A summary of the 2022 field sampling program:

  • Two new ≈25-ton bulk samples were collected from the western portion of the main Dotson Ridge mineralized zone
  • A total of 31 new sites across the entire Dotson Ridge mineralized zone were channel sampledand consisted of 137 samples
  • The geological team expects:
    • the channel sampling program will allow a significant portion of the modeled rare earth resource to be upgraded from 'Indicated' to 'Measured'
    • the overall quantity of the mineral resource will marginally increase due to new exposures of vein materials discovered during the sampling program

Ucore Rare Metals Inc. (TSXV: UCU) (OTCQX: UURAF) ("Ucore" or the "Company") is pleased to provide an update regarding the 2022 field sampling program (the "Field Program") at its Bokan-Dotson Ridge heavy rare earth element ("REE") mineral resource project ("Bokan").

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1119/139746_1302f57d34d70938_001.jpg

Figure 1 - Typical Channel Sample of a Bokan-Dotson Ridge Zone Vein Outcrop

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1119/139746_1302f57d34d70938_001full.jpg

"Ucore continues to work to unlock the critical heavy rare earth elements at Bokan Mountain," stated Mike Schrider, P.E., Ucore's Vice-President and COO. "The execution of this summer's Field Program, coupled with previous years' successful drill programs, now positions the Bokan property closer to a feasibility study and will allow Ucore to upgrade approximately 20% of the currently 'Indicated' mineral resource to a 'Measured' resource classification.

"Ucore continues to advance its Bokan project as a long-range heavy rare earth source to eventually complement the planned Western feedstock sources for its near-term Strategic Metals Complexes. North America desperately needs independent mineral resources to transition to a green energy future centered on electric vehicles and renewable energy sources - both of which are more achievable with the heavy rare earth elements provided at Bokan Mountain."

Aurora Geosciences Ltd.'s ("Aurora") contractors, consisting of two geologists and three geotechnical laborers, were on site from May 13 to June 10, 2022. This work was followed by sample submissions to the Bureau Veritas preparation lab in Juneau, Alaska. Final analyses are still in process at the Bureau Veritas laboratory in Vancouver, BC, Canada, with current assay analyses times measured in months due to the extremely high levels of mineral exploration activity.

Additional details of the Field Program:

  • Two new ≈25-ton bulk samples were collected from the western portion of the main Dotson Ridge mineralized zone.
    • This will enable a comparison to the bulk material collected from the east side of the main Dotson Ridge mineralized zone in 2011.
  • A total of 31 new sites across the entire Dotson Ridge zone were channel sampled and consisted of 137 samples.
    • These 31 channel sites varied from two samples extending over a total of 1-meter to up to eleven samples across 4-meters.
    • These sample locations were selected to fill in gaps in Aurora's geological model of the deposit and improve the confidence level of the published resource for the property.
  • All accommodations, rental equipment, marine & aircraft charters, and camp supplies were sourced from local Ketchikan suppliers, and two of the five geological contractors were Ketchikan locals.
    • The camp cook and drilling & blasting subcontractors were also sourced from Southeast Alaska.

Aurora expects that the results of the channel sampling program will allow a significant portion of the modeled rare earth resource to be upgraded from 'Indicated' to now 'Measured.' It is also expected that the total tonnage of the current mineral resource will marginally increase due to the new exposures of mineralized vein materials discovered in the Field Program.

# # #

About Ucore Rare Metals Inc.

Ucore is focused on rare- and critical-metals resources, extraction, beneficiation, and separation technologies with the potential for production, growth, and scalability. Ucore has an effective 100% ownership stake in the Bokan-Dotson Ridge Rare Earth Element Project in Southeast Alaska, USA. Ucore's vision and plan is to become a leading advanced technology company, providing best-in-class metal separation products and services to the mining and mineral extraction industry.

Through strategic partnerships, this includes disrupting the People's Republic of China's control of the US REE supply chain through the near-term development of heavy and light rare-earth processing facilities throughout North America - including the Alaska Strategic Metals Complex in Southeast Alaska and the long-term development of Ucore's heavy-rare-earth-element mineral-resource property located at Bokan Mountain on Prince of Wales Island, Alaska.

Ucore is listed on the TSXV under the trading symbol "UCU" and in the United States on the OTC Markets' OTCQX® Best Market under the ticker symbol "UURAF."

For further information, please visit www.ucore.com.

