GoviEx's Muntanga Project in Zambia Ramps Up for 2023

GoviEx's Muntanga Project in Zambia Ramps Up for 2023

  • Feasibility Study and ESIA planned for 2024
  • Dibbwi East Deposit resource update to be released shortly
  • GoviEx is the only uranium developer with two African projects in development and expected near term production

GoviEx Uranium Inc. (TSXV: GXU) (OTCQX: GVXXF) ("GoviEx" or the "Company") is pleased to announce that, following a successful drilling program in 2022 on its Muntanga uranium project in Zambia ("Muntanga Project"), it will expand the scope of the Feasibility Study for the Muntanga Project to include detailed engineering and design. The Company will also complete the project's Environmental and Social Impact Assessment ("ESIA") update and undertake additional drilling to target mineralisation extensions along sections at the project's Dibbwi East deposit.

In 2022, the Company conducted an extensive 15,500-metre infill drilling program at the Dibbwi East Deposit, which is targeting conversion of the current 29 million pounds U3O8 from inferred into indicated resources.1 GoviEx will provide an update to its mineral resource estimate in the coming weeks.

Analysis of the 2022 drilling results has highlighted that the Dibbwi East deposit is open up and down dip, as several sections have not closed off the uranium resource, as shown in figures 1 and 2 below. In response, GoviEx plans to conduct 7,000 metres of mud rotary drilling to target these areas of open mineralisation at the deposit and further enhance its understanding of the deposit's potential.

Currently, over 4 tonnes of ore samples have been delivered to the Copperbelt University in Zambia where confirmatory metallurgical test work is ongoing. This will be used to support the Feasibility Study process design and costing.

Daniel Major, CEO of GoviEx, said:

"Our continued progress on the Muntanga uranium project reflects our commitment to responsible and sustainable development in Africa. With the completion of our ESIA and Feasibility Study planned for 2024, we are well positioned to advance this project towards near term production and to become a significant contributor to the global uranium market. We are excited about the potential of the Muntanga Project and the positive impact that it will have on our stakeholders and the local community."

With the updated mineral resource due in the coming weeks and metallurgical test work underway, GoviEx has appointed Ukwazi Site Services (project manager and mining), SGS Bateman (process design) and SRK UK (power, hydrogeology and heap leach design) as the project team to undertake the Feasibility Study for the Muntanga Project, targeting 2024 for completion. These firms will provide specialized expertise and guidance will help ensure that the final design and development of the Muntanga Project are optimized for efficiency, safety, and sustainability, and ensure that GoviEx's commitments to ESG are included in the Study.

During 2022, GoviEx committed to updating the ESIA for the Muntanga Project, to bring it to an International Finance Corporation (IFC) standard and to include the Dibbwi East deposit, which was only discovered after the previous ESIA was approved. Most of the baseline studies have now been completed, and Phase One of the Relocation Action Plan is currently underway. As part of last year's program, GoviEx achieved a significant milestone by successfully submitting and obtaining approval of the Term of Reference document with the Zambia Environmental Management Agency.

GoviEx is currently the only uranium developer with two African mine-permitted projects in development with projected near-term production. Based on the 2017 PEA1, Muntanga's anticipated output is forecast to be 2.5 million pounds per annum, with Madaouela's Project in Niger forecast to produce 2.6 million pounds per annum. This places GoviEx in a favorable position within the uranium industry and as an attractive partner for offtakers. We remain dedicated to advancing our projects and delivering value to our stakeholders.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/166259_goviex1.jpg

Figure 1: Dibbwi East deposit drillhole location plan and outline of orebody model, showing selected section lines.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/166259_goviex1en.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/166259_goviex2.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/166259_goviex2en.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/166259_goviex3.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/166259_goviex3en.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/166259_goviex4.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/166259_goviex4en.jpg

Figure 2: Sections 10, 17 and 22 demonstrates that the mineralisation is still open along each section for several 100 metres, both up dip (to the left) and down dip (to the right), and requires additional drilling.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Qualified Person Statement

The information and associated data in this release has been reviewed, verified and approved by Dr. Rob Bowell, a chartered chemist of the Royal Society of Chemistry, a chartered geologist of the Geological Society of London, and a Fellow of the Institute of Mining, Metallurgy and Materials, who is an independent Qualified Person under the terms of NI 43-101 for uranium deposits.

