Park Place Lithium Brine Project Delivers Up to 82.0 mg/L Li From Initial Sampling

Park Place Lithium Brine Project Delivers Up to 82.0 mg/L Li From Initial Sampling

LithiumBank Resources Corp. ( TSX-V: LBNK ) ( OTCQX: LBNKF) (" LithiumBank " or the " Company ") is pleased to announce assay results from samples taken at the Company's 100% owned Park Place Lithium Brine Project located 180 km west of Edmonton, Alberta. Three brine samples were collected from a 72-meter-thick interval at the top of the Leduc Formation in well 10012-03-059-23W500 and returned grades ranging between 71.2 82.0 mgL lithium with an overall average of 77.2 mgL lithium (Table 1).

The Park Place Lithium Brine Project consists of 1,602,209 acres of contiguous MIM permits (89 MIM permits) that overlie the lithium-rich Devonian aged, Leduc Formation, Carbonate Reef complex (Woodbend Group) and the underlying Beaverhill Lake Group (Swan Hills FM) (Figure 1). These Formations are confined aquifers and are considered to be hydraulically connected. The Leduc Formation reaches thicknesses of just over 300m and the Swan Hills Formation is up to 250 metres thick within the Company's Metallic and Industrial Mineral (MIM) permits. LithiumBank considers both Formations highly favourable for potential brine production and intends for both to be the focus of continued sampling and study to lead to a NI 43-101 Resource Estimate. The contiguous MIM permits covering the Formations give the Company the dominant position over the contained lithium-rich brines.

The Leduc and Swan Hills Formations at Park Place, formally known as Fox Creek, have been producing petroleum and natural gas since the 1950's and there are over 215 past producing wells within the Company's MIM permits (Figure 1). This legacy hydrocarbon extraction infrastructure has enabled the Company to easily collect brine samples from existing wells without drilling new exploration holes. Furthermore, historical production logs and reports are expected to significantly reduce the timelines required to complete detailed geological and hydrogeological studies ( News Release, Sept. 27, 2022 ). LithiumBank expects that by leveraging the extensive infrastructure in Park Place region, including highways, all-weather gravel roads, permitted drill sites, and a local skilled labour force, the Company will be able to rapidly advance the project.

The Leduc and Swan Hills Formations have historically been known to host some of the highest grades of lithium-in-brine in Alberta, with samples that range from 76 mg/L to 130 mg/L lithium within the Park Place MIM permit area ( ags.aer.ca/publication/ofr-2011-10 ). These samples were provided to the Alberta Geological Survey by Petro-operators in 2010 and are considered historical. The samples have not been verified by a Qualified Person (QP) under the latest NI 43-101 Standards of Disclosure, cannot be relied upon and are not indicative of lithium-in-brine grades at the Formations. There has been insufficient exploration of the Formations to define a mineral resource and it is uncertain if further exploration will result in delineation of a mineral resource at either of the Leduc or Swan Hills Formations. Historical sampling results are mentioned as a reference only until such time they have been verified.

Independent Director, Paul Matysek comments, "We are very pleased to see our first Park Place brine samples reflect lithium grades from historical assays. The Park Place area has historically reported some of the highest-grade lithium brine samples in Alberta and it is very encouraging that our sampling to date confirms that lithium grades at Park Place tend to be higher than typically seen anywhere in Alberta. We look forward to providing further results from additional planned sampling campaigns and incorporating them in a NI 43-101 Resource Estimate."

Table 1: Park Place assay results from well 100/12-03-059-23W5/00

Well ID Sample
Date
Sample ID Lithium (mg/L) Average Sample
Grade (mg/L Li)
100/12-03-059-23W5/00 03-Dec-22 PB2B-LB-PP-O 82.0 80.8
100/12-03-059-23W5/00 03-Dec-22 PB4D-LB-PP-A (Duplicate) 79.5
100/12-03-059-23W5/00 03-Dec-22 PB1A-LB-PP-Q 71.2 73.6
100/12-03-059-23W5/00 03-Dec-22 PB3C-LB-PP-L (Duplicate) 76.0
100/12-03-059-23W5/00 03-Dec-22 PB5E-LB-PP-Y 78.2 77.1
100/12-03-059-23W5/00 03-Dec-22 PB6F-LB-PP-V (Duplicate) 76.0
Average lithium grade of well
77.2

Samples were analysed at AGAT Laboratories, an ISO 17025:2017 certified lab, in Calgary Alberta. LithiumBank implemented strict Quality Control and Quality Assurance (QA/QC) protocols for the analysis. Testing of the three samples included three duplicates, two blanks and one standard reference material. Samples were collected from the well head by BV Labs technicians and couriered to AGAT Laboratories for analysis in Calgary.