Qualified Person

Ronald James (Jim) Robinson, B.Sc., P.Geo., an independent geologist and General Manager of Aurora Geosciences (Alaska) Ltd. of Juneau, Alaska, has prepared, reviewed and approved the technical data regarding the Bokan-Dotson Ridge Mineral Resource provided in this news release and is the qualified person responsible for its accuracy.

Forward-Looking Statements

This press release includes certain statements that may be deemed "forward-looking statements." All statements in this release (other than statements of historical facts) that address future business development, technological development and/or acquisition activities (including any related required financings), timelines, events, or developments that the Company is pursuing, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance or results, and actual results or developments may differ materially from those in forward-looking statements.

In regard to the disclosure in the "About Ucore Rare Metals Inc." section above, the Company has assumed that it will be able to procure or retain additional partners and/or suppliers, in addition to Innovation Metals Corp. ("IMC"), as suppliers for Ucore's expected future Strategic Metals Complexes ("SMCs"). Ucore has also assumed that sufficient external funding will be found to prepare a new National Instrument 43-101 ("NI 43-101") technical report that demonstrates that the Bokan Mountain Rare Earth Elements project ("Bokan") is feasible and economically viable for the production of both REE and co-product metals and the then prevailing market prices based upon assumed customer offtake agreements. Ucore has also assumed that sufficient external funding will be secured to continue the development of the specific engineering plans for the SMCs and their construction. Factors that could cause actual results to differ materially from those in forward-looking statements include, without limitation: IMC failing to protect its intellectual property rights in RapidSX™; RapidSX™ failing to demonstrate commercial viability in large commercial-scale applications; Ucore not being able to procure additional key partners or suppliers for the SMCs; Ucore not being able to raise sufficient funds to fund the specific design and construction of the SMCs and/or the continued development of RapidSX™; adverse capital-market conditions; unexpected due-diligence findings; the emergence of alternative superior metallurgy and metal-separation technologies; the inability of Ucore and/or IMC to retain its key staff members; a change in the legislation in Alaska and/or in the support expressed by the Alaska Industrial Development and Export Authority ("AIDEA") regarding the development of Bokan and/or the Alaska SMC; the availability and procurement of any required interim and/or long-term financing that may be required; and general economic, market or business conditions.

Neither the TSXV nor its Regulation Services Provider (as that term is defined by the TSXV) accept responsibility for the adequacy or accuracy of this release.

CONTACT

Mark MacDonald
Vice President, Investor Relations
Ucore Rare Metals Inc.
1.902.482.5214
mark@ucore.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/139746

News Provided by Newsfile via QuoteMedia

UCU:CA
The Conversation (0)
Ucore Announces Private Placement Financing

Ucore Announces Private Placement Financing

Ucore Rare Metals Inc. (TSXV: UCU) (OTCQX: UURAF) ("Ucore" or the "Company") is pleased to announce plans to complete a non-brokered private placement of approximately 3.1 million units ("Units") for total proceeds of $2 million (the "Offering").

Proceeds from the Offering are expected to be used towards the commissioning of the Company's planned RapidSXTM demonstration plant; the processing of initial feedstock through the demonstration plant; finalization of offtake and feedstock agreements; engineering work for the proposed Strategic Metals Complex in Louisiana, USA; and for general working capital purposes.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
The US State of Louisiana Offers C$15M+ Incentive Package for Ucore's First RapidSX Rare Earth Processing Facility - the Louisiana SMC

The US State of Louisiana Offers C$15M+ Incentive Package for Ucore's First RapidSX Rare Earth Processing Facility - the Louisiana SMC

  • The proposed incentive package from Louisiana includes US$9.6M in tax incentives and payroll rebates over the first ten years of operation. Upon specific site selection:
    • potential additional state and local economic and workforce incentives
    • an expedited process for all required state permits
  • Ucore's Board of Directors has unanimously agreed to commit the Company toward establishing its first Strategic Metals Complex (SMC) in Louisiana
  • Rare earth oxide products from the Louisiana SMC will be critical to North America's and Louisiana's goal to expand toward green energy technologies

Ucore Rare Metals Inc. (TSXV: UCU) (OTCQX: UURAF) ("Ucore" or the "Company") is pleased to announce a mutual commitment with the US State of Louisiana ("Louisiana" or the "State") toward the establishment of the Company's first Strategic Metals Complex ("SMC") rare earth element ("REE") separation facility - the Louisiana SMC.

