Anson Advances Lithium Plant Front End Engineering & 
Design Study

Anson Advances Lithium Plant Front End Engineering & Design Study


Anson Resources Limited (ASX: ASN, ASNOC, ASNOD) (Anson or the Company) is pleased to announce the commencement of the Front End Engineering and Design (FEED) Study at its Paradox Lithium Project (the Project) in the Paradox Basin, in Utah, USA.

Highlights:

  • Worley Group Inc. has been appointed to undertake the Front End Engineering and Design Study for the proposed lithium carbonate processing plant
  • Results will be incorporated into Anson’s financial model to support project financing proposals to commercial banks, export credit agencies and/or US government agencies
  • Anson has appointed its own engineering team to support Worley in delivering the Study
  • Sunresin’s commercially proven Direct Lithium Extraction process will be incorporated into the FEED Study through collaboration with Sunresin and its engineers
  • The FEED Study is underway and is expected to be completed by Q4 2023

The FEED Study is a pivotal next step in Anson’s plans for the construction of a lithium carbonate processing plant, with a production capacity of a 13,000tpa lithium carbonate equivalent (LCE). Worley Group Inc. (Worley) has been appointed to undertake the FEED Study, which will build on the Project’s robust Definitive Feasibility Study (DFS) completed in 2022 (ASX announcement, 8 September 2022). The Feed Study is progressing and is expected to be completed in Q4 2023.

Anson has appointed its own engineering team to support Worley in the delivery of the FEED Study. Initially, the Anson and Worley teams will be co-located to maximise the effective delivery of the FEED Study’s work streams (Figure 1).

Figure 1: Picture of Combined Anson and Worley Engineering Team

Click here for the full ASX Release

This article includes content from European Lithium Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

ASN:AU
The Conversation (0)
Rox Resources

High grade Assay Results Continue at Youanmi

West Australian gold exploration and development company, Rox Resources Limited (“Rox” or “the Company”) (ASX: RXL), has received the final batch of assays from its 11,000m DD and RC program at the Youanmi Gold Project in WA.

Keep reading...Show less
Alice Queen

Drilling Commenced at Viani in Fiji

Alice Queen Limited (ASX:AQX) (“Alice Queen” or the “Company”) is pleased to announce that drilling has commenced at its 100% owned Viani Project in Vanua Levu, Fiji (see Image 1). The initial planned three-hole diamond drilling program will test for high-grade epithermal gold-style mineralisation intersected at the Viani Project by historic drilling.

Keep reading...Show less
Firefly Metals logo

FireFly Drills its Best Hole Yet with Assay of 86.3m at 3.7% CuEq

Latest drilling returns very thick intersections with exceptional grades, outlining a rich area of mineralistion which will form part of the next Resource update

FireFly Metals Ltd (ASX: FFM) (“Company” or “Firefly”) is pleased to announce its best assays yet at the Green Bay copper-gold project.

Keep reading...Show less

Latest Press Releases

Related News

×