Bradda Head Lithium Ltd Announces Results of Annual General Meeting

Bradda Head Lithium Ltd Announces Results of Annual General Meeting

Bradda Head Lithium Ltd (AIM:BHL, TSX-V:BHLI, OTCQB:BHLIF), the North America-focused lithium development group, announces that at the AGM held yesterday, all resolutions were passed

The Company is also pleased to provide an update on its operations, which is available on the Company's website at the link below:

https://www.braddaheadltd.com/investors#Presentations

For further information:

Contact:

Bradda Head Lithium Limited+44 (0) 1624 639 396
Ian Stalker, Executive Chairman
Denham Eke, Finance Director
Beaumont Cornish (Nomad)+44 (0) 2076 283 396
James Biddle / Roland Cornish
Panmure Gordon (Joint Broker)+44 (0) 2078 862 500
John Prior / Hugh Rich
Shard Capital (Joint Broker)+44 (0) 2071 869 927
Damon Heath / Isabella Pierre
Red Cloud (North American Broker)+1 416 803 3562
Joe Fars
Tavistock (Financial PR)+ 44 20 7920 3150
Nick Elwes / Adam Baynesbraddahead@tavistock.co.uk

About Bradda Head Lithium Ltd.

Bradda Head Lithium Ltd. is a North America-focused lithium development group. The Company currently has interests in a variety of projects, the most advanced of which are in Central and Western Arizona: The Basin Project (Basin East Project, and the Basin West Project) and the Wikieup Project.

The Basin East Project has an Indicated Mineral Resource of 17 Mt at an average grade of 940 ppm Li and 3.4% K for a total of 85 kt LCE and an Inferred Mineral Resource of 210 Mt at an average grade of 900 ppm Li and 2.8% K (potassium) for a total of 1.09 Mt LCE. In the rest of the Basin Project SRK has determined an Exploration Target of 250 to 830 Mt of material grading between 750 to 900 ppm Li, which is equivalent to a range of between 1 to 4 Mt contained LCE. The Group intends to continue to develop its three phase one projects in Arizona, whilst endeavouring to unlock value at its other prospective pegmatite and brine assets in Arizona, Nevada, and Pennsylvania. All of Bradda Head's licences are held on a 100% equity basis and are in close proximity to the required infrastructure. Bradda Head is quoted on the AIM of the London Stock Exchange with the ticker of BHL, on the TSX Venture Exchange with a ticker of BHLI, and on the US OTCQB market with a ticker of BHLIF.

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "intends to", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties, and other factors involved with forward-looking information could cause actual events, results, performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, following: The Company's objectives, goals, or future plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: failure to identify mineral resources; failure to convert estimated mineral resources to reserves; delays in obtaining or failures to obtain required regulatory, governmental, environmental or other project approvals; political risks; future operating and capital costs, timelines, permit timelines, the market and future price of and demand for lithium, and the ongoing ability to work cooperatively with stakeholders, including the local levels of government; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices; delays in the development of projects, capital and operating costs varying significantly from estimates; an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains; and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDARplus. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

SOURCE:Bradda Head Lithium Limited



View source version on accesswire.com:
https://www.accesswire.com/809724/bradda-head-lithium-ltd-announces-results-of-annual-general-meeting

News Provided by ACCESSWIRE via QuoteMedia

BHLI:CA
The Conversation (0)
Bradda Head Lithium Ltd Announces Delisting from the US OTCQB

Bradda Head Lithium Ltd Announces Delisting from the US OTCQB

Bradda Head Lithium Ltd ("Bradda Head", "BHL" or the "Company") (AIM:BHL)(TSX-V:BHLI) the North America-focused lithium development group, announces that the Company has delisted its shares from trading on the US OTCQB Market, with effect from 1 January 2024, due to share trading liquidity expectations not having been met and cost saving in this current market environment

The Company's shares continue to trade on the London AIM Market and on the Canadian TSX Venture Exchange.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Bradda Head Lithium Ltd Announces Holding in Company

