Tinka Acquires Minority Stake in Gold Exploration Property in Saudi Arabia

Tinka Resources Limited (TSXV: TK,OTC:TKRFF) (OTCQB: TKRFF) ("Tinka" or the "Company") is pleased to announce that it has acquired, through its 100%-owned subsidiary Tinka Saudi Resources Corp., a minority stake in a mineral exploration property in Saudi Arabia prospective for gold deposits. The concession over the Property, known as "Huwaymidan", was acquired as the result of a successful competitive tender by a mining consortium including Tinka in Round 6 exploration licence auction held by the Ministry of Industry and Mineral Resources of Saudi Arabia (the "Ministry") in November 2024 (link here). The Ministry granted a concession over the Property to Midad Al Mona Mining Company ("Midad Al Mona"), a newly established Saudi Arabian company, in late July 2025. Tinka now owns a 5% carried interest in Midad Al Mona while our Saudi Arabian partner owns 94%. Midad Al Mona will be fully funded and capitalized by our Saudi partner for the first two years of the exploration program.

Huwaymidan covers an area of 34 km2 in the Jiddah Terrane of the Saudi Arabian Shield (Figure 1). Numerous gold workings are known, while no mineral resources have been defined. Past trench sampling results include 10 g/t gold over 2.5 metres within a much wider clay - silica alteration zone with gold anomalism and a mapped strike of 1 km. Field work will commence in September 2025 with a program of mapping, rock sampling and ground-based geophysics (magnetics). An initial shallow drill program is planned for late 2025, and no additional permitting is required to allow drilling.

Key highlights of the Huwaymidan Property acquisition:

  • Huwaymidan is situated 300 km east of the Red Sea city of Jeddah in central Saudi Arabia, an area with excellent road access.
  • The Property has historic gold workings (surface trench results up to 2.5 m @ 10 g/t Au) yet to be tested by modern exploration. There is no past drilling recorded. Much of the area is covered by shallow sand.
  • The Property is located in an underexplored region of the Precambrian-age Arabian Shield prospective for orogenic gold. Deposits in the region include Ar Rjum (~ 3.9 Moz Au) just 30 km from Huwaymidan, and Mansourrah-Masarah gold mines (~ 7.5 Moz Au) operated by Maaden approximately 100 km from the Property (Figure 1);
  • Midad Al Mona will be funded and capitalized by Kalimat Al Hikma our Saudi partner, a private company, to undertake the anticipated exploration programs in 2025 and 2026.
  • Tinka will provide exploration expertise and technical leadership to Midad Al Mona and be paid consulting fees for all services provided;
  • Tinka holds a 5% carried interest for the first two years. Afterwards, Tinka may continue to hold its interest by negotiating a renewed consulting agreement or via a funding arrangement.

Dr. Graham Carman, Tinka's President and CEO, stated: "This new venture in Saudi Arabia is an exciting opportunity for our Company. Our Saudi partner is a well funded and well-respected family-run company based out of Jeddah. The project company will be funded and capitalized by our Saudi partner for at least the first two years, with Tinka providing exploration leadership and project oversight. Not only is there no upfront funding required by Tinka but we will be paid for all services provided."

Dr. Carman continued: "Tinka gains critical access through this relationship to exploration and capital market opportunities in the Middle East. This is a huge capital market, which has started to diversify investments from hydrocarbon industries into new opportunities including in the mining sector. Importantly, the Saudi venture will not detract from our focus in Peru. On-ground activities in Saudi will largely be supervised by 3rd party geological consultants and locally sourced personnel."

The Huwaymidan Gold Property

Background

Huwaymidan was awarded to the Midad Al Mona - Tinka consortium on November 24, 2024, following a competitive tender process under exploration licencing Round 6 by the Saudi government (link here). A concession over the Property was granted to Midad Al Mona in late July 2025 covering 34 km2. The ownership of Midad Al Mona is: Kalimat Al Hikma 94% (a local company), Tinka Saudi Resources Corp. 5% and Orthosa Pty. Ltd. 1% (a private Australian exploration consulting company not related to Tinka). Tinka is responsible for providing technical expertise and exploration leadership to Midad Al Mona, and in overseeing the field program to be largely undertaken by 3rd party consultants and local personnel. The Saudi partner will cover sufficient funding and capitalization for the first 2 years.