The Company's executive team has been in discussions with the State since the spring of 2022 and spent the better part of summer in a due-diligence process. This included an August trip to examine ten existing "brownfield facilities" throughout the State. Each of these facilities provides a head start as the prospective location of the Louisiana SMC versus a new construction or "greenfield facility."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Ucore's Rare Earth Separation Commercial Demonstration Plant On-Track for Q4-2022 Commissioning

Ucore's Rare Earth Separation Commercial Demonstration Plant On-Track for Q4-2022 Commissioning

  • Ucore's rare earth separation commercial demonstration plant is designed to process:
    • Tens of tonnes of mixed rare earth concentrates on a per annum basis.
    • Many feedstock sources, including heavy and light rare earth element feedstocks planned for the full-scale Strategic Metals Complexes (SMC).
    • All RapidSX™ splits required to produce individual praseodymium, neodymium, terbium, and dysprosium.
  • Planned commissioning in Q4-2022, followed by product qualification trials for prospective North American metal/alloy makers and original equipment manufacturers seeking diversified and sustainable metallic supply chains.
  • The full-scale SMC engineering entity, Mech-Chem Associates, Inc., is now fully integrated into all demonstration plant activities.

Ucore Rare Metals Inc. (TSXV: UCU) (OTCQX: UURAF) ("Ucore" or the "Company") is pleased to provide an update on the Innovation Metals Corp.[i] ("IMC") RapidSX™ rare earth element ("REE") separation technology platform and the Company's commercial Strategic Metals Complex ("SMC") technology deployment process (the "Program"). The work is taking place at the companies' laboratory partner's (Kingston Process Metallurgy Inc. ("KPM")) facility in Kingston, Ontario, Canada.

The Program was enhanced after Ucore received the independent evaluation of the RapidSX™ technology platform leading to the subsequent July 12, 2022, announcement of the nearly 3X increase in scope of the RapidSX™ REE demonstration-scale plant ("Demo Plant"). Since then, the Ucore, IMC, KPM, and Mech-Chem Associates, Inc.[ii] ("Mech-Chem") commercialization team (the "Team") has made significant strides in the procurement and construction process for the Demo Plant.

The final engineered layout of the Demo Plant takes up nearly all of the 5,000 square foot Commercialization and Demonstration Facility ("CDF") at KPM. And the concept of building a plant within an existing building is the go-forward transition template for the engineering process that the Team will replicate to create the first full-scale SMC, once the brownfield site[iii] selection process is finalized. This initial SMC is scheduled to produce 2,000 tonnes of total rare earth oxides ("TREOs") by the end of 2024 and 5,000 tonnes by 2026.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1119/137284_ffcfc5cec4a3a9a7_001.jpg

Figure 1 - Engineered Design of the Currently Under Construction 51-Stage RapidSX™ REE Demo Plant

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/1119/137284_ffcfc5cec4a3a9a7_001full.jpg.

"The CDF Team, and the rest of the world, is facing extraordinary supply chain challenges regarding equipment and component availability," stated Mike Schrider, P.E., Ucore's VP and COO. "Despite this situation,we have managed to procure the initial feedstocks and virtually all of the required major equipment and components, and the Demo Plant remains on track for a late 2022 commencement of the commissioning process."

"This process will demonstrate the unprecedented North American separation of tonnes of both heavy and light rare earth elements. It will then continue with end-user qualification trials throughout 2023 for Western entities seeking diversified and sustainable metallic supply chains as Ucore transitions to full-scale commercial mode with the construction of our first SMC."

Ucore's REE Separation Demo Plant is designed to:

  • Have the ability to process tens of tonnes of mixed rare earth concentrates on a per annum basis:

    • from a wide variety of feedstock sources, including the heavy REE ("HREE") and light REE ("LREE") feedstocks planned for the full-scale SMCs.

  • Be capable of processing all RapidSX™ splits required to produce individual praseodymium, neodymium, terbium, and dysprosium.

  • Have a parallel 51-stage conventional solvent extraction ("CSX") mixer/settler circuit that will match the RapidSX™ process' configuration and enable direct head-to-head comparison of the performance of RapidSX™ vs. CSX.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1119/137284_ffcfc5cec4a3a9a7_002.jpg

Figure 2 - A Sampling of the On-hand CDF Components and Construction Efforts

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/1119/137284_ffcfc5cec4a3a9a7_002full.jpg.

