fieldwork denver

Publication of the Feasibility Study

(TheNewswire)

Otso Gold Corp.

November 5, 2021 TheNewswire - Toronto, ON. Otso Gold Corp. (" Otso " or the " Company "), (TSXV:OTSO) (OTC:FIEIF) is pleased to announce the completion of a National Instrument 43-101 compliant feasibility study (the " Feasibility Study ") for the Otso Gold Mine. The Feasibility Study, prepared by John T. Boyd Company (" BOYD ") of Denver, Colorado, has now been filed on SEDAR.

The Feasibility Study includes  the  mine designs and production plan which will underpin the Company's long term production as well as optimisations to the milling circuit being implemented by the Company.

The following table summarizes the findings included in the Mineral Reserves of the  Feasibility Study.

Mining Method

Reserve Classification

Cutoff

Tonnes

Au g/t

Au Troy Ozs

Open Pit - High Grade

Proven

0.700

678,000

1.853

40,400

Open Pit - High Grade

Probable

0.700

4,780,000

1.622

249,300

Open Pit - High Grade

Proven + Probable

0.700

5,458,000

1.651

289,700

Open Pit - Low Grade

Proven

0.323

547,000

0.466

8,200

Open Pit - Low Grade

Probable

0.323

4,488,000

0.468

67,500

Open Pit - Low Grade

Proven + Probable

0.323

5,035,000

0.468

75,700

Total Open Pit

Proven

0.323

1,225,000

1.234

48,600

Total Open Pit

Probable

0.323

9,268,000

1.063

316,800

Total Open Pit

Proven + Probable

0.323

10,493,000

1.083

365,400

Brian Wesson stated: "Otso is pleased with the results of the Feasibility Study and thanks BOYD for their significant contribution to the project. The Feasibiltiy Study provides the Company with reserves to underpin a minimum of five years of mine life. The Company will continue its exploration and infill drilling program to replace and expand our reserve base on an ongoing basis. The publication of reserves is the first time the project has had proven and probable reserves since its acquisition by the Company".

The Reserves are based on the parameters set forth below.

Item

Units

Laiva

Open Pit Waste Mining Cost

US$/Waste Tonne

$1.90

Open Pit Ore Mining Cost

US$/Ore Tonne

$2.73

Underground Mining Cost

US$/Ore Tonne

$75.00

Mill - High Grade Processing Cost

US$/Mill Ore Tonne

$11.78

Mill - Low Grade Processing Cost

US$/Mill Ore Tonne

$10.22

G&A Cost

US$/Feed Tonne

$2.20

Mill Gold Recovery (at cutoff)

%

92.0%

Mill - Low Grade Gold Recovery (at cutoff)

%

80.0%

Mill Annual Capacity (Both High & Low Grade)

Tonnes

1,500,000

Gold Price

US$/Troy Ounce

$1,600.00

Selling Cost

US$/Troy Ounce

$2.55

Royalty

%

0.15%

NSR Royalty*

%

2.5%

*excluded in determination of Reserves.

Brian Wesson

President and CEO
Otso Gold Corp.

For further information, please contact:

Clyde Wesson
Vice President

Otso Gold Corp.

1 917 287 0716

info@otsogold.com
www.otsogold.com

The technical disclosure in this news release has been reviewed and approved by Gregory B. Sparks, P. Eng., Managing Director – Metals for John T. Boyd Company, a Qualified Person as defined by National Instrument 43-101.


About the Company

Otso Gold Corp. wholly owns the Otso Gold Mine near the Town of Raahe in Finland. The

Otso Gold Mine is developed, fully permitted, has all infrastructure in place, two open pits

and is currently in the ramp-up towards commercial production at name plate capacity of 2 million tonnes per annum.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
Otso Gold

Otso Gold

Emerging Mid-Tier Green Gold Producer

Emerging Mid-Tier Green Gold Producer Keep Reading...
Keep reading...Show less

Onyx Gold Intersects 1.7 g/t Au over 67.0 Meters, Including 13.2 g/t over 6.0 Meters and Visible Gold Grading 73.4 g/t Au at Argus Main

Drilling Continues to Define Higher-Grade Plunging Mineralization within the 1.4-km-long Argus Gold System Onyx Gold Corp. (TSXV: ONYX,OTC:ONXGF) (OTCQX: ONXGF) ("Onyx" or the "Company") is pleased to report assay results from an additional nine (9) drill holes from the Argus Gold System... Keep Reading...
Skull Ridge Gold Acquires 17,225-Hectare Strategic Land Position Along Emerging Crippleback–Stony Lake Gold-Copper Corridor

Skull Ridge Gold Acquires 17,225-Hectare Strategic Land Position Along Emerging Crippleback–Stony Lake Gold-Copper Corridor

Skull Ridge Gold Corp. (CSE: SKUL) (“Skull Ridge” or the “Company”) is pleased to announce that it has acquired, through an arm’s-length Newfoundland prospector 689 mineral claims covering approximately 17,225 hectares in Central Newfoundland. The claims were acquired through the reimbursement... Keep Reading...
M&A written on puzzle pieces.

OceanaGold to Acquire Ausgold in US$549 Million Deal

OceanaGold (TSX:OGC,NYSE:OGC) has agreed to acquire Australian developer Ausgold (ASX:AUC,OTCPL:AUSGF) for US$549 million, securing full ownership of the Katanning gold project in Western Australia.The Ausgold board unanimously recommended the transaction, and major shareholder Dundee... Keep Reading...
American Eagle Drills One Kilometre of Copper-Gold Mineralization from Surface at NAK: 1,001 Metres of 0.46% CuEq, Including 218 Metres of 1.01% CuEq

American Eagle Drills One Kilometre of Copper-Gold Mineralization from Surface at NAK: 1,001 Metres of 0.46% CuEq, Including 218 Metres of 1.01% CuEq

Highlights: NAK26-87 intersected 1,001 metres of 0.46% copper equivalent (CuEq) starting at surface, including 218 metres of 1.01% CuEq, a full kilometre of continuous copper-gold mineralization and the longest mineralized intercept ever drilled at NAK. Kilometre-long intercepts of copper and... Keep Reading...
iMetal Resources Announces Closing of Private Placement

iMetal Resources Announces Closing of Private Placement

iMetal Resources, Inc. (TSXV: IMR,OTC:IMRFF) (OTCQB: IMRFF) (FSE: A7VA) ("iMetal" or the "Company") confirms that its previously announced non-brokered private placement (the "Offering") has now been closed. In connection with closing of the Offering, the Company issued 30,000,000 Units (each, a... Keep Reading...
Red "approved" stamp over architectural proposal with technical drawings.

Equinox Gold Secures Federal Approval for Nevada Mine

Equinox Gold (TSX:EQX,NYSEAMERICAN:EQX) has secured federal approval to build the South Railroad mine in Nevada, clearing the primary regulatory hurdle for its next major development project.The US Bureau of Land Management issued a positive record of decision for the site on Monday (August 17),... Keep Reading...

Interactive Chart

Latest Press Releases

Related News