TSXV:AL

ALX Resources Corp. Receives Geochemical Results from Drilling at the Firebird Nickel Project, Northern Saskatchewan

ALX Resources Corp. (TSXV: AL) (FSE: 6LLN) (OTC: ALXEF) ("ALX" or the "Company") announced today that geochemical results have been received from a diamond drilling program at its Firebird Nickel Project ("Firebird") located near the town of Stony Rapids in northern Saskatchewan. The drilling program was fully-funded by ALX's exploration partner Rio Tinto Exploration Canada Inc. ("Rio Tinto") with ALX as operator.

Firebird 2021 Exploration Program

The Firebird 2021 exploration program began during the first week of June with a ground-truthing program of geophysical anomalies that were detected in the airborne VTEM™Max survey completed in October 2020 (see ALX news release dated November 9, 2020, "ALX Resources Corp. and Rio Tinto Locate Airborne EM Anomalies at the Firebird Nickel Project").

A total of 739.5 metres was completed in four helicopter-supported diamond drill holes. Ground geophysical surveys were carried out on three targets to improve the definition of the conductive anomalies detected in the 2020 airborne survey. Sulphide mineralization was intersected in three of the four completed drill holes, but no significant nickel-copper-cobalt geochemical values were encountered in the mineralized intervals.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/3046/101406_38caee42c42c2a95_001.jpg

2021 Drilling Program, Firebird Nickel Project, Northern Saskatchewan

To view an enhanced version of this map, please visit:
https://orders.newsfilecorp.com/files/3046/101406_38caee42c42c2a95_001full.jpg

Summary of Firebird 2021 Drill Holes

Hole No.Target
Name
Depth
of
Hole

(m)
UTM
Easting
(NAD83
Zone 13)
UTM
Northing
(NAD83
Zone 13)
Dip/
Azimuth
(°)
Host
Rock
Sulphide ZoneWidth
of

Zone
(m)*
From
(m)
To
(m)
FIRE-001Meersman West279.0433801.86583183.1-85/340Norite80.7282.171.45
FIRE-002FBM-4A201.0429056.56577663.7-65/340Para-gneiss148.19155.577.38
FIRE-003FBM-4A120.0429056.16577664.6-45/340Norite69.483.1813.78
FIRE-004Wiley Lake B139.5427042.46580334.1-85/160Norite19.4829.229.74

 

* True widths of mineralized zones are not yet known

Other highly-conductive targets from the 2020 airborne survey remain to be tested at Firebird and additional drilling is recommended. ALX will update its shareholders on future exploration plans at the Project as information from its optionee Rio Tinto becomes available.

Click on the highlighted link to view maps and pictures of ALX's exploration activities at the Firebird Nickel Project

About the Firebird Nickel Project

ALX owns 100% of Firebird, subject to 2.0% net smelter returns royalties on certain claims acquired from arm's-length vendors to the Company. ALX acquired its first claims at Firebird during a staking rush in May 2019. Additional land purchases and acquisitions by staking in 2019 and 2020 has increased the size of the Project to approximately 20,491 hectares (50,635 acres). Mobilization of equipment and personnel is achieved from the town of Stony Rapids, SK, located approximately 18 kilometres (11 miles) by air from the centre of the Project. Stony Rapids is connected to the Saskatchewan provincial road system by all-weather Highway 905 and has a fully-serviced airport to support both fixed-wing aircraft and helicopters.

Firebird is currently the subject of an option agreement whereby Rio Tinto can earn up to an 80% interest in Firebird by incurring exploration expenditures of $12.0 million over a six-year period and by making a total of $125,000 in cash payments to the Company (see ALX news release dated August 24, 2020, "ALX Resources Corp. Announces Earn-In for the Falcon Nickel Project").

The 2020 airborne survey successfully delineated several new anomalous zones of strong conductivity in the northern part of Firebird where no modern airborne survey had ever been flown and high-grade nickel is present on surface. For example, in July 2020 ALX sampled up to 2.43% nickel in surface grab sampling in the Wiley Lake target area and up to 1.31% nickel in outcrop drilling using a portable backpack drill (see ALX news release dated July 27, 2020, "ALX Resources Corp. Samples up to 2.43% Nickel and 8.34 Grams/Tonne Gold in the Northern Athabasca Region, Saskatchewan"). ALX and Rio Tinto personnel identified high-priority anomalies from the VTEM™survey results based on their strong conductivity and coincident high magnetic responses, which suggested the presence of sulphides, and subsequently developed drill targets for the summer of 2021.