Bradda Head Lithium Ltd Announces Holding in Company

TR-1: Standard form for notification of major holdings

NOTIFICATION OF MAJOR HOLDINGS (to be sent to the relevant issuer and to the FCA in Microsoft Word format if possible)

8. Notified details of the resulting situation on the date on which the threshold was crossed or reachedviii

A: Voting rights attached to shares

Class/type of
shares

ISIN code (if possible)

Number of voting rightsix

% of voting rights

Direct

(DTR5.1)

Indirect

(DTR5.2.1)

Direct

(DTR5.1)

Indirect

(DTR5.2.1)

VGG154091083

39,739,569

10.17%

SUBTOTAL 8. A

39,739,569

10.17%

B 1: Financial Instruments according to DTR5.3.1R (1) (a)

Type of financial instrument

Expiration
date

Exercise/
Conversion Period

Number of voting rights that may be acquired if the instrument is

exercised/converted.

% of voting rights

SUBTOTAL 8. B 1

B 2: Financial Instruments with similar economic effect according to DTR5.3.1R (1) (b)

Type of financial instrument

Expiration
datex

Exercise/
Conversion Period

Physical or cash

Settlement

Number of voting rights

% of voting rights

SUBTOTAL 8.B.2

9. Information in relation to the person subject to the notification obligation (please mark the

applicable box with an "X")

Person subject to the notification obligation is not controlled by any natural person or legal entity and does not control any other undertaking(s) holding directly or indirectly an interest in the (underlying) issuer xiii

Full chain of controlled undertakings through which the voting rights and/or the
financial instruments are effectively held starting with the ultimate controlling natural person or legal entity (please add additional rows as necessary)

X

Name

% of voting rights if it equals or is higher than the notifiable threshold

% of voting rights through financial instruments if it equals or is higher than the notifiable threshold

Total of both if it equals or is higher than the notifiable threshold

Electrification and Decarbonization AIE LP

6.03%

6.03%

Li Equities Investments LP

4.15%

4.15%

Waratah Advisors GP I Limited

0%

N/A

0%

Waratah Capital Advisors Ltd.

0%

N/A

0%

2401261 Ontario Inc.

0%

N/A

0%

10. In case of proxy voting, please identify:

Name of the proxy holder

N/A

The number and % of voting rights held

N/A

The date until which the voting rights will be held

N/A

11. Additional information

Waratah Advisors GP I Limited is the general partner of Electrification and Decarbonization AIE LP and Li Equities Investments LP and has delegated investment management to Waratah Capital Advisors Ltd. ("Waratah"), which is a wholly owned subsidiary of 2401261 Ontario Inc.

Holdings in items 7 and 8 of this document are consolidated for both Electrification and Decarbonization AIE LP and Li Equities Investments LP. Please refer to item 9 for a breakdown of holdings by entity.

As of November 20, 2023, Electrification and Decarbonization AIE LP and Li Equities Investments LP own 23,535,515 and 16,204,054 shares, respectively, representing a total percentage ownership of 10.17% based on 390,609,400 issued and outstanding shares.

This notification is being made pursuant to Regulation 25.3 of the issuer's articles of association and pursuant to DTR5.

Place of completion

Toronto, Canada

Date of completion

21/11/2023

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

SOURCE: Bradda Head Lithium Limited



View source version on accesswire.com:
https://www.accesswire.com/808429/bradda-head-lithium-ltd-announces-holdings-in-company

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Bradda Head Lithium Ltd - Replacement: San Domingo Update

Bradda Head Lithium Ltd - Replacement: San Domingo Update

THIS ANNOUNCEMENT REPLACES THE ANNOUNCEMENT " PHASE 2 DRILLING IDENTIFIES NEW LITHIUM-BEARING PEGMATITE ZONES AT SAN DOMINGO" OF 13 NOVEMBER 2023.