The potential of lithium-in-brine as an industrial resource was first recognized in a study authored by B. Hitchon et al. in 1993 ( Hitchon et al, 1993 ) entitled "Industrial Mineral Potential of Alberta Formation Waters". The study used 130,000 Alberta Formation water samples to determine areas of potential economic interest. The study highlights the Boardwalk and Park Place areas (Sturgeon Lake, and Fox Creek areas, respectfully) specifically as having the highest lithium grades in the Provence.

The Park Place area was the focus of an additional study, authored by D.R. Eccles and H. Berhane, entitled "Geological Introduction to Lithium-Rich Formation Water with Emphasis on the Fox Creek Area of West-Central Alberta (NTS 83F and 83K)" ( ags.aer.ca/publication/ofr-2011-10 ). The report highlights significant lithium potential in three different formations, the Leduc (Woodbend), Nisku (Winterburn), and Swan Hills (Beaverhill Lake Group), is supported by historical lithium brine samples that range from 76 mg/l to 130 mg/l lithium in these formations.

Park Place and Boardwalk lithium brine projects showing most recent Leduc recent Leduc brine sample lithium results along with historical lithium assays from the Leduc and Beaverhill Lake (BHL) Formations.

Figure 1. Park Place and Boardwalk lithium brine projects showing most recent Leduc recent Leduc brine sample lithium results along with historical lithium assays from the Leduc and Beaverhill Lake (BHL) Formations.

The scientific and technical disclosure in this news release has been reviewed and approved by Mr. Kevin Piepgrass (Chief Operations Officer, LithiumBank Resources Corp.), who is a Member of the Association of Professional Engineers and Geoscientists of the Province of British Columbia (APEGBC) and is a Qualified Person (QP) for the purposes of National Instrument 43-101. Mr. Piepgrass consents to the inclusion of the data in the form and context in which it appears.

About LithiumBank Resources Corp.

LithiumBank Resources Corp. is an exploration and development company focused on lithium-enriched brine projects in Western Canada where low-carbon-impact, rapid DLE technology can be deployed. LithiumBank currently holds over 4 million acres of mineral titles, 3.68M acres in Alberta and 326K acres in Saskatchewan. LithiumBank's mineral titles are strategically positioned over known reservoirs that provide a unique combination of scale, grade and exceptional flow rates that are necessary for a large-scale direct brine lithium production. LithiumBank is advancing and de-risking several projects in parallel of the Boardwalk Lithium Brine Project.

Contact:

Rob Shewchuk
CEO & Director
rob@lithiumbank.ca
(778) 987-9767

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward Looking Statements

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance, including without limitation, the statement that the Company intends to complete a NI 43-101 Resource Estimate and the expecting timing thereof, the expectation that historical production logs and reports will reduce the timeline to complete geological and hydrogeological studies, and the Company's expected ability to leverage existing infrastructure to advance its project are forward-looking statements and contain forward-looking information. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should" or "would" or occur. Forward-looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this press release, including that the Leduc Formation and the Swan Hills Formation will be favourable for brine production and that the continued sampling and study of both Formations will lead to a NI 43-101 Resource Estimate, that the Company will be able to use historical production logs and reports to significantly reduce the timelines required to complete detailed geological and hydrogeological studies, that the Company will be able to leverage existing infrastructure to rapidly advance the project, and that further sampling at Park Place will continue to confirm high lithium grades relative to elsewhere in Alberta. These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information. Important factors that may cause actual results to vary, include, without limitation, that the Company is not able to complete a NI 43-101 Resource Estimate as anticipated or at all, or that the results of the NI 43-101 Resource Estimate will not be as expected by management, that the Company is not able to use historical production logs and reports and/or leverage existing infrastructure to advance the project more rapidly, and that further sampling at Park Place will not have the results expected by management. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/39f56be1-8f3d-47f5-bea7-43360a5ca6c3


