Tisdale Clean Energy To Begin Initial Phase One Drill Program at South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

Tisdale Clean Energy To Begin Initial Phase One Drill Program at South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

(TheNewswire)

Tisdale Clean Energy Corp.

Tisdale Clean Energy Corp. (" Tisdale " or the " Company ") (TSXV:TCEC ) ( OTC: TCEFF ) ( FSE: T1KC ) is pleased to confirm its upcoming work program at the South Falcon East Uranium Project which hosts the Fraser Lakes B uranium deposit.  The south Falcon East Project lies 18 km outside the edge of the Athabasca Basin, approximately 50 km east of the Key Lake uranium mill and former mine

Tisdale Clean Energy Corp entered into an option agreement with SkyHarbour Resources Ltd in October of 2022 whereby the company can earn up to a 75% interest in the South Falcon East property.

The Company is set to begin a preliminary phase one drill program for late winter 2024.  The initial phase one program will consist of up to approximately 1,500 meters of drilling.   The priority will be to confirm and expand the existing mineralization associated with the Fraser Lakes B Uranium Deposit (Figure 2).  Infill drilling will confirm the presence and continuity of existing mineralization in preparation for a current updated resource estimate and 3D model in the future.  Step out drilling will endeavor to expand the footprint of the deposit, as the current mineralization is open in all directions.  Initial focus will be in extending mineralization along strike and down dip into the basement.

A secondary priority will be to begin regional exploration by following up promising anomalies located in the T-Bone Lake area (Figure 2).  Regional drilling will focus on the effort to add additional mineralized zones and deposits along the folded structural package that hosts the Fraser Lakes B Deposit.

"The commencement of drilling is a milestone in terms of our ability to unlock the value contained at South Falcon," said Alex Klenman, CEO.  "Right now, nobody is getting much credit for those pounds in the ground. This will begin to change as we drill and earn our interest in the project. The initial phase one plan allows us to meet the early obligations of the earn-in with Skyharbour.  We are hopeful our valuation will grow as a result, therefore reducing the barrier to entry for institutional support and giving us the opportunity to implement larger drill programs moving forward through 2024 and beyond.

"We believe very strongly that both the size and average grade of the resource can be increased.  The last holes drilled in 2015 generated U308 values of .172% and .165% over intervals of two meters or more.   These results established that higher grade uranium exists within the deposit.  We have a very compelling exploration narrative, and one we feel confident in pursuing.  No doubt the first steps are the hardest, and we're pleased we're able to begin to execute on the plan," continued Mr. Klenman.

"We are thrilled to have Tisdale commence their inaugural drill program at South Falcon East," said Jordan Trimble, CEO of Skyharbour Resources.  "The project is an advanced-stage exploration asset that hosts a near-surface uranium resource with strong expansion potential as well as robust discovery upside potential regionally on the property. We are confident that this winter drill program will unlock further value for both companies' shareholders with the uranium price trading near sixteen-year highs," continued Mr. Trimble.

The field program is anticipated to commence in late February and will be executed by Terralogic Exploration Inc. under the supervision of Laura Tennent, Project Manager with TerraLogic Exploration, and C. Trevor Perkins, consulting geologist for Tisdale.  The drill program will be operating out of Skyharbour's McGowan Lake Camp with helicopter support for the daily drilling operations. The expected budget for the initial phase one program is anticipated to be $1.25 million.


Click Image To View Full Size

Figure 1: South Falcon East Project Location – Eastern Athabasca Basin, Saskatchewan, Canada


Click Image To View Full Size

Figure 2: 2024 Drill Target areas at the south Falcon East Uranium Project


Click Image To View Full Size

Figure 3: South Falcon East Project – Camp and drilling location Map

About the South Falcon East Project

The South Falcon East Project is a uranium exploration project in the southeast Athabasca Basin and represents a portion of Skyharbour Resources Ltd.'s existing South Falcon Project. The project covers approximately 12,464 hectares and lies 18 kilometers outside the Athabasca Basin, approximately 50 kilometers east of the Key Lake Mine.

The South Falcon East Project contains the Fraser Lakes B Uranium/Thorium Deposit with a historic mineral resource* of 6.9 Mlbs U3O8 inferred at a grade of 0.03% U3O8 and 5.3 Mlbs ThO2 inferred at a grade of 0.023 % ThO2.  Uranium and thorium mineralization discovered to date is shallow classic Athabasca-style basement mineralization associated with well-developed EM conductors.

About Tisdale Clean Energy Corp.

Tisdale Clean Energy is a Canadian-based uranium exploration and development company.  The Company is currently developing the South Falcon East uranium project, which holds a 6.96M pound inferred uranium resource within the Fraser Lakes B uranium/thorium deposit, located in the Athabasca Basin region, Saskatchewan, Canada.

