Maximus Resources

Strong Drill Results At Golden Orb/S5 Expand Wattle Dam Gold Project

Maximus Resources Limited (‘Maximus’ or the ‘Company’, ASX:MXR) is pleased to announce results from a ~4,100m Reverse Circulation (RC) programme at Wattle Dam Gold Project (“Wattle Dam”) targeting the Golden Orb/S5 trend.


  • The 26-hole drill programme was designed to test mineralisation controls and gaps in legacy drilling south of Wattle Dam Gold Mine, along the S5/Golden Orb corridor and following up previous mineralised zones.
  • Significant gold mineralisation intersected with high-grade intervals within broad zones of mineralisation. Results include:
    • 11m @ 3.8 g/t Au from 37m; incl. 1m @ 11.5 g/t Au from 38m, 1m @ 9.0 g/t Au from 42m and 1m @ 4.3 g/t Au from 44m (RBRC039)
    • 20m @ 1.3 g/t Au from 160m; incl. 8m @ 2.5 g/t Au from 166m and 3m @ 4.4 g/t Au from 170m (WDSRC010)
    • 3m @ 4.2 g/t Au from 20m; incl. 1m @ 9.6 g/t Au from 21m (GORC068)
    • 100m @ 0.8 g/t Au from 90m; incl. 5m @ 2.3 g/t Au from 94m and 7m @ 3.5 g/t Au from 156m (GORC064)
    • 22m @ 1.1 g/t Au from 38m; incl. 2m @ 4.5 g/t Au from 38m incl. 1m @ 7.6 g/t Au from 38m and 1m @ 1.5 g/t Au from 59m (RBRC037)
    • 19m @ 0.9 g/t Au from 20m; incl. 4m @ 1.4 g/t Au from 27m and 3m @ 2.0 g/t Au from 36m and 2m @ 2.4 g/t Au from 36m (S05RC011)
    • 21m @ 1.0 g/t Au from 100m; incl. 4m @ 3.0 g/t Au from 117m and 1m @ 0.7 g/t Au from 120m (RBRC036A)
  • The completed drill programme demonstrates the potential to significantly increase the scale of Wattle Dam.
  • Due to the proximity of the Golden Orb/S5 mineralisation to the Redback Deposit, the scope of Mineral Resource Estimate work has been expanded to include a new larger pit design.

Managing Director Tim Wither commented, “These results from the recent RC drill programme which successfully intersected gold mineralisation across the ~800m Golden Orb / S5 trend, confirm the continuity of mineralisation from Wattle Dam Stockwork through S5 Prospect and Golden Orb, demonstrating the potential for Mineral Resource growth across the Wattle Dam Gold Project.”

“Gold mineralisation across the Golden Orb/S5 trend is similar to the stockwork mineralisation observed immediately adjacent to the Wattle Dam Gold Mine high-grade shoot and provides assurance that the completed drilling is narrowing the search for the potential discovery of another Wattle Dam. With several holes intersecting the broad zones of stockwork mineralisation, it is evident that any follow-up drilling requires several holes to be positioned further to the east of the initial target corridor to investigate potential high-grade shoots. With the receipt of the drill results, the Company is focused on completing a Mineral Resource Estimate for the Wattle Dam Gold Project southern mineralisation, incorporating Redback, Golden Orb and S5."

About Wattle Dam Gold Project

Wattle Dam represents a near-term gold production opportunity for Maximus, strategically located within short trucking distance to several regional gold processing plants. Gold mineralisation at Wattle Dam including the Redback Deposit, Golden Orb and S5 are all considered to be part of a much larger interconnecting mineralised system.

The geological observation along the S5 / Golden Orb corridor drilling is analogous to the Wattle Dam Gold Mine, which is not unexpected, with previous drilling passing through the Western Shear Zone and into variably altered and veined ultramafics in the footwall of the shear zone.

Wattle Dam - Forward Plan

With the positive drill results, the Company will incorporate the Golden Orb, S5 and Redback gold mineralisation for a combined Wattle Dam South Mineral Resource Estimate. The Company expects the Resource Estimate to be completed during December 2022.

The Company has commenced metallurgical test work on representative composite samples across the Wattle Dam, focusing on replicating typical gold processing conditions found in the Western Australian goldfields. Results from the metallurgical test work will define processing requirements for the ores as a precursor to negotiating toll-treating agreements with several gold processing plants within ~70km of the Wattle Dam.


Click here for the full ASX Release

This article includes content from Maximus Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

MXR:AU
The Conversation (0)
Rox Resources

High grade Assay Results Continue at Youanmi

West Australian gold exploration and development company, Rox Resources Limited (“Rox” or “the Company”) (ASX: RXL), has received the final batch of assays from its 11,000m DD and RC program at the Youanmi Gold Project in WA.

Keep reading...Show less
Alice Queen

Drilling Commenced at Viani in Fiji

Alice Queen Limited (ASX:AQX) (“Alice Queen” or the “Company”) is pleased to announce that drilling has commenced at its 100% owned Viani Project in Vanua Levu, Fiji (see Image 1). The initial planned three-hole diamond drilling program will test for high-grade epithermal gold-style mineralisation intersected at the Viani Project by historic drilling.

Keep reading...Show less
Firefly Metals logo

FireFly Drills its Best Hole Yet with Assay of 86.3m at 3.7% CuEq

Latest drilling returns very thick intersections with exceptional grades, outlining a rich area of mineralistion which will form part of the next Resource update

FireFly Metals Ltd (ASX: FFM) (“Company” or “Firefly”) is pleased to announce its best assays yet at the Green Bay copper-gold project.

Keep reading...Show less
Corazon Mining

Strategic Expansion of MacBride Base & Precious Metal Project in Canada

Acquired ground more than doubles Corazon’s prospective landholding / Aerial geophyical survey extended to test new tenure / Work underway defining priority targets for early 2025 drill program

Corazon Mining Limited (ASX: CZN) (Corazon or Company) is pleased to announce the strategic expansion of its MacBride Base and Precious Metals Project (MacBride or Project) in the Lynn Lake district, of Manitoba, Canada.

Keep reading...Show less

Latest Press Releases

Related News

×