Mountain Province Diamonds Announces Fourth Quarter 2022 Production and Sales Results, and Guidance for 2023

TSX and OTC: MPVD

Mountain Province Diamonds Inc. ("Mountain Province", the "Company") (TSX: MPVD) (OTC: MPVD) today announces production and sales results for the fourth quarter ended December 31, 2022 ("the Quarter" or "Q4 2022") from the Gahcho Kué Diamond Mine ("GK Mine"). All figures are expressed in Canadian dollars unless otherwise noted.

Q4 and FY 2022 Highlights

  • 1,621,800 carats recovered during Q4 at an average grade of 1.96 carats per tonne. Full year 2022 production of 5.52 million carats against guidance of 5.60 - 5.80 million carats.

  • In 2022, approximately 2.7 million carats were sold at an average value of $146 per carat ( US$112 per carat) for total proceeds of $388.8 million ( US$297.3 million ). This compared to 3.2 million carats sold at an average value of $94 per carat ( US$75 per carat) for total proceeds of $298.4 million ( US$236.9 million ) in FY 2021.

  • Ore mined on a full year 2022 basis was 4.1 million tonnes against guidance of 3.75 – 4.30 million tonnes. Ore processed on a full year 2022 basis was 3.1 million tonnes against guidance of 3.0 – 3.2 million tonnes.

Mark Wall , the Company's President and Chief Executive Officer, commented:

"After a very challenging start to the year, primarily due to a spike in Covid cases at the GK Mine, a detailed recovery plan was developed and executed resulting in quarter over quarter improvement through 2022.  We closed out 2022 with the refinance of our bonds, including reducing our total debt by approximately US$60 million compared to this time last year.  We now enter the 2023 cold weather and ice road resupply season with good momentum and a backdrop of a resilient rough diamond market."

Q4 and FY 2022 Production Highlights (All figures reported on a 100% basis unless otherwise stated)

  • 10,144,844 total tonnes mined during the quarter, a 6% decrease on comparable period (Q4 2021: 10,812,723). 33,947,188 total tonnes mined during FY 2022, a 4% decrease from comparable period (FY 2021: 35,447,014).

  • 705,924 ore tonnes mined during the quarter, a 31% decrease on comparable period (Q4 2021: 1,019,671). 4,113,648 ore tonnes mined during FY 2022, a 16% increase from comparable period (FY 2021: 3,561,417).

  • 828,644 ore tonnes treated during the quarter, a 2% increase on comparable period (Q4 2021: 813,308). 3,102,219 ore tonnes treated during FY 2022, a 1% increase from comparable period (FY 2021: 3,082,572).

  • 1,621,800 carats recovered during the quarter at an average grade of 1.96 carats per tonne, 7% higher than comparable quarter (Q4 2021: 1,511,253 carats at 1.86). 5,519,309 carats recovered during FY 2022 at an average grade of 1.78 carats per tonne, 12% lower than comparable period (FY 2021: 6,229,042 carats at 2.02).

Q4 and FY 2022 Production Statistics






2022 Q4

2021 Q4

YoY Variance

Total tonnes mined (ore and waste)

10,144,844

10,812,723

-6 %

Ore tonnes mined

705,924

1,019,671

-31 %

Ore tonnes treated

828,644

813,308

2 %

Carats recovered

1,621,800

1,511,253

7 %

Carats recovered (49% share)

794,682

740,514

7 %

Recovered grade (carats per tonne)

1.96

1.86

5 %


FY 2022

FY 2021

YoY Variance

Total tonnes mined (ore and waste)

33,947,188

35,447,014

-4 %

Ore tonnes mined

4,113,648

3,561,417

16 %

Ore tonnes treated

3,102,219

3,082,572

1 %

Carats recovered

5,519,309

6,229,042

-12 %

Carats recovered (49% share)

2,704,461

3,052,231

-11 %

Recovered grade (carats per tonne)

1.78

2.02

-12 %


Q4 and FY22 Sales Performanc
  e

Q4 2022 diamond sales totaled 757,830 carats sold at an average value of $127 per carat (US$94 per carat) for total proceeds of $96.3 million ( US$71.3 million ) in comparison to 808,739 carats sold at an average value of $105 per carat ( US$83 per carat) for total proceeds of $85.2 million ( US$67.5 million ) in Q4 2021

During FY 2022, 2,656,387 carats were sold at an average value of $146 per carat ( US$112 per carat) for total proceeds of $388.8 million ( US$297.3 million ) in comparison to 3,158,418 carats sold at an average value of $94 per carat ( US$75 per carat) for total proceeds of $298.4 million ( US$236.9 million ) in FY 2021.