Notes:

  1. See: Technical report title, "NI 43-101 Technical Report on a Preliminary Economic Assessment of the Mutanga Uranium Project in Zambia", dated November 30, 2017 (the "PEA"), prepared by Qualified Persons from SRK Consulting (UK) Limited.

  2. The PEA is considered preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. Mineral Resources that are not Mineral Reserves have not yet demonstrated economic viability. Due to the uncertainty that may be attached to Inferred Mineral Resources, it cannot be assumed that all, or any part of an Inferred Mineral Resource, will be upgraded to an Indicated or Measured Mineral Resource as a result of continued exploration or Mineral Reserves once economic considerations are applied; therefore, there is no certainty that the production profile concluded in the PEA will be realized.

About GoviEx Uranium Inc.

GoviEx is a mineral resource company focused on the exploration and development of uranium properties in Africa. GoviEx's principal objective is to become a significant uranium producer through the continued exploration and development of its flagship mine-permitted Madaouela Project in Niger and its mine-permitted Mutanga Project in Zambia.

Contact Information

Isabel Vilela
Head of Investor Relations and Corporate Communications
Tel: +1-604-681-5529
Email: info@goviex.com
Web: www.goviex.com

Cautionary Statement Regarding Forward-Looking Statements

This news release may contain forward-looking information within the meaning of applicable securities laws. All information and statements other than statements of current or historical facts contained in this news release are forward-looking information.

Forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in GoviEx's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "could", "plan", "estimate", "expect", "intend", "may", "potential", "should," and similar expressions, are forward- looking statements. Information provided in this document is necessarily summarized and may not contain all available material information.

Forward-looking statements include those related to: i) the nature, method and timing of any exploration, development and/or mining operations at the Mutanga Project or Madaouela Project; ii) the scope of the Feasibility Study for the Muntanga Project (iii) timing for and completion of the Muntanga Projects ESIA; (iv) the timing for and completion of additional drilling to target mineralisation extensions along sections at the Dibbwi East deposit; (v) the ability or willingness of the timing for and completion of an updated mineral resource estimate for the Muntanga Project; (vi) the ability to conduct and complete a 7,000 metres of mud rotary drilling to target these areas of open mineralisation at the Dibbwi East deposit; (vii) the suitability of any metallurgical test work conducted at Copperbelt University in Zambia being confirmatory to support the Feasibility Study process design and costing; (viii) the completion of the ESIA and Feasibility Study in 2024; (ix) GoviEx being well positioned to advance this the Muntanga Project towards near term production and for GoviEx to become a significant contributor to the global uranium market; (x) the potential of the Muntanga Project and the positive impact that it will have on our stakeholders and the local community; (xi) the ability or willingness of the project team to undertake the Feasibility Study for the Muntanga Project, targeting H1 2024 for completion and that their guidance and expertise will help ensure that the final design and development of the Muntanga Project are optimized for efficiency, safety, and sustainability, and ensure that GoviEx's commitments to ESG are included in the Feasibility Study; and (xii) the updating of the ESIA for the Muntanga Project, to bring it to an IFC standard and to include the Dibbwi East deposit.

Although the Company believes the expectations reflected in such forward-looking statements are based on reasonable assumptions, it can give no assurances that its expectations will be achieved. Such assumptions, which may prove incorrect, include the following: (i) that the Company will be successful in its exploration and development plans for all its projects; (ii) that all the service providers noted above will be able and willing to complete their works as agreed and expected; (iii) that the planned works on the Mutanga Project will be completed as planned and meet GoviEx's objectives; and (iv) that the price of uranium will remain sufficiently high and the costs of advancing the Company's mining projects will remain sufficiently low so as to permit GoviEx to implement its business plans in a profitable manner.

