NiCAN Intersects Nickel Bearing Massive Sulphides on the Pipy South Project, Thompson Manitoba

NiCAN Intersects Nickel Bearing Massive Sulphides on the Pipy South Project, Thompson Manitoba

NiCan Limited ("NiCAN" or the "Company") (TSXV: NICN,OTC:NILTF) (OTCQB: NILTF) (FRA: W8Y) is pleased to report that it has intersected nickel bearing massive sulphides in its Phase I reconnaissance drilling and geophysical program on the Pipy South Nickel Project close to Thompson Manitoba.

To date, NiCAN has drilled a total of 1,264 metres (m) in nine diamond drill holes on the project. Drill hole PIPY25-06 intersected 1.45m of nickel bearing massive sulphides at 60m below surface within the Pipe Formation unit, 20km north of the Thompson Nickel Mine. The Pipe Formation hosts all of the economic nickel mineralization within the Thompson Nickel Belt. Visual examination of the core indicates the presence of fine disseminations and thin seams of pentlandite (nickel sulphides) and handheld XRF-readings confirms the interval to be nickel bearing (Figure 1). Assays are pending.

Drill Hole PIPY25-06

Diamond drill hole PIPY25-06 was drilled in the vicinity of a historical 1966 INCO diamond drill hole that intersected a 1.35m zone described in the drill-log as "mineral breccia" (Manitoba Assessment File 99136). No assays accompanied the drill log. Another INCO drill hole located 250m to the south of PIPY25-06 intersected 2.13m of "mineral zone" indicating good to excellent potential to expand the mineralization.

Strong Associated Geophysical Response

A downhole electromagnetic (BHEM) survey conducted on PIPY25-06, displayed an in-hole conductive anomaly which correlates well with the intersected mineralization. Four surface lines of transient electromagnetic (TEM) survey were also completed over the immediate area and 400m to the south. The geophysical survey displayed strong conductivity over the entire 400m length, with the anomaly open along strike to the north and south as well as up and down dip (Figure 2).

Based on NiCAN's detailed aeromagnetic survey the prospective Pipe Formation stratigraphy intersected in PIPY25-06 can be traced for five kilometres along strike on NiCAN's two claim blocks. Two-kilometres of the five kilometre Pipe Formation's prospective strike length is present on the southern claim block where historical hole BD-02 (Manitoba Assessment Report 99102) reported two 0.3m intervals of 1.55% and 1.04% nickel within Pipe Formation sediments (Figure 2). Follow up work is planned as the thickness of sulphide intersections can vary significantly along strike due to the polyphase deformation within the Thompson Nickel Belt and relatively thin intervals can be present adjacent to much thicker zones as illustrated in the 1C orebody at the Thompson Nickel Mine (Figure 3).

Brad Humphrey, President and CEO of NiCAN, commented, "NiCAN is excited to report confirmation of nickel bearing sulphides on the highly prospective Pipy South Property. The primary objective of this reconnaissance drill program was to test for the presence of nickel mineralization. This intersection clearly indicates that there is nickel within the favourable Pipe Formation, which underlies the Pipy South Property. Geophysical surveys completed downhole and across the strike of the intersection suggests it remains open to the north and south as well as up and down dip."

"The project area has excellent access, with roads and existing trails cutting across the property and is located just north of the City of Thomspon, which hosts Vale's long producing, Thompson Nickel Mine Complex. Pipy South is underlain by the essential Pipe Formation, which is known to host all the economic nickel mineralization within the Thompson Nickel Belt."

Figure 1: Core Image of Massive Sulphides in PIPY25-06 (CNW Group/Nican Ltd.)

Figure 2: Pipy South 2025 Diamond Drill Holes (CNW Group/Nican Ltd.)

Four diamond drill holes (PIPY25-01,02,02A,03) that tested targets elsewhere on the property were not on the same trend as PIPY25-06. All intersected Pipe Formation but did not cut significant massive sulphides. The remaining four holes were drilled on newly acquired claims tied on to the northwest boundary of the Pipy South Property (Figure 2). Assays are pending.

Figure 3: Thompson Nickel Deposit 1C Ore Zone Section Source: Camiro TNB Project 97E-02 Final Report (2004 Revision) (CNW Group/Nican Ltd.)

NiCAN plans follow-up drilling to trace and expand the nickel bearing massive sulphide zone intersected in PIPY25-06. Additionally, an airborne electromagnetic survey is being designed to trace the conductive trend that hosts the massive sulphides and define other prospective mineralized zones.

Pipy Project Overview

The Pipy South Project is included in an Exploration Agreement with Nisichawayasihk Cree Nation ("NCN").

The Pipy Properties consist of three project areas, Pipy South, Pipy North and Pipy West, totaling 69.3 km2 in the world class Thompson Nickel Belt. Initial exploration activities will focus on the Pipy South Project, which is adjacent to the Mystery Lake South area, located approximately 20 km northeast of the City of Thompson and Vale's Thompson Nickel Mine, with excellent road access and local infrastructure (Figure 4). 