Sentiment in the rough diamond market remains resilient despite some recent turbulence. Strong diamond jewellery sales during the holidays and lower rough diamond supply volumes from the major producers are expected to maintain these stable prices through to the Company's upcoming January sale.

Medium to longer-term, the Company's outlook for rough diamonds remains positive. Retail diamond jewellery sales in the important US market confirm a growing preference for smaller, lower priced diamonds which align well with the diamond profile of the GK Mine.

2023 Guidance (all figures quoted on a 100% basis unless otherwise specified)

The Company wishes to provide operating and cost guidance for 2023, as follows:

  • 37 – 42 million total tonnes mined (ore and waste)
  • 4.1 – 4.5 million ore tonnes mined
  • 3.2 – 3.5 million ore tonnes treated
  • 5.6 – 6.1 million carats recovered
  • Production costs of $127 - $137 per tonne treated
  • Production costs of $70 $80 per carat recovered
  • Sustaining Capital Expenditure of $7 million (49% share)

About Mountain Province Diamonds Inc.

Mountain Province Diamonds is a 49% participant with De Beers Canada in the Gahcho Kué diamond mine located in Canada's Northwest Territories. The Gahcho Kué Joint Venture property consists of several kimberlites that are actively being mined, developed, and explored for future development. The Company also controls 107,373 hectares of highly prospective mineral claims and leases surrounding the Gahcho Kué Mine that include an Indicated mineral resource for the Kelvin kimberlite and Inferred mineral resources for the Faraday kimberlites. Kelvin is estimated to contain 13.62 million carats (Mct) in 8.50 million tonnes (Mt) at a grade of 1.60 carats/tonne and value of US$63/carat. Faraday 2 is estimated to contain 5.45Mct in 2.07Mt at a grade of 2.63 carats/tonne and value of US$140/ct. Faraday 1-3 is estimated to contain 1.90Mct in 1.87Mt at a grade of 1.04 carats/tonne and value of US$75/carat. All resource estimations are based on a 1mm diamond size bottom cut-off.

For further information on Mountain Province Diamonds and to receive news releases by email, visit the Company's website at www.mountainprovince.com .

Caution Regarding Forward Looking Information
This news release contains certain "forward-looking statements" and "forward-looking information" under applicable Canadian and United States securities laws concerning the business, operations and financial performance and condition of Mountain Province Diamonds Inc. Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to operational hazards, including possible disruption due to pandemic such as COVID-19, its impact on travel, self-isolation protocols and business and operations, estimated production and mine life of the project of Mountain Province ; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; the future price of diamonds; the estimation of mineral reserves and resources; the ability to manage debt; capital expenditures; the ability to obtain permits for operations; liquidity; tax rates; and currency exchange rate fluctuations.  Except for statements of historical fact relating to Mountain Province , certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as "anticipates," "may," "can," "plans," "believes," "estimates," "expects," "projects," "targets," "intends," "likely," "will," "should," "to be", "potential" and other similar words, or statements that certain events or conditions "may", "should" or "will" occur.  Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements.  Many of these assumptions are based on factors and events that are not within the control of Mountain Province and there is no assurance they will prove to be correct.

Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include the development of operation hazards which could arise in relation to COVID-19, including, but not limited to protocols which may be adopted to reduce the spread of COVID-19 and any impact of such protocols on Mountain Province's business and operations, variations in ore grade or recovery rates, changes in market conditions, changes in project parameters, mine sequencing; production rates; cash flow; risks relating to the availability and timeliness of permitting and governmental approvals; supply of, and demand for, diamonds; fluctuating commodity prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated.

These factors are discussed in greater detail in Mountain Province's most recent Annual Information Form and in the most recent MD&A filed on SEDAR, which also provide additional general assumptions in connection with these statements. Mountain Province cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Mountain Province believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this news release should not be unduly relied upon. These statements speak only as of the date of this news release.