· In figure 3: Bolt cross-section and drill hole SD-DH23-057, looking northwest - one of the captions in the image read 5.27m at 5.27%, but should read 5.27m at 0.51%.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Bradda Head Lithium Ltd Announces Positive San Domingo Metallurgical Results

Bradda Head Lithium Ltd Announces Positive San Domingo Metallurgical Results

Positive preliminary metallurgical results on samples from Jumbo Spodumene Pegmatite target at San Domingo Pegmatite District, Arizona

Bradda Head Lithium Ltd (AIM:BHL)(TSX-V:BHLI)(OTCQB:BHLIF), the North America-focused lithium development group, is pleased to announce positive metallurgical heavy liquid separation ("HLS") results from test work undertaken by the SGS Metallurgical Process Facility in Lakefield, Canada ("SGS Canada") on quartered drill core samples taken from its Jumbo Exploration Target at San Domingo District, Arizona, USA

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Bradda Head Lithium Ltd Announces Basin East MRE Uploaded to SEDARplus

Bradda Head Lithium Ltd Announces Basin East MRE Uploaded to SEDARplus

Basin East Mineral Resource Estimate Uploaded to SEDARplus

Bradda Head Lithium Ltd (AIM:BHL)(TSX-V:BHLI)(OTCQB:BHLIF), the North America-focused lithium development group, announces that, further to its press release of 28 September 2023, it has, on 14 November 2023, filed a Technical Report ("Report") on SEDARplus for the updated Mineral Resource Estimate ("MRE") at the Company's Basin East ("BE") asset in Arizona

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
GMV Minerals Inc. Reaffirms Commitment to Mexican Hat Gold Project - Drill Permit Received for Nevada Project

GMV Minerals Inc. Reaffirms Commitment to Mexican Hat Gold Project - Drill Permit Received for Nevada Project

GMV Minerals Inc. (the "Company" or "GMV") (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce the following update

The Company continues to be highly encouraged by its primary core project known as the Mexican Hat gold deposit located in SE Arizona. The Company's Preliminary Economic Assessment" PEA" reports 36.7 million tonnes grading 0.58 gpt gold in a 688,000 ounce Inferred Mineral Resource. An open pit with a 1.87:1 strip ratio was modeled to extract 32.6 million tonnes of this deposit recovering 525,000 ounces of gold over a 10-year mine life. This is a low capital cost operation, total cost of US$67.8 million, which includes US$12 million in contingency and US$13 million in sustaining capital. Heap leach testing demonstrates an exceptional recovery of 88% of the gold from a two-stage crushing circuit.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Victory Updates Management

Victory Updates Management

Victory Battery Metals CORP. (CSE:VR)(OTC PINK:VRCFF)(FWB:VR6) is pleased to announce that its board of directors now consist of Gerald Tritt, David Stadnyk and George Tsafalas, all of Vancouver, BC. David Stadnyk has assumed the role of president and CEO. The Company intends to close its recently announced Yellow Chief Uranium acquisition in the next 10 days

The Company wishes to thank Mark Ireton for his service to the company and wishes him well in his future endeavors.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CENTURY LITHIUM CHANGES PROJECT NAME TO ANGEL ISLAND MINE

CENTURY LITHIUM CHANGES PROJECT NAME TO ANGEL ISLAND MINE

Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or the Company) announces it has changed the name of its 100%-owned Clayton Valley Lithium Project in Nevada, USA to the Angel Island Mine (the Project). In April 2024 the Company announced a positive Feasibility Study for the Project, making it one of the few advanced lithium projects being developed in the United States . As the Company now continues to work towards permitting the Project, regulators encouraged a name change for clarity in the permitting process. The Angel Island name distinguishes it from other mining and energy projects in the area by using the name of a topographical feature from the Project.