Geology

Huwaymidan is located 300 km east of Jeddah in the Jiddah Terrane (Figure 1). The Property is prospective for orogenic gold deposits hosted by Precambrian mafic volcanic and intrusive igneous rocks associated with shear zones. Past exploration data is limited to surface sampling for gold associated with old workings. Geochemical data from historic trenches returned results up to 2.5 m grading 10 g/t gold within a zone of hydrothermal clay-silica alteration with iron oxides up to 200 metres wide and 1 km in strike length (NW-SE). A reconnaissance field trip in January 2025 confirmed this zone of alteration in trench debris (with trenches largely infilled with recent sand) with check samples grading up to 6 g/t Au.

Regionally, the Arabian Shield is composed of Proterozoic (~900-550 million year old) igneous and sedimentary rocks. Several large gold deposits are currently in operation within the Arabian Shield in Saudi Arabia and the Nubian Shield across the Red Sea in Egypt (including the world-class Sukari mine >10 Moz gold) - see Figure 1. The Huwaymidan Property lies within the Ash Shakhtaliyat belt consisting mostly of mafic volcanics and intrusive rocks. The Ar Rjum gold deposit (3.9 Moz Au) lies within the same belt 30 km to the southeast of the Property. Mansourrah-Masarah gold mines (~ 7.5 Moz Au) are located approximately 100 km to the east. Gold mineralization in these deposits is generally associated with shear zones and quartz veining hosted either in volcanic or intrusive rocks. The Jabal Sayid copper mine is a volcanogenic massive sulphide deposit approximately 150 km to the NNW of the Property.

Key Deal Terms

  • Tinka to have 5% carried ownership of Midad Al Mona for the first two years;
  • Exploration to focus on the Huwaymidan Property for gold. All exploration and administration costs to be covered by our Saudi partner for the first two years (up to ~C$2.3 M);
  • Tinka to provide exploration leadership to Midad Al Mona with Dr. Graham Carman as Technical Director;
  • Consulting fees to be paid to Tinka technical personnel, at market rates, capped at US$250K over 2 years;
  • Certain KPIs to be met by Tinka during the first two years in order to retain an interest in Huwaymidan, including the successful execution of a drill program;
  • Following the initial two-year period, Tinka may continue to hold its interest via a renewed consulting agreement or by a funding arrangement;
  • All shareholders to be locked-in for the first two years, a period when shareholders are unable to sell, transfer, or otherwise dispose of its shares or their interest in Midad Al Mona.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2197/263041_4a0c4722a46d3a59_007.jpg

Figure 1. Simplified Geology Map of the Saudi Arabian Shield and location of the Huwaymidan property

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2197/263041_4a0c4722a46d3a59_007full.jpg

Data sources: Annual Reports for Maaden and Centamin (now AngloGold Ashanti) at Dec. 31, 2023 - Mineral Resource tables.

On behalf of the Board,

"Graham Carman"
Dr. Graham Carman, President & CEO
Further Information:
www.tinkaresources.com
Mariana Bermudez 1.604.685.9316
info@tinkaresources.com

  Stay up to date by subscribing for news alerts at Contact Tinka and by following Tinka on X, LinkedIn and Facebook.  

 

About Tinka Resources Limited

Tinka is an exploration and development company with its flagship property being the 100%-owned Ayawilca zinc-silver-tin project in central Peru, and is also exploring the nearby Silvia copper-gold project. Mineral Resources at Ayawilca include the Zinc Zone which has an estimated Indicated Mineral Resource of 28.3 Mt grading 5.8% zinc, 16.4 g/t silver, 0.2% lead and 91 g/t indium, and an Inferred Mineral Resource of 31.2 Mt grading 4.2% zinc, 14.5 g/t silver, 0.2% lead and 45 g/t indium. The Tin Zone at Ayawilca has an estimated Indicated Mineral Resource of 1.4 million tonnes grading 0.72% tin and an Inferred Mineral Resource of 12.7 Mt grading 0.76% tin. The Company filed a NI 43-101 technical report on an updated PEA for the Ayawilca Project on April 15, 2024 (link to NI 43-101 report here).

Dr. Graham Carman, Tinka's President and CEO, has reviewed, verified and approved the technical contents of this release. Dr. Carman is a Fellow of the Australasian Institute of Mining and Metallurgy, and is a Qualified Person as defined by National Instrument 43-101.