Factors that could cause actual results to differ materially from expectations include (i) the inability or unwillingness of the service providers to complete their works on the Mutanga Project as agreed and expected; (ii) the inability of the Company to successfully complete the exploration and development milestones that are the conditions of the reinstatement of the Chirundu Mining License (12634-HQ-LML); (iii) potential delays due to COVID-19 restrictions; (iv) the failure of the Company's projects, for technical, logistical, labour-relations, or other reasons; (v) a decrease in the price of uranium below what is necessary to sustain the Company's operations; (vi) an increase in the Company's operating costs above what is necessary to sustain its operations; (vii) accidents, labour disputes, or the materialization of similar risks; (viii) a deterioration in capital market conditions that prevents the Company from raising the funds it requires on a timely basis; and (ix) generally, the Company's inability to develop and implement a successful business plan for any reason.

In addition, the factors described or referred to in the section entitled "Risks Factors" in the MD&A for the year ended December 31, 2022, of GoviEx, which is available on the SEDAR website at www.sedar.com, should be reviewed in conjunction with the information found in this news release.

Although GoviEx has attempted to identify important factors that could cause actual results, performance, or achievements to differ materially from those contained in the forward- looking statements, there can be other factors that cause results, performance, or achievements not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances, or results will materialize. As a result of these risks and uncertainties, no assurance can be given that any events anticipated by the forward-looking information in this news release will transpire or occur, or, if any of them do so, what benefits that GoviEx will derive therefrom. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and GoviEx disclaims any intention or obligation to update or revise such information, except as required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/166259

News Provided by Newsfile via QuoteMedia

GXU:CA
The Conversation (0)
GoviEx Uranium Inc.

GoviEx Uranium Inc.

GoviEx Uranium Inc is a Canada-based company involved in the industrial metals and mining business sector. It is focused on the evaluation and development of uranium properties located in the Republic of Niger. The asset portfolio of the company includes uranium development projects, including the Madaouela project in Niger, Mutanga project in Zambia, and Falea in Mali.

GoviEx Uranium Statement on Recent Coup in Niger

GoviEx Uranium Statement on Recent Coup in Niger

In light of the recent coup d'état in Niger, GoviEx Uranium Inc. (TSXV: GXU) (OTCQB: GVXXF) wishes to assure its stakeholders, partners, and the people of Niger of the following:

GoviEx's operations in Niger remain unaffected by the current situation. We are committed to ensuring that our activities continue as normal, both at our Project site and our office in Niamey.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
GoviEx Announces Substantial Increase of Open-Pit Mineral Resources at Its 100% Owned Muntanga Uranium Project in Zambia

GoviEx Announces Substantial Increase of Open-Pit Mineral Resources at Its 100% Owned Muntanga Uranium Project in Zambia

  • Measured & Indicated resources nearly tripled, now representing 74% from 29% of total resources.
  • Total in-pit constrained resources increased 18%.
  • Grade improvement in all mineral categories.
  • Current drilling targeting further potential in pit resource upgrade to measured and/or indicated.
  • Results fully support continued feasibility study.

GoviEx Uranium Inc. (TSXV: GXU) (OTCQX: GVXXF) ("GoviEx or the "Company") is pleased to announce an updated Mineral Resource Estimate ("MRE") for its wholly owned, mine permitted Muntanga Uranium Project in Zambia (the "Muntanga Project"). The Muntanga Project consists of three mining permits that cover some 720km2, and contains five deposits: Dibbwi, Dibbwi East, Muntanga, Gwabi and Njame.

