Canada Silver Cobalt Begins Drilling at Eby-Otto Gold Property

Canada Silver Cobalt Begins Drilling at Eby-Otto Gold Property

(TheNewswire)

The Eby-Otto property is located in a prime geological setting with mineralized veins identified at surface, and is proximal to both the Cadillac-Larder Lake Break and an existing high-grade gold mine.

Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt") announces that it has begun diamond drilling at its Eby-Otto gold property near the town of Kirkland Lake

The planned 2,000-2,500-meter drill program is being conducted by Laframboise Drill Inc. and is part of the Company's Phase II exploration activity at Eby-Otto.

This initial drilling may include targets such as:

  • Regional fault structures such as the Cadillac-Larder Lake Break and/or Eby-Otto Fault.

  • Regional mapped alteration zones and areas of increased sulphides.

  • Mapped surface veins with anomalous gold mineralization.

  • Areas with high potential based on the drone mag and existing local 2D EM.

The Company has also initiated a 3D IP Resistivity geophysics survey at Eby-Otto to be completed by Dias Geophysical as part of its Phase II exploration at the property (see news release October 24, 2022).

"We are excited to start drilling at Eby-Otto. It is a very promising land package close to a producing mine with outcropping mineralized veins already identified. Our geological team has done a good amount of work there already this year with channel samples taken at key outcrop locations and sent to the lab for analysis (assays pending).  We are looking forward to the results of both the channel sampling and the drilling," said Matthew Halliday, P.Geo., President and COO.

The Company has outlined the planned three exploration phases at the property as follows:

Phase I: The first phase consisted of an initial site assessment to determine the logistics of future operations and to provide the Company time to receive any pending surface exploration work permits that will be necessary.  Surveying was completed for key standard iron bars (SIB), legacy claim posts, and access points to refresh select existing cut line grids. An overall geological assessment was completed based on field work consisting of geological mapping and stripping key outcrops. A drone magnetic survey on the entire claim package was completed by EarthEx Geophysical Solutions Inc.

Phase II: The second phase of exploration will be based on the results from Phase 1 and will expand to include a ground 3D IP/EM survey on the entire claim package which will compliment the magnetic survey completed earlier this year. A 2,000 - 2,500m diamond program will be completed to intercept targeted areas of strong potential. The targets will be based on the geophysical data provided by the drone magnetic survey, historic geological data, regional geophysics, geological mapping, and existing selective 2D electromagnetic (EM) surveys completed by geologist Doug Robinson prior to the Company's acquisition of the property. This will help refine Phase III.

Phase III: The third phase of exploration will expand on the drilling and field work outlined in Phase II. The Company will combine the IP/EM ground survey and cross reference the geophysical anomalies between the magnetic and IP/EM survey. The technical team will correlate the information gathered from Phase I and Phase II with known mineralization that has been identified via field work to better refine the targets, and adjust the exploration accordingly. Phase III is estimated to begin in January 2023.

The Company has option agreements on contiguous properties covering 1,000 ha at Eby-Otto and the area, importantly, includes approximately 5km of strike length along the Eby-Otto Fault and along a major alteration trend (OGS OFR 6184). The property is within the Kirkland Lake gold district in northeastern Ontario and is located within 5km of Agnico-Eagle's producing, high-grade Macassa Gold Mine.

Qualified person

The technical information in this news release was approved and prepared under the supervision of Mr. Matthew Halliday, P.Geo., (PGO), President and COO of Canada Silver Cobalt Works Inc., a qualified person in accordance with National Instrument 43-101.

About Canada Silver Cobalt Works Inc.

Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.

In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.

The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed a nearly 15,000-metre drill program on the Graal property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it is exploring.

Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com

"Frank J. Basa"

Frank J. Basa, P. Eng.

Chief Executive Officer

For further information, contact:

Frank J. Basa, P.Eng.

Chief Executive Officer

416-625-2342

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward- looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com .

Copyright (c) 2022 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

CCW:CA
The Conversation (0)
Canada Silver Announces Effective Date of Name Change to "NORD PRECIOUS METALS MINING INC."