Ucore stands alone in its speed of executing the commercial deployment of one of the first modern technology platforms for separating HREEs and LREEs - as a replacement for CSX. Mech-Chem is now fully integrated into all CDF activities and is aligned to assist with the full-scale SMC techno-economic assessment and engineering data transfer. The efficiencies and environmental advantages resulting from the CDF demonstration processes are, and will continue to be, directly incorporated into the full-scale SMC engineering design packages. This integrated process is rapidly positioning Ucore to meet the demanding schedule requirements for the development of the first SMC and REO production for the Company's emerging list of prospective downstream partners.

# # #

About Ucore Rare Metals Inc.

Ucore is focused on rare- and critical-metals resources, extraction, beneficiation, and separation technologies with the potential for production, growth, and scalability. Ucore has an effective 100% ownership stake in the Bokan-Dotson Ridge Rare Earth Element Project in Southeast Alaska, USA. Ucore's vision and plan is to become a leading advanced technology company, providing best-in-class metal separation products and services to the mining and mineral extraction industry.

Through strategic partnerships, this includes disrupting the People's Republic of China's control of the US REE supply chain through the near-term development of heavy and light rare-earth processing facilities - including the Alaska Strategic Metals Complex in Southeast Alaska and the long-term development of Ucore's heavy-rare-earth-element mineral-resource property located at Bokan Mountain on Prince of Wales Island, Alaska.

Ucore is listed on the TSXV under the trading symbol "UCU" and in the United States on the OTC Markets' OTCQX® Best Market under the ticker symbol "UURAF."

For further information, please visit www.ucore.com.

About RapidSX™ Technology

IMC developed the RapidSX™ separation technology platform with early-stage assistance from the United States Department of Defense ("US DoD"), later resulting in the production of commercial-grade, separated rare-earth oxides at the pilot scale. RapidSX™ combines the time-proven chemistry of conventional solvent extraction ("SX") with a new column-based platform, which significantly reduces time to completion and plant footprint, as well as potentially lowering capital and operating costs. SX is the international rare-earth-element ("REE") industry's standard commercial separation technology and is currently used by 100% of all REE producers worldwide for bulk commercial separation of both heavy and light REEs. Utilizing similar chemistry to conventional SX, RapidSX™ is not a "new" technology but represents a significant improvement on the well-established, well-understood, proven conventional SX separation technology preferred by REE producers.

Forward-Looking Statements

This press release includes certain statements that may be deemed "forward-looking statements." All statements in this release (other than statements of historical facts) that address future business development, technological development and/or acquisition activities (including any related required financings), timelines, events, or developments that the Company is pursuing, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance or results, and actual results or developments may differ materially from those in forward-looking statements.

In regard to the disclosure in the "About Ucore Rare Metals Inc." section above, the Company has assumed that it will be able to procure or retain additional partners and/or suppliers, in addition to Innovation Metals Corp. ("IMC"), as suppliers for Ucore's expected future Strategic Metals Complexes ("SMCs"). Ucore has also assumed that sufficient external funding will be found to prepare a new National Instrument 43-101 ("NI 43-101") technical report that demonstrates that the Bokan Mountain Rare Earth Elements project ("Bokan") is feasible and economically viable for the production of both REE and co-product metals and the then prevailing market prices based upon assumed customer offtake agreements. Ucore has also assumed that sufficient external funding will be secured to continue the development of the specific engineering plans for the SMCs and their construction. Factors that could cause actual results to differ materially from those in forward-looking statements include, without limitation: IMC failing to protect its intellectual property rights in RapidSX™; RapidSX™ failing to demonstrate commercial viability in large commercial-scale applications; Ucore not being able to procure additional key partners or suppliers for the SMCs; Ucore not being able to raise sufficient funds to fund the specific design and construction of the SMCs and/or the continued development of RapidSX™; adverse capital-market conditions; unexpected due-diligence findings; the emergence of alternative superior metallurgy and metal-separation technologies; the inability of Ucore and/or IMC to retain its key staff members; a change in the legislation in Alaska and/or in the support expressed by the Alaska Industrial Development and Export Authority ("AIDEA") regarding the development of Bokan and/or the Alaska SMC; the availability and procurement of any required interim and/or long-term financing that may be required; and general economic, market or business conditions.

Neither the TSXV nor its Regulation Services Provider (as that term is defined by the TSXV) accept responsibility for the adequacy or accuracy of this release.