Forward-Looking Statements: Certain information in this news release contains forward-looking statements and forward-looking information within the meaning of applicable securities laws (collectively "forward-looking statements"). All statements, other than statements of historical fact are forward-looking statements. Forward-looking statements include, but are not limited to, statements regarding the strategic review. Forward-looking statements are based on the beliefs and expectations of Tinka as well as assumptions made by and information currently available to Tinka's management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations: timing and successful completion of the strategic review; timing of planned work programs and results varying from expectations; delay in obtaining results; changes in equity markets; uncertainties relating to the availability and costs of financing needed in the future; equipment failure, unexpected geological conditions; imprecision in resource estimates or metal recoveries; success of future development initiatives; competition and operating performance; environmental and safety risks; timing of geological reports; the preliminary nature of the Ayawilca Project PEA and the Company's ability to realize the results of the Ayawilca Project PEA; the political environment in which the Company operates continuing to support the development and operation of mining projects; risks related to negative publicity with respect to the Company or the mining industry in general; delays in obtaining or failure to obtain necessary permits and approvals from local authorities; community agreements and relations; and, other development and operating risks. Should any one or more of these risks or uncertainties materialize, or should any underlying assumptions prove incorrect, actual results may vary materially from those described herein. Although Tinka believes that assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. Except as may be required by applicable securities laws, Tinka disclaims any intent or obligation to update any forward-looking statement.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/263041

News Provided by Newsfile via QuoteMedia

TK:CC
The Conversation (0)

Tinka Announces Filing of Technical Report on an Updated Preliminary Economic Assessment of the Ayawilca Polymetallic Project

Tinka Resources Limited ("Tinka" or the "Company") (TSXV:TK)(BVL:TK)(OTCQB:TKRFF) announces that the Company has filed a National Instrument 43-101 Technical Report entitled "NI 43-101 Technical Report on a Preliminary Economic Assessment of the Ayawilca Polymetallic Project, Peru" ("Technical Report") in support of the Company's news release dated February 28, 2024 (the "News Release"). There are no material differences in the Technical Report from the information disclosed in the News Release. The effective date of the Technical Report is February 28, 2024

Dr. Graham Carman, Tinka's President and CEO stated: "We are pleased to release the Technical Report for the updated 2024 Preliminary Economic Assessment ("PEA") which showcases Ayawilca as an attractive polymetallic project with a mix of critical metals and excellent economics using conservative metal prices. The updated PEA introduces significant improvements from the previous study, including a streamlined operation with a more efficient zinc-silver-lead plant and a dedicated tin plant. In addition, the Ayawilca Mineral Resource has a stronger level of confidence following drilling completed in 2023 while the updated conceptual mine footprint is more compact. Ayawilca has a mix of essential critical metals for the modern hi-tech economy, and we look forward to continuing to move the project towards development."

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Tinka Reports Updated PEA and Mineral Resource Estimate for the Ayawilca Polymetallic Zinc-Tin-Silver Deposit

Tinka Resources Limited ("Tinka" or the "Company") (TSXV:TK)(BVL:TK)(OTCQB:TKRFF) is pleased to announce the results from an updated Preliminary Economic Assessment ("PEA") on the Company's 100%-owned polymetallic Ayawilca project ("Ayawilca" or the "Project") in central Peru. The updated PEA shows Ayawilca to be an excellent base metals project with significant enhancements from the previous PEA study. The Project now features a smaller, more efficient zinc-silver-lead plant, introduces a separate tin plant for additional revenue and commodity diversification and highlights the development path forward for Ayawilca to become a producing mine

PEA Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Tinka Provides Ayawilca Project Update

Tinka Resources Limited ("Tinka" or the "Company") (TSXV:TK)(BVL:TK)(OTCQB:TKRFF) is pleased to provide an update on the Company's exploration and development activities at its 100%-owned Ayawilca project ("Ayawilca" or the "Project") in central Peru

Key Highlights for 2023

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Tinka Reports Final Drill Hole Results from 11,000 metre Drill Program and Provides Exploration Update

Tinka Resources Limited ("Tinka" or the "Company") (TSXV:TK)(BVL:TK)(OTCQB:TKRFF) is pleased to announce results for the final three drill holes of the 11,000-metre 2022-2023 drill program at South Ayawilca and to provide an update on the Company's ongoing exploration activities. The recent drill campaign at Ayawilca was completed at the end of May 2023. The Company is now focused on completing a Mineral Resource update for the Ayawilca deposit and revising future mining scenarios via a desktop trade-off study. Exploration is also continuing at the Company's nearby Silvia copper-gold project