Canada Silver Announces Effective Date of Name Change to "NORD PRECIOUS METALS MINING INC."

(TheNewswire)

January 19, 2024 TheNewswire - Coquitlam, BC, Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt") is pleased to announce that further to its news release dated January 4, 2024, the TSX Venture Exchange has accepted the name change to " Nord Precious Metals Mining Inc. ".

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Announces Name Change to Nord Precious Metals Mining Inc.

Canada Silver Announces Name Change to Nord Precious Metals Mining Inc.

(TheNewswire)

Coquitlam, BCCanada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt is pleased to announce that shareholders at the Annual and General Meeting held on October 31, 2023 voted in favour to change the Company's name to "Nord Precious Metals Mining Inc".  The new name will better reflect the direction of the Company.  The name change is subject to TSX Venture Exchange ("Exchange") approval.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt Works Reflects on a Productive Year of Achievements

Canada Silver Cobalt Works Reflects on a Productive Year of Achievements

(TheNewswire)

New discoveries of precious and battery metals and progress towards surfacing value for shareholders through a spinout of a potentially large nickel-copper-cobalt property in Quebec

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt Begins Drilling at Lowney-Lac Edouard in Quebec, Targeting Nickel-Copper-Cobalt Mineralization

Canada Silver Cobalt Begins Drilling at Lowney-Lac Edouard in Quebec, Targeting Nickel-Copper-Cobalt Mineralization

(TheNewswire)

The property has many yet-to-be-drilled targets and prospective electromagnetic anomalies identified by an airborne geophysical survey.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt to Reprice Warrants

Canada Silver Cobalt to Reprice Warrants

(TheNewswire)

Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the " Company " or " Canada Silver Cobalt ") announces that it is proposing to amend the terms of an aggregate 23,380,092 outstanding common share purchase warrants ("Warrants") by amending the exercise price to $0.06 per share

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Annual Report to Shareholders

Altech Batteries Ltd Annual Report to Shareholders

Perth, Australia (ABN Newswire) - Altech Batteries Ltd (ASX:ATC,OTC:ALTHF) (FRA:A3Y) (OTCMKTS:ALTHF) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("IKTS") to commercialise the revolutionary CERENERGY Sodium Chloride Solid State (SCSS) Battery. CERENERGY batteries are the game-changing alternative to lithium-ion batteries. CERENERGY batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY battery, with plans to construct a 120MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY battery modules to provide grid storage solutions to the market.

Altech has executed sales offtake Letters of Intent with three companies that covers the full first five years of production from the 120MWh production facility. Altech is now forging forward with securing the finance to construct the production facility, envisaged to be a combination of debt, equity from the sale of a minority interest in the project, and grants and subsidies.

The CERENERGY battery has achieved the highest possible dark green rating from Standard & Poors, due to its non-reliance on critical minerals as well as its expected 50% less greenhouse gas emissions to lithium-ion battery technology.

Altech has licenced its proprietary high purity alumina coating technology to 75% owned subsidiary Altech Industries Germany GmbH (AIG), which has finalised a Definitive Feasibility Study for the development of a 8,000tpa silicon/graphite alumina coating plant in the state of Saxony, Germany to supply its Silumina Anodes product to the burgeoning European electric vehicle market.

The Company patented its game changing technology of incorporating high-capacity silicon into lithium-ion batteries. Through in house R&D, the Company has cracked the "silicon code" and successfully achieved a 55% higher energy battery with improved cyclability or battery life. Higher density batteries result in smaller, lighter batteries and substantially less greenhouse gases, and is the future for the EV market. The Company's proprietary silicon graphite product is registered as Silumina Anodes.

The Company is in the race to get its patented technology to market, has finalised the construction of a Silumina Anodes pilot plant at AIG's industrial site within the Schwarze Pumpe Industrial Park in Saxony, Germany. The European silicon feedstock supply partner for this plant will be Ferroglobe. The project has also received green accreditation from the independent Norwegian Centre of International Climate and Environmental Research (CICERO). The pilot plant adjacent to the proposed project site will allow the qualification process for its Silumina Anodes product. AIG has executed NDAs with German and American automakers as well as a European based battery company.