CONTACT

Mark MacDonald
Vice President, Investor Relations
Ucore Rare Metals Inc.
1.902.482.5214
mark@ucore.com

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Orca Holdings, LLC Granted Warrants as Part of New Credit Facility for Ucore Rare Metals Inc.

Orca Holdings, LLC Granted Warrants as Part of New Credit Facility for Ucore Rare Metals Inc.

This press release is issued pursuant to Multilateral Instrument 62-104 - Take-Over Bids and Issuer Bids and National Instrument 62-103 - The Early Warning System and Related Take-Over Bid and Insider Reporting Issues.

This release is being made by Randy Johnson to report information concerning holdings of Mr. Johnson and Orca Holdings, LLC (collectively, the "Acquiror") in Ucore Rare Metals Inc. (the "Issuer" or "Ucore"). Orca Holdings, LLC ("Orca") is wholly owned by Mr. Johnson, serving as a holding company for Mr. Johnson's securities holdings. Mr. Johnson has been a director of Ucore since October 6, 2020.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Ucore Secures Line of Credit Financing, Maintains Its Fast Track Plan for RapidSX Commercial Deployment

Ucore Secures Line of Credit Financing, Maintains Its Fast Track Plan for RapidSX Commercial Deployment

  • Orca Holdings, LLC provides a Line of Credit Facility in the amount of USD$2 million
  • The primary use of funds is for the continued construction of Ucore's rare earth element Commercial Demonstration Plant and its planned Q4-2022 commissioning

Ucore Rare Metals Inc. (TSXV: UCU) (OTCQX: UURAF) ("Ucore" or the "Company") is pleased to announce the receipt of financing by way of a secured line of credit facility in the amount of up to USD$2 million (the "Line of Credit"). Proceeds from the Line of Credit will primarily be used to continue the development of the Company's RapidSXTM Rare Earth Element ("REE") Commercial Demonstration Plant ("Demo Plant"), currently scheduled for commissioning in Q4 of 2022, as detailed in the Company's July 12, 2022 news release.

The Line of Credit has been extended by Orca Holdings, LLC ("Orca"). In consideration for granting the Line of Credit and subject to the approval of the TSX Venture Exchange, two million warrants ("Warrants") will be issued to Orca, with each Warrant entitling Orca to acquire one common share of the Company at an exercise price of CAD$0.75 during a one-year term ending on July 20, 2023. On July 21, 2022, the Company applied to the TSXV for the exchange's approval of the issuance of the Warrants.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Victory Sells Tahlo Lake Property in British Columbia

Victory Sells Tahlo Lake Property in British Columbia

Victory Battery Metals Corp. (CSE:VR)(FWB:VR61)(OTC PINK:VRCFF) ("Victory" or the "Company") is pleased to announce its sale of its Tahlo Lake, British Columbia property to a private company, Trimera Metals Corp., of Vancouver, British Columbia

Highlights of the Tahlo Lake Sale:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to announce that the Company and its exploration team have been awarded the prestigious 2023 Bernie Schnieders Discovery of the Year Award for the spodumene discovery at its Victory Project in Ontario, Canada.

The award, presented by the Northwestern Ontario Prospectors Association (NWOPA), annually recognizes an exceptional discovery in Northwestern Ontario during the previous calendar year. It was presented on April 24 to Beyond Lithium and its exploration team at the annual awards banquet hosted during the 2024 Ontario Prospectors Exploration Showcase in Thunder Bay, Ontario. Past recipients of this prestigious award include Great Bear Resources Inc., Frontier Lithium Inc. and Delta Resources Ltd.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

alx resources corp. (TSXV: AL) (FSE: 6LLN) (OTC: ALXEF) ("ALX" or the "Company") is pleased to announce the completion of the 2024 winter drilling program at its 100%-owned Gibbons Creek Uranium Project ("Gibbons Creek", or the "Project") located in the northern Athabasca Basin near the community of Stony Rapids, Saskatchewan. The 2024 drilling program was designed to test for continuity of uranium mineralization first discovered in 1979 by Eldorado Nuclear and by ALX in 2015. Five holes totaling 849.44 metres were completed. Four of the five holes intersected uranium mineralization at or near the unconformity, based upon hand-held scintillometer readings on drill core, downhole gamma probe results, and visual observation of uranium minerals by ALX's geological team. Mineralization found in the 2024 drilling was intersected in two areas located 500 metres apart within a target area that ALX defined in late 2023 by carrying out a high-resolution magnetic survey and a Soil Gas Hydrocarbon ("SGH") survey (see ALX news release dated January 23, 2024).