Although Mountain Province has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended.  There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Mountain Province undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered as the property is developed. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

Further, Mountain Province may make changes to its business plans that could affect its results. The principal assets of Mountain Province are administered pursuant to a joint venture under which Mountain Province is not the operator. Mountain Province is exposed to actions taken or omissions made by the operator within its prerogative and/or determinations made by the joint venture under its terms. Such actions or omissions may impact the future performance of Mountain Province . Under its current note and revolving credit facilities Mountain Province is subject to certain limitations on its ability to pay dividends on common stock. The declaration of dividends is at the discretion of Mountain Province's Board of Directors, subject to the limitations under the Company's debt facilities, and will depend on Mountain Province's financial results, cash requirements, future prospects, and other factors deemed relevant by the Board.

Cision View original content: https://www.prnewswire.com/news-releases/mountain-province-diamonds-announces-fourth-quarter-2022-production-and-sales-results-and-guidance-for-2023-301725433.html

SOURCE Mountain Province Diamonds Inc.

Cision View original content: https://www.newswire.ca/en/releases/archive/January2023/19/c2451.html

News Provided by Canada Newswire via QuoteMedia

MPVD:CA,MPVDF
The Conversation (0)

STAR DIAMOND CORPORATION ANNOUNCES THIRD QUARTER 2024 RESULTS

TSX: DIAM

Star Diamond Corporation ("Star Diamond" or the "Company") reports that the unaudited financial results for the quarter ended September 30, 2024 will be filed today on SEDAR+ and may be viewed at www.sedarplus.ca once posted.

Overview

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Close up of diamonds in a mine.

Rio Tinto: Phase 1 of Diavik's A21 Pipe Complete, Diamond Production Next

Mining giant Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) said in a press release on Thursday, October 3, that it has completed the development and construction of Phase 1 of the A21 underground mine at its 100 percent-owned Diavik diamond mine.

The company detailed the construction process, which involved over 1,800 meters of underground tunnel development.

The Diavik diamond mine is located at the bottom of Lac de Gras in Canada's Northwest Territories. A21 is the fourth diamond pipe of the project and was opened by Rio Tinto in 2018. The company made the decision to go ahead with Phase 1 in February 2023, investing US$40 million.

Phase 1 of mining at A21 is expected to produce 1.4 million carats of diamonds.

Keep reading...Show less
A locked gate.

Burgundy Diamond Pauses Ekati Development, Asks Northwest Territories for More Support

Burgundy Diamond Mines (ASX:BDM,OTC Pink:BDMMF) has paused plans for further development at the Ekati diamond mine, saying diamond prices have fallen at least 20 percent since it acquired the project.

In a letter to RJ Simpson, premier of Canada's Northwest Territories (NWT), Burgundy said that along with the decreasing prices, the diamond industry has been receiving “very little support."

“Environmental requirements are getting unnecessarily more onerous, government agencies are inflexible to change and the burden placed on the asset is increasing,” the company said, adding that it may need to revisit the viability of the Ekati asset and focus on growth elsewhere should these problems continue.

Keep reading...Show less
1,094 carat rough diamond from Lucara Diamond's Karowe mine.

Lucara Continues Streak of Big Diamond Discoveries with 1,094 Carat Find at Karowe

Only a month after the discovery of the second largest diamond ever recorded, Lucara Diamond (TSX:LUC,OTC Pink:LUCRF) has announced the recovery of another significant stone from its Karowe mine in Botswana.

The new find is 1,094 carats compared to the massive 2,942 carat rough diamond uncovered by Lucara in August, solidifying Karowe’s reputation as one of the world’s most prolific sources of large diamonds.

The rough diamond is the sixth stone over 1,000 carats that Lucara has unearthed from the mine. According to the company, the EMPKS ore type at Karowe's South Lobe hosts these large, high-value stones.

Keep reading...Show less

STAR - ORION SOUTH DIAMOND PROJECT REVISED MINERAL RESOURCES ESTIMATE TECHNICAL REPORT FILED ON SEDAR+

Star Diamond Corporation ("Star Diamond" or the "Company") is pleased to announce that the Technical Report documenting the Revised Mineral Resources Estimate (see News Release dated July 24, 2024 ) for the Star Orion South Diamond Project (the "Project") has been filed on SEDAR+ ( www.sedarplus.ca ). This Technical Report has also been posted on the Star Diamond website: Technical Report 2024 .

Star Diamond Corporation logo (CNW Group/Star Diamond Corporation)

The scientific and technical information contained in this press release has been prepared and verified by A.C.A. Howe International Limited ("Howe"), under the supervision of Mr. Daniel C. Leroux, M.Sc., P. Geo. and the Mineral Resource estimation methodology under the supervision of Peter Ravenscroft , FAusIMM, of Ravenscroft Mining Advisors, an independent mining consultant, and a Qualified Person ("QP") within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") of the Canadian Securities Administrators. This Revised Mineral Resources estimate uses diamond industry standard methods which are rigorously applied to the Star and Orion South evaluation data, acknowledging the significant control that fundamental kimberlite geology has on the distribution of diamonds within these deposits.