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

LBNK:CA
The Conversation (0)
LITHIUMBANK ANNOUNCES $6 MILLION "BOUGHT DEAL" PRIVATE PLACEMENT

LITHIUMBANK ANNOUNCES $6 MILLION "BOUGHT DEAL" PRIVATE PLACEMENT

/NOT FOR DISTRIBUTION TO THE U.S. NEWSWIRE OR FOR DISSEMINATION IN THE UNITED STATES /

LithiumBank Resources Corp. (TSXV: LBNK) (the " Company " or " LithiumBank ") is pleased to announce it has entered into an agreement with Echelon Capital Markets (" Echelon ") and, if applicable, on behalf of a syndicate of underwriters (collectively the " Underwriters ") in respect of a bought deal private placement of 3,158,000 units of the Company issued on a charity flow-through basis (the " FT Units ") at a price of $1.90 per FT Unit (the " FT Issue Price ") for gross proceeds of $6,000,200 (" Offering ").  Each FT Unit will consist of one common share of the Company to be issued as a "flow-through share" within the meaning of the Income Tax Act ( Canada ) (each, a " FT Share ") and three quarters of one common share purchase warrant of the Company (each whole common share purchase warrant, a " FT Warrant ") each to be issued as a "flow-through share" within the meaning of the Income Tax Act ( Canada ). Each FT Warrant will entitle the holder thereof to purchase one non flow-through Common Share (a " Warrant Share ") at an exercise price of $2.00 for a period of 36 months from the date of issuance thereof, subject to adjustment in certain events.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
LithiumBank Commences Trading on the OTCQX Under the Symbol LBNKF

LithiumBank Commences Trading on the OTCQX Under the Symbol LBNKF

LithiumBank Resources Corp. ("LithiumBank or the "Company") (TSXV:LBNK) (OTCQX: LBNKF) is pleased to announce that the Company's common shares have commenced trading on the OTCQX® Best Market, an over-the-counter public market in the United States, under the ticker symbol LBNKF. LithiumBank will continue to trade on the TSX Venture Exchange ("TSXV") in Canada, as its primary listing under the symbol "LBNK".

"We are pleased to begin trading on the OTCQX Market, which we believe will increase our visibility and accessibility for current and potential investors in the United States as we continue to advance our exploration and development of our Lithium projects in Western Canada. We also look forward to seeing the results of our Preliminary Economic Assessment currently underway with Hatch Ltd. on our flagship Boardwalk Project at Sturgeon Lake, Alberta in the coming quarter," stated Rob Shewchuk, Director & CEO. "We believe that trading on OTCQX will also improve our market information, transparency, liquidity and ease of trading in the Company's securities, and will be a benefit to all of our shareholders as we present our corporate developments at Boardwalk and other projects in our portfolio of over 3.2 Million acres over the balance of 2022 and into 2023."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
LithiumBank Resources Corp. Virtually Closes the Market

LithiumBank Resources Corp. Virtually Closes the Market

Rob Shewchuk Chief Executive Officer, LithiumBank Resources Corp. ("LithiumBank") (TSXV: LBNK) and his team joined Monica Hamm Manager, Client Success, Toronto Stock Exchange, to celebrate the Company's new listing on TSX Venture Exchange and close the market.

LithiumBank Resources Corp. is an exploration and development company focused on direct brine lithium resources in Western Canada . The company plans to take advantage of Alberta's long history of fossil fuel production to create a local source of "green" lithium in North America .

SOURCE TSX Venture Exchange

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/April2022/29/c6922.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Victory is Pleased to Announce the Appointment of Gary Musil to the Company's Board of Directors and a Private Placement

Victory is Pleased to Announce the Appointment of Gary Musil to the Company's Board of Directors and a Private Placement

Victory Battery Metals Corp. (CSE:VR)(OTC PINK:VRCFF)(FWB:VR6) welcomes Gary Musil as a director of the Company, effective July 1, 2024. Gary Musil has more than 35 years of management and financial consulting experience and has served as an officer and director on numerous public companies since 1988. This experience has resulted in his overseeing the financial aspects and expenditures on exploration projects in Peru, Chile, Eastern Europe (Slovak Republic), and British Columbia, Ontario, Quebec, Saskatchewan and New Brunswick (Canada). Prior to his public company work, he was employed for 15 years with Dickenson Mines Ltd. and Kam-Kotia Mines Ltd., as the Controller for their producing silverleadzinc mine in the interior of British Columbia

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Albemarle Announces Quarterly Common Stock Dividend

Albemarle Announces Quarterly Common Stock Dividend

The Board of Directors of Albemarle Corporation (NYSE: ALB) announces that it has declared a quarterly common stock dividend of $0.405 per share. The dividend, which has an annualized rate of $1.62 is payable Oct. 1, 2024 to shareholders of record at the close of business as of Sept. 13, 2024 . For 30 consecutive years, Albemarle has raised its dividend.