Daniel Major, CEO of GoviEx commented: "Our drilling campaigns in 2021 and 2022 have led to a significant update in the Muntanga mineral resource estimate. This progress is characterized by a notable growth in in-pit resources, a substantial conversion of inferred resources into the Indicated category, and an overall rise in uranium grades. What's more exciting is that this upward trajectory in resource growth persists even under lower uranium prices, such as the USD50/lb used in our Preliminary Economic Assessment( PEA)1. There is also additional potential for further upgrading of inferred resources, thereby expanding the resources that can be included in the feasibility study. These are very promising results and will be integrated into our ongoing feasibility study."

The 2023 updated MRE is the result of extensive infill drilling, including 8,010 metres drilled in 2021 and a further 19,990 metres drilling in 2022, predominately on the Dibbwi East deposit, to further delineate the deposit and convert inferred resources to the indicated category. The mineral resource update included a comprehensive reassessment of previous work and a revised correlation between down-hole radiometric probe data and chemical assays used to convert down-hole radiometric data into equivalent uranium grades (eU3O8) for mineral resource estimation.

Table 1.0 Comparison between 2017 & 2023 Constrained Mineral Resource Estimates

Constrained Mineral Resource Constrained Mineral Resource % Change
20172023
Tonnes (Mt)eU3O8 Grade (ppm)eU3O8 (Mlb) Tonnes (Mt)eU3O8 Grade (ppm)eU3O8 (Mlb) Tonnes (Mt)eU3O8 Grade (ppm)eU3O8 (Mlb)
Measured & Indicated 16.1735312.5942.5935933.7163%2%168%
Inferred 38.8229425.1614.9533010.88-61%12%-57%

 

Based on the USD50/lb U3O8, used to define the mining schedule in the 2017 PEA, constrained total pit resources are 36.5 Mlb eU3O8, comprising 34 Mt at 374 ppm eU3O8 for 28.4 Mlb in measured and indicated and 11 Mt at 348 ppm eU3O8 for8.1 Mlb of inferred, highlighting the robustness of the mineral resources at Muntanga. With the quality of the resource estimate improved, higher M&I, higher grade and a notable increase in estimated resources within the constrained open-pit area, we are optimistic that the updated MRE will be favourable to the project economics previously estimated for Muntanga in the PEA, and especially as the ongoing drilling is targeting conversion of more inferred resources into indicated resources.

As per the regulations applicable in 2017 when the Company released its NI 43-101 Technical Report1, the MRE reported did not need to be constrained by pit shells based on any particular uranium price, as almost all mineralisation at the time occurred within 125 m of surface with uranium grades that were, in general, considered to have a reasonable prospect for eventual economic extraction ("RPEEE") by open pit mining. The cut-off grade used for reporting the 2017 MRE was 100 ppm eU3O8.

The 2023 MRE is disclosed including an additional constraint applied to comply with the RPEEE and is accordingly reported within a constraining open-pit shell based on a uranium selling price of USD70/lb U3O8 and a 100 ppm eU3O8 cut-off grade. The updated 2023 MRE is presented in Table 3.0.

To facilitate a comparison between the 2023 and 2017 MRE, Table 2.0 below provides an assessment on the impact of a constraining open-pit shell based on uranium selling price of USD70/lb U3O8 and a 100 ppm eU3O8 cut-off grade on the 2017 MRE.

Table 2.0 Comparison of 2017 unconstrained and constrained mineral resources

Unconstrained Mineral Resource
2017
Constrained Mineral Resource
2017
Tonnes (Mt)eU3O8 Grade (ppm)eU3O8 (Mlb) Tonnes (Mt)eU3O8 Grade (ppm)eU3O8 (Mlb)
Measured & Indicated21.631815.116.235312.6
Inferred74.627344.938.829425.2

 

The 2017 constrained mineral resources are based on a fixed uranium price, and should uranium prices increase, a conversion of additional material into a constrained mineral resource would be anticipated.

