and Technical Report for Updated Resource Estimate for the Zonia Project

Provides ATM Quarterly Report

This news release constitutes a "designated news release" for the purposes of the Company's prospectus supplement dated July 17, 2024 to its short form base shelf prospectus and amended and restated short form base shelf prospectus dated June 7, 2024

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Files Technical Report for Updated Resource Estimate for the Zonia Project

World Copper Files Technical Report for Updated Resource Estimate for the Zonia Project

This news release constitutes a "designated news release" for the purposes of the Company's prospectus supplement dated July 17, 2024 to its short form base shelf prospectus and amended and restated short form base shelf prospectus dated June 7, 2024

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper" or the "Company") is pleased to announce that further to its news release dated September 9, 2024, World Copper has filed on SEDAR+ a National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report for an updated mineral resource estimate (the "Updated Resource Estimate") for the Zonia copper-oxide deposit in Arizona, USA ("Zonia" or the "Project").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Provides Project Updates and Announces an Updated Resource Estimate for the Zonia Project

World Copper Provides Project Updates and Announces an Updated Resource Estimate for the Zonia Project

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper" or the "Company") announces, project updates.

Zonia

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Announces Corporate Update Webinar

World Copper Announces Corporate Update Webinar

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE:7LY0) ("World Copper" or the "Company") announces an upcoming corporate update webinar, scheduled for September 5, 2024 at 1:15pm PST.

Webinar Details

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Dore Copper Announces Filing and Mailing of Management Information Circular in Connection with Special Meeting and Encourages Shareholders to Access Meeting Materials Electronically

Dore Copper Announces Filing and Mailing of Management Information Circular in Connection with Special Meeting and Encourages Shareholders to Access Meeting Materials Electronically

Doré Copper Mining Corp. (" Doré Copper ") (TSXV: DCMC; OTCQB: DRCMF; FRA: DCM) today announced that it has filed and is in the process of mailing the management information circular (the " Circular ") and related materials for the special meeting (the " Meeting ") of shareholders of Doré Copper (" Doré Copper Shareholders ") to be held December 16, 2024. At the Meeting, Doré Copper Shareholders will be asked to consider and vote on a special resolution (the " Arrangement Resolution ") approving a statutory plan of arrangement (the " Plan of Arrangement ") pursuant to Section 192 of the Canada Business Corporations Act (the " Arrangement "), subject to the terms and conditions of an arrangement agreement dated October 14, 2024 (the " Arrangement Agreement ") entered into among Doré Copper, Cygnus Metals Limited (" Cygnus ") and 1505901 B.C. Ltd., a wholly owned subsidiary of Cygnus, all as more particularly described in the Circular.

The board of directors of Doré Copper (the " Doré Copper Board ") and the special committee of independent directors established by the Doré Copper Board (the " Special Committee ") have unanimously determined that the Arrangement is in the best interests of Doré Copper and that the Arrangement is fair to the Doré Copper Shareholders. The Special Committee and the Doré Copper Board reviewed and considered a significant amount of information and considered a number of factors relating to the Arrangement, with the benefit of advice from Doré Copper's management, and the financial and legal advisors of the Special Committee and the Doré Copper Board. The Special Committee unanimously recommended that the Doré Copper Board recommend to Doré Copper Shareholders that they vote FOR the Arrangement Resolution. The Doré Copper   Board unanimously recommends that Doré Copper   Shareholders vote   FOR   the Arrangement Resolution. See pages 33 to 36 of the Circular for a detailed description of the " Reasons for the Arrangement ".

In accordance with the interim order granted by the Ontario Superior Court of Justice (Commercial List) on November 12, 2024, providing for the calling and holding of the Meeting and other procedural matters relating to the Arrangement, the Arrangement can only proceed if, among other conditions, it receives the approval of not less than two-thirds (66⅔%) of the votes cast on the Arrangement Resolution by Doré Copper Shareholders in person or by proxy at the Meeting and not less than a majority (50% + 1) of the votes cast on the Arrangement Resolution by Doré Copper Shareholders in person or by proxy at the Meeting excluding the votes cast by certain interested or related parties or joint actors of Doré Copper in accordance with the minority approval requirements of Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions .

