Slave Lake Zinc Enhances Critical Metal Exploration Potential at the O'Connor Lake Project

Slave Lake Zinc Enhances Critical Metal Exploration Potential at the O'Connor Lake Project

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") has continued to identify exciting new exploration targets at the O'Connor Lake project. The Company's review of historical drill logs indicates that the extensive drill program testing zinc lead deposits at the original discovery, MWK Number 1 vein, also reported intersecting pegmatitic dykes and pegmatitic granite in multiple drill holes. Intersections of pegmatite recorded in 1952 ranged from less than half a meter to over 8 meters within the same drill holes as multi meter intercepts of the highly prospective zinclead mineralization at the "head frame" area. This pegmatitic material is present as dyke swarms or injections. No sampling was ever done to test for the presence of lithium or other "critical metals" in these rocks. As part of the proposed summer work program, Slave Lake plans to locate the old core to determine if sampling it for lithium is feasible after this length of time.

This new information extends the area on the Slave Lake property now known to contain pegmatitic material to over 7 kilometers from west to east and 6 kilometers from north to south. Favorable host rock units also extend beyond this area on the Company's claims, and provide additional prospective pegmatite exploration target areas.

The O'Connor Lake pegmatitic granites are described to vary from "fine" to "coarse" grained and have border contacts ranging from sharp to gradational with their enclosing host rocks. They are reported to be composed of various feldspars and quartz, and contain accessory minerals including tourmaline, biotite, muscovite and red or purple garnets. No other study of these rocks was done beyond identifying their presence. The Hearne Channel pegmatite deposits now being explored by LiFT Power lie some 120 kilometers north of the Slave Lake claims, across Great Slave Lake. These lithium mineralized pegmatites occur in a geological setting similar to that at O'Connor Lake and provide regional exploration models for the Company.

Ritch Wigham, CEO of Slave Lake, commented, "This recent information demonstrates that pegmatite granite systems are widespread on our property. It is important to note that only preliminary study of these pegmatites was ever done, and only then because they were associated with the structures being explored for zinc and lead prior to 1952. As we continue to focus on further exploration for high-grade zinc, lead and copper within our large property we will also sample for lithium and other critical metals in all pegmatitic material that we encounter. As a result, Slave Lake has a unique opportunity to have prospectivity for multiple 'critical metal' exploration targets."

About Slave Lake Zinc

Slave Lake Zinc Corp. intends to develop the potential of its O'Connor Lake property, an historic zinc lead copper property located in the Northwest Territories of Canada. The property is located south of Great Slave Lake and to the east of Pine Point project. The property was initially developed after the Second World War and subsequently abandoned in 1952 when the prices of zinc and lead collapsed post war. Slave Lake Zinc Corp. believes that it is well positioned to advance this project and to expand significantly the historic potential of the property. For more information, please visit www.zinccorp.ca.

On Behalf of the Board of Directors,

Slave Lake Zinc Corp.
Per:

Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release

Forward-Looking Statement

Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic, and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/159163

News Provided by Newsfile via QuoteMedia

SLZ:CC
The Conversation (0)
Climate Change Has Now Become Personal for the North and South Slave and Slave Lake Zinc

Climate Change Has Now Become Personal for the North and South Slave and Slave Lake Zinc

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company"): As much as we want to get on the ground and advance our project, we support and sympathise with the efforts to contain the devastation that our friends are subjected to in the communities that we are associated with in the South Slave.

Hay River, Fort Smith, and Yellowknife are integral to our partners and our ongoing advancement of our mutually beneficial project to combat the obvious climate change challenges that we all face. Thankfully at this point Fort Resolution has only been superficially affected by this regional catastrophe. We deeply hope that remains the case as the summer and this catastrophic fire season are not yet contained.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Forest Fires Delay Plans for Slave Lake Zinc

Forest Fires Delay Plans for Slave Lake Zinc

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") With the expansion of the forest fire issues in the Northwest Territories, the Territorial government has expropriated all the rotary wing aircraft available in the N.W.T. to support the efforts to fight the expanding forest fire problem. Fixed wing aircraft are also have significant issues in operating under the current conditions.

Consequently, Slave Lake Zinc has had to postpone the proposed ground exploration recognisance program that was scheduled. We will resume these plans as soon as practicable and look even more forward to advancing our exciting critical metals suite of minerals.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Slave Lake Zinc Initiates Summer Lithium Exploration Program to Expand "Critical Metals" Project

Slave Lake Zinc Initiates Summer Lithium Exploration Program to Expand "Critical Metals" Project

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") is pleased to announce the commencement of its anticipated summer Lithium exploration program, as previously announced on July 17, 2022. This program marks a significant step towards enhancing the Company's "critical metals" project.

The summer exploration program will begin with a focus on conducting reconnaissance prospecting and sampling within a 15 square kilometer area located west of the original headframe, where many pegmatite showings are mapped. The initial fieldwork will target a pegmatite dyke swarm within this region, where northwest trending pegmatites are found to intrude all other rock units. The Company's property is part of the regional-scale Yellowknife Lithium initiative, with the east arm of Great Slave Lake providing the only separation of SLZ from known lithium bearing pegmatites in this extensive lithium corridor. Slave Lake Zinc has engaged Aurora Geosciences of Yellowknife as their experienced geological consultants. CEO Ritch Wigham will accompany Aurora Geosciences during this phase of exploration.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Slave Lake Zinc Announces Corporate Update and Exploration of Lithium Potential in Northwest Territories

Slave Lake Zinc Announces Corporate Update and Exploration of Lithium Potential in Northwest Territories

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") Slave Lake Zinc is excited to share its corporate update and announce its exploration plans for lithium potential in Canada's Northwest Territories. The company is currently designing its summer exploration program and is eagerly anticipating the sampling of pegmatite formations on its property for potential lithium content. This project could potentially add to the company's already important critical metals project in the region.

