Sun Summit Commences 2025 Exploration Program at the JD Project, Toodoggone District, British Columbia

Sun Summit Commences 2025 Exploration Program at the JD Project, Toodoggone District, British Columbia

Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) ("Sun Summit" or the "Company") is pleased to announce the commencement of its $6 million 2025 project-wide exploration program at the JD Project, Toodoggone Mining District, north-central British Columbia. Over 5,000 meters of drilling together with geophysical and geochemical surveys are designed to focus on target advancement, target generation and discovery.

Highlights and Next Steps:

  • Transformational Exploration Season Has Commenced: The 2025 program is more robust than the inaugural 2024 program, with double the budget and drill metres planned. Crews have mobilised to site with camp construction, geological mapping, IP Geophysics, and drill pad construction now underway. Drilling is anticipated to begin no later than mid-July.
  • Over 3,000 meters of drilling planned at the Creek Zone, designed to investigate the extent and continuity of near-surface, high-grade and bulk-tonnage gold mineralization. Historical and recent highlight intercepts include:
  • 122.53 m of 2.11 g/t Au including 1.5 of 121.0 g/t Au (CZ-24-0047)
  • 57.95 m of 2.69 g/t Au including 19.50 m of 7.31 g/t Au (CZ-24-0058)
  • 22.0 m of 11.7 g/t Au including 4.0 m of 61.2 g/t Au (CZ97-0085)
  • Over 2,000 meters of drilling planned at the Finn Zone, designed to evaluate the extent and continuity of high-grade and bulk-tonnage gold mineralization. Historical highlight intercepts include:
  • 35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0472)
  • 25.9 m of 6.42 g/t Au including 6.1 m of 12.8 g/t Au (JD94-0151)
  • 22.0 m of 6.32 g/t Au including 12.6 m of 10.8 g/t Au (JD12-0033)
  • Project-wide exploration will also focus on drill target refinement, including:
  • Over 20 line km of induced polarization ("IP") geophysics along the newly defined 12 km long JD porphyry trend
  • Over 2,000 soil samples across parts of the JD porphyry trend and the epithermal-related Finn to Creek corridor
  • Over 30 days of project-wide geological mapping and prospecting

Niel Marotta, CEO of Sun Summit Minerals, commented: "We are very excited to have kicked off our 2025 exploration season at our JD project, which is fully funded by the proceeds of our recently completed private placement. The Toodoggone region in north-central British Columbia is one of the hottest mineral exploration districts in Canada, and has seen heightened corporate activity, combined with a large influx of capital. We expect plenty of news flow coming from the Toodoggone over the summer and fall, including drill results from our own aggressive 5,000 metre program."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_001.jpg

Figure 1. Map of the Toodoggone District showing the location of the JD Project in relation to other development and exploration projects. Data sourced from Thesis, TDG, Amarc and Centerra's corporate websites.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_001full.jpg

JD Exploration Program

Crews have mobilised to the Toodoggone District to commence the 2025 JD Project exploration season (Figure 1). The primary goal for 2025 multidisciplinary exploration program is to advance and expand the epithermal-related Creek and Finn gold-silver targets through a series of systematic step-out holes, and to generate and refine new priority targets across the highly-prospective 4.5 km long Finn to Creek corridor, as well as the 12 km long JD porphyry trend (Figure 2).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_002.jpg

Figure 2. Map of the JD Project showing the broad JD Porphyry trend and the epithermal-related Finn to Creek Corridor. Planned areas for IP and soil surveys are shown in grey. Key targets are highlighted.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_002full.jpg

Creek Zone: Drilling at the Creek Zone (Figure 2) is designed to investigate the lateral and vertical extent of high-grade and bulk-tonnage gold mineralization (e.g., 122.53 m of 2.11 g/t Au, including 20.0 m of 10.01 g/t Au, and including 1.52 m over 121.0 g/t Au, CZ-24-004, Figure 3, see October 2, 2024, news release). Based on new geological and structural modelling, a series of steeply-dipping, northwest trending parallel vein sets with associated halos of disseminated gold mineralization have been defined. Over 3,000 meters across 10 to 12 drill holes are planned to systematically test the vein-controlling structures on 50 to 100 meter pierce-points covering a strike-length of over 700 meters (Figure 3) and a down-dip extent of over 200 meters. Results from this phase of drilling should inform grade continuity, the scale of the epithermal system and where follow-up deeper and/or step-out holes are warranted.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_003.jpg

Figure 3. Map of the Creek Zone showing drill collar locations with selected highlights. The area targeted for 2025 drilling is outlined in red. See references below for data sources.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_003full.jpg