Quality Assurance/Quality Control ("QA/QC")

A QA/QC following industry best practices was incorporated into the drill core sampling and included systematic insertion of quartz blanks and certified reference materials into sample batches, as well as collection of quarter-core duplicates, at a rate of approximately 10%. All drill core samples were collected as half-split core, apart from quarter-split duplicates.

All samples were shipped by ground to ALS Global Geochemistry Analytical Lab ("ALS") in North Vancouver, BC, Canada, for multi-element analysis. ALS is an ISO-IEC 17025:2017 and ISO 9001:2015 accredited analytical laboratory that is independent of ALX and its Qualified Person. Mafic intrusive and mineralized samples were analyzed using ALS's super trace multi-element complete characterization package. This includes determination of major oxides by fused bead preparation with ICP-ES determination, C and S by combustion furnace, Au-Pd-Pt by 30-gram lead fire assay with ICP-MS determination, resistate elements by lithium borate fusion with ICP-MS determination, aqua regia digest ICP-MS determination for volatile trace elements, and 4-acid digest ICP-MS determination for base metals. Barren country rock samples were analyzed using ALS's super trace multi-element 4-acid digest with ICP-MS determination for 51 elements plus Au-Pt-Pd by 30-gram lead bead fire assay ICP-MS determination and pXRF determination for 7 resistate elements (Cr, Nb, Si, Ta, Ti, Y, Zr).

The technical information in this news release has been reviewed and approved by Jody Dahrouge, P.Geo., a Director of ALX, who is a Qualified Person in accordance with the Canadian regulatory requirements set out in National Instrument 43-101.

About ALX

ALX is based in Vancouver, BC, Canada and its common shares are listed on the TSX Venture Exchange under the symbol "AL", on the Frankfurt Stock Exchange under the symbol "6LLN" and in the United States OTC market under the symbol "ALXEF".

ALX's mandate is to provide shareholders with multiple opportunities for discovery by exploring a portfolio of prospective mineral properties, which include uranium, nickel-copper-cobalt and gold projects. The Company uses the latest exploration technologies and holds interests in over 250,000 hectares of prospective lands in Saskatchewan, a stable Canadian jurisdiction that hosts the highest-grade uranium mines in the world, a producing gold mine, and production from base metals mines, both current and historical.

ALX holds interests in a number of uranium exploration properties in northern Saskatchewan, including a 20% interest in the Hook-Carter Uranium Project, located within the uranium-rich Patterson Lake Corridor with Denison Mines Corp. (80% interest) operating exploration since 2016, a 40% interest in the Black Lake Uranium Project (a joint venture with UEX Corporation and Orano Canada Inc.), and 100% interests in the Gibbons Creek Uranium Project,the Sabre Uranium Project and the Javelin and McKenzie Lake Uranium Projects.

ALX also owns 100% interests in the Firebird Nickel Project (now under option to Rio Tinto Exploration Canada Inc., who can earn up to an 80% interest), the Flying VeeNickel/Gold and Sceptre Gold projects, and can earn up to an 80% interest in the Alligator Lake Gold Project, all located in northern Saskatchewan, Canada. ALX owns, or can earn, up to 100% interests in the Electra Nickel Project and the Cannon Copper Project located in historic mining districts of Ontario, Canada, the Vixen Gold Project (now under option to First Mining Gold Corp., who can earn up to a 100% interest in two stages), and in the Draco VMS Project in Norway.

For more information about the Company, please visit the ALX corporate website at www.alxresources.com or contact Roger Leschuk, Manager, Corporate Communications at: PH: 604.629.0293 or Toll-Free: 866.629.8368, or by email: rleschuk@alxresources.com

On Behalf of the Board of Directors of ALX Resources Corp.