The company's geologists and advisors have identified numerous significant pegmatite formations from historic mapping conducted on the maiden O'Connor Lake MWK claims from the 1950s. These formations have been mapped over several hundreds of meters. This historical mapping was conducted in conjunction with the then-company, American Yellowknife Mines, which was establishing production for zinc/lead at O'Connor Lake prior to operations halting due to poor metals prices in the early 1950s.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Slave Lake Zinc Poised to Become a Key Player in Canada's Green Economy

Slave Lake Zinc Poised to Become a Key Player in Canada's Green Economy

Slave Lake Zinc Corp (CSE: SLZ) is on the verge of becoming a significant participant in the country's green economy with its strategic metal's exploration operations. The company has recently expanded its potential to include lithium, which is a critical component for electric car batteries, alongside its existing zinc and lead exploration developments.

Slave Lake Zinc has a unique project with an established zinc/lead target and unparalleled lithium potential in the same suite of host rocks.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Exploration Corp. (TSXV: AGA,OTC:AAGAF) (OTCQB: AAGAF) ("Silver47" or the "Company") is pleased to announce the 2025 exploration program is nearing completion at its wholly-owned Adams Plateau Project (the "Project") in southern British Columbia, a silver-zinc-copper-gold-lead SEDEX project.

Gary Thompson, CEO of Silver47, stated: "We are glad to continue our work on Adams Plateau toward defining drill targets on this road-accessible project. The abundance of surface mineralization on the Project is very encouraging for the potential of new and exciting discoveries. The Company has received a 5-year permit for drilling. This year is shaping up to be transformational for the Company with a full season of drilling at the flagship Red Mountain Project and the pending merger with Summa Silver."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

 

   New Expansion Hole Intersects    279    Metres Averaging    0.49    % Cu   

 

   Nine Drill Rigs Now Active on Site   

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Reward Gold Mine Project Update

Vertex Minerals Limited Reward Gold Mine Project Update

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX,VTXXF) (OTCMKTS:VTXXF) is pleased to announce that the underground mining operation is on track to be producing high grade gold feed to the recently commissioned gravity gold plant in the coming weeks.

HIGHLIGHTS:

- Operational Milestones

o VTX remains firmly on track to commence production of high-grade ore from the underground mine in the forthcoming weeks.

o Transformer and cabling for the installation of 11kV high voltage underground power system on site with installation commenced.

o Preparations for the underground mine startup up progressing as planned and stripping of the main access is completed.

o New Aramine L350D has departed France for the journey to Hill End. Arrival in Orange NSW expected in by 26th August where it will be fitted with an RCT remote control system for open stoping operations.

o Mining the Reward Gold Mine - Resource 225kozs at 16.7g/t (VTX ASX Announcement 21 June 2023).

o Weekly Gold production Oz's from Stockpiles improving with depth in the stockpiles, with coarser particle size and better process throughput experienced.

- Mine start up

o Fan chambers have been excavated to provide secondary ventilation for production activities, exploration drilling and the future southern access toward the Fosters' exploration target.

o Primary ventilation fan has been installed and bulkhead completed.

o High voltage surface substation has been installed.

o High voltage cabling installation commences next week, with power up of the system scheduled for 28 July 2025.

o Stripping of the main accessis completed with the final elements of ground support (approx. 30m) to be completed before power cable installation starts next week.

o Cable bolts installed for the intersection of Lady Belmore exploration drive with first cut drilled out and ready to charge.

o Development Jumbo #1 (Epiroc T1D) is exceeding performance expectations.

o Dewatered of declines well underway.

o Mine schedule for FY26 finalised.

o First airleg stope secondary vent installed and specialty equipment on site to start first air leg stope.

o First long hole stope planned for August. High grade from airleg and longhole stopes to complement larger tonnage from development ore headings.

- People that have been onboarded

o 2x Drill Fitters and Heavy diesel fitter.

o Process superintendent commences next week.

o Full Tech team started including mine surveyor this week.

o Have back-to-back airleg miners for stoping.

o Full underground and mill crews.

- Improvements to plant

o DSM screen installed to improve product delivery to Wilfley Table.

o Gemini table improvements with new tabletop and gearbox improving final concentrate grade to over 20% gold (suitable for direct smelting to Dore on site).

o Process water pump upgrade improving ore washing and Tomra performance.

- Revised mine plan and schedule completed and ready to implement

- Updated Reward Gold mine mining plan and mine schedule completed.

- Adding a high-grade long hole stope upfront to be mined concurrently with the high grade airleg stope.

Vertex Director Declan Franzmann commented: "It is great to see all the elements of re-developing the underground mine and processing facility coming together so rapidly. The most pleasing aspect is our success in employing an incredible team of people to run the operation and all credit to management for developing great "esprit de corps" and a single sense of purpose as we push to full production."

As previously announced, the startup mine schedule includes mining 2,075 tonnes at 17.8 g/t Au from a developed airleg stope block. The planned stope width is the same as the interpretation of the mineralisation. (Refer to Table 1 in Appendices 1) (VTX ASX announcement 26/06/23).

Given this stope will take some time to extract, the Vertex geology and Mining Team have additionally brought forward a very high-grade long hole stope to commence mining in August as well. Further optimisations to the mining schedule will continue to be made.

This stope can be exploited as soon as services have been established. The mining crews have done a great job in the access drive to make room for the services (11kV cable, water and air lines) while improving accessibility for the mobile mining equipment selected for the Project.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/OUQP5Z21

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX,VTXXF) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×