Lode Gold Executes Agreement with Axiom to Initiate Drill Targeting Plan Focused on RIRGS Targets at WIN and Golden Culvert in Yukon

Lode Gold Executes Agreement with Axiom to Initiate Drill Targeting Plan Focused on RIRGS Targets at WIN and Golden Culvert in Yukon

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold " or the "Company") is pleased to report it has engaged the services of Axiom Exploration Group Ltd. ("Axiom") of Saskatoon, Saskatchewan. Axiom's primary role will be to supply geological and field technical staff, along with equipment for our forthcoming field program. This program will target four distinct RIRGS (Reduced Intrusion-Related Gold System) prospects named Border, Steelhead, Stingray and Camp. Among these, the Border prospect on the WIN property is the most developed, exhibiting RIRGS-style gold mineralization in sheeted quartz veins hosted within hornfels, along with high bismuth to gold ratios. Our efforts will concentrate on this prospect, aiming to identify drill targets at Border for drill testing in the later part of the season. The entire operation will be overseen by Buddy Doyle, Gold Orogen's Vice President of Exploration, a seasoned explorer with a 40-year career marked by numerous significant discoveries.

Axiom is well-positioned to execute this work effectively, leveraging its team of diverse geoscientists with extensive experience gained across Canada and internationally. The company's professionals are equipped with cutting-edge industry knowledge and tools, ensuring the provision of reliable and accurate data. Additionally, Axiom's in-house field equipment and established relationships with suppliers offer cost advantages through volume discounts, benefits that are typically unavailable to individual junior companies.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4064/242650_lodegoldimage_550.jpg

Left: Golden Culvert and WIN: 99.5 km² area spanning 27 km of strike length in the southern Tombstone Gold Belt. Four confirmed RIRGS targets highlight the district-scale potential of this high-grade gold trend Right: Boundary Zone Discovery Site: Gold-bearing sheeted quartz veins in hornfels-altered rock

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4064/242650_lodegoldimage.jpg

"We welcome the increased exploration investment and our ability to apply a systemic, technical approach to our prospective Golden Culvert and WIN properties, in particular the added opportunities provided by the recognition of RIRGS in addition to the known orogenic styles of mineralization in the area," comments Jonathan Hill, Director and Head of the Technical Committee. "Prior exploration drilling has tested less than 10% of the overall >20km strike potential highlighted by our quality geochemical and geophysical datasets. We expect that the current work in 2025 will identify some compelling potential targets and progress them to initial drilling phases."

The program is being executed in two stages. The first stage takes place at the Border prospect, a high-altitude site near an ice field that benefits from its close proximity to the all-weather Highway 10. The crews will map the extent of the sheeted quartz veins and collect channel samples across the vein system. Additionally, they will search for other vein swarms within the large hornfels roof pendant delineated by the QMAGT survey conducted in 2024. To maximize planning time for the drill program, samples will be expedited for gold assays to obtain rapid results. Concurrent work on other RIRGS targets is also planned, particularly during periods when weather conditions restrict access to the Border prospect.

Phase 2 is scheduled to commence in August 2025, featuring a 1400 m drill program consisting of seven holes, designed to test the targets generated during Phase 1.

About Lode Gold

Lode Gold (TSXV: LOD) is an exploration and development company with projects in highly prospective and safe mining jurisdictions in Canada and the United States.

In Canada, its Golden Culvert and WIN Projects in Yukon, covering 99.5 km2 across a 27-km strike length, are situated in a district-scale, high grade gold mineralized trend within the southern portion of the Tombstone Gold Belt. A total of four RIRGS targets have been confirmed on the property. A NI 43-101 technical report has been completed in May 2024.

In New Brunswick, Lode Gold has created one of the largest land packages with its Acadian Gold JV Co; consisting of an area that spans 445 km2 and a 44 km strike. McIntyre Brook covers 111 km2 and a 17-km strike in the emerging Appalachian/Iapetus Gold Belt; it is hosted by orogenic rocks of similar age and structure as New Found Gold's Queensway Project. Riley Brook is a 335 km2 package covering a 26 km strike of Wapske formation with its numerous felsic units. A NI 43-101 technical report has been completed in August 2024.