Finn Zone: Drilling at the Finn Zone is designed to expand the footprint of high-grade, near-surface base metal-rich gold-silver mineralization intersected in historical drilling (e.g., 35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au in hole JD95-0472). Based on an extensive compilation of over 300 historical drill holes, a new geological and structural model suggests that epithermal-related gold-silver mineralization is hosted within veins and vein-breccias situated along a northwest striking and gently dipping volcaniclastic unit. Over 2,000 meters of drilling across 7 to 9 drill holes are planned to test the model along strike (e.g., towards hole JD13-024) and down-dip (e.g., toward JD12-015) covering a strike-length of over 650 meters (Figure 4). Drilling near the higher-grade core may also be completed to verify historical grades, confirm structural controls and explore at depth to assess the geometry and grade of the mineralized footwall zone (e.g., JD12-0093).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_004.jpg

Figure 4. Map of the Finn Zone showing historical drill collar locations with selected highlights. The area targeted for 2025 drilling is outlined in red. See references below for data sources.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6142/255925_2d2b07a7743f0abf_004full.jpg

Target Generation: Project-wide exploration activities are aimed at target generation and drill target refinement.

  • Over 20 line km of IP geophysics will build on previous surveys and expand the grid along the high-prospective, 12 km long JD porphyry trend. Areas considered prospective for porphyry-related mineralization along this trend (e.g., Belle South) will also be covered by new soil geochemical grids (Figure 2).
  • Areas considered highly-prospective for epithermal-related gold-silver mineralization along and proximal to the Finn to Creek corridor will be covered by new soil geochemical grids. Detailed geological mapping focused on lithological and structural controls of epithermal-related veins and breccias will be completed to inform a new targeting model.
  • High-priority target areas outside of the main JD area (e.g., Oxide Peak West, Moosehorn, and East McClair) will be investigated through geological mapping and prospecting (Figure 2).

Timeline: Crews have mobilised to site with camp construction, geological mapping, IP Geophysics, and drill pad construction now underway. Drilling at the Creek Zone is anticipated to begin by mid-July, at the latest.

National Instrument 43-101 Disclosure

This news release has been reviewed and approved by Sun Summit's Vice President Exploration, Ken MacDonald, P. Geo., a "Qualified Person" as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators. He has not been able to verify the historical exploration data disclosed, including sampling, analytical and test data, underlying the technical information in this news release since such data is historical and the original drill core is not readily available. Some technical information contained in this release is historical in nature and has been compiled from public sources believed to be accurate. The historical technical information has not been verified by Sun Summit and may in some instances be unverifiable dependent on the existence of historical drill core and grab samples.

Community Engagement

Sun Summit is engaging with First Nations on whose territory our projects are located and is discussing their interests and identifying contract and work opportunities, as well as opportunities to support community initiatives. The Company looks forward to continuing to work with local and regional First Nations with ongoing exploration.

Webinar Invitation

Sun Summit Minerals invites investors and interested parties to a live webinar and Q&A hosted by Simone Capital. CEO Niel Marotta will present an overview of the Company's 2025 exploration and drill program.

Date: Thursday, June 19
Time: 4:00 PM ET | 1:00 PM PT
Register: https://app.livestorm.co/simone-capital/sun-summit-minerals-2025-exploration-update

About the JD Project

The JD Project is located in the Toodoggone mining district in north-central British Columbia, a highly prospective deposit-rich mineral trend. The project covers an area of over 15,000 hectares and is in close proximity to active exploration and development projects, such as Thesis Gold's Lawyers and Ranch projects, TDG Gold's Baker-Shasta projects, Amarc Resource's AuRORA project, Centerra's Gold's Kemess East and Underground projects, as well as the past-producing Kemess open pit copper-gold mine.

The project is 450 kilometres northwest of the city of Prince George, and 25 kilometres north of the Sturdee airstrip. It is proximal to existing infrastructure in place to support the past-producing Kemess mine, including roads and a hydroelectric power line.

The JD Project is in a favourable geological environment characterized by both high-grade epithermal gold and silver mineralization, as well as porphyry-related copper and gold mineralization. Some historical exploration, including drilling, geochemistry and geophysics, has been carried out on the property, however the project area is largely underexplored.

About Sun Summit

Sun Summit Minerals (TSXV: SMN) (OTCQB: SMREF) is a mineral exploration company focused on the discovery, expansion and advancement of district scale gold and copper assets in British Columbia. The Company's diverse portfolio includes the JD Project in the Toodoggone region of north-central B.C., and the Buck Project in central B.C.

Further details are available at www.sunsummitminerals.com.