Under the Arrangement Agreement, the parties have agreed to effect the Arrangement, pursuant to which Cygnus will indirectly acquire all of the issued and outstanding common shares in the capital of Doré Copper (" Doré Copper Shares "), and Doré Copper Shareholders will be entitled to receive, for each Doré Copper Share held immediately prior to the effective time of the Arrangement (the " Effective Time "), 1.8297 fully paid ordinary shares (the " Consideration ") in the capital of Cygnus (each one whole share, a " Cygnus Share ").

As a result of, and immediately following the completion of, the Arrangement, Doré Copper will be an indirect wholly-owned subsidiary of Cygnus and the former Doré Copper Shareholders will be entitled to receive the Consideration for each Doré Copper Share previously held by them immediately prior to the Effective Time (subject to rounding, as provided for in the Plan of Arrangement).

Cygnus has applied for its Cygnus Shares to be listed on the TSX Venture Exchange (the " TSXV "). It is a condition of closing that Cygnus shall have received conditional listing approval from the TSXV to list the Cygnus Shares on the TSXV. Listing of the Cygnus Shares on the TSXV will be subject to Cygnus receiving approval from, and fulfilling all of the minimum listing requirements of, the TSXV.

Meeting and Circular

The Meeting of the Doré Copper Shareholders will be held at the offices of Bennett Jones LLP located at One First Canadian Place, 100 King Street West, Suite 3400, Toronto, Ontario, M5X 1A4 on December 16, 2024 at 12:00 p.m. (Toronto time). Doré Copper Shareholders of record as of the close of business on November 13, 2024 are entitled to receive notice of and to vote at the Meeting. Doré Copper Shareholders are urged to vote before the proxy deadline of 12:00 p.m. (Toronto time) on December 12, 2024.

The Circular provides important information on the Arrangement and related matters, including the background of the Arrangement, the rationale for the recommendations made by the Special Committee and the Doré Copper Board, and voting procedures. Doré Copper Shareholders are urged to read the Circular and its appendices carefully and in their entirety. The Circular is being mailed to Doré Copper Shareholders in compliance with applicable Canadian securities laws. The Circular is available under Doré Copper's profile on SEDAR+ at www.sedarplus.ca and on Doré Copper's website at www.dorecopper.com .

Impact of Canada Post Labour Strike

Due to the ongoing Canada Post labour strike, it is possible that Doré Copper Shareholders may experience a delay in receiving the Circular and related materials in respect of the Meeting. Doré Copper Shareholders are encouraged to access the Circular and related materials electronically as noted above. Registered holders of Doré Copper Shares experiencing a delay in receiving the Circular and related materials may contact Computershare Investor Services Inc. at 1-800-564-6253 to obtain their individual control numbers in order to vote their Doré Copper Shares. Registered holders of Doré Copper Shares are encouraged to vote their Doré Copper Shares via the internet at www.investorvote.com or via telephone at 1-866-732-VOTE (8683). Registered holders of Doré Copper Shares are also encouraged to complete and return letters of transmittal by hand or by courier to ensure the appropriate documents are received in a timely manner. Beneficial holders of Doré Copper Shares experiencing a delay in receiving the Circular and related materials should contact their broker or other intermediary for assistance in obtaining their individual control numbers in order to vote their Doré Copper Shares. Beneficial holders of Doré Copper Shares are encouraged to vote their Doré Copper Shares via the internet at www.proxyvote.com or via telephone at 1-800-474-7493 (English) or 1-800-474-7501 (French). It is recommended that any physical forms of proxy or voting instruction forms be delivered via courier to ensure that they are received in a timely manner.

Registered holders of Doré Copper Shares who wish to exercise their dissent rights in connection with the Arrangement are also cautioned to deliver their written objection to Doré Copper by mail using a method other than Canada Post or by facsimile transmission in accordance with the instructions set forth in the Circular to ensure that they are received in a timely manner.

Other Matters

Agreement with SOQUEM

Further to its news release dated July 3, 2024, on July 2, 2024, Doré Copper issued 1,190,476 Doré Copper Shares to SOQUEM at a deemed price of $0.105 per Doré Copper Share in connection with its acquisition of a 56.41% interest in a group of contiguous claims located immediately north and east of its flagship high-grade Corner Bay copper project in the Chibougamau mining camp.

About Doré Copper Mining Corp.

