Largo Reports Third Quarter 2023 Production and Sales Results and Begins Hot Commissioning of its 6.1 MWh Vanadium Redox Flow Battery; Production and Cost Guidance Remains Unchanged

Q3 2023 and Other Highlights

  • V 2 O 5 production of 2,163 tonnes (4.8 million lbs 1 ) vs. 2,906 tonnes produced in Q3 2022, including 644 tonnes in July, 775 tonnes in August and 744 tonnes in September
  • Global V 2 O 5 recovery rate 3 of 76.9% in Q3 2023 vs. 80.7% in Q3 2022
  • V 2 O 5 equivalent sales of 2,385 tonnes vs. 2,796 tonnes sold in Q3 2022
  • The average benchmark price per lb of V 2 O 5 in Europe was $8.03, a 2.5% decrease from the average of $8.23 seen in Q3 2022
  • Ramp up of its new ilmenite concentration plant continues with ilmenite concentrate production of 350 tonnes in August and 700 tonnes in September
  • Largo Clean Energy ("LCE") completed site acceptance testing of its Enel Green Power España ("EGPE") 6.1 MWh vanadium redox flow battery ("VRFB") deployment and submitted results to EGPE, with the expectation of completing the hot commissioning phase of the battery; Provisional acceptance is expected in Q4 2023
  • 2023 production, sales, cost and capital expenditures guidance remain unchanged

Largo Inc. (" Largo " or the " Company ") ( TSX: LGO ) ( NASDAQ: LGO ) today announces quarterly production of 2,163 tonnes (4.8 million lbs 1 ) and sales of 2,385 tonnes of vanadium pentoxide ("V 2 O 5 ") equivalent, respectively, in Q3 2023.

Daniel Tellechea, Interim CEO and Director of Largo, stated: "Despite production setbacks in the third quarter caused by the previously reported accident in our chemical plant and delays in the ramp of our new magnetic separator in the crushing plant, Largo remains steadfast in its commitment to rectifying operations in the fourth quarter and has maintained its production, cost and capex guidance for 2023. Our top priority is safety and returning production to a more normalized level through the strengthening of operational efficiencies at the mine and crushing plant." He continued: "On the Largo Clean Energy front, we are pleased that hot commissioning and provisional acceptance of the EGPE 6.1 MWh VRFB deployment are in the final stages of completion, marking an exciting step towards the conclusion of LCE's inaugural vanadium battery project. Furthermore, the review of strategic alternatives to unlock and fully maximize the value of LCE remains ongoing and has garnered interest from various parties thus far. While near-term vanadium demand and prices are challenging on the back of weak demand from the steel sector, we are optimistic about future demand projections, particularly driven by an explosive growth of future VRFB deployments in the coming years."

Maracás Menchen Mine Operational and Sales Results

Q3 2023

Q2 2023

Q1 2023

Q3 2022

Total Ore Mined (tonnes)

447,165

489,892

341,967

351,450

Ore Grade Mined - Effective Grade (%) 2

0.74

0.86

0.81

1.02

Total Mined – Dry Basis (tonnes)

4,178,185

3,671,842

3,523,656

2,248,360

Concentrate Produced (tonnes)

87,447

99,083

78,695

99,513

Grade of Concentrate (%)

2.94

3.34

2.99

3.26

Global Recovery (%) 3

76.9

81.0

83.0

80.7

V 2 O 5 produced (Flake + Powder) (tonnes)

2,163

2,639

2,111

2,906

High purity V 2 O 5 equivalent produced (%)

37.6

37.3

49.3

34.5

V 2 O 5 produced (equivalent pounds) 1

4,768,593

5,817,992

4,653,953

6,406,626

Total V 2 O 5 equivalent sold (tonnes)

2,385

2,557

2,849

2,796

Produced V 2 O 5 equivalent sold (tonnes)

2,129

2,268

2,604

2,445

Purchased V 2 O 5 equivalent sold (tonnes)