In the United States, the Company is advancing its Fremont Gold project. This is a brownfield project with over 43,000 m drilled and 23 km of underground workings. It was previously mined at 10.7 g/t Au in the 1930's.

Mining was halted in 1942 due the gold mining prohibition in World War Two (WWII) just as it was ramping up production. Unlike typical brownfield projects that are mined out, only 8% of the veins have been exploited. The Company is the first owner to investigate an underground high grade mine potential at Fremont.

The project is located on 3,351 acres of private and patented land in Mariposa County. The asset is a 4 km strike on the prolific 190 km Mother Lode Gold Belt, California that produced over 50,000,000 oz of gold and is instrumental in the creation of the towns, the businesses and infrastructure in the 1800s gold rush. It is 1.5 hours from Fresno, California. The property has year-round road access and is close to airports and rail.

Previously, in March 2023 the company completed an NI 43 101 Preliminary Economic Assessment(" PEA"). A sensitivity to the March 31, 2023 PEA at USD $2,000/oz gold gives an after-tax NPV of USD $370M and a 31% IRR over an 11-year LOM. At $1,750 /oz gold, NPV (5%) is $217M. The project hosts an NI 43-101 resource of 1.16 Moz at 1.90 g/t Au within 19.0 MT Indicated and 2.02 Moz at 2.22 g/t Au within 28.3 MT Inferred. The MRE evaluates only 1.4 km of the 4 km strike of Fremont property. Three step-out holes at depth (up to 1200 m) hit structure and were mineralized.

All NI 43-101 technical reports are available on the Company's profile on SEDAR+ (www.sedarplus.ca) and the Company's website (www.lode-gold.com)

QUALIFIED PERSON STATEMENT

The scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, Director, BSc (Hons) (Economic Geology - UCT), FAusIMM, and who is a "qualified person" as defined by NI-43-101.

ON BEHALF OF THE COMPANY

Wendy T. Chan, CEO & Director

Information Contact

Winfield Ding
CFO
info@lode-gold.com
+1-416-915-4257

Kevin Shum
Investor Relations
kevin@lode-gold.com
+1 (647) 725-3888 ext. 702

Cautionary Note Related to this News Release and Figures

This news release contains information about adjacent properties on which the Company has no right to explore or mine. Readers are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company's properties.

Cautionary Statement Regarding Forward-Looking Information

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release includes "forward-looking statements" and "forward-looking information" within the meaning of Canadian securities legislation. All statements included in this news release, other than statements of historical fact, are forward-looking statements including, without limitation, statements with respect to the completion of the transaction and the timing thereof, the expected benefits of the transaction to shareholders of the Company, the structure, terms and conditions of the transaction and the execution of a definitive agreement, the timing of submission to the CSE and TSXV, Gold Orogen raising an additional $1,500,000 and the anticipated use of proceeds. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as "anticipate", "believe", "plan", "estimate", "expect", "potential", "target", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof.

Forward-looking statements are based on a number of assumptions and estimates that, while considered reasonable by management based on the business and markets in which the Company operates, are inherently subject to significant operational, economic, and competitive uncertainties, risks and contingencies. These include assumptions regarding, among other things: that the Company and GRM will be able to negotiate the definitive agreement on the terms and within the time frame expected, that the Company and GRM will be able to make submissions to the CSE and TSXV within the time frame expected, that the Company and GRM will be able to obtain shareholder approval for the transaction, that the Company and GRM will be able to obtain necessary third party and regulatory approvals required for the transaction, if completed, that the transaction will provide the expected benefits to the Company and its shareholders.