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Brunswick Exploration Outlines New Spodumene Rich Boulder Trains at Mirage and Launches Summer Drill Campaign

Brunswick Exploration Outlines New Spodumene Rich Boulder Trains at Mirage and Launches Summer Drill Campaign

Brunswick Exploration Inc. (" BRW " or the " Company ") is pleased to announce the completion of the 2024 prospecting program and start of a 5,000-metre summer drill program at the Mirage Project, located in the Eeyou Istchee-James Bay region of Quebec. To date, 71 drill holes and more than12,000 meters have been drilled on the Mirage project which have delineated nine near-surface spodumene-bearing pegmatite dykes, all of which remain open at depth and along strike. Approximately two dozen additional dykes, with widths ranging from 8 metres to approximately 20 metres, have also been intercepted in the two previous campaigns with minimal to no follow-up work. The proposed program will focus on MR-6, MR-3 and MR-4 as well as new targets that were delineated using drilling, geophysics, till mineralogy and prospecting.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Becancour Lithium Refinery Project Update

Lithium Universe Ltd Becancour Lithium Refinery Project Update

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (OTCMKTS:ESMAF) is pleased to announce a project update of the Becancour Lithium Refinery Project. The project is advancing well and remains on track. Key milestones include finalizing the plant layout, issuing technical specifications for capex estimation, and progressing with supplier quotation activities. Environmental site visits and studies are ongoing, with no significant issues identified. Hatch's transition from Brisbane to Montreal offices is smoothly underway, ensuring continuity in project management. Early contractor engagement and strategic risk assignment are mitigating potential delays. Overall, the project is adhering to its timeline, with significant progress in engineering and procurement, ensuring readiness for a capital cost estimate and commitment to ensure environmental compliance with the regulatory framework.

Highlights

- Project is advancing well and remains on track

- Engineering milestones include plant layout, equipment packages, datasheets, scopes of work, and specifications

- Procurement priority one packages for quotes about 60% complete

- Early contractor engagement and strategic risk assignment

- Environmental work is progressing with no show-stoppers identified to date

- Strong engagement from Federal, Provincial and Local Government

- Becancour Lithium Refinery well aligned with Provincial strategy

- Mature local government support and project understanding

Procurement

Procurement activities include sending technical specifications to suppliers for detailed quotations to build the capex estimation. For priority one mechanical equipment, nine packages have been issued, with seven offers received and evaluations currently underway. Five priority one electrical equipment supply packages will be issued for inquiry within the next week. The goal is to evaluate all priority one packages by the end of September.

Due to potential lead times for electrical transformers, the tenderer list will be expanded to reduce these lead times.

Engineering

The major engineering activities include finalizing the plant layout and preparing documentation for equipment packages, such as datasheets, scopes of work, and specifications. Key tasks also involve creating the main power distribution single line diagram and providing clarifications during the tender period. Additionally, proposals received are being thoroughly reviewed to ensure they meet project requirements. Effective handling of process effluent and site runoff is another critical focus area. The development of the package register, material take-offs (MTOs), and comprehensive equipment lists are ongoing, ensuring all necessary components and details are accurately documented and organized for the project's successful execution.

Plant Layout

The first release of the plant layout has been published, with several features still under development. These include new plant areas such as the boiler plant and process effluent treatment. Structural framing of buildings and HVAC systems are in progress, along with civil works encompassing drainage, road pavements, vehicle paths, sedimentation ponds, and car parking. The location and number of plant switch rooms is being optimised.

Efforts are being made to enhance spodumene and residue storage, focusing on materials handling and capacity. Additionally, the routing of major pipe and cable racks is being planned. The layout on-site is being designed with consideration of likely environmental constraints to ensure compliance and sustainability. These developments aim to enhance the overall efficiency and effectiveness of the project.

Environmental Work

The team is actively involved in field inventories to develop knowledge of the biodiversity present on site. Four field campaigns have been carried-out to survey the presence of short-eared owls, breeding birds, fish and fish habitat, and wetlands. Based on preliminary results, no species at risk nor species of concern as listed under the Canadian Species at Risk Act (SARA) have been identified so far. The project team is also engaged in activities to optimize the site layout and reduce encroachment on wetlands identified on the property. Surveys are expected to be completed during the Canadian Summer. Field inventory results will be used to support environmental permitting activities and discussions with the Regulators to ensure site layout and the design of the industrial facility are developed in full compliance with the environmental regulatory framework.