Based on the drilling completed in 2021 and 2022, an updated mineral resource estimate has been prepared by SRK Consulting (Canada) Inc. ("SRK"). The Mineral Resource is that portion of the resource estimate which has been constrained within an open-pit shell, considering reasonable mining, processing and general and administrative cost, geotechnical parameters and processing recoveries. SRK considers that the material reported as a Mineral Resource fulfils the requirement by the CIM Guidelines of having a RPEEE through open pit mining.

A summary of the Mineral Resources for all deposits comprising the Muntanga Project are presented in Table 3.0 below.

Table 3.0Mineral Resource Statement*, Muntanga Uranium Project, Zambia, effective date of March 31, 2023

ClassificationDepositTonnesU3O8 GradeU3O8
(Mt)(ppm)Mlb
MeasuredGwabi1.12540.6
Njame2.23741.8
IndicatedMuntanga7.53605.9
Dibbwi3.12551.8
Dibbwi East25.237420.8
Gwabi2.73742.2
Njame0.83210.6
     Total M&I42.635933.7
InferredMuntanga4.03192.8
Dibbwi0.62500.3
Dibbwi East9.13446.9
Gwabi0.22790.1
Njame1.13260.8
     Total Inferred15.033010.9

 

*Notes:

  1. The effective date of the mineral resource statement is March 31, 2023. The QP for the estimate is Cliff Revering, P.Eng., an employee of SRK Consulting (Canada) Inc.
  2. Mineral resources are prepared in accordance with CIM Definition Standards (CIM, 2014) and the CIM estimation of Mineral Resources and Mineral Reserves Best Practise Guidelines (CIM, 2019).
  3. Mineral Resources are reported at a cut-off grade of 100 ppm eU3O8.
  4. Mineral resources are constrained within an optimized pit shell using a uranium price of USD70/lb U3O8, mining costs of USD2.90/t, processing costs of USD8.00/t ore, additional ore mining costs of USD0.50/t ore, G&A costs of USD1.50/t ore, royalty of 5% on U3O8 price and a discount rate of 8%.
  5. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves in the future.
  6. All figures have been rounded to reflect the relative accuracy of the estimate.

Analysis of the open-pit shell used to constrain the MRE highlights that there are still inferred category mineral resources that have the potential to be converted to indicated resources with additional drilling. That would enable them to be included in the economics related to any future feasibility study, as the examples below indicate. This work is currently under way as part of this year's previously announced drilling program.

Figures 1&2: Sections from Dibbwi East showing resource classification and MRE Shell

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/173744_44a688c3142f4895_001.jpg

Fig 1

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/173744_44a688c3142f4895_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/173744_44a688c3142f4895_002.jpg

Fig 2

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/173744_44a688c3142f4895_002full.jpg

Figure 3 - Dibbwi East drillhole and cross-section location map

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5017/173744_44a688c3142f4895_003.jpg

Fig 3

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5017/173744_44a688c3142f4895_003full.jpg

In conclusion, the updated MRE for the Muntanga Project is a testament to GoviEx's strategic focus and commitment to maximizing the potential of its vast resource base. As the only uranium developer with two African projects ready to begin development and near-term production, GoviEx is well placed to benefit from future growth.

Qualified Person Statement
The technical information and associated data in this release has been reviewed, verified and approved by Cliff Revering, P.Eng., who is an independent Qualified Person under the terms of NI 43-101 for uranium deposits.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

About GoviEx Uranium Inc.
|GoviEx is a mineral resource company focused on the exploration and development of uranium properties in Africa. GoviEx's principal objective is to become a significant uranium producer through the continued exploration and development of its flagship mine-permitted Madaouela Project in Niger, its mine-permitted Mutanga Project in Zambia, and its multi-element Falea Project in Mali.