There can be no assurance that forward-looking statements will prove to be accurate and actual results, and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include adverse market conditions, general economic, market or business risks, unanticipated costs, the failure of the Company and GRM to negotiate the definitive agreement on the terms and conditions and within the timeframe expected, the failure of the Company and GRM to make submissions to the CSE and TSXV within the timeframe expected, the failure of the Company and GRM to obtain shareholder approval for the transaction, the failure of the Company and GRM to obtain all necessary approvals for the transaction, and r other risks detailed from time to time in the filings made by the Company with securities regulators, including those described under the heading "Risks and Uncertainties" in the Company's most recently filed MD&A. The Company does not undertake to update or revise any forward-looking statements, except in accordance with applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/242650

News Provided by Newsfile via QuoteMedia

LOD:CC
Lode Gold Resources

Lode Gold Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Lode Gold Resources (TSXV:LOD)

Lode Gold Resources


Keep reading...Show less

Discovering the next orogenic/reduced intrusive deposit in Yukon and New Brunswick

Lode Gold Closes Financing - $790,186 to Advance California and Yukon Projects

Lode Gold Closes Financing - $790,186 to Advance California and Yukon Projects

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce that it has closed on its first tranche of its non-brokered private placement offering. The Company has raised $790,186 through the issuance of 4,389,922 Units at a price of $0.18 per Unit. The cash raised will be used for the execution of the 2025 business plan and general working capital. In Yukon, the Company will conduct field work, including geological mapping, soil sampling, and channel sampling to advance drill target development. In California, the funds will support the completion of a 2025 Preliminary Economic Assessment( PEA) focused on bulk mining, underground channel sampling to upgrade resources, and moving towards the pre-feasibility study (PFS) at the Fremont project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Shareholders Approve Plan of Arrangement for Spin Out of Gold Orogen

Lode Gold Shareholders Approve Plan of Arrangement for Spin Out of Gold Orogen

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce that the proposed plan of arrangement (the "Arrangement") for the tax-efficient spin out of Gold Orogen was approved at the Company's annual general and special meeting of shareholders (the "Meeting") held on March 10, 2025.

The resolution approving the Arrangement (the "Arrangement Resolution") was required to be passed by: (i) the affirmative vote of at least two-thirds (66 2/3%) of the votes cast by shareholders of the Company present in person or represented by proxy and entitled to vote at the Meeting; and (ii) the affirmative vote of at least two-thirds (66 2/3%) of the votes cast by Company shareholders, optionholders and warrantholders, voting as a single class, present in person or represented by proxy and entitled to vote at the Meeting.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Strengthens Board of Spin Co Gold Orogen Ahead of Tax-Efficient Spin-out

Lode Gold Strengthens Board of Spin Co Gold Orogen Ahead of Tax-Efficient Spin-out

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce the proposed appointment of Bill Fisher and Rajesh Sharma to the Board of Directors of its upcoming spin-out company, Gold Orogen. The spin-out is scheduled for March 2025, with a shareholder meeting set for March 10, 2025, to approve the tax-efficient plan of arrangement.

The proposed appointments of Bill, Rajesh and the other Directors will be subject to shareholder approval at the Company's Annual General Meeting (AGM) on March 10, 2025. Their appointments will be finalized following the AGM.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Updates Resources: Over 1 Moz Au, 4 g/t with 16.8 M Average True Width

Lode Gold Updates Resources: Over 1 Moz Au, 4 g/t with 16.8 M Average True Width

Initiates Internal Scoping Study to Optimize Underground Mining

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce the positive results of its new 2025 Mineral Resource Estimation ("MRE") at its Fremont Gold project (the "Project") in Mariposa County, California: 1.198 Moz 1 at 3.97 gt* of Recoverable Gold (1.297 Moz at 4.37 gt Content Gold)2 at a 3 gt cut-off with an average true width of 16.8 m.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold's Upcoming Spin Co, Gold Orogen, Defines 2025 New Brunswick Exploration Targets; Reports Gold-in-Soil and EM Anomalies Identifying Highly Prospective Mineralized Systems at McIntyre Brook

Lode Gold's Upcoming Spin Co, Gold Orogen, Defines 2025 New Brunswick Exploration Targets; Reports Gold-in-Soil and EM Anomalies Identifying Highly Prospective Mineralized Systems at McIntyre Brook

 Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce 2025 exploration targets for its Phase 1 exploration program in its subsidiary, Gold Orogen, which will be spun out as a separate public company in March 2025, pending Exchange and Shareholder approval. The Annual Shareholder Meeting is set for March 10, 2025. Shareholders of Lode Gold as of the Record Date will be eligible to receive shares of the new Spin Co (Gold Orogen). This tax-efficient spin-out is to ensure maximum return on investment for shareholders.