"Warren Stanyer"

Warren Stanyer, CEO and Chairman

FORWARD-LOOKING STATEMENTS

Statements in this document which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Forward-looking statements in this news release include references to ALX's exploration projects, their prospectivity for minerals, and the Company's plans to undertake exploration activities at its projects. It is important to note that the Company's actual business outcomes and exploration results could differ materially from those in such forward-looking statements. Risks and uncertainties include that ALX may not be able to fully finance exploration at its projects, including drilling; initial findings at its projects may prove to be unworthy of further expenditure; commodity prices may not support exploration expenditures at its projects; and economic, competitive, governmental, public health, environmental and technological factors may affect the Company's operations, markets, products and share price. Even if we explore and develop our projects, and even if nickel, gold or other metals or minerals are discovered in quantity, the projects may not be commercially viable. Additional risk factors are discussed in the Company's Management Discussion and Analysis for the Six Months Ended June 30, 2021, which is available under Company's SEDAR profile at www.sedar.com. Except as required by law, we will not update these forward-looking statement risk factors.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/101406

News Provided by Newsfile via QuoteMedia

ALX Resources

ALX Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
ALX Resources

ALX Resources


Keep reading...Show less
Horizon Minerals Limited

Nimbus Zinc Silver Project Update

Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an update on the Nimbus silver-zinc project, adjacent to the Boorara gold mine, 17km east-southeast of Kalgoorlie-Boulder in the goldfields of Western Australia (Figure 1).

Keep reading...Show less

Newmont's Lori Douglas Honored as a 2024 Paradigm for Parity Woman on the Rise

Paradigm for Parity honors impactful female leaders on Women's Equality Day

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Gary Wagner, gold bar.

Gary Wagner: Gold's Next Price Target is US$2,700, Can Silver Catch Up?

Gary Wagner, executive producer TheGoldForecast.com, shared his outlook for gold, using technical analysis to explain how the yellow metal could rise to the US$2,700 per ounce level by the first quarter of 2025.

He also discussed the US Federal Reserve's upcoming interest rate turnaround and what it means for gold.

"To me what is most important is not that they're signaling a rate cut in September — it's much more than that," said Wagner, who is also a frequent Kitco News contributor. "They are signaling a major pivot from a highly restrictive to a highly accommodative monetary policy that's end goal is interest rate normalization."

Keep reading...Show less
Gold coin in rolled up Australian bills.

De Grey Mining Gets AU$150 Million Loan for Hemi Gold Project from Australia's NAIF

Gold explorer and developer De Grey Mining (ASX:DEG,OTC Pink:DGMLF) announced the receipt of AU$150 million in debt funding from the Northern Australia Infrastructure Facility (NAIF) on Monday (August 26).

The loan is intended for the development of the company’s 100 percent owned Hemi gold project in the Pilbara region, which De Grey says has the potential to be a large-scale, low-strip-ratio and low-cost open-pit operation.

The funds will form part of a lending syndicate that is expected to provide a AU$1 billion senior debt facility and a AU$130 million cost overrun facility. Along with De Grey's existing cash balance, this money is anticipated to be enough to finance Hemi's development. The company said it has received credit-approved terms from local and international commercial banks that can support the targeted funding levels for the debt facilities.

Keep reading...Show less
Calendar with red push pins and circled date.

Aura Minerals Delays Construction at Matupá Gold Project to Maximize Potential

Aura Minerals (TSX:ORA,OTCQX:ORAAF) announced plans to delay the start of construction at its Matupá gold project in Brazil after acquiring the right to explorethe Pezão and Pé Quente projects in mid-May.

The company said it is revising its strategy in order to maximize the region’s geological potential. In addition to its plans for Pezão and Pé Quente, Aura is conducting ongoing exploration at the Serrinhas and X2 targets.

Pezão and Pé Quente cover six mineral rights and span over 28,000 hectares in the Alta Floresta gold province. The company said in its mid-May announcement that it was planning to invest US$1.6 million over 12 months to complete 13,000 meters of drilling at the assets. Its goal is to further assess mineralization continuity and grades.

Keep reading...Show less
Map of BC.

Artemis Gold Ordered to Dismantle Unauthorized Worker Camp at Blackwater Project

Artemis Gold (TSXV:ARTG,OTC Pink:ARGTF) has reportedly been directed by BC's Environmental Assessment Office (EAO) to dismantle an unauthorized worker camp at its Blackwater gold asset.

According to CBC, the camp, which has at least 48 accommodation units and is located 110 kilometers south of Vanderhoof, BC, is not in compliance with provincial regulations following an on-site inspection.

The inspection took place on May 14 and showed that the camp is not permitted under Artemis' environmental certificate. Blackwater's existing certificate allows for a main construction camp accommodating up to 1,000 workers and an operations camp for 500 workers, both of which must be located within designated site boundaries.

Keep reading...Show less
ALX Resources

ALX Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×