The pilot plant to produce commercial samples of the product has now been completed and is operational. Altech is working to ramp up production of the pilot plant in order to provide the commercial samples to the prospective companies for their independent testing within their product range.

*To view the full Annual Report, please visit:
https://abnnewswire.net/lnk/35XEX5O2



About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
A.I.S. Resources Signs Earn-In Agreement with Riversgold on the New Copper/Gold/Antimony Discovery at Saint John, New Brunswick

A.I.S. Resources Signs Earn-In Agreement with Riversgold on the New Copper/Gold/Antimony Discovery at Saint John, New Brunswick

A.I.S. Resources Limited (TSXV: AIS,OTC:AISSF, OTC-Pink: AISSF) ("AIS" or the "Company") is pleased to announce that it has entered into an earn-in agreement with Riversgold Ltd. (ASX: RGL) ("Riversgold"), granting AIS the right to acquire up to a 75% interest in the new Saint John IOCGPorphyry Project located in New Brunswick, Canada.

AIS CEO Marc Enright-Morin commented, "We are excited to partner with Riversgold on this very exciting newly discovered Saint John Project. The combination of very high-grade mineralisation, excellent infrastructure, and district-scale potential provides AIS with a unique opportunity to advance a possible IOCG/porphyry system in one of Canada's most mining-friendly jurisdictions. Saint John is exploration and drill ready with two drill programs already approved. Its unique location near the coast means we can explore here in a meaningful way all year round and we look forward to getting the drills turning and come up with the discovery hole."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
ALTECH - CERENERGY Battery Prototype Reaches Key Milestones

ALTECH - CERENERGY Battery Prototype Reaches Key Milestones

Altech Batteries (ATC:AU) has announced ALTECH - CERENERGY Battery Prototype Reaches Key Milestones

Download the PDF here.

Altech Batteries Ltd  CERENERGY Battery Prototype Reaches Key Milestones

Altech Batteries Ltd CERENERGY Battery Prototype Reaches Key Milestones

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce the latest performance results of the CERENERGY(R) cell and battery pack prototypes. These results confirm the technological maturity and robustness of the CERENERGY(R) technology and mark another decisive step towards industrialisation.

Highlights

- 650+ cycles with no capacity loss, proving exceptional material stability and long operational lifespan compared to conventional batteries

- Near 100% Coulombic efficiency, confirming minimal side reactions and strong intrinsic safety of sodium nickel chloride chemistry

- High energy efficiency of up to 92%, surpassing typical 70-80% levels of competing battery technologies

- Proven safety under extreme conditions - cells remained stable during overcharge, deep discharge, and thermal cycling up to 300 degC with no gassing, leakage, or rupture

- Robust and reliable chemistry - sodium nickel chloride avoids flammable electrolytes and runaway risks, confirming suitability for safe, large-scale grid and renewable energy storage

- ABS60 prototype validated under real-world conditions -tested across diverse load profiles, high-current pulses up to 50 A, and thermal variations

- Stable, efficient performance - achieved ~88% round-trip efficiency with no observable capacity fade over 110+ cycles

CELL PERFORMANCE

The CERENERGY(R) prototype cells have successfully completed over 650 charge-discharge cycles without any detectable capacity loss. Cycle life is a critical measure of battery durability, as most conventional batteries experience gradual degradation with every cycle. Achieving such performance highlights the outstanding stability of the materials and points to the potential for a long operational lifespan.

For stationary energy storage systems (ESS), this translates into fewer battery replacements, lower lifetime operating costs, and greater reliability for end users.