Gold Orogen has formed a JV-Co, Acadian Gold, with Fancamp, creating one of the largest land packages on the Iapetus Suture Belt in New Brunswick. This potential district-scale play covers 445 km². Atlantic Canada, especially New Brunswick, equipped with excellent infrastructure and geopolitics, is under-explored yet highly prospective for both gold and polymetallic minerals. In recent months, majors such as Kinross, Equinox Gold and others have strategically made advancements in the area.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Metals and Mining Virtual Investor Conference: Presentations Now Available for Online Viewing

Metals and Mining Virtual Investor Conference: Presentations Now Available for Online Viewing

Virtual Investor Conferences, the leading proprietary investor conference series, today announced the presentations from the Metals and Mining Virtual Investor Conference, held May 6 th -8th are now available for online viewing.

REGISTER AND VIEW PRESENTATIONS HERE

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

AngloGold Ashanti delivers strong start in Q1 2025 YoY: Gold production +22%; AISC* +1%; Free cash flow* rises 607% to $403m; Headline earnings up 671% to $447m; 2025 guidance reaffirmed

AngloGold Ashanti plc (2) ("AngloGold Ashanti", "AGA", the "Company" or the "Group") reported a sevenfold increase in free cash flow* and an almost eightfold rise in profit attributable to equity shareholders in Q1 2025 compared to Q1 2024, underpinned by higher gold production (3) , effective cost management, and a stronger gold price.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250509761018/en/

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Freegold Reports Final 2024 Drilling Results from Golden Summit Continuing to Confirm Higher Grade Potential

Freegold Reports Final 2024 Drilling Results from Golden Summit Continuing to Confirm Higher Grade Potential

  • WOW ZONE – GS2437

    • 6.84 g/t Au over 20.6 m including 115.5 g/t over 0.8m
    • 43.8 g/t Au over 3.0m

GS2435

    • 1.01 g/t over 216 m
    • 20.4 g/t over 1.3 m

GS2431

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Blackrock Drills 4.2m of 700 g/t AgEq  and Reports Multiple +1 kg/t AgEq Intercepts at Tonopah West

Blackrock Drills 4.2m of 700 g/t AgEq and Reports Multiple +1 kg/t AgEq Intercepts at Tonopah West

M&I Conversion Program Drilling Continues to Expand and Confirm Continuity of High-Grade Gold and Silver Mineralization in the Shallowest Portion of the M&I Conversion Area

HIGHLIGHTS:

  • TXC25-138 returned multiple broad zones of high-grade silver and gold mineralization spanning from 230.4 metres to 241.86 metres down hole, including:
    • 4.24 metres grading 700 grams per tonne (g/t) silver equivalent (AgEq) (Ag/Au ratio 90:1) (378.5 g/t silver (Ag) and 3.57 g/t gold (Au)) from 230 metres down hole, including 0.31 metres grading 3,182 g/t AgEq (1,805.0 g/t Ag and 15.27 g/t Au); and
    • 5.18 metres grading 556 gt/ AgEq (328.2 g/t Ag and 2.53 g/t Au) from 236.68 metres, which included intervals of 3,340 g/t AgEq (1,987 g/t Ag and15.0 g/t Au) over 0.31 metres and 1,714 g/t AgEq (1,037.0 g/t Ag and 7.51 g/t Au) over 0.61 metres respectively.
  • There are ten drillholes with pending assays from the M&I Conversion Program, and seven drillholes are pending assays from the Resource Expansion program.
  • Modelling of the M&I Conversion Program drillholes is now underway, with an updated mineral resource estimate on track for Q3, 2025.

Blackrock Silver Corp. (TSXV: BRC) (OTCQX: BKRRF) (FSE: AHZ0) ("Blackrock" or the "Company") announces additional high-grade silver and gold drill intercepts from the M&I Conversion Program (as defined herein) at its 100% owned Tonopah West project ("Tonopah West") located in Nye and Esmeralda Counties, Nevada, United States.