References

  1. Krause, R.G. (1995), 1994 Geological and Geochemical Report on the JD Gold Silver Property, Toodoggone River Area, Omineca Mining Division, British Columbia, Assessment Report Indexing System, Report 23663, https://apps.nrs.gov.bc.ca/pub/aris.
  2. Krause, R.G. (1996), 1995 Geological Report on the JD Gold Silver Property, Toodoggone River Area, Omineca Mining Division, British Columbia, Assessment Report Indexing System, Report 24284, https://apps.nrs.gov.bc.ca/pub/aris.
  3. McBride, S. (2013), 2012 Geological, geochemical and diamond drilling report on the JD Property, Assessment Report Indexing System, Report 33556, https://apps.nrs.gov.bc.ca/pub/aris.
  4. McBride, S. and Leslie, C. (2014), 2013 Geological, geophysical and diamond drilling report on the JD Property, Assessment Report Indexing System, Report 34762, https://apps.nrs.gov.bc.ca/pub/aris.
  5. Hawkins, P.A. (1998), 1997 Exploration Report on the Creek Zone for Antares Mining and Exploration Corporation and AGC Americas Gold Corporation, JD Property, Toodoggone River Area, Omineca Mining Division, Internal Report #98-065-1.
  6. Davis, J.W., and Jamieson, M.D. (1998), Drilling and Geophysical Report on the M.H. Mineral Clain Group, Toodoggone District, Assessment Report Indexing System, Report 25757, https://apps.nrs.gov.bc.ca/pub/aris.
  7. Sun Summit Minerals news release October 2, 2024
  8. Sun Summit Minerals news release October 16, 2024


Links to Figures

Figure 1: https://wp-sunsummitminerals-2024.s3.ca-central-1.amazonaws.com/media/2025/06/SMN_JD_Plans_20250618_Fig-1.jpg 
Figure 2: https://wp-sunsummitminerals-2024.s3.ca-central-1.amazonaws.com/media/2025/06/SMN_JD_Plans_20250618_Fig-2-scaled.jpg 
Figure 3: https://wp-sunsummitminerals-2024.s3.ca-central-1.amazonaws.com/media/2025/06/SMN_JD_Plans_20250618_Fig-3-scaled.jpg
Figure 4: https://wp-sunsummitminerals-2024.s3.ca-central-1.amazonaws.com/media/2025/06/SMN_JD_Plans_20250618_Fig-4-scaled.jpg 

On behalf of the board of directors,

Niel Marotta
Chief Executive Officer & Director
info@sunsummitminerals.com 

For further information, contact:

Matthew Benedetto, Simone Capital
mbenedetto@simonecapital.ca 
Tel. 416-817-1226

Forward-Looking Information

Statements contained in this news release that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. In addition, the forward-looking statements require management to make assumptions and are subject to inherent risks and uncertainties. There is significant risk that the forward-looking statements will not prove to be accurate, that the management's assumptions may not be correct and that actual results may differ materially from such forward-looking statements. Accordingly, readers should not place undue reliance on the forward-looking statements. Generally forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. Forward-looking statements contained in this press release may include, but are not limited to, the Company's exploration plans and forecasts; the geology, grade and continuity of mineral deposits; potential mineralization, exploration plans, and engagement with First Nations communities. These forward-looking statements are based on a number of assumptions which may prove to be incorrect which, without limiting the generality of the following, include: the focus, purpose and goals of project wide exploration; the existence and timing of news releases and updates, if any, coming from the project area; the Company's ability to complete the drill program as currently contemplated; risks inherent in exploration activities; the uncertainties involved in interpreting drill results and other exploration data; the potential for delays in exploration or development activities; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; accidents, equipment breakdowns, title and permitting matters; labour disputes or other unanticipated difficulties with or interruptions in operations; fluctuating metal prices; unanticipated costs and expenses; uncertainties relating to the availability and costs of financing needed in the future, including to fund any exploration programs on its projects; that the Company may not be able to confirm historical exploration results; the geology, grade and continuity of mineral deposits; volatility and sensitivity to market prices; volatility and sensitivity to capital market fluctuations; and fluctuations in metal prices. The forward-looking statements contained in this press release are made as of the date hereof or the dates specifically referenced in this press release, where applicable. Except as required by applicable securities laws and regulation, Sun Summit disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/255925

News Provided by Newsfile via QuoteMedia

SMN:CC
Sun Summit Minerals

Sun Summit Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Sun Summit Minerals (TSXV:SMN)

Sun Summit Minerals

Keep reading...Show less

Advancing district-scale gold and copper projects in British Columbia.

Sun Summit Commences Drilling and Provides Exploration Update from the JD Project in BC's Toodoggone District

Sun Summit Commences Drilling and Provides Exploration Update from the JD Project in BC's Toodoggone District

Sun Summit Minerals Corp. (TSXV: SMN,OTC:SMREF) (OTCQB: SMREF) ("Sun Summit" or the "Company") is pleased to provide an update from its ongoing project-wide exploration program at the JD Project, Toodoggone Mining District, north-central British Columbia (the "JD Project"). Drilling has now commenced with over 5,000 meters of drilling planned.

