Odessa Minerals

Airborne Survey Underway at Gascoyne East Project Gascoyne Region – Western Australia

Odessa Minerals Limited (ASX:ODE) (“Odessa” or the “Company”) is pleased announce that it has engaged MAGSPEC Airborne Surveys Pty Ltd (MAGSPEC) to conduct an airborne magnetic and radiometric survey over the Company’s +2,100 square kilometre tenement package at its Gascoyne East Project in the Gascoyne region of Western Australia.


The program will see a total of 24,846 line-kilometres flown at 100m spaced lines and nominal flight height of 40m. The flying program is now 59% completed and it is estimated to be finished around the middle of December.

David Lenigas, Executive Director of Odessa, said:

“Very little historic exploration has been conducted on this highly prospective piece of ground. This high- resolution airborne survey for magnetics and radiometrics over the entire +2,100 square kilometres (see figures 1-3) will provide us a clearer picture of target areas for lithium, rare earths, base metals, gold and graphite. On completion of the flying, the data will go to processing and interpretation and results from this should be available in January. On the back of these results, we plan to refine our drilling targets and look to drill in Q1 next year.”

Gascoyne East Project

The Gascoyne East Project consists of 2,108km2 of exploration licences and covers the southern margin of the Edmund Basin and metamorphic core of the Proterozoic Capricorn Orogen. The Project encompasses the confluence of major, metal-endowed trans-lithospheric structural corridors (including the Ti-Tree, Errabiddy, Chalba, Cardilya, Mt Clere and Hibernian South Fault/Shear zones). The Project is also transected by a recently-recognised deep crustal stability edge that is a loci for mantle-derived fluid upwelling and heat-driven hydrothermal processes. These tectonic edges are associated with 85% of large-scale sediment-hosted base metal deposits globally and is strongly correlated with porphyry, IOCG and Pb-Zn deposits.1

The Project encompasses the Gascoyne-Glenburgh Terranes and Yarlarweelor Complex, which have undergone significant deformation during the Ophthalmian, Glenburgh and Capricorn Orogenies. Critically, the basement pre-dates known lithium pegmatite and rare earth events, such as the Mutherbukin event (carbonatites) and Edmundian Orogeny (Yinnetharra LCT pegmatites). The trans- lithospheric structures that converge at the Project (Ti-Tree, Errabiddy, Chalba, Mt Clere) are long-lived crustal sutures binding accreted Paleoproterozoic terranes to the Archaean Yilgarn Craton, offering favourable fluid conduits spanning multiple, overprinting metal-endowed events.

As such, the Project offers a unique geological setting of multiple metal-rich structural events converging at the location. Successful exploration has been conducted across the broader region, yet the Gascoyne East Project has remained unexplored due to 90% of the tenure being concealed by transported cover.

Figure 1: Gascoyne East Project planned drilling underlain with 1:500k GSWA bedrock geology and major structures.

Figure 2: Gascoyne East Project within a regional context compared to other known mineral occurrences.

Figure 3: Odessa Minerals regional Gascoyne Project location map overlain with Geological Survey WA Minedex Occurrences.

Please visit our website for more information and to sign up to receive corporate news alerts: www.odessaminerals.com.au


Click here for the full ASX Release

This article includes content from Odessa Minerals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

ODE:AU
The Conversation (0)
Australian dollars Australian flag in the background.

5 Australian Mining Grants Open for Applications in 2025

As 2025 begins, companies in the mining sector are gearing up for another year of work.

In Australia, there are many chances for explorers and developers to access government funding at both the state and federal level. The list below includes five programs that are open for applications, or will be soon.

Read on to learn more about what companies can apply and how much money is up for grabs.

Keep reading...Show less
Jay Martin, city skyline and gold bars.

VRIC 2025 Preview — Jay Martin Talks Resource Wars, Geopolitics and How to Invest

The next Vancouver Resource Investment Conference (VRIC) is set to run from January 19 to 20, 2025, and Jay Martin, president of Cambridge House, joined the Investing News Network ahead of time to discuss the event.

Looking at the resource sector, Martin, who also hosts the Jay Martin Show on YouTube, said the current decade has been defined by chaos and uncertainty, with no signs of a slowdown any time soon.

With that in mind, his macro thesis on commodities remains steadfast, and he's watching three key drivers.

Keep reading...Show less
Check mark on wooden blocks.

Queensland to Streamline Mining Approvals Under New Resources Cabinet Committee

Queensland's new Resources Cabinet Committee (RCC) has met for the first time, the government said last week.

The RCC is part of the Crisafulli government’s 100 Day Plan, announced last October. The plan outlines more than 40 actions the government will take in its first 100 days in office, focusing on youth crime, health, housing and cost of living.

“We’ve pulled together the key players in our ministerial team that have a direct impact on resources,” said Minister for Natural Resources and Mines Dale Last, who has been appointed chair of the RCC.

Keep reading...Show less
Receipt of Section 249D Notice

Receipt of Section 249D Notice

Basin Energy (BSN:AU) has announced Receipt of Section 249D Notice

Download the PDF here.

Hand holding magnifying glass with words "january effect" inside.

What is the January Effect? (Updated 2024)

With the end of 2024 quickly approaching, active investors may be looking to position ahead of 2025.

In January, market watchers are often keen to talk about the January effect, which is the idea that stock markets often rally in the first month of the year. However, it has become less consistent as the years go by, and some consider it a myth at this point.

Find out more about the January effect below, and learn what strategies you can use if you do decide to position ahead of a potential January stock rally.

Keep reading...Show less
Yellow road sign shaped like arrow that says "Stock Exchange Santa Claus Rally."

What is the Santa Claus Rally and Has it Arrived?

The Santa Claus rally has long been attractive to investors looking to end the year on a high note.

North American markets have already experienced robust growth throughout 2024, but the prospect of a year-end rally could offer one final opportunity for gains before heading into the new year.

The Santa Claus rally is a period between the final trading days of December and the first days of January when stocks tend to climb. While this seasonal uptick isn’t guaranteed, historical data shows that markets rise more often than not during this window, driven by investor optimism, low trading volumes and year-end portfolio adjustments.

Keep reading...Show less

Latest Press Releases

Related News

×