Contact Information
Isabel Vilela, Head of Investor Relations and Corporate Communications
Tel: +1-604-681-5529
Email: info@goviex.com Web: www.goviex.com

Cautionary Statement Regarding Forward-Looking Statements
This news release contains forward-looking information within the meaning of applicable securities laws. All information and statements other than statements of current or historical facts contained in this news release are forward-looking information.

Forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in GoviEx's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "could", "plan", "estimate", "expect", "intend", "may", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information.

Although the Company believes the expectations reflected in such forward-looking statements are based on reasonable assumptions, it can give no assurances that its expectations will be achieved. Such assumptions, which may prove incorrect, include the following: (i) that the Company will be successful in its exploration and development plans for all its projects; (ii) that projected low capital expenditures for the mine-permitted projects will remain unchanged or improve; (iii) that the planned exploration and development programs on GoviEx's projects will be completed as planned and meet GoviEx's objectives; and (iv) that the price of uranium will remain sufficiently high and the costs of advancing the Company's projects will remain sufficiently low so as to permit GoviEx to implement its business plans in a profitable manner.

Factors that could cause actual results to differ materially from expectations include (i) the risk that the Company may not be able to fully realize the anticipated benefits of the updated MRE and the conversion of inferred resources to indicated resources; (ii) the risk that the ongoing feasibility study may not yield the expected results; (iii) the risk that the current drilling program may not result in further potential resource upgrades; (iv) potential delays or changes in the Company's development plans due to various factors, including COVID-19 restrictions; (v) the failure of the Company's projects, for technical, logistical, labour-relations, or other reasons; (vi) a decrease in the price of uranium below what is necessary to sustain the Company's operations; (vii) an increase in the Company's operating costs above what is necessary to sustain its operations; (viii) accidents, labour disputes, or the materialization of similar risks; (ix) a deterioration in capital market conditions that prevents the Company from raising the funds it requires on a timely basis; and (x) generally, the Company's inability to develop and implement a successful business plan for any reason.

In addition, the factors described or referred to in the section entitled "Risks Factors" in the MD&A for the year ended December 31, 2022, of GoviEx, which is available on the SEDAR website at www.sedar.com, should be reviewed in conjunction with the information found in this news release.

Although GoviEx has attempted to identify important factors that could cause actual results, performance, or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance, or achievements not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances, or results will materialize. As a result of these risks and uncertainties, no assurance can be given that any events anticipated by the forward-looking information in this news release will transpire or occur, or, if any of them do so, what benefits that GoviEx will derive therefrom. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and GoviEx disclaims any intention or obligation to update or revise such information, except as required by applicable law.


News Provided by Newsfile via QuoteMedia

Keep reading...Show less
GoviEX Uranium Files Annual Information Form

GoviEX Uranium Files Annual Information Form

GoviEx Uranium Inc. (TSXV: GXU) (OTCQX: GVXXF) ("GoviEx" or the "Company"), a mineral resource company specializing in uranium exploration and development in Africa, announces that further to the filing of its audited consolidated financial statements and management's discussion and analysis for the year ended December 31, 2022, it has today voluntarily filed its Annual Information Form for the year ended December 31, 2022. These filings can be found on the Company's website at www.goviex.com and under the Company's SEDAR profile at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
GoviEx Sponsors Barefoot College International's Solar Project in Niger to Support Local Communities

GoviEx Sponsors Barefoot College International's Solar Project in Niger to Support Local Communities

GoviEx Uranium Inc. (TSXV: GXU) (OTCQX: GVXXF) ("GoviEx" or the "Company") is proud to announce its sponsorship of Barefoot College International's Solar Project in Niger.