Highlights:

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Sun Summit Announces Closing of $10 Million Non-Brokered Private Placement

Sun Summit Announces Closing of $10 Million Non-Brokered Private Placement

Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) ("Sun Summit" or the "Company") is pleased to announce that it has closed its non-brokered private placement (the "Private Placement") previously announced in the Company's press releases on April 24, 2025 and April 28, 2025, through the issuance of (i) 40,868,432 charity flow-through units of the Company (each, a "Charity FT Unit") at a price of $0.105 per Charity FT Unit; (ii) 33,832,770 flow-through units of the Company (each, a "FT Unit") at a price of $0.075 per FT Unit; and (iii) 47,338,602 non-flow-through units (each, an "NFT Unit") at a price of $0.07 per NFT Unit, for aggregate gross proceeds to the Company of $10,142,345, representing a partial exercise of the Company's over-allotment option.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Spools of copper wire.

Top 5 Junior Copper Stocks on the TSXV in 2025

The copper price climbed to a record high of US$5.64 per pound on the COMEX during the second quarter of 2025.

The price rise comes on the back of escalating trade tensions and economic chaos from the United States’ new tariff policy.

While copper was initially spared from tariffs at the start of the year, US President Donald Trump announced the US would be imposing a 50 percent tariff on all copper products entering the US. The announcement sparked speculative buying by US metals traders, who sought to position themselves ahead of the yet-to-be-announced tariff deadline.

How has this affected small-cap copper-focused companies on the TSX Venture Exchange? Read on to learn about the five best-performing junior copper stocks since the start of 2025.

Data for this article was gathered on July 17, 2025, using TradingView's stock screener, and copper companies with market caps of over C$10 million at that time were considered.

Keep reading...Show less
Pile of raw copper nuggets on a dark background.

Barrick Backs Hercules in Leviathan-Linked Copper Expansion

Hercules Metals (TSXV:BIG,OTCQB:BADEF) has entered into a transformative agreement with Barrick Mining (TSX:ABX,NYSE:B) to acquire a vast package of unpatented copper claims surrounding its Leviathan discovery in western Idaho.

Hercules will have the option to acquire a 100 percent interest in more than 74,000 acres of claims, collectively known as the Olympus belt, that flank both sides of the company’s existing Hercules property.

If exercised, the deal would expand Hercules’ total land position from 26,000 acres to over 100,000 acres, granting it control over a 73 kilometer stretch of highly prospective terrain.

The transaction is structured as an option agreement through Hercules’ US subsidiary, Anglo-Bomarc, with Barrick Gold Exploration, a wholly owned subsidiary of Barrick Mining.

Keep reading...Show less
Rows of fine copper bars with text that reads '5 Top Canadian Mining Stocks This Week.'

Top 5 Canadian Mining Stocks This Week: St. Augustine Gains 67 Percent

Welcome to the Investing News Network's weekly look at the best-performing Canadian mining stocks on the TSX, TSXV and CSE, starting with a round-up of Canadian and US news impacting the resource sector.

Statistics Canada released its monthly mineral production report for May 2025 on Monday (July 21). The data shows that the production of both copper and silver increased from April. Copper output rose to 36.3 million kilograms from 35.85 million in April, and silver increased to 26,502 kilograms from 25,412. Meanwhile, gold production decreased marginally to 16,518 kilograms from 16,640 the previous month.

However, shipments were up across the board. Copper shipments rose to 34.34 million kilograms compared to 30.01 million kilograms in April. Silver increased to 26,376 kilograms, up considerably from 22,106 kilograms a month earlier. Gold shipments saw a slighter gain, rising to 14,858 kilograms from 14,660 kilograms in April.

Keep reading...Show less
Silhouetted miners work in a dimly lit tunnel; "Weekly Editor's Picks" text overlay.

Editor's Picks: Miners Rescued, US Mine Waste Strategy, Ontario Expands CIMF

Here's a quick recap of some of the most impactful resource sector news items for the week.

The period saw three miners rescued after 60 hours underground at the Red Chris mine in BC, the US announce a mine waste recovery strategy and the Ontario government add C$7 million to boost critical minerals innovation.

Keep reading...Show less
Traffic light with green signal against a blue sky.

Teck Greenlights Highland Valley Expansion After Beating Q2 Profit Estimates

Teck Resources (TSX:TECK.A,TSX:TECK.B,NYSE:TECK) has secured board approval for a multi-billion-dollar life extension of its Highland Valley copper mine in British Columbia, setting the stage for a two-decade boost in copper output.

The Vancouver-based miner said Thursday (July 24) that construction on the Highland Valley Copper Mine Life Extension Project (HVC MLE) will begin in August, following receipt of environmental and permitting approvals in June.

Keep reading...Show less
Blackstone Minerals

Blackstone Minerals


Keep reading...Show less
Sun Summit Minerals

Sun Summit Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×