The Company is currently in the process of completing its in-fill drilling program at Tonopah West which commenced in mid-July 2024 and consists of 62 drillholes within the shallow southern portion of the Bermuda-Merten vein group ("DPB South") resource area (the "M&I Conversion Area") with a goal to convert up to 1.0-million tonnes of material from inferred mineral resources to measured and indicated mineral resources (the "M&I Conversion Program"). The M&I Conversion Area represents the initial years of production based on the mine plan laid out in the Company's Preliminary Economic Assessment on Tonopah West (see September 4, 2024 news release).

Andrew Pollard, the Company's President and Chief Executive Officer, stated: "Additional results from our M&I Conversion Program continue to validate our model, supporting mineral continuity as we track and define the geometry of the high-grade shoots within the vein system. Today's results, coupled with results previously announced from this same program, highlight that broader intercepts are associated with higher-than-average grades which should be beneficial in delineating high-grade tonnes. The broad zones of high-grade mineralization encountered in drillhole TXC-138 are a standout for us, as at a composite of 11.46 metres of 514 g/t AgEq (290 g/t Ag & 2.48 g/t Au), this is thickest (composite) zone we've drilled throughout the district outside of the historic Victor mine. As we await the final assays from the M&I Conversion Program, modelling has begun for our upcoming mineral resource update on Tonopah West, currently on track for Q3, 2025."

Table 1: Tonopah West Assay Intercepts using 150 g/t AgEq cut off

Drillhole
ID
Hole TypeProgramFrom
(m)
To (m)Drill
Interval
(m)
Ag g/tAu g/tAgEq g/t
TXC25-125RC/CoreM&I Conversion327.97329.311.34118.211.336238.73
Including328.27328.580.31432.004.900874.03
TXC25-126RC/CoreM&I Conversion319.61320.220.61247.802.554478.20
Including319.92320.220.31421.004.380816.12
TXC25-127RC/CoreM&I Conversion230.22230.730.5266.140.964153.10
TXC25-128RC/CoreM&I Conversion300.81302.211.40244.832.070431.56
TXC25-128RC/CoreM&I Conversion348.14348.750.61300.503.030573.84
TXC25-128RC/CoreM&I Conversion427.76428.460.70129.001.360251.69
TXC25-129RC/CoreM&I Conversion307.24308.150.91155.501.322274.76
TXC25-129RC/CoreM&I Conversion323.27323.880.6165.101.140167.94
TXC25-129RC/CoreM&I Conversion344.94345.550.61237.002.520464.33
TXC25-131RC/CoreM&I Conversion319.19319.800.61292.742.480516.46
Including319.49319.800.31584.004.9401,029.64
TXC25-132RC/CoreM&I Conversion437.60438.520.92125.811.804288.55
TXC25-138RC/CoreM&I Conversion213.30213.820.52111.000.945196.25
TXC25-138RC/CoreM&I Conversion230.40234.644.24378.523.572700.75
Including232.72233.020.311,805.0015.2673,182.24
TXC25-138RC/CoreM&I Conversion236.68241.865.18328.232.528556.28
Including238.35238.660.311,987.0015.0003,340.15
Including240.03240.640.611,037.007.5101,714.48
TXC25-140RC/CoreM&I Conversion295.96296.510.5578.091.180184.54
TXC25-140RC/CoreM&I Conversion358.14358.840.7077.310.989166.53
TXC25-140RC/CoreM&I Conversion362.90363.810.91335.633.803678.70
Including362.90363.200.30371.004.310759.81
TXC25-140RC/CoreM&I Conversion378.11380.091.9895.981.215205.59
Including379.05380.091.04136.491.787297.70
AgEq = Ag + Au*(Factor); where Factor = (Au Price/Ag Price)*(Au Recovery/Ag Recovery or
Factor=($1900/$23)*(95%/87%)=90.21; True thickness is 90 to 100% of interval thickness based on the modelled
vein geometries; Cut-off grade is 150 gpt AgEq; Reverse Circulation (RC)/Core = RC pre-collar with core tail.