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by C. Trevor Perkins, P.Geo., a Consulting Geologist for the Company, and a Qualified Person as defined by National Instrument 43-101.

* The historical resource is described in the Technical Report on the South Falcon East Property, filed on sedar.com on February 9, 2023.  The Company is not treating the resource as current and has not completed sufficient work to classify the resource as a current mineral resource.  While the Company is not treating the historical resource as current, it does believe the work conducted is reliable and the information may be of assistance to readers.

ON BEHALF OF THE BOARD OF TISDALE CLEAN ENERGY CORP.

"Alex Klenman"

Alex Klenman, CEO

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release, the words "anticipate", "believe", "estimate", "expect", "target, "plan", "forecast", "may", "schedule" and similar words or expressions identify forward-looking statements or information. Such statements represent the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political, and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules, and regulations.

For further information please contact:

Alex Klenman, CEO

Tel: 604-970-4330

info@tisdalecleanenergy.com

Tisdale Clean Energy Corp

Suite 2200, HSBC Building, 885 West Georgia St.
Vancouver, BC  V6C 3E8 Canada

www.tisdalecleanenergy.com

Copyright (c) 2024 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

TCEC:CC
Tisdale Clean Energy

Tisdale Clean Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Tisdale Clean Energy

Tisdale Clean Energy


Keep reading...Show less
Tisdale Clean Energy Corp. Presents in Red Cloud's Virtual Webinar Series

Tisdale Clean Energy Corp. Presents in Red Cloud's Virtual Webinar Series

Tisdale Clean Energy Corp. (CSE: TCEC) is pleased to announce that the company is presenting a live virtual corporate update hosted by Red Cloud Financial Services on May 6th, 2024 at 2pm ET.

We invite our shareholders, and all interested parties to register for the webinar and participate in the live Q&A session at the end of the presentation moderated by Red Cloud.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Tisdale Clean Energy to be Featured on Radius Research's Pitch, Deep Dive and Q&A Webinar

Tisdale Clean Energy to be Featured on Radius Research's Pitch, Deep Dive and Q&A Webinar

(TheNewswire)

Tisdale Clean Energy Corp.

Tisdale Clean Energy Corp. ("Tisdale" or the "Company") (CSE:TCEC ) ( OTC:TCEFF ) ( FSE:T1KC), is pleased to invite investors and other interested parties to attend an upcoming interview with Market Radius Research

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Tisdale Clean Energy Closes Additional Private Placement

Tisdale Clean Energy Closes Additional Private Placement

(TheNewswire)

Tisdale Clean Energy Corp.

Tisdale Clean Energy Corp. (the " Company " or " Tisdale ") (CSE:TCEC ) ( OTC:TCEFF ) ( FSE:T1KC ) is pleased to announce that it has closed a further non-brokered private placement (the " Offering ") and has issued 2,179,500 units (each, a " Unit ") at a price of $0.18 per Unit for gross proceeds of $392,310.  Each "Unit" issued in the Offering consists of one common share of the Company and one share purchase warrant exercisable at a price of $0.30 until February 29, 2026

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Tisdale Clean Energy Upsizes Private Placement and Closes $1.145M Second Tranche

Tisdale Clean Energy Upsizes Private Placement and Closes $1.145M Second Tranche

(TheNewswire)

Tisdale Clean Energy Corp.

Vancouver, B.C. TheNewswire - February 1, 2024 Tisdale Clean Energy Corp. (the " Company " or " Tisdale ") (CSE:TCEC ) ( OTC:TCEFF ) ( FSE:T1KC ) is pleased to announce that it has closed a second tranche of its non-brokered private placement (the " Offering ") and has issued a further 6,362,216 units (each, a " Unit ") at a price of $0.18 per Unit for gross proceeds of $1,145,199.  Each "Unit" issued in the second tranche of the Offering consists of one common share of the Company and one share purchase warrant exercisable at a price of $0.30 until February 1, 2026.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Baselode Discovers New Zone of Radioactivity Six Kilometres Northeast of ACKIO

Baselode Discovers New Zone of Radioactivity Six Kilometres Northeast of ACKIO

  • Intersected over 30 metres of continuous radioactivity within a massive hydrothermal alteration system
  • New zone discovered on the second drill hole of Hook's regional exploration program, 6 km from ACKIO discovery
  • Demonstrates the fertility of the uranium corridor along Baselode's Hook Project

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce the discovery of a new uranium prospect on the Hook project ("Hook") in the Athabasca Basin area of northern Saskatchewan (Figure 1).