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Brunswick Exploration Drills 58.1 Meters at 1.59% Li2O Starting From Surface at Mirage

Brunswick Exploration Drills 58.1 Meters at 1.59% Li2O Starting From Surface at Mirage

Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; " BRW " or the " Company ") is pleased to report the first assays from the Mirage winter drilling campaign where it drilled an additional thirty-five holes. The Mirage Project is located in the Eeyou Istchee-James Bay region of Quebec approximately 40 kilometres south from the Trans-Taiga Road. The winter drill campaign focused on the Central Zone and has continued to intersect multiple wide, well mineralized intervals on the MR-6 dyke and its vicinity where it remains open in all directions.

Highlights include:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Positive Lithium Values in the 12th Exploration Well at the Rincon West Project

Argentina Lithium Announces Positive Lithium Values in the 12th Exploration Well at the Rincon West Project

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") reports positive results from the twelfth exploration hole at its Rincon West Project in Salta Province Argentina . Brine samples collected over a 165 metre interval of RW-DDH-012 ranged from 322 to 371 mgl lithium.

Argentina Lithium & Energy Logo (CNW Group/Argentina Lithium & Energy Corp.)

"Our ongoing drilling continues to evaluate the Rinconcita II concession that extends from our original claims, eastwards over the salt flat towards the neighboring Rio Tinto concessions. Our twelfth hole demonstrates a long interval of impressive lithium values in porous host lithologies. Thus far, our drilling at Rincon West demonstrates a continuous aquifer of concentrated lithium brines over an extensive basin." stated Miles Rideout , V.P. of Exploration.

The results including sampling method, the sample interval data, and the brine analyses for RW-DDH-012 are shown in Table 1. Drill collar information is presented in Table 2. An extensive selection of core samples has been sent to an independent laboratory for brine recovery testing; results are pending.

The Rincon West Project covers 5198.8 hectares of the salar basin, consisting of three property blocks adjacent to Rio Tinto's Rincon Project. Drill hole RW-DDH-012 represents the third exploration hole of the 6-hole program planned for the Rinconcita II property, announced in the Company's October 19, 2023 News Release. The Company is currently completing the access to the next drill platform (RW-DDH-013), representing a further 1000 m step towards the northeast corner of the property block.

Figure 1 presents a map of the western (main) block of the Rincon West project showing the positions of the twelve completed exploration holes (see News Releases dated July 13, 2022 , October 3, 2022 , October 25, 2022 , January 26, 2023 , April 24, 2023 , May 31, 2023 and January 22, 2024 ). The drill locations are overlain on the conductive zones (shaded yellow) delineated by two geophysics campaigns (see News Releases dated May 2, 2022 and October 19, 2023 ).

Table 1: Interval data and results of brine analyses for lithium, potassium, and magnesium for drill hole RW-DDH-01 2*

Sample Interval (m)

Sample
Method

Li

K

Mg

Density

From

To

Thickness

(mg/litre)

(g/ml)

RW-DDH-012






48.5

51.5

3.0

Single packer

337

6284

3062

1.201

54.5

57.5

3.0

Single packer

345

6667

3116

1.204

60.5

63.5

3.0

Single packer

355

6884

3143

1.207

66.5

69.5

3.0

Single packer

365

7230

3169

1.212

78.5

81.5

3.0

Single packer

363

7210

3208

1.216

96.5

99.5

3.0

Single packer

329

7087

2764

1.218

102.5

105.5

3.0

Single packer

339

7262

2867

1.218

108.5

111.5

3.0

Single packer

356

7483

3034

1.216

120.5

123.5

3.0

Single packer

347

7202

2971

1.215

126.5

129.5

3.0

Single packer

366

7260

3184

1.212

132.5

135.5

3.0

Single packer

352

7152

3067

1.213

138.5

141.5

3.0

Single packer

371

7451

3298

1.214

144.5

147.5

3.0

Single packer

356

7192

3157

1.216

156.5

159.5

3.0

Single packer

345

7054

3091

1.219

162.5

165.5

3.0

Single packer

335

6858

2998

1.219

168.5

171.5

3.0

Single packer

315

6679

2827

1.22

174.5

177.5

3.0

Single packer

324

6696

2893

1.219

180.5

183.5

3.0

Single packer

327

6694

2914

1.218

186.5

189.5

3.0

Single packer

323

6685

2874

1.217

192.5

195.5

3.0

Single packer

324

6744

2897

1.218

198.5

201.5

3.0

Single packer

324

6718

2860

1.217

204.5

207.5

3.0

Single packer

322

6697

2827

1.217

210.5

213.5

3.0

Single packer

324

6717

2834

1.217

*The drill hole was inclined vertically; the brine hosting strata are believed to be flat lying resulting in reported intervals approximating true thickness.