As is evident from Table 1, the highest-grade results are associated with thicker intercepts of quartz vein material. This is similar to previous results seen from the M&I Conversion Program where broader intercepts were encountered, such as: TXC24-095 which returned 5.03 metres of 774.5 g/t AgEq (461.5 g/t Ag and 3.47 g/t Au),1 TXC24-119 which returned 4.69 metres of 714 g/t AgEq (379.0 g/t Ag and 3.72 g/t Au),2 and TXC24-122 which cut 5.21 metres of 563 g/t AgEq (3.02 g/t Au and 292 g/t Ag)3 .This combination of high grade and thickness should have a positive impact on the proposed development of the M&I Conversion Area and the scheduled mineral resource update. Modelling of the M&I Conversion Program drillholes has started and an updated mineral resource estimate on Tonopah West is currently scheduled for Q3 2025.

The geometry of the high-grade silver and gold is sizable with high-grade shoots plunging to the northwest within the M&I Conversion Area. These shoots are open to the northwest, east and open down plunge. TXC25-138 shows high-grade shoots have thicker vein intercepts along the axis of the shoot and multiple high-grade intercepts are being returned under the M&I Conversion Program. Allowing for the 3 metres of internal waste, TXC25-138 would have a drill interval of 11.46 metres grading 290.2 g/t Ag and 2.48 g/t Au or 514.3 g/t AgEq. The thickness of this mineralized shoot is approaching those seen in the historic mining at the Victor and Ohio mines where the Victor vein area was 24 metres thick and the Ohio vein area was 15 metres thick4.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_001.jpg

Figure 1: Tonopah West project showing NI43-101 resource location and expansion potential

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_001full.jpg

Drillholes TXC25-133, -134, -135, and TXC25-136 returned silver and gold assays below the cutoff grade for Table 1. The drillholes returned silver equivalent grades ranging between 100 and 144 g/t AgEq with silver values ranging between 6 to 71 g/t and gold values between 0.51 and 1.34 g/t. There are ten drillholes (TXC25-137, -139, -141, -142, and TXC25-146 to -TXC25-151) with pending assays from the M&I Conversion Program. In addition, seven drillholes are pending assays from the Company's exploration drill program that is targeting expansion potential across a one kilometre trend of vein corridor linking the Denver-Paymaster and Bermuda-Merten vein groups and the Northwest step out resource area at Tonopah West (the "Resource Expansion Program") (see February 24, 2025 news release).

Figure 2 is a plan map showing the location of all the drillholes in the M&I Conversion Program and highlighting those reported in this news release.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_002.jpg

Figure 2: Drillhole location map of the M&I Conversion Program showing drillholes reported in this news release.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_002full.jpg

Table 2: Tonopah West Drillhole Location Coordinates (based on GPS readings in the field, Datum UTM, NAD 1927, Zone 11)

Hole IDAreaTypeUTM_NAD27 EastUTM_NAD27 NorthElevation
(m)
Depth
(ft)
Depth
(m)
AzimuthDip
TXC25-125DPB SouthRC/Core477803.704213416.771772.861177.0358.7180-55
TXC25-126DPB SouthRC/Core477804.024213508.861767.741377.0419.7180-55
TXC25-127DPB SouthRC/Core477777.734213417.951771.991002.0305.4180-62
TXC25-128DPB SouthRC/Core477748.864213697.901767.221559.0475.2180-55
TXC25-129DPB SouthRC/Core477792.344213590.241769.091398.0426.1180-60
TXC25-130DPB SouthRC/Core477813.054213696.501768.971332.0406.0180-55
TXC25-131DPB SouthRC/Core477774.724213512.621767.171312.0399.9180-60
TXC25-132DPB SouthRC/Core477738.294213429.151768.791532.0467.0180-55
TXC25-133DPB SouthRC/Core478534.924213166.731803.791160.0353.6180-67
TXC25-134DPB SouthRC/Core478382.374213223.621798.881256.5383.0180-69
TXC25-135DPB SouthRC/Core478196.914213351.051782.351002.0305.4180-58
TXC25-136DPB SouthRC/Core477845.604213690.571770.441470.0448.1180-72
TXC25-137DPB SouthRC/Core477930.704213330.781776.321028.0313.3180-62
TXC25-138DPB SouthRC/Core477930.704213330.041776.491050.0320.0180-51
TXC25-139DPB SouthRC/Core477980.654213246.521778.411061.0323.4180-67
TXC25-140DPB SouthRC/Core477834.094213503.161768.961646.0501.7180-65

Quality Assurance/ Quality Control

All sampling is conducted under the supervision of the Company's project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The RC and core samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where they are loaded on to American Assay Laboratory's (AAL) flat-bed truck and delivered to AAL's facility in Sparks, Nevada. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company's instructions.