The cells also delivered nearly 100% Coulombic efficiency alongside an energy efficiency of up to 92% across 650 cycles. Coulombic efficiency reflects the proportion of charge recovered during discharge relative to what was supplied during charging. A value approaching 100% indicates minimal side reactions or parasitic losses, confirming the intrinsic stability and safety of sodium nickel chloride chemistry. This high efficiency demonstrates that the cells are not expending energy on unwanted processes such as electrode degradation. Such performance is vital for scalability, ensuring reliable, longterm operation in commercial energy storage applications.

Energy efficiency represents the proportion of energy delivered relative to the energy supplied. Competing technologies, including conventional high-temperature batteries and many flow batteries, typically achieve only around 70-80%. By reaching 92%, CERENERGY(R) positions itself in a highly competitive class, offering more cost-effective energy storage, stronger economics for grid operators, and seamless compatibility with the requirements of renewable energy integration.

The cells achieved a nominal capacity of 100 Ah and 250 Wh, with reliable performance even at higher discharge rates. A key feature is their ability to support multiple daily charge-discharge cycles within the 20-80% state of charge (SoC) range at 25 A. This capability positions CERENERGY(R) as a highly flexible solution for grid operators and energy storage providers, enabling cost-efficient, long-life performance in applications that demand frequent cycling such as renewable integration, peak shaving, and backup power.

CERENERGY(R) prototype cells underwent rigorous abuse testing, including overcharge to 4 V, deep discharge to 0.2 V, and thermal cycling between room temperature and 300 degC. In all cases, the cells remained stable with no gassing, leakage, or rupture -clear proof of their outstanding safety. These results highlight the intrinsic stability of sodium nickel chloride chemistry, which avoids the flammable electrolytes and runaway risks common in lithium-ion batteries. The ability to withstand extreme electrical and thermal stress demonstrates CERENERGY(R)'s robustness and confirms its suitability for safe, largescale deployment in grid, renewable, and industrial energy storage applications. This was achieved over 3 cycles with 1.8 Full Charge Equivalent (FCE) into 22 hours.

BATTERY PACK ABS60 (60 kWh) PROTOTYPE

The first ABS60 battery pack prototype has been successfully validated under real-world operating conditions, marking a major step forward in product readiness. Testing included diverse load profiles,

continuous discharges at 25 A (equivalent to C-rate of C/4 (discharges in 4 hours), or one-quarter of the pack's rated capacity per hour) at 80% depth of discharge (DoD), short-duration high-current pulses up to 50 A, and carefully controlled thermal variations.

The pack consistently demonstrated stable performance, achieving ~88% round-trip efficiency while maintaining reliable thermal management. Efficiency refers to the proportion of input energy that can be retrieved during operation-a critical measure of economic viability for large-scale storage. Over more than 110 cycles, results showed no observable capacity fading and only a slight increase in internal resistance. Capacity fading refers to the gradual decline in usable energy over repeated cycles, while internal resistance influences power delivery and heat generation.

The absence of meaningful degradation confirms the durability and electrochemical stability of the ABS60 design. These outcomes are highly significant as they demonstrate that the pack can withstand real-world duty cycles while retaining performance and efficiency, translating into longer service life, fewer replacements, and lower total cost of ownership.

For grid operators and renewable integration projects, this combination of robust cycling capability, efficiency, and thermal stability underscores the ABS60's commercial readiness and competitive advantage in the stationary energy storage market.

These results are a strong confirmation of CERENERGY(R)'s technological leadership and a clear signal of the technology's competitiveness and robustness for future applications in energy storage and industrial markets.

Group Managing Director, Iggy Tan said "These results confirm CERENERGY(R)'s robustness and readiness for market adoption. Demonstrating long cycle life, high efficiency, and unmatched safety, we are now strongly positioned to deliver a competitive and sustainable alternative for grid and industrial energy storage."

*To view photographs, tables and figures, please visit:
https://abnnewswire.net/lnk/17QS44T3



About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Battery Anode Material Refinery - Design & Location Update

Battery Anode Material Refinery - Design & Location Update

Metals Australia (MLS:AU) has announced Battery Anode Material Refinery - Design & Location Update

Download the PDF here.

Latest Press Releases

Related News

×