First Helium Adds Over 500,000 Barrels of Total Proved + Probable Light Oil Reserves at Worsley

First Helium Adds Over 500,000 Barrels of Total Proved + Probable Light Oil Reserves at Worsley

TSXV: HELI    OTCQB: FHELF    FRA: 2MC

Receives $1.2 Million for Oil Deliveries in June

First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC), today announced that it has received a reserve report from its independent evaluator, prepared in accordance with "NI 51-101" guidelines, indicating Total Proved plus Probable ("2P") gross reserves of 505,100 barrels of light oil with corresponding NPV 10% of $24.6 million 1,2 for its oil property at Worsley . In addition, the Company received revenue of approximately $1.2 million in late July for oil volumes that the Company delivered for sale during June. In late June, the Company received revenue of approximately $0.7 million for oil volumes that the Company delivered for sale during May.

First Helium Inc. (TSXV: HELI) (CNW Group/First Helium Inc.)

"When combined with the independent contingent resource 5 evaluation of First Helium's 15-25 well, the receipt of an independent evaluation of the Company's light oil reserves further substantiates First Helium's underlying asset value," said Ed Bereznicki , President & CEO of First Helium.  "First Helium intends to deploy ongoing cash flow from its oil production to help fund further exploration of the numerous, internally generated helium drilling locations identified on its Worsley property and Southern Alberta Lands. These opportunities represent significant potential growth for First Helium shareholders beyond established asset value", added Mr. Bereznicki.

Growth, Beyond Established Asset Value

First Helium's geoscience team has identified numerous potential drilling locations across the largely undeveloped balance of its 79,000 acre Worsley property. These locations are based on detailed geological and geophysical mapping with the incorporation of nearly 15,000 acres of 3D seismic data, and approximately 210 km of 2D seismic data. Similarly, the team has identified a number of potentially high-impact locations on its Southern Alberta Area ( Lethbridge ) lands, including a drill-ready location for later this year.

"With 3D seismic data covering approximately 60% of the 276,000 acre Lethbridge land base, the Company has been able to evaluate potential targets which are similar to known helium accumulations at Knappen, Battle Creek and Cypress," commented David Safton , Vice President of Exploration & Development. "We have targets with four-way closure at both the Basal Cambrian Sandstone and Beaverhill Lake/Souris River levels. These formations possess excellent porosity and permeability, and based on the helium content at Knappen, for successful wells we expect helium content of about 1% in the Lethbridge area", added Mr. Safton.

Based on preliminary "FEED" (Front End Engineering Design) study work that commenced in the Spring of 2021, First Helium has now completed the FEED study of a larger scale helium processing facility which can be applied to meet the immediate timing requirements of its 15-25 single well helium processing facility at Worsley . The Company is currently in the process of securing helium gas off-take sales arrangements to help support the financing, fabrication, installation and commissioning of a single well helium gas processing facility for 15-25, planned to commence later this year.

Sproule Independent Reserves Evaluation

In July 2022 , the Company received an independent report, focused on its oil property at Worsley , entitled "Evaluation of the P&NG Reserves of First Helium Inc. in the Beaton Area of Alberta, Canada (as of March 31, 2022 )" (the "Reserve Report") from Sproule Associates Limited ("Sproule"). Sproule carried out its evaluation in accordance with standards set out in the current Canadian Oil and Gas Evaluation Handbook, as maintained by the Society of Petroleum Evaluation Engineers (Calgary Chapter). The reserves evaluation includes risked estimates of oil volumes and related net present values of future net revenues, estimated using various forecasted oil prices.

Specifically, Sproule estimated the Total Proved plus Probable gross reserves associated with First Helium's oil property, including the 1-30 and 4-29 wells. In summary, Sproule estimated Total Proved Reserves to be 287,900 barrels, and the Total Probable Reserves to be 217,300 barrels of light oil, respectively. Sproule further estimated the 2P gross reserves to have a net present value, discounted at 10%, of approximately $24.6 million 1,2 , which equates to a foundational amount of approximately $0.33 per basic outstanding common share 3 of the Company. First Helium has filed requisite disclosure, in accordance with National Instrument 51-101, Standards of Disclosure for Oil and Gas Activities ("NI 51-101"), in connection with this release 4 .

Establishing a base of oil reserves will provide the Company with further financial flexibility to pursue its business objective of exploring and developing helium projects.  Production from its oil property at Worsley will provide cash flow to help fund these activities. During June, First Helium produced a total of 9,592 barrels of light oil, or an average of 320 barrels per day. Ongoing wet weather during the early part of June continued to hamper the Company's operations at its Worsley oil battery, including temporarily suspending access of trucks to pick up and transport oil from the battery to the sales terminal.

Notes:

(1)

Estimates of future net revenue, whether calculated without discount or using a discount rate, do not represent fair market value.

(2)

2P reserve NPV 10% is calculated as the before tax net present value of the reserves at March 31, 2022 discounted at 10%.

(3)

2P reserve value per share is calculated as the before tax net present value of the reserves at March 31, 2022 discounted at 10% divided by the basic issued and outstanding shares at July 26, 2022.