The RC samples are lined out at the lab and logged in to AAL's system. The core samples are cut using core saws and personnel at AAL's facility in Sparks, Nevada according to the Company's instructions delivered with each core hole.

All samples are dried, crushed to 85% passing 10 mesh (2mm) and a 250-gram sub-sample split is collected and pulverized to 200 mesh (74 micron) in a ring and puck pulverizer. Then the pulverized material is digested and analyzed for gold using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split (FA-PB30-ICP). Silver is determined using five-acid digestion and ICP analysis (ICP-5AM48). Over limits for gold and silver are determined using a gravimetric finish (GRAVAU30 and GRAVAG30). Data verification of the assay and analytical results are completed to ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a certified reference material approximately every 15th to 20th sample.

Qualified Persons

Blackrock's exploration activities at Tonopah West are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Howald has reviewed and approved the contents of this news release.

About Blackrock Silver Corp.

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration and development company driven to add shareholder value. Anchored by a seasoned Board of Directors, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of low-sulphidation, epithermal gold and silver mineralization located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

Additional information on Blackrock Silver Corp. can be found on its website at www.blackrocksilver.com and by reviewing its profile on SEDAR at www.sedarplus.ca.

Cautionary Note Regarding Forward-Looking Statements and Information

This news release contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking statements") within the meaning of Canadian and United States securities legislation, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, are forward-looking statements. Forward-Looking statements in this news release relate to, among other things: the Company's strategic plans; the timing of completion of the Company's drill programs at Tonopah West and the anticipated objectives and results therefrom; the incorporation of the results from the M&I Conversion Program in an updated mineral resource estimate on Tonopah West and the anticipated timing of release thereof; the Company's de-risking initiatives at Tonopah West; estimates of mineral resource quantities and qualities; estimates of mineralization from drilling; geological information projected from sampling results; and the potential quantities and grades of the target zones.

These forward-looking statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; the historical basis for current estimates of potential quantities and grades of target zones; the availability of skilled labour and no labour related disruptions at any of the Company's operations; no unplanned delays or interruptions in scheduled activities; all necessary permits, licenses and regulatory approvals for operations are received in a timely manner; the ability to secure and maintain title and ownership to properties and the surface rights necessary for operations; and the Company's ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; general market and industry conditions; and those factors identified under the caption "Risks Factors" in the Company's most recent Annual Information Form.

Forward-Looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For Further Information, Contact:

Andrew Pollard
President and Chief Executive Officer
(604) 817-6044
info@blackrocksilver.com

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Element79 Provides Corporate Update

Element79 Provides Corporate Update

(TheNewswire)

Element79 Gold Corp.

V ANCOUVER, BC T heNewswire May 7, 2025 Element79 Gold Corp. (CSE: ELEM) (OTC: ELMGF) (FSE: 7YS) ("Element79", or the "Company") provides the following updates on multiple corporate initiatives underway:

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Quimbaya Gold and Denarius Metals Partner to Formalize Artisanal Mining at Tahami Project, Strengthening Long-Term Exploration Strategy

Quimbaya Gold and Denarius Metals Partner to Formalize Artisanal Mining at Tahami Project, Strengthening Long-Term Exploration Strategy

Partnership with Leading Colombian Mining Group to Formalize Artisanal Mining Production and Accelerate Exploration

Quimbaya Gold Inc. (CSE: QIM) (OTCQB: QIMGF) (FSE: K05) ("Quimbaya Gold" or the "Company") is pleased to announce the signing of a binding Letter of Intent with Denarius Metals Corp. (Cboe CA: DMET) (OTCQX: DNRSF), establishing a 50:50 joint venture aimed at formalizing existing small-scale mining operations located within the Company's Tahami Project, located in the Segovia Gold District of Antioquia, Colombia.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Resources

Lode Gold Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×