Doré Copper Mining Corp. aims to be the next copper producer in Québec with an initial production target of +50 million pounds of copper equivalent annually by implementing a hub-and-spoke operation model with multiple high-grade copper-gold assets feeding its centralized Copper Rand mill 1 . Doré Copper has delivered its PEA in May 2022 and is proceeding with a feasibility study. Doré Copper has consolidated a large land package in the prolific Lac Doré/Chibougamau and Joe Mann mining camps that has historically produced 1.6 billion pounds of copper and 4.4 million ounces of gold. 2 The land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometer radius of Doré Copper's Copper Rand Mill.

About Cygnus Metals

Cygnus Metals Limited (ASX: CY5) is an emerging exploration company focused on advancing the Pontax Lithium Project (earning up to 70%), the Auclair Lithium Project and the Sakami Lithium Project in the world class James Bay lithium district in Québec, Canada. In addition, Cygnus has REE and base metal projects at Bencubbin and Snake Rock in Western Australia. The Cygnus Board of Directors and Technical Management team have a proven track record of substantial exploration success and creating wealth for shareholders and all stakeholders in recent years. Cygnus' tenements range from early-stage exploration areas through to advanced drill-ready targets.

For further information about Doré Copper, please contact:

Ernest Mast Laurie Gaborit
President and Chief Executive Officer Vice President, Investor Relations
Phone: (416) 792-2229 Phone: (416) 219-2049
Email: ernest.mast@dorecopper.com Email: laurie.gaborit@dorecopper.com

Visit: www.dorecopper.com
Facebook: Doré Copper Mining
LinkedIn: Doré Copper Mining Corp.
Twitter: @DoreCopper
Instagram: @DoreCopperMining

Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this news release, including, without limitation, statements with respect to the proposed Arrangement and the terms thereof, the completion of the Arrangement, including receipt of all necessary court, shareholder and regulatory approvals and timing thereof, the listing of the Cygnus Shares on the TSXV, and the plans, operations and prospects of Doré Copper and its properties are forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties and other factors which may cause actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to, the ability to obtain approvals in respect of the Arrangement and to consummate the Arrangement, the ability to obtain approvals for the listing of the Cygnus Shares on the TSXV, integration risks, actual results of current and future exploration activities, benefit of certain technology usage, the ability of prior successes and track record to determine future results, changes in project parameters and/or economic assessments, availability of capital and financing on acceptable terms, general economic, market or business conditions, future prices of metals, uninsured risks, risks relating to estimated costs, regulatory changes, delays or inability to receive required regulatory approvals, health emergencies, pandemics and other exploration or other risks detailed herein and from time to time in the filings made by Doré Copper with securities regulators. Although Doré Copper has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Doré Copper disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Silver47 Drills 2.9m of 1,078.8 g/t Silver Equivalent  at the West Tundra Flats Zone at Its Red Mountain Project, Alaska

Silver47 Drills 2.9m of 1,078.8 g/t Silver Equivalent at the West Tundra Flats Zone at Its Red Mountain Project, Alaska

Silver47 Exploration Corp. (TSXV: AGA) ("Silver47" or the "Company), is pleased to announce results from two diamond drill core holes at the West Tundra Flats resource area for a combined 331m at its wholly owned flagship Red Mountain Project in Alaska, USA. Both drill holes cut high-grade silver-zinc-lead-gold-copper zones within a wider sulfide mineralization horizon.

Highlights from 2024 West Tundra Flats Drill Holes:

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Red Metal Resources Engages German Investor Awareness and Digital Marketing Consultants

Red Metal Resources Engages German Investor Awareness and Digital Marketing Consultants

Red Metal Resources Ltd. (CSE: RMES) (OTC Pink: RMESF) (FSE: I660) ("Red Metal" or the "Company") The Company has engaged Investment-Zirkel-München ("IZM") that offers several services for German language investor awareness including news dissemination, conference calls, real-time investor forums and an active investors network throughout Europe. IZM has a select investor following that participate in both financings and open market buying. The IZM contract is for a two-year term at a cost of CAD$25,000.

IZM has a business address at Lena-Chris-Str 9, Nuebiberg, Germany. The services to be provided will be overseen by Mathias Voigt, President of the company, who can be contacted at mv@i-z-m.info. Mr. Voigt owns 150,000 shares of the Company.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper

World Copper Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×