Drilling Methodology

RW-DDH-012 was executed with HQ-diameter diamond drilling, permitting the extraction of core samples of the salar basin formations and the recovery of brine samples where possible.

Drilling was carried out by Salta-based AGV Falcon Drilling SRL, under the supervision of Argentina Lithium's geologists.

Table 2: Collar and maximum depth information for RW-DDH-012

Hole ID

East

North

Elevation

Azimuth

Dip

Depth


UTM Zone 19S (WGS84)

(m)

(deg.)

(deg.)

(m)

RW-DDH-012

684144

7337989

3722

n/a

90

339.0

LIT's preferred method for brine sampling deploys a 'single packer' sampling unit during drilling. The packer sampling method allows the recovery of brine samples at specific depths while sealing the hole at the top and bottom of the interval. For single packer sampling, an inflatable seal closes the top of the interval; the lower limit of drilling represents the bottom of the interval.

Geophysical profiling and lining the hole with 2" diameter PVC filters have been completed. All core samples recovered in drilling were retained for geologic logging.

Observations regarding RW-DDH-012

RW-DDH-012 extends drilling eastwards from previous holes over the Rincon salt flat. The hole was completed to 339.5 m depth and a total 23 brine samples extracted using the single packer method were submitted for analysis.

Samples collected between 48.5 m depth and 213.5 m depth (the deepest sample) ranged from 322 to 371 mg/l lithium. Over this 165 m interval, 23 single packer brine samples were collected from discrete 3 m intervals, totalling 69.0 m of sampling, which represents 41.8% of the total interval.

From surface to 20 m depth, gravels with a sandy-clayey matrix were drilled. Dacite was recovered from 20.0 to 22.9 m , whereupon the drill crossed coarse gray-brown sand, to 52.3 m . Fine black sands were then sampled to 106.5 m depth, followed by reddish clayey sand to 122 m . The drill sampled fine black sands to 129.5, followed by coarse red sand to 135.5 m , then medium brown sand to 144.5 m . Breccia with grey sandy matrix was crossed to 151.0, with clasts of andesite and other compositions. Fine reddish and gray sands were then drilled to 177.4 m , where sulphates were encountered, extending to 178.2 m . Brown, medium-grained sand was then drilled to 180.5, followed by breccia to 185.5 m . Between 185.5 m and 201.4 m , the drill sampled andesitic porphyry with veinlets. From 201.4 to 339.5 m , the drill sampled a sequence of volcanic units (porphyries, breccias and ignimbrites, among others) characterised by the presence of fractures and carbonate or quartz veinlets. Brine sampling in these relatively competent basement units proved unproductive below the initial weathered zone.

Analyses and QA/QC

Samples of brine were submitted for analysis to Alex Stewart International Argentina S.A. ("Alex Stewart"), the local subsidiary of Alex Stewart International, an ISO 9001:2017 certified laboratory, with ISO 17025:2017 certification for the analysis of lithium, potassium and other elements. Alex Stewart employed Inductively Coupled Plasma Optical Emission Spectrometry ("ICP-OES") as the analytical technique for the primary constituents of interest, including boron, calcium, potassium, lithium, and magnesium. Measurements in the field included pH, electrical conductivity, temperature and density.

The quality of sample analytical results was controlled and assessed with a protocol of blank, duplicate and reference standard samples included within the sample sequences. For hole RW-DDH-012 the lot contained one blank and two duplicate samples, which all reported within the acceptable range. Single low-grade, medium-grade and high-grade reference standard samples (3 standards in total) were included within the submitted sample suite. The low-grade reference standard analysed higher than 3 standard deviations (SD) of best value, with 8.6 relative percent difference (RPD); the medium-grade reference standard analysed below 3 SD of best value, with 4.9 RPD; the high-grade reference standard analysed below 3 SD of the best value; with 2.9 RPD.