(4)

Further information regarding the NI 51-101 filing can be found in First Helium's SEDAR profile at www.sedar.com .

(5)

"Contingent resources" are not, and should not be confused with, oil and gas, or helium reserves.  Further information regarding Contingent Resources can be found in First Helium's Final Prospectus, dated June 28, 2021, filed on First Helium's SEDAR profile at www.sedar.com

Led by a core Senior Executive Team with diverse and extensive backgrounds in Oil & Gas Exploration and Operations, Mining, Finance, and Capital Markets, First Helium seeks to be one of the leading independent providers of helium gas in North America .

Building on its successful 15-25 helium discovery well at the Worsley project, the Company has identified numerous follow-up drill locations and acquired an expansive infrastructure system to facilitate future exploration and development of helium across its Worsley land base.  Cash flow from its successful oil wells at Worsley will help support First Helium's ongoing helium exploration and development growth strategy.

First Helium holds over 79,000 acres along the highly prospective Worsley Trend in Northern Alberta , and 276,000 acres in the Southern Alberta Helium Fairway, near existing helium production.  In addition to continuing its ongoing exploration and development drilling at Worsley , the Company has identified a number of high impact helium exploration targets on the prospective Southern Alberta Helium Fairway lands to set up a second core exploration growth area for the Company.

For more information about the Company, please visit www.firsthelium.com .

ON BEHALF OF THE BOARD OF DIRECTORS

Edward J. Bereznicki
President, CEO and Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING AND CAUTIONARY STATEMENTS

This news release contains certain statements or disclosures relating to First Helium that are based on the expectations of its management as well as assumptions made by and information currently available to First Helium which may constitute forward-looking statements or information ("forward-looking statements") under applicable securities laws. All such statements and disclosures, other than those of historical fact, which address activities, events, outcomes, results, or developments that First Helium anticipates or expects may or will occur in the future (in whole or in part) should be considered forward-looking statements. In some cases, forward-looking statements can be identified by the use of the words "expect", "will" and similar expressions. In particular, but without limiting the foregoing, this news release contains forward-looking statements pertaining to the timing and rate of production of the 4-29 and 1-30 discovery wells, respectively; anticipated cash flows; the entering into of off-take marketing arrangements; the use of funds and the Company's strategy. The forward-looking statements contained in this news release reflect several material factors and expectations and assumptions of First Helium including, without limitation: that First Helium will continue to conduct its operations in a manner consistent with past operations; the general continuance of current or, where applicable, assumed industry conditions; availability of debt and/or equity sources to fund First Helium's capital and operating requirements as needed; and certain cost assumptions.

Forward-looking statements are based on estimates and opinions of management at the date the statements are made and are subject to risks, uncertainties and assumptions, including those set out in the Final Prospectus dated June 28, 2021 and filed under the Company's profile on SEDAR at www.sedar.com . Readers are cautioned that actual results may vary materially from the forward-looking statements made in this news release. Risks that could cause actual events or results to differ materially from those projected in forward-looking statements include, but are not limited to, risks associated with the oil and gas industry; the ability of First Helium to fund the capital and operating expenses necessary to achieve its business objectives; the impact of the COVID-19 pandemic on the business and operations of First Helium; the state of financial markets; increased costs and physical risks relating to climate change; loss of key employees and those risks described in the Final Prospectus dated June 28 , 2021.  First Helium does not undertake any obligation to update forward looking statements, except as required by applicable securities laws. Investors should not place undue reliance on forward-looking statements.

SOURCE First Helium Inc.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/August2022/02/c8007.html

News Provided by Canada Newswire via QuoteMedia

HELI:CA
First Helium

First Helium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
First Helium (TSXV:HELI)

First Helium


Keep reading...Show less
First Helium Licenses First of Two Wells Targeting Leduc Light Oil at Worsley

First Helium Licenses First of Two Wells Targeting Leduc Light Oil at Worsley

First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced receipt of regulatory licensing approval to proceed with the drilling of its proven undeveloped ("PUD") 7-30 location, which has been assigned proved plus probable undeveloped reserves of 196,700 barrels 2 by Sproule Associates Limited ("Sproule") 1 its independent evaluator. The Company continues to advance the licensing process for its high-impact 7-15 Leduc anomaly target and is working to secure drilling and ancillary services to drill both wells in a sequential, cost-effective manner.