"We're very excited about this new discovery on Hook, on the second hole of our regional exploration program. HK24-010 intersected over 30 metres of continuous radioactivity at approximately 173 metres vertical depth. This new discovery is hosted within a massive alteration corridor similar in scale to what we have observed at our ACKIO zone 6 km to the southwest. We believe the alteration corridor has mobilized uranium from the host rocks and deposited it within a redox front, similar to what we interpret for HK24-010. We intend to follow-up drilling in this area in the coming weeks after completing exploration drilling in a logistically efficient order on other targets with stronger geophysical anomalisms. Hook's regional exploration aim was to discover new zones of uranium mineralization and we're well on our way with this new prospect," commented James Sykes, CEO, President, and Director of Baselode.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs

Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) (the "Company") is pleased to announce assay results from its 2024 winter diamond drilling program which totaled 2,864 metres in nine holes at its 100% owned, 35,705 hectare Moore Uranium Project. The project is located approximately 15 kilometres east of Denison Mine's Wheeler River project and proximal to regional infrastructure for Cameco's Key Lake and McArthur River operations in the Athabasca Basin, Saskatchewan. A highlight from this program was from hole ML24-08 which intersected 5.0 metres of 4.61% U 3 O 8 from a relatively shallow downhole depth of 265.5 metres to 270.5 metres including 10.19% U 3 O 8 over 1.0 metre at the Main Maverick Zone. Skyharbour plans to continue advancing Moore through additional drilling in 2024 in conjunction with a fully-funded summer drill program to follow-up on the recently reported Fork target uranium discovery at the Company's adjacent Russell Lake Uranium Project. The combined drill campaign this summer is planned to consist of approximately 7,000 - 8,000 metres with details forthcoming.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program

Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQB: SYHBF ) (Frankfurt: SC1P ) (the "Company") is pleased to announce initial results from Phase One of its 2024 winter drill program at the 73,294 hectare Russell Lake Uranium Project ("Russell" or the "Project"). The Project is strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan adjacent to regional infrastructure, including an all-weather road and powerline. Drilling at Russell was completed during two separate phases of drilling with a total of 3,094 metres drilled in six holes during Phase One with geochemical assays reported here. The second phase of the winter drill program at Russell consisted of 2,058 metres in four holes with the geochemical assays still pending and to be released at a later date. The Company also recently completed 2,864 metres of drilling in nine holes at its Moore Project with assays pending from that program.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Provides Exploration Update on Geophysical Programs at Russell South, Tabbernor, and Smart Lake Projects

Purepoint Uranium Provides Exploration Update on Geophysical Programs at Russell South, Tabbernor, and Smart Lake Projects

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") is pleased to announce the completion of two geophysical programs at its Russell South project, the commencement of a new geophysical survey at the Tabbernor project, and the rescheduled survey at the Smart Lake joint venture project. Additionally, Purepoint has released an updated Portfolio Handbook, now available on the Company's newly launched website.

"Our team has made significant strides in advancing our exploration efforts at both Russell South and Tabbernor," said Chris Frostad, President and CEO of Purepoint. "We are particularly excited about the upcoming completion of the Smart Lake survey, which will set the stage for our winter drilling program."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Baselode Reports High Levels of Radioactivity Over Wide Intercepts at ACKIO Uranium Project

Baselode Reports High Levels of Radioactivity Over Wide Intercepts at ACKIO Uranium Project

  • Over 30 metres of continuous radioactivity, such as 907 cps over 34 m, including 9,173 cps over 0.4 m
  • AK24-118 and AK24-119 returned the widest radioactivity levels in Pod 6
  • All three drill holes with over 20 metres of cumulative thickness of radioactivity
  • The second drill for regional exploration targets has now mobilized to site

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce radioactivity results from the first three diamond drill holes within the ACKIO ("ACKIO") uranium prospect of the Hook project ("Hook") in the Athabasca Basin area of northern Saskatchewan (Figure 1).

"AK24-119's results rank as one of the top 10 best drill hole radioactivity intersections at ACKIO, making this a unique drill hole. Previous drill hole AK22-035 intersected 0.54% U3O8 over 7.3 m (see Baselode News Release dated September 12, 2022) in Pod 6, and we are seeing similar levels of radioactivity within AK24-118 and AK24-119 but over broader widths within the same Pod, suggesting mineralization remains open in this area. ACKIO has continued to deliver encouraging results since the discovery in 2021, and we expect more promising results to follow.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project

Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has recently completed a geophysical program at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program included a ground electromagnetic survey (ML-TEM) and a ground gravity survey. Orano is now preparing for a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program that will take place this summer at the project.

Location Map of Preston Project:
https://www.skyharbourltd.com/_resources/maps/Sky_Preston_20211209.jpg

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Tisdale Clean Energy

Tisdale Clean Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×