Qualified Person

Frits Reidel , CPG is a Qualified Person as defined in National Instrument 43-101, is the Principal of Atacama Water Consultants, and is independent of Argentina Lithium. Mr. Reidel has reviewed the work carried out by the Company's exploration team at the early-stage Rincon West property. The disclosure in this news release has been reviewed and approved by Mr. Reidel.

About Argentina Lithium

Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in Argentina and advancing them towards production in order to meet the growing global demand from the battery sector. The Company's recent strategic investment by Peugeot Citroen Argentina S.A., a subsidiary of Stellantis N.V., one of the world's leading automakers, places Argentina Lithium in a unique position to explore, develop and advance its four key projects covering over 67,000 hectares in the Lithium Triangle of Argentina . Management has a long history of success in the resource sector of Argentina and has assembled some of the most prospective lithium properties in the world renowned "Lithium Triangle". The Company is a member of the Grosso Group, a resource management group that has pioneered exploration in Argentina since 1993.

ON BEHALF OF THE BOARD

"Nikolaos Cacos"

_______________________________
Nikolaos Cacos , President, CEO and Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments management of the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.

Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Accordingly, readers should not place undue reliance on the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things: risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; the state of financial markets in Canada and other jurisdictions; the Company's ability to meet its working capital needs; fluctuations in metal prices; operations in foreign countries and the compliance with foreign laws; environmental regulations or hazards and compliance with regulations associated with mining activities; climate change and climate change regulations; fluctuations in foreign currency exchange rates; failure to obtain or delays in obtaining necessary governmental and regulatory approvals; labour disputes and other risks generally in the mining industry. There may be other factors that cause results or events to not be as anticipated. Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's Management's Discussion and Analysis for a more detailed discussion of factors that may impact expected future results. The forward-looking statements contained in this press release are made as of the date hereof or the dates specifically referenced in this press release, where applicable. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.

We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/argentina-lithium-announces-positive-lithium-values-in-the-12th-exploration-well-at-the-rincon-west-project-302125564.html

SOURCE Argentina Lithium & Energy Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/24/c3920.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
CENTURY LITHIUM PROVIDES UPDATE ON THE FEASIBILITY STUDY

CENTURY LITHIUM PROVIDES UPDATE ON THE FEASIBILITY STUDY

Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or Company) reports that the Feasibility Study on the Company's Clayton Valley Lithium Project (Project), in Nevada, USA under the direction of Wood PLC and Global Resource Engineering Ltd., is currently under review by the Qualified Persons, and the Company anticipates its announcement imminently.

Century Lithium Provides Update on the Feasibility Study (CNW Group/Century Lithium Corp.)

To date, the Company's Feasibility Study team has revised and updated estimates for a phased production approach at the Project. These revisions also included assessment and evaluation of the economic benefit of sales of the surplus sodium hydroxide produced by the chlor-alkali plant.

The Company's Lithium Extraction Facility (Pilot Plant) in Amargosa Valley, Nevada is now in its third year of testing the processing of lithium-bearing claystone from the Project. All data collected has been essential to the Feasibility Study. Century Lithium continues to work toward permitting the Project including the collection of baseline data collection for biology, surface and groundwater hydrology, and social impacts. Earlier this year, baseline reports were submitted by the Company's consultants and were accepted by the appropriate government agencies. Multiple reports have been completed which will aide in the preparation of a Plan of Operations to initiate the National Environmental Policy Act (NEPA) process.

About Century Lithium Corp.

Century Lithium Corp. (formerly Cypress Development Corp.) is an advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in west-central Nevada, USA . Century Lithium is currently in the pilot stage of testing on material from its lithium-bearing claystone deposit at its Lithium Extraction Facility in Amargosa Valley, Nevada and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.

ON BEHALF OF Century Lithium CORP.
WILLIAM WILLOUGHBY , PhD., PE
President & Chief Executive Officer

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Cautionary Note Regarding Forward-Looking Statements

This release includes certain statements that may be deemed to be "forward-looking statements". Forward-looking statements are subject to risks, uncertainties and assumptions and are identified by words such as " expects," "estimates," "projects," "anticipates," "believes," "could," "scheduled," and other similar words. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration, and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/century-lithium-provides-update-on-the-feasibility-study-302121633.html

SOURCE Century Lithium Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/19/c7578.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×