"With drilling license in hand for the 7-30 PUD location, we are moving ahead to secure the required services necessary to drill both our 7-30 PUD well along with our high impact Leduc anomaly, 7-15, which on seismic is approximately 5X the areal extent of our successful 1-30 light oil pool discovery," said Ed Bereznicki, President & CEO of First Helium. "With success, the combined oil potential from these two operations would provide immediate cash flow and meaningful near-term value for our shareholders. It would also set the stage to execute on ten additional, highly prospective lower risk drilling locations," added Mr. Bereznicki.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
First Helium Advances Licensing of Strategic 7-15 and 7-30 Leduc Wells Targeting Light Oil

First Helium Advances Licensing of Strategic 7-15 and 7-30 Leduc Wells Targeting Light Oil

First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced that it has completed surveying its proven undeveloped ("PUD") 7-30 location and is advancing through the licensing process for both the 7-30 and 7-15 locations, respectively. The 7-30 PUD well will be drilled on an existing surface location which will enable the Company to expedite drilling. The PUD well has been assigned proved plus probable undeveloped reserves of 196,700 barrels 2 by Sproule Associates Limited ("Sproule") 1 the Company's independent evaluator, and will be drilled in conjunction with the recently identified 7-15 Leduc anomaly.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
First Helium Confirms Plans for Sequential Drilling of Two Oil Targets - Proven Undeveloped  Oil Location and Large Leduc Anomaly

First Helium Confirms Plans for Sequential Drilling of Two Oil Targets - Proven Undeveloped Oil Location and Large Leduc Anomaly

First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced plans to drill two complementary vertical Leduc oil targets at its Worsley property. The program will include drilling two strategic targets: the Company's proven undeveloped ("PUD") location at 7-30, which has been assigned proved plus probable undeveloped reserves of 196,700 barrels 2 by Sproule Associates Limited ("Sproule") 1 the Company's independent evaluator, and the recently identified 7-15 Leduc anomaly. The Company has initiated licensing for both locations and intends to optimize drilling costs by executing a two-well drilling program in succession.

"Given our focus on near-term cash flow opportunities, we are excited to be proceeding with a two-well program targeting proven undeveloped oil reserves at our 7-30 location and exploring the large Leduc anomaly, 7-15, which is approximately five times the areal extent of our successful 1-30 light oil pool discovery," said Ed Bereznicki, President & CEO of First Helium. "This strategic approach allows us to efficiently develop both a proven undeveloped oil opportunity and potentially make a significant discovery at a high-impact exploration oil target while maintaining operational efficiency," added Mr. Bereznicki.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
First Helium Reviewing Potential Follow Up Targets to Leduc Anomaly Drill

First Helium Reviewing Potential Follow Up Targets to Leduc Anomaly Drill

First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced that it is reviewing its extensive drilling inventory for follow up operations to its planned Leduc anomaly drill ("7-15") targeting light oil. This program may include drilling its proven undeveloped 1, 3 location ("7-30"), a follow up well on the Leduc anomaly, or another one of 12 primary Leduc prospects identified on its proprietary 3D seismic at Worsley. Other operations include completion and testing of the existing 5-27 horizontal well, along with the re-entry and completion of an existing vertical well bore at east Worsley, both targeting helium-enriched natural gas in the Blue Ridge formation to establish a regional, repeatable play.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
First Helium Initiates Process to License & Drill the Leduc Anomaly

First Helium Initiates Process to License & Drill the Leduc Anomaly

First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced that it has completed its field survey activities and selected the surface location for its Leduc anomaly test well planned for drilling this winter. The survey will be used to prepare necessary regulatory applications for drilling approval. The well location has been selected based on a thorough evaluation of recently acquired proprietary 3D seismic data where the Company has identified a significant anomaly in the Leduc Formation which it believes to be prospective for oil. To date, the Company has drilled two successful Leduc oil wells at Worsley, including the 1-30 and 4-29 Leduc oil pool discoveries, respectively, which together have produced more than 113,000 barrels of light oil, generating in excess of $13 million in revenue and $8 million in cash flow.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Rox Resources

High grade Assay Results Continue at Youanmi

West Australian gold exploration and development company, Rox Resources Limited (“Rox” or “the Company”) (ASX: RXL), has received the final batch of assays from its 11,000m DD and RC program at the Youanmi Gold Project in WA.

Keep reading...Show less
Alice Queen

Drilling Commenced at Viani in Fiji

Alice Queen Limited (ASX:AQX) (“Alice Queen” or the “Company”) is pleased to announce that drilling has commenced at its 100% owned Viani Project in Vanua Levu, Fiji (see Image 1). The initial planned three-hole diamond drilling program will test for high-grade epithermal gold-style mineralisation intersected at the Viani Project by historic drilling.

Keep reading...Show less
Firefly Metals logo

FireFly Drills its Best Hole Yet with Assay of 86.3m at 3.7% CuEq

Latest drilling returns very thick intersections with exceptional grades, outlining a rich area of mineralistion which will form part of the next Resource update

FireFly Metals Ltd (ASX: FFM) (“Company” or “Firefly”) is pleased to announce its best assays yet at the Green Bay copper-gold project.

Keep reading...Show less
Corazon Mining

Strategic Expansion of MacBride Base & Precious Metal Project in Canada

Acquired ground more than doubles Corazon’s prospective landholding / Aerial geophyical survey extended to test new tenure / Work underway defining priority targets for early 2025 drill program

Corazon Mining Limited (ASX: CZN) (Corazon or Company) is pleased to announce the strategic expansion of its MacBride Base and Precious Metals Project (MacBride or Project) in the Lynn Lake district, of Manitoba, Canada.

Keep reading...Show less
First Helium

First Helium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×