This groundbreaking initiative is dedicated to empowering rural women without formal education through comprehensive training in solar technology installation and maintenance, livelihoods development and a holistic women's empowerment curriculum. By fostering self-sufficiency, promoting livelihood development, and ensuring environmental sustainability, the Solar Project aims to enhance the quality of life for individuals living in rural areas.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
GoviEx Uranium Provides Update on the Sale of the Falea Exploration Project

GoviEx Uranium Provides Update on the Sale of the Falea Exploration Project

GoviEx Uranium Inc. (TSXV: GXU) (OTCQX: GVXXF) ("GoviEx" or the "Company"), a mineral resource company specializing in uranium exploration and development in Africa, announces that the agreement with African Energy Metals Inc. ("AEM") for AEM's acquisition of all the issued and outstanding shares of GoviEx's wholly-owned Malian subsidiary, Delta Exploration Mali SARL ("Delta"), which holds the Falea project in Mali, has been terminated due to the fact that AEM was unable to complete its obligations for closing.

In light of this development, GoviEx retains ownership of the Falea project. GoviEx's primary focus is to concentrate its resources on the development of its two advanced-stage mine-permitted projects, namely Madaouela in Niger and Muntanga in Zambia.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Imperial to hold 2024 First Quarter Earnings Call

(TSE: IMO, NYSE American: IMO) Brad Corson, chairman, president and chief executive officer, and Peter Shaw, vice-president, investor relations, Imperial Oil Limited, will host a 2024 First Quarter Earnings Call on Friday, April 26, following the company's first quarter earnings release that morning. The event begins at 9 a.m. MT and will be accessible by webcast.

During the call, Mr. Corson will offer brief remarks prior to taking questions from Imperial's covering analysts.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

PrairieSky Royalty Announces Conference Call for Q1 2024 Results

PrairieSky will release its Q1 2024 results on Monday, April 22, 2024 after markets close. The news release detailing PrairieSky's Q1 2024 results will provide operating and financial information. Financial statements along with management's discussion and analysis will be available on PrairieSky's website at www.prairiesky.com and on SEDAR+ at www.sedarplus.com .

A conference call to discuss the results will be held for the investment community on Tuesday, April 23, 2023 beginning at 6:30 am MT (8:30 am ET). To participate in the conference call, you are asked to register at the link provided below. Details regarding the call will be provided to you upon registration.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the completion of its winter drill program at the Hook Lake Joint Venture at the Carter Corridor. The Hook Lake Project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and lies on trend with high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

"This year's drill program ended with a discovery of 0.9 metres of 0.29% U3O8, including 0.3 metres of 0.68% U3O8, associated with a major structure intersected by hole CRT24-10," said Scott Frostad, Vice President Exploration at Purepoint. "Encouragingly, the basement hosted uranium mineralization is within an altered breccia matrix that borders a 10 metre wide graphitic shear. All the 2024 holes intersected anomalous radioactivity and the results continue to show the extensive 20-kilometre conductive structural zone known as the Carter Corridor remains highly prospective for an economic uranium discovery."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHB F ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has commenced a comprehensive 2024 field campaign at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program will include a ground electromagnetic survey (ML-TEM), a ground gravity survey, and a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTC: BKUCF) "Blue Sky" or the "Company") is pleased to announce that the Company has filed the NI 43-101 Technical Report (the "Report") supporting disclosure of the independent Preliminary Economic Assessment(" PEA") for the Ivana Deposit at the Company's 100% owned Amarillo Grande Uranium-Vanadium Project in Rio Negro Province Argentina as reported on February 22 nd 2024 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Skyharbour Partner Company Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

Skyharbour Partner Company Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ( " Skyharbour " or the " Company ") is pleased to announce that partner company Tisdale Clean Energy Corp. ("Tisdale") has provided an update on its diamond drilling program at the South Falcon East Uranium Project, which hosts the Fraser Lakes B uranium deposit. Under the Option Agreement and assuming the 75% interest is earned, Tisdale will have issued Skyharbour 1,111,111 Tisdale shares upfront, and will fund exploration expenditures totaling CAD $10,500,000, as well as pay Skyharbour CAD $11,100,000 in cash of which $6,500,000 can be settled for shares in the capital of Tisdale ("Shares") over the five-year earn-in period.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×