A Phase I study to understand previous uses of the site is progressing and no potential environmental liability has been identified based on preliminary results. The Phase I Study is expected to be completed by the end of July. Over the coming months, the team is expected to initiate the preparation of permitting documents to ensure the Project follows formal approval lines.

Priorities

The highest priorities for the next few months include finalising the environmental permitting and approvals program, which entails completing the initial field survey, briefing with the Ministry, finalising the Phase 1 Report, and preparing the first application. Engineering work necessary for the environmental permit application is also a top priority, focusing on civil design, updated plant layout, and water management strategy. In parallel, equipment procurement will involve preliminary engineering, securing vendor proposals, and establishing schedules. Confirming the treatment of process effluent and site runoff is crucial for environmental compliance.

Additionally, commencing civil and structural engineering work is essential to maintain project momentum.

Finalising the plant layout will ensure all components are correctly positioned and integrated. Lastly, execution phase planning will be progressed, contingent on the monthly budget, to ensure that all activities are appropriately funded and scheduled for efficient project advancement.

Government and Community Engagement

A trip by key leadership members to Eastern Canada. The delegation, led by CEO Alex Hanly and including Chairman Iggy Tan, Board Directors Patrick Scallan and Dr. Jingyuan Liu, and Canadian Director, Victoria Vargas, engaged with government stakeholders, community partners, and industry peers. The meetings in Montreal, Becancour, Quebec City, and Ottawa reinforced the Company's strategy to address the Lithium Conversion Gap in North America and provided updates on our engineering progress and commercial discussions.

Ministry of Economics, Innovation, and Energy

A meeting was held in Quebec City with the Honourable Minister Pierre Fitzgibbon, Minister of Economics, Innovation, and Energy. This follows the Company's initial presentation of the Company's unique strategy in November 2023 in Dubai. Once again, Minister Fitzgibbon expressed enthusiasm for our engineering progress, the acquisition of the Option agreement within the Becancour Industrial Park, and the Hydro-Quebec application for an estimated 22.5MW energy allocation for our Becancour Lithium Refinery.

Lithium Universe emphasized Quebec's strategic benefits, including hydroelectric power, proximity to the James Bay region, and logistic advantages with port access to the transatlantic region. The Minister reiterated his support for our vision of transforming Quebec into the Centre of Lithium Conversion for the transatlantic region.

The Company is impressed with the forward-thinking provincial government of Quebec and the progress of the Strategic Innovation Zone under the pragmatic guidance of Minister Fitzgibbon.

Becancour Lithium Refinery Site

In February 2024, the Company successfully executed an option agreement to acquire a refinery site strategically located within the Becancour Waterfront Industrial Park (BWIP). The site in Becancour, close to Trois-Rivieres, lies between Montreal and Quebec City and is near major highways and railways. The Port of Becancour supports year-round operations with deep-water access. The site offers low-cost hydroelectric power, robust infrastructure, and comprehensive water and waste facilities, ideal for the proposed Lithium Refinery.

The Company once again met with key executives from the BWIP in Becancour. The meeting focused on the Company's progress in site evaluation activities and included a presentation on the process design, featuring pictures from a reference lithium carbonate refinery. The port was confirmed to have the capacity to manage 50,000-ton bulk shipments, exceeding the Company's initial requirements. The Company had the opportunity to inspect Lot 22, encompassing an area of 27-hectare, and view the proximity to infrastructure and immediate tiein to existing BWIP utilities. The SPIPB team provided an overview of planned expansions and facility upgrades to the onsite infrastructure, positioning Becancour as a leader in offering prime industrial real estate in Quebec.

The Company will be looking to commence various community initiatives to integrate the industrial site into the wider community.

Municipality of Becancour

The Company met with the Mayoress of Becancour to discuss the Company's objectives to contribute to the local economy by providing hundreds of employment opportunities and helping to realize its economic potential.