Albemarle Corp. Logo. (PRNewsFoto/Albemarle Corporation)

About Albemarle
Albemarle Corporation (NYSE: ALB) leads the world in transforming essential resources into critical ingredients for mobility, energy, connectivity and health. We partner to pioneer new ways to move, power, connect and protect with people and planet in mind. A reliable and high-quality global supply of lithium and bromine allows us to deliver advanced solutions for our customers. Learn more about how the people of Albemarle are enabling a more resilient world at Albemarle.com , LinkedIn and on X (formerly known as Twitter) @AlbemarleCorp .

Albemarle regularly posts information to www.albemarle.com , including notification of events, news, financial performance, investor presentations and webcasts, non-GAAP reconciliations, U.S. Securities and Exchange Commission filings and other information regarding the company, its businesses and the markets it serves.

Forward-Looking Statements

Some of the information presented in this press release, including, without limitation, information related to future dividends and results, and all other information relating to matters that are not historical facts may constitute forward- looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Actual results could differ materially from the views expressed. Factors that could cause actual results to differ materially from the outlook expressed or implied in any forward-looking statement include, without limitation: changes in economic and business conditions; adverse changes in liquidity or financial or operating performance; changes in the demand for our products or the end-user markets in which our products are sold and the other factors detailed from time to time in the reports we file with the U.S. Securities and Exchange Commission, including those described under "Risk Factors" in our Annual Report on Form 10-K and our Quarterly Reports on Form 10-Q. These forward-looking statements speak only as of the date of this press release. We assume no obligation to provide any revisions to any forward-looking statements should circumstances change, except as otherwise required by securities and other applicable laws.

Investor Relations Contact: Meredith Bandy , +1 (980) 999-5768, meredith.bandy@albemarle.com
Media Contact: Peter Smolowitz
, +1 (980) 308-6310, media@albemarle.com

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/albemarle-announces-quarterly-common-stock-dividend-302198618.html

SOURCE Albemarle Corporation

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Update on CERENERGY ABS60 Battery-pack Prototypes

Altech Batteries Ltd Update on CERENERGY ABS60 Battery-pack Prototypes

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to provide an update on the production of its CERENERGY(R) ABS60 BatteryPack prototypes. All 240 cells for the first ABS60 BatteryPack Prototype have now been fabricated, assembled and initialized at Fraunhofer IKTS Hermsdorf's pilot plant.

Highlights

- Prototype production is progressing well

- All CERENERGY(R) cells for the first 60 KWh Prototype completed

- Cell contacting system manufacturing finished and delivered

- Improved cell electrode design showing excellent results

- Cell quality tests by Fraunhofer delivering better than expected capacity

- Welding of cells to cell contacting system underway

- Completed modules will be mounted into ABS60 BatteryPack next week

To validate a homogeneous cathode material distribution, all cells were cycled through several testing stations at Fraunhofer IKTS Hermsdorf and Arnstadt.

IMPROVED CELL ELECTRODE DESIGN

During the fabrication of the two 60kWh CERENERGY(R) ABS60 BatteryPack prototypes, the Altech and Fraunhofer team made several design improvements to the cell's positive probe. These enhancements aimed to boost the cell's energy capacity and reduce the nickel content. The "V2" design of the positive probe allows for slightly faster charging and discharging while lowering the unit costs of the battery. Testing revealed that most cells had higher-than-expected energy capacities, an outstanding result that strongly supports the chosen electrode design. With all cells manufactured according to the series design and optimized processes, the best cells to date have been completed. The table below demonstrates that all the cells are meeting the expected specifications.

CELL CONTACTING SYSTEM COMPLETED

The Cell Contacting System (CCS) has undergone stringent testing and has now been completed and delivered by key supplier Hofer AG. The CCS was delivered to Fraunhofer IKTS in Dresden, where all parts of the modules will be collected to assemble each of the five modules. Each module contains 48 cells, that are currently being welded to the CCS by an external service provider.

