SPECTACULAR MYRTLEFORD RESULTS WITH UP TO 446g/t GOLD

SPECTACULAR MYRTLEFORD RESULTS WITH UP TO 446g/t GOLD

Advance Metals Limited (“Advance” or “the Company”) is pleased to provide further assay results for its
maiden drilling program at the Myrtleford Project in the Victorian Goldfields, Australia. Advance recently
entered into a binding agreement with Serra Energy Metals Corp. (CSE:SEEM and OTCQB:ESVNF) to
acquire an 80% interest via joint venture on the high grade Myrtleford and Beaufort Gold Projects1.



HIGHLIGHTS – Diamond hole AMD003 returns intersection of 7.5 metres at 47.9g/t gold

  • Advance has now received the final assay results for second and third diamond drill holes completed at the Happy Valley Prospect in the southeastern portion of the Myrtleford Gold Project
  • This follows the release of exceptional results from the Company’s first hole at the prospect, which returned 8.2 metres at 22.4g/t Au including 3.2 metres at 54.7g/t Au2

Click here for the full press release


AVM:AU
The Conversation (0)
LaFleur Minerals Advances Swanson Confirmation Drilling to Support Beacon Mill Restart and PEA

LaFleur Minerals Advances Swanson Confirmation Drilling to Support Beacon Mill Restart and PEA

LaFleur Minerals Inc. (CSE: LFLR,OTC:LFLRF) (OTCQB: LFLRF) (FSE: 3WK0) is moving closer to near-term gold production with the launch of a confirmation drilling program at its Swanson Gold Deposit in Val-d'Or, Québec. The program will support a Preliminary Economic Assessment (PEA) for the... Keep Reading...
LaFleur Minerals Announces Brokered Private Placement of Gold-Linked Convertible Notes to Finance Restart of Gold Production at Beacon Gold Mill

LaFleur Minerals Announces Brokered Private Placement of Gold-Linked Convertible Notes to Finance Restart of Gold Production at Beacon Gold Mill

LaFleur Minerals Inc. (CSE: LFLR,OTC:LFLRF) (OTCQB: LFLRF) (FSE: 3WK0) ("LaFleur Minerals" or the "Company") is pleased to announce the launch of a brokered private placement of gold-linked convertible notes with a minimum principal amount of $4,000,000 and up to a maximum principal amount of... Keep Reading...
Freegold Intersects 3.63 g/t Au over 45.4m at Golden Summit

Freegold Intersects 3.63 g/t Au over 45.4m at Golden Summit

Highlights: v GS2523 1.24 g/t A over 277.1 m incl 3.63g/t Au over 45.4m v GS2509 1.16 g/t Au over 44.7m v GS2511 3.30 g/t Au over 18.3m v GS2514 1.44 g/t Au over 36.6m The width refers to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization 2025... Keep Reading...
Nine Mile Metals Announces Phase 3 XRF High-Grade Results up to 26.14% Copper with 1.03% Antimony from the Upper Pre Drill Area at the Wedge Copper - Gold Project, BMC, NB

Nine Mile Metals Announces Phase 3 XRF High-Grade Results up to 26.14% Copper with 1.03% Antimony from the Upper Pre Drill Area at the Wedge Copper - Gold Project, BMC, NB

Nine Mile Metals LTD. (CSE: NINE,OTC:VMSXF) (OTC Pink: VMSXF) (FSE: KQ9) (the "Company" or "Nine Mile") is pleased to announce (18) Wedge Pre-Drill Phase 3 - XRF results for Volcanogenic Massive Sulphide (VMS - Cu-Pb-Zn-Ag-Au) mineralization ore samples collected from the upcoming northwestern... Keep Reading...
NevGold Announces Up to 85% Antimony Recovery From Positive Phase II Metallurgical Testwork at Oxide Gold-Antimony Limo Butte Project in Nevada

NevGold Announces Up to 85% Antimony Recovery From Positive Phase II Metallurgical Testwork at Oxide Gold-Antimony Limo Butte Project in Nevada

Nevgold Corp. (" NevGold " or the " Company ") ( TSXV:NAU,OTC:NAUFF) (OTCQX:NAUFF) (Frankfurt:5E50 ) is pleased to announce further positive antimony ("Antimony", "Sb") metallurgical testwork results at its oxide gold-antimony Limousine Butte Project (the "Project", "Limo Butte") in Nevada, one... Keep Reading...
Horn Island Project Update

Horn Island Project Update

Alice Queen (AQX:AU) has announced Horn Island Project UpdateDownload the PDF here. Keep Reading...

Latest Press Releases

Related News