256

289

245

351

Q3 2023 and Other Additional Highlights

  • Despite higher mining throughput in Q3 2023 (447,165 tonnes) compared with Q3 2022 (351,450 tonnes), V 2 O 5 production from the Maracás Menchen Mine was impacted in July and August as a result of the accident at the chemical plant in July, while production in September was affected by the lack of availability of the crushing circuit in September. Mitigative measures to increase production levels in future quarters, including increasing crusher availability and recommissioning evaporation sections of the chemical plant are underway. High purity V 2 O 5 equivalent production represented 38% of the total quarterly production in Q3 2023.
  • The global recovery 3 achieved in Q3 2023 was 76.9%, representing a 5% decrease from the 80.7% achieved in Q3 2022 and 5% lower than the 81.0% achieved in Q2 2023. The global recovery 3 in July was 78.8%, with 77.7% achieved in August and 73.6% achieved in September. Lower recovery levels achieved during the quarter relate production impacts mentioned previously. The Company produced 87,447 tonnes of concentrate with an effective grade 2 of 2.94%.
  • V 2 O 5 equivalent sales of 2,385 tonnes (inclusive of 256 tonnes of purchase material) were in line with expectations for Q3 2023 but represented a 17% decrease in tonnes sold over Q3 2022. The Company's sales remain geographically diversified, with North America and Europe each representing approximately one third of total sales, and South America and Asia representing the remaining third. Spot demand was soft in Q3 2023, primarily due to adverse conditions in the Chinese and European steel industries. However, strong demand for high purity vanadium products continued.
  • Effective Monday, October 9, 2023, Mr. Celio Pereira assumed the role of Chief Operating Officer (COO) of Largo Vanádio de Maracás S/A ("LVMSA"). This decision follows the departure of Álvaro Resende, to whom the Company thanks for his many years of service. Celio's appointment is a testament to his excellent track record and the trust and confidence placed in him by the Board and management of Largo. Celio brings to LVMSA over 8 years of operational and technical expertise, honed during his tenure at the Maracás Menchen Mine. He will be instrumental in implementing a culture of safety and operational efficiency at the mine. Following this operational restructuring, the Company expects an enhancement in operational efficiencies at the crushing and milling circuits, as well as the increasing throughput to the ilmenite plant.

About Largo

Largo is a globally recognized vanadium company known for its high-quality VPURE TM and VPURE+ TM products, sourced from its Maracás Menchen Mine in Brazil. The Company is currently focused on implementing an ilmenite concentrate plant and is undertaking a strategic evaluation of its U.S.-based clean energy business, including its advanced VCHARGE vanadium battery technology to maximize the value of the organization. Largo's strategic business plan centers on maintaining its position as a leading vanadium supplier with a growth strategy to support a low-carbon future.

Largo's common shares trade on the Nasdaq Stock Market and on the Toronto Stock Exchange under the symbol "LGO". For more information on the Company, please visit www.largoinc.com .

Cautionary Statement Regarding Forward-looking Information:

This press release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation. Forward‐looking information in this press release includes, but is not limited to, statements with respect to the hot commissioning and provisional acceptance of the LCE's EGPE 6.1 MWh VRFB deployment; the strategic review of LCE; future demand projections, including the growth of future VRFB deployments; and the success of mitigating measures to increase production levels. Forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". All information contained in this news release, other than statements of current and historical fact, is forward looking information. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Largo or LCE to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Largo and in its public documents filed on www.sedar.com and available on www.sec.gov from time to time. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Although management of Largo has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Largo does not undertake to update any forward-looking statements, except in accordance with applicable securities laws. Readers should also review the risks and uncertainties sections of Largo's annual and interim MD&A which also apply.

Trademarks are owned by Largo Inc.

______________________________
1
Conversion of tonnes to pounds, 1 tonne = 2,204.62 pounds or lbs.
2 Effective grade represents the percentage of magnetic material mined multiplied by the percentage of V2O5 in the magnetic concentrate.
3 Global recovery is the product of crushing recovery, milling recovery, kiln recovery, leaching recovery and chemical plant recovery.

For further information, please contact:

Investor Relations
Alex Guthrie
Senior Manager, External Relations
+1.416.861.9778
aguthrie@largoinc.com

News Provided by Business Wire via QuoteMedia

LGO:CC
The Conversation (0)

Largo Announces Annual General Meeting Extension

Largo Inc. ("Largo" or the "Company") (TSX: LGO) (NASDAQ: LGO) today announces that the Company has received approval from the Toronto Stock Exchange (" TSX ") to extend its Annual General Meeting of Shareholders (the " Meeting ") to Monday, July 29, 2024, at 10:00 a.m. ET. The Meeting will be held at the offices of Stikeman Elliott LLP, 5300 Commerce Court West, 199 Bay Street, Toronto, Ontario, M5L 1B9, Canada. Without TSX approval, the Company's annual meeting must be held by June 30 each year.