After welding is completed, the ABS60 BatteryPack with its 60 kWh capacity can be completely assembled.

MODULE WELDING TRIALS

To guarantee the most time-efficient welding, a unique tool was designed and built at Xenon, which is responsible for welding and quality control across the 120 MWh battery plant. After completing the welding tool, it was shipped to an external laboratory, accompanied by a test module and several trial cells. The aim was to determine the best working parameters and to proof the handling of certain parts of the module.

The trials were successfully finished.

CELL MANUFACTURING PROGRESSING WELL

All 240 cells for the first ABS60 BatteryPack Prototype have been assembled and initialised at Fraunhofer IKTS, Hermsdorf. To validate a homogeneous cathode material distribution, all cells were cycled through several testing stations at Fraunhofer IKTS Hermsdorf and Arnstadt.

INTERIM CELL TESTING

At Fraunhofer IKTS in Hermsdorf, all cells were scanned using a unique X-ray microtomography device that enables the ability to look inside cells after they are hermetically closed. This is required to ensure the most homogeneous material distribution inside the cells as well as the best possible alignment of cell components e.g. electrode. The results have been excellent to date. Another quality assurance procedure involved cycling cells to ensure the electrical requirements and parameters are operating as designed.

MODULE WELDING AND BATTERYPACK ASSEMBLY

After every cell passed all quality checks, the modules containing the cells were shipped to the laboratory for welding onto the CCS. By using the predetermined parameters for welding, all modules have been successfully welded. After completion, the modules will be shipped to Fraunhofer IKTS, Dresden, where all five modules will then be mounted into the ABS60 BatteryPack and the first Prototype will be completed.

This will enable testing and demonstration to potential customers, to prove individual use cases for each customer.

ABOUT THE ABS60 - BATTERYPACK

The 60kWh Altech Battery Pack consists of five 12kWh modules with 48 cells each, mounted on top of each other and sealed in a thermal isolated stainless steel hood housing. The Battery management system is mounted at the base. To maintain thermal self-sufficiency, an insulation hood was designed, where the required heat of the system can be maintained inside the BatteryPack as long as possible, although the outer surface only has ambient temperature. This was achieved by using vacuum insulation. The base of each module is designed to accommodate folklift transport for easy mounting into the GridPack.

Commenting on the progress, MD and CEO Iggy Tan stated "Altech's team in Germany, together with its joint venture partner Fraunhofer, and with the assistance of key suppliers, have made excellent progress on the fabrication of two 60kWh CERENERGY(R) ABS60 BatteryPack prototypes. All components for the first BatteryPack have now been fabricated. Altech is now completing the welding of the cells to the Cell Contacting System, after which the five completed battery modules will be delivered to Fraunhofer IKTS in Dresden, where all five modules will be mounted into the ABS60 BatteryPack and the first ABS60 Prototype will be completed. The BatteryPack will then be available for testing and demonstration to potential customers, thereby assisting Altech in securing offtake and finance for the 120MWh CERENERGY(R) battery plant to be constructed on Altech's land in Germany".

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/O449B2I4



About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Nevada Sunrise Initiates Data Review to Develop New Drill Targets at the Coronado Copper Project, Nevada

Nevada Sunrise Initiates Data Review to Develop New Drill Targets at the Coronado Copper Project, Nevada

Nevada Sunrise Metals Corporation (TSXV: NEV) (OTCBB: NVSGF) ("Nevada Sunrise" or the "Company") is pleased to announce that the Company has initiated a geological and geophysical data review on its Coronado Copper Project (" Coronado ", or the " Project ") located in Pershing County, Nevada approximately 48 kilometers (30 miles) southeast of Winnemucca . The purpose of the Coronado data review is to identify new, shallow drill targets in an area of the Project where historical drilling in 1976 identified high-grade copper mineralization.