Drill results from the "Silver Zone" at South Ayawilca were highly encouraging with a high-grade silver intercept in a 150-metre step-out in hole A22-195. The other two new holes reported here, A23-221 and A23-223, intersected high-grade "Zinc Zone" mineralization in resource confirmation holes. All drill hole results have now been incorporated into a revised geological model for the Ayawilca deposit, and an independent consultant is currently updating the Mineral Resource estimation for the Zinc and Tin Zones.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Tinka Drills 98 Metres at 8.8% Zinc Including 36 Metres at 19.0% Zinc at Ayawilca and Provides Exploration Update

Tinka Resources Limited ("Tinka" or the "Company") (TSXV:TK)(BVL:TK)(OTCQB:TKRFF) is pleased to announce results for five recent drill holes from the Ayawilca Project and to provide an update on the Company's exploration activities. All five drill holes were resource confirmation holes from West Ayawilca, and all intersected strong zinc mineralization. The Company has now successfully completed its 11,000-metre drill program at Ayawilca which commenced midway through 2022. Two drill rigs were demobilized during May 2023 and independent mining consultants have now been engaged to complete an updated mineral resource estimate

The 2022-23 drill program has significantly improved the geological model of the mineralized zinc bodies at West and South Ayawilca and improved the confidence in the continuity of mineralization. One exploration hole at South Ayawilca has results pending. The next steps for the project include an updated resource estimate to be announced during Q3 2023 and the continuation of low impact exploration.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Bold Ventures Announces Prospecting and Sampling Results and Mobilizes Crew to Burchell Gold and Copper Project

Bold Ventures Announces Prospecting and Sampling Results and Mobilizes Crew to Burchell Gold and Copper Project

Bold Ventures Inc. (TSXV: BOL,OTC:BVLDF) (the "Company" or "Bold") is pleased to announce the results of a prospecting and sampling program on its Burchell Gold and Copper Property (the "Property"), located within the Shebandowan Greenstone Belt, approximately 100 km west of Thunder Bay, Ontario. 209 grab samples and 42 channel samples were collected in total. The goal of this phase of work was preparation for a mechanical stripping, sampling and geological mapping program at the 111 Zone gold showing and surroundings. A crew has been mobilized for the mechanical stripping program which will commence immediately.

Highlights from the program include:

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Heritage Mining Plans Aggressive Program at Zone 3 Extension Mega-Quartz Vein System at its Flagship Drayton-Black Lake Project

Heritage Mining Plans Aggressive Program at Zone 3 Extension Mega-Quartz Vein System at its Flagship Drayton-Black Lake Project

/ NOT INTENDED FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES /

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Quetzal Copper Announces Refiling of June 30, 2025 Financial Statements

Quetzal Copper Announces Refiling of June 30, 2025 Financial Statements

Quetzal Copper Ltd. (TSXV: Q,OTC:QTZCF) ("Quetzal" or the "Company") announces that it has refiled its interim financial statements and management's discussion and analysis ("MD&A") for the three and six months ended June 30, 2025 (the "Q2 2025 Financial Statements"). The original filings were made on August 28, 2025.

The amendment was made to correct and clarify disclosure relating to the Company's share-based compensation. The Q2 2025 financials originally filed on August 28, 2025 did not reflect the correct number of options and warrants outstanding, and the share-based compensation related to the January 15, 2025 option grant was not accounted for. In this refiling, the correct number of outstanding options and warrants and the share-based compensation related to the January 15, 2025 option grant have now been properly reflected and accounted.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Two Pools Project expands with new tenement applications

Two Pools Project expands with new tenement applications

Corazon Mining (CZN:AU) has announced Two Pools Project expands with new tenement applications

Download the PDF here.

Angkor Resources Receives Approval to Incorporate Mussel Basin into Block VIII Oil and Gas License, Cambodia

Angkor Resources Receives Approval to Incorporate Mussel Basin into Block VIII Oil and Gas License, Cambodia

(TheNewswire)

GRANDE PRAIRIE, ALBERTA (September 10, 2025) TheNewswire - Angkor Resources Corp. (TSXV: ANK,OTC:ANKOF) ("ANGKOR" OR "THE COMPANY") announces its subsidiary, EnerCam Resources Co. Ltd. (Cambodia) ("EnerCam") has received approval from government authorities of Ministry of Mines and Energy for an additional 220 square kilometers added within the Block VIII boundaries, referred to as the Mussel Basin.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×