Figure 4: Pipy South Property Location and Infrastructure (CNW Group/Nican Ltd.)

Note: Mineral Resources for Moak Lake and Mystery Lake deposits are historical resource estimates listed in Manitoba Energy and Mines Geological Services Open File Report OF90-2. The historical mineral resource for the Mel Deposit is listed in 43-101 Victory Nickel Inc. Technical Report on Mel Deposit (2007).

Qualified Person

Mr. Stanley Clemmer, P.Geo, an independent consultant to NiCAN, who is a qualified person under National Instrument 43-101 – Standards of Disclosure of Mineral Projects ("NI 43-101") has reviewed and approved the scientific and technical information in this press release. 

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbol "NICN" on the TSX-V. The Company is actively exploring two nickel projects, the high grade nickel-copper Wine Project and highly prospective Pipy Project, both located in well-established mining jurisdictions in Manitoba, Canada.

www.nicanltd.com 

To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain "forward-looking information" under applicable securities laws concerning the proposed financing, business, operations and financial performance and condition of NiCan Limited. Forward-looking information includes, but is not limited to, the size and timing of the drill program, results of the drill program, interpretations of the various surveys, NiCAN's ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of the properties of the Company; future commodity prices (including in relation to NiEq calculations); drilling and other exploration potential; costs; and permitting. Forward-looking information may be characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking information includes changes in market conditions, fluctuating metal prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or delays. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Figure 5: NiCAN's Project Locations in Manitoba, Canada (CNW Group/Nican Ltd.)

SOURCE Nican Ltd.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/January2026/19/c2529.html

News Provided by Canada Newswire via QuoteMedia

NICN:CC
NiCan

NiCan Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Logo for NiCan Limited (TSXV:NICN)

NiCan

Exploring Prospective and Underexplored Nickel Assets in Manitoba

Exploring Prospective and Underexplored Nickel Assets in Manitoba Keep Reading...
Bold Ventures Approved for Trading on the OTCQB Venture Market

Bold Ventures Approved for Trading on the OTCQB Venture Market

Bold Ventures Inc. (TSXV: BOL,OTC:BVLDF) (the "Company" or "Bold") wishes to announce that its common shares have been approved for trading on the OTCQB Venture Market in the United States under the symbol (OTCQB: BVLDF). Trading commenced at the open of the market on May 7, 2026. Investors in... Keep Reading...
Drilling Commences on the Rip Copper-Molybdenum Project

Drilling Commences on the Rip Copper-Molybdenum Project

Copper Quest Exploration Inc. (CSE: CQX,OTC:IMIMF; OTCQB: IMIMF; FRA: 3MX) ("Copper Quest" or the "Company") is pleased to announce that drilling has commenced on the Rip Copper-Molybdenum Project (the "Project" or "RIP") for drilling a minimum of 2,000 meters. The RIP Project is in the Stikine... Keep Reading...
Sankamap Metals Launches Inaugural Drill Program at Kuma

Sankamap Metals Launches Inaugural Drill Program at Kuma

Sankamap Metals Inc. (CSE: SCU) ("Sankamap" or the "Company"), is pleased to provide additional geological context for its inaugural drill program at the Kuma Property in the Solomon Islands, with a focus on the identification of a well-developed lithocap and its significance for targeting. -... Keep Reading...
Finlay Minerals Ltd. engages German Mining Networks and renews engagement with Investing News Network

Finlay Minerals Ltd. engages German Mining Networks and renews engagement with Investing News Network

finlay minerals ltd. (TSXV: FYL,OTC:FYMNF) (OTCQB: FYMNF) ("Finlay" or the "Company") reports that it has engaged German Mining Networks GmbH ("GMN") and renewed its engagement with Dig Media Inc. doing business as Investing News Network ("INN") for investor relations services. The Company has... Keep Reading...
Transition Metals Corp. Closes $618,844 Private Placement

Transition Metals Corp. Closes $618,844 Private Placement

Transition Metals Corp. (TSXV: XTM,OTC:TNTMF) ("Transition" or the "Company") is pleased to announce that it has closed its previously announced non-brokered private placement. A total of 5,381,250 Flow Through Units ("FT Units") were issued for gross proceeds of $618,844 (the "Offering"). The... Keep Reading...
Bold Ventures Announces Additional Results from Drilling at Burchell

Bold Ventures Announces Additional Results from Drilling at Burchell

Bold Ventures Inc. (TSXV: BOL,OTC:BVLDF) (the "Company" or "Bold") is pleased to announce the results from holes BL-26-03 and BL-26-04a from the first phase of drilling at its Burchell Project earlier this winter. 4 holes totaling 669 meters were completed. Table 1 below provides drillhole... Keep Reading...
NiCan

NiCan Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News