The Meeting is being held for the following purposes:

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo Reports First Quarter 2024 Financial Results; Cost Reduction Measures and Productivity Initiatives Underway

All dollar amounts expressed are in thousands of U.S. dollars unless otherwise indicated.

Q1 2024 and Other Highlights

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo Revises First Quarter 2024 Financial Results Release Date to May 15, 2024

Largo Inc. ("Largo" or the "Company") (TSX: LGO) (NASDAQ: LGO) announces a revised release date for its first quarter 2024 financial results to Wednesday, May 15, 2024. The Company will host a conference call to discuss its first quarter 2024 results and other updates on Thursday, May 16 at 10:00 a.m. ET.

To join the conference call without operator assistance on the day, you may register and enter your phone number at https://emportal.ink/3JCUmjJ to receive an instant automated call back.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo to Release its First Quarter 2024 Financial Results on May 10, 2024

Largo Inc. ("Largo" or the "Company") (TSX: LGO) (NASDAQ: LGO) will release its first quarter 2024 financial results on Friday, May 10, 2024. Additionally, the Company will host a conference call to discuss its first quarter 2024 results and other updates on Monday, May 13 at 3:30 p.m. ET.

To join the conference call without operator assistance on the day, you may register and enter your phone number at https://emportal.ink/3JCUmjJ to receive an instant automated call back.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo Announces Cost Reduction and Productivity Improvements at its Maracás Menchen Mine; Reports Q1 2024 Production and Sales Results

All dollar amounts expressed are in thousands of U.S. dollars unless otherwise indicated.

Q1 2024 Highlights

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
 Australian Vanadium Limited

Final Payment Received for Vanadium Flow Battery Grant

Australian Vanadium Limited (ASX: AVL, “the Company” or “AVL”) advises that it has successfully completed work relating to the Australian Government grant awarded in 2021 under the Modern Manufacturing Initiative – Manufacturing Translation (MMI-T) Stream of the Resources Technology and Critical Minerals Processing National Manufacturing Priority Roadmap.1 The final payment of $922,049* of the total MMI-T grant value of $3.69 million* has now been received. This grant is in addition to AVL’s grant of $49 million* under the Modern Manufacturing Initiative – Manufacturing Collaboration (MMI-C) Stream, which was awarded in 2022 and is ongoing.2

Keep reading...Show less
Vanadium (V) element on a glowing periodic table.

Top 4 Vanadium-producing Countries (Updated 2024)

Global vanadium-producing countries have benefited from infrastructure spending in China in recent years. However, in 2024 and beyond, the market is likely to be driven by demand related to energy storage as well.

While vanadium consumption has softened in recent months, there is still plenty of optimism that the market's medium- to long-term outlook remains strong. As mentioned, part of that is to do with the energy transition.

On the supply side, vanadium production has fallen in recent years as producers respond to lower levels of demand. Coming in at 110,000 metric tons (MT) in 2021, mined production of the metal dropped to 102,000 MT in 2022 and fell further to 100,000 MT in 2023, as per the most recent data from the US Geological Survey.

Keep reading...Show less
 Australian Vanadium Limited

39% Increase in High Grade Measured and Indicated Mineral Resource

Resource update confirms Australian Vanadium Project as a Tier-1 high grade vanadium deposit

Australian Vanadium Limited (ASX: AVL, “the Company” or “AVL”) is pleased to announce an updated Mineral Resource Estimate (‘MRE’) for its vanadium project near Meekatharra, Western Australia (see Figure 1). This resource update continues to build on AVL’s aspirations to be the next primary producer of high purity vanadium underpinned by a quality, long life, Tier-1 asset.

Keep reading...Show less
 Australian Vanadium Limited

Quarterly Activities Report - Period Ending 31 March 2024

Australian Vanadium Limited (ASX: AVL, “the Company” or “AVL”) is pleased to present its Quarterly Activities and Cash Flow Report.
Keep reading...Show less
Australian Vanadium

Australian Vanadium


Keep reading...Show less
 Australian Vanadium Limited

Achievement of Ultra-High Purity 99.9% Vanadium Product

Australian Vanadium Limited (ASX: AVL, “the Company” or “AVL”) is pleased to announce that it has demonstrated the capability to produce greater than 99.9% ultra-high purity vanadium pentoxide (V2O5) at pilot scale, using AVL ore. These results confirm a processing route that can easily be incorporated into the AVL flowsheet, employing well known processing technology that can be readily scaled to meet market demand.

Keep reading...Show less

Latest Press Releases

Related News

×