LU7 reaffirmed its commitment to the Becancour and wider Trois-Rivieres region, pledging to support various social, community, and environmental initiatives in the coming years. The Mayoress expressed enthusiasm for the Company's plans within the SPIPB, recognizing the development of a proven and reliable design with internationally aligned process outputs.

Provincial Government - Quebec

The Company also met with key delegates in Montreal from Investissement Quebec (IQ), the Ministry of Natural Resources and Forests (MRNF), Energy Transition Valley Innovation Zone, and the Ministry of the Environment, the Fight Against Climate Change, Wildlife and Parks. The provincial government has identified a lithium conversion gap within the supply chain, crucial for servicing the expected increase in spodumene supply from the James Bay region in the coming years. Quebec is a North American leader in attracting foreign direct investment, sustainable development, and supporting battery metals projects. The province has a strong history of supporting lithium battery supply chain development, with significant provincial and federal government incentives.

Recent government support includes the General Motors (GM) and Korea-based POSCO Chemicals' US$1 billion cathode active material (CAM) factory, the Ford/EcoPro BM US$800 million cathode factory, and Northvolt's US$7 billion EV Battery Facility at Saint-Basile-le-Grand. This creates a favourable regulatory environment for the Company's project, ensuring robust support throughout the cycle.

Canadian Federal Government - Ottawa

The Company met with various federal government stakeholders from Invest in Canada (IIC), Natural Resources Canada (NRCAN), Innovation, Science and Economic Development (ISED), and Export Development Canada (EDC). Given the lack of refining capacity in Canada, LU7's lithium carbonate plant is an innovative project, as there are no current operating or planned facilities of this kind within the country. Building lithium conversion capacity alongside spodumene mines will enable Canada to become wholly self-sufficient in the lithium chemical supply chain.

Hatch - Montreal

The Company and its engineering partner, Hatch, held a productive meeting at the Montreal office to align their shared culture and fast-track development vision. They reinforced the philosophy of "same process, same equipment, same supplier," which minimizes technical risks, ensures quality, and reduces costs. The operational environments in Australia and Canada share many similarities, facilitating the integration of skills into Quebec.

Hatch's leadership in building lithium conversion facilities and tackling challenging projects validates the decision to partner with them. Through this collaboration, the Company acknowledges Hatch's expertise as the premier lithium refinery engineering expert.

Lithium Universe Chairman, Iggy Tan said, "The project is on track, finalizing plant layout, issuing capex specs, progressing supplier quotes, with smooth office transition, and no environmental issues, ensuring readiness for capex cost estimate. The reception from federal, provincial and local government delegates has left a very positive impression on the LU7 Board of Directors. The region has made strong commitments since releasing the Critical Minerals Strategies four years ago and we have seen that in the significant investments made within the battery supply chain and pragmatic discussions held with key government executives. We look forward to advancing the Company's Becancour Lithium Refinery to contribute in making Quebec the lithium conversion centre within the Transatlantic region."

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/82C8D877



About Lithium Universe Ltd:

Lithium Universe Ltd (ASX:LU7) (OTCMKTS:ESMAF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Victory is Pleased to Announce the Appointment of Gary Musil to the Company's Board of Directors and a Private Placement

Victory is Pleased to Announce the Appointment of Gary Musil to the Company's Board of Directors and a Private Placement

Victory Battery Metals Corp. (CSE:VR)(OTC PINK:VRCFF)(FWB:VR6) welcomes Gary Musil as a director of the Company, effective July 1, 2024. Gary Musil has more than 35 years of management and financial consulting experience and has served as an officer and director on numerous public companies since 1988. This experience has resulted in his overseeing the financial aspects and expenditures on exploration projects in Peru, Chile, Eastern Europe (Slovak Republic), and British Columbia, Ontario, Quebec, Saskatchewan and New Brunswick (Canada). Prior to his public company work, he was employed for 15 years with Dickenson Mines Ltd. and Kam-Kotia Mines Ltd., as the Controller for their producing silverleadzinc mine in the interior of British Columbia

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×