Highlights of the Coronado Copper Project

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
NextSource Materials Appoints Jaco Crouse as Chief Financial Officer

NextSource Materials Appoints Jaco Crouse as Chief Financial Officer

NextSource Materials Inc. (TSX:NEXT)(OTCQB:NSRCF) ("NextSource" or the "Company") announces the appointment of Jaco Crouse as Chief Financial Officer (CFO) of the Company as part of its global growth strategy

Mr. Crouse today replaces Marc Johnson who has served as CFO since October 2015. Mr. Johnson will continue to provide consulting services to the Company to assist with the smooth transition of this role. The Board of Directors of the Company would like to thank Mr. Johnson for his service to the Company over the years and wishes him well in his future endeavours.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Nevada Sunrise Signs Indicative Term Sheet to Sell Remaining Interest in the Kinsley Mountain Gold Project, Nevada

Nevada Sunrise Signs Indicative Term Sheet to Sell Remaining Interest in the Kinsley Mountain Gold Project, Nevada

Nevada Sunrise Metals Corp. (TSXV: NEV) (OTCBB: NVSGF) ("Nevada Sunrise" or the "Company") announced today that it has signed a non-binding, indicative term sheet with CopAur Minerals Inc. (" CopAur ") for CopAur to acquire Nevada Sunrise's remaining ownership interest in the Kinsley Mountain Gold Project in Nevada (" Kinsley Mountain "). If the transaction is completed, CopAur will own 100% of Kinsley Mountain .

Nevada Sunrise Metals Corporation Logo (CNW Group/Nevada Sunrise Metals Corporation)

The indicative term sheet outlines a potential transaction whereby CopAur would acquire Nevada Sunrises' 18.74% ownership interest in Kinsley Mountain in consideration of the payment of CDN$475,000 and the issuance of 1,000,000 common shares of CopAur (the "Shares"). The Shares would be deposited in escrow and released in successive releases of 250,000 Shares once every calendar quarter commencing after expiry of the four-month statutory hold period following the closing date. The terms of the transaction are indicative and the final terms are subject to the negotiation and completion of a definitive agreement on terms acceptable to Nevada Sunrise and CopAur. The transaction is subject to a number of conditions including CopAur arranging a financing in the amount of a minimum of CDN$475,000 , completion of satisfactory due diligence, and the fulfilment of various closing conditions, including acceptance by the TSX Venture Exchange.

About Kinsley Mountain

Kinsley Mountain was a historical past producer that yielded 138,000 ounces of near-surface, open-pit oxide gold between 1995 and 1999, and currently hosts a compliant National Instrument 43-101 mineral resource. A technical report on Kinsley Mountain entitled "Technical Report of the Kinsley Project, Elko and White Pine Counties, Nevada, U.S.A. ", dated June 21, 2021 , with an effective date of May 5, 2021 , prepared by Michael M. Gustin and Gary L. Simmons , is available for review under New Placer Dome Gold Corp.'s issuer profile on sedarplus.ca

About Nevada Sunrise

Nevada Sunrise is a junior mineral exploration company with a strong technical team based in Vancouver, BC , Canada , that holds interests in lithium, gold and copper exploration projects located in the State of Nevada, USA .

Nevada Sunrise owns 100% interests in the Gemini, Jackson Wash and Badlands lithium projects, all of which are located in the Lida Valley in Esmeralda County, NV , and in the Pelican lithium project in Saskatchewan, Canada . The Company owns Nevada Water Right Permit 86863, also located in the Lida Valley basin, near Gold Point, NV.

Nevada Sunrise has the right to earn a 100% interest in the Coronado Copper Project , located approximately 48 kilometers (30 miles) southeast of Winnemucca, NV.

The Company owns an 18.74% interest in the Kinsley Mountain Gold Project near Wendover, NV , in a joint venture with CopAur, which is now the subject of a potential transaction between Nevada Sunrise and CopAur.

FORWARD LOOKING STATEMENTS

This release may contain forward–looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and include disclosure of anticipated exploration activities. Although the Company believes the expectations expressed in such forward–looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward–looking statements are based on the beliefs, estimates and opinions of the Company's management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward–looking statements whether as a result of new information, future events or otherwise.

Such factors include, among others, risks related to: the completion of the potential transaction with CopAur Minerals Inc. for the purchase of the Company's remaining participating interest in the Kinsley Mountain Gold Project joint venture; reliance on technical information provided by third parties on any of our exploration properties; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labor disputes and other risks of the mining industry; delays due to pandemic; delays in obtaining governmental approvals, financing or in the completion of exploration, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Management Discussion and Analysis for the Six Months Ending March 31 , 2024,  which is available under Company's SEDAR profile at www.sedar.com .

Although Nevada Sunrise has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Nevada Sunrise disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Nevada Sunrise Metals Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2024/08/c5338.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×