The Revised Mineral Resources estimate will now be incorporated into a re-optimized open pit mine plan for the Project, which will include a re-evaluation of Mineral Reserves and an economic assessment based thereon. It is anticipated this work will be completed during 2024-25 and will result in an updated Pre-feasibility Study including a revised statement of Mineral Reserves for the Project, if warranted, and an economic assessment based thereon. Accordingly, the Mineral Resources and economic assessment previously disclosed by Star Diamond for the Project should no longer be relied upon.

All technical information in this press release has been prepared under the supervision of George Read , Senior Vice President Corporate Development, a registered Professional Geoscientist in the Provinces of Saskatchewan and British Columbia and Mark Shimell , Vice President Exploration, a registered Professional Geoscientist in the Provinces of Saskatchewan and Alberta , who are Star Diamond's QP's under the definition of NI 43-101.

About Star Diamond Corporation

Star Diamond is a Canadian-based corporation engaged in the acquisition, exploration and development of mineral properties. Shares of Star Diamond trade on the Toronto Stock Exchange under the trading symbol "DIAM".   Star Diamond's most significant asset is its 100% interest in the Fort à la Corne Project in central Saskatchewan.  These kimberlites are located in close proximity to established infrastructure, including paved highways and the electrical power grid, which provide significant advantages for future mine development.

Stay Connected with Us:
X (Twitter) - https://twitter.com/StarDiamondCorp
LinkedIn - https://www.linkedin.com/company/star-diamond-corp/
Facebook - https://web.facebook.com/stardiamondcorp
Instagram - https://www.instagram.com/stardiamondcorp
YouTube - https://youtube.com/@StarDiamondCorp

Caution Regarding Forward-looking Statements

This press release contains "forward-looking statements" and/or "forward-looking information" (collectively, "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, are forward-looking statements. Forward-looking information is often, but not always, identified by the use of words such as "anticipate", "believe", "expect", "plan", "intend", "forecast", "target", "project", "guidance", "may", "will", "should", "could", "estimate", "predict" or similar words suggesting future outcomes or language suggesting an outlook. In particular, statements regarding Star Diamond's future operations, future exploration and development activities or other development plans constitute forward-looking statements. By their nature, statements referring to mineral reserves or mineral resources constitute forward-looking statements.

Forward-looking statements in this press release include but are not limited to statements with respect to the Revised Mineral Resources Estimate; improvement in the Mineral Resource estimate; the re-optimization of the Star and Orion South open pits; the publication of the Technical Report; and the aim of the Company to undertake a PFS and Feasibility Study and timelines.

These forward-looking statements are based on Star Diamond's current beliefs as well as assumptions made by and information currently available to Star Diamond and involve inherent risks and uncertainties, both general and specific. Risks exist that forward-looking statements will not be achieved due to a number of factors including, but not limited to, developments in world diamond markets, changes in diamond prices, risks relating to fluctuations in the Canadian dollar and other currencies relative to the US dollar, changes in exploration, development or mining plans due to exploration results and changing budget priorities of Star Diamond, the impact of changes in the laws and regulations regulating mining exploration, development, closure, judicial or regulatory judgments and legal proceedings, operational and infrastructure risks and the additional risks described in Star Diamond's most recently filed Annual Information Form, annual and interim MDA.

SOURCE Star Diamond Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/September2024/05/c1009.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
2,492 carat diamond recovered at Lucara Diamond's Karowe mine.

Lucara Unearths 2,492 Carat Diamond in Botswana, Second Largest in History

Lucara Diamond (TSX:LUC,OTC Pink:LUCRF) announced the discovery of an "epic" 2,492 carat diamond at its Karowe mine in Botswana on Wednesday (August 21), saying it is one of the largest rough diamonds ever found.

Media reports indicate that it is second only to the 3,106 carat Cullinan diamond found in South Africa in 1905.

The site where the diamond was discovered is no stranger to producing large stones. Previous significant discoveries from Karowe include the 1,758 carat Sewelô and the 1,109 carat Lesedi La Rona diamonds.

Keep reading...Show less

Latest Press Releases

Related News

×