Energy

athabasca torre pacheco

Ellis Martin Report: Skyharbour Resources Intersects High Grade Uranium Mineralization at Maverick East Zone with Drill Results of 2.54% U3O8 over 6.0m

Vancouver, Canada (ABN Newswire) - Join Ellis Martin for a conversation with Jordan Trimble, the President and Chief Executive Officer of Skyharbour Resources (CVE:SYH) (OTCMKTS:SYHBF) a preeminent uranium and thorium exploration Company with projects located in the prolific Athabasca Basin of Saskatchewan, Canada which was ranked as the best mining jurisdiction to work in globally by the Fraser Institute in 2017.

The Company has been acquiring top tier exploration projects at attractive valuations culminating in five uranium properties totalling approx. 200,000 hectares throughout the Basin. In July 2016, Skyharbour secured an option from Denison Mines (TSE:DML) to acquire a 100% interest in the Moore Uranium Project, now the flagship project, which hosts the high grade Maverick Zone.

The Company is run by a strong management and geological team who are major shareholders with extensive capital markets experience as well as focused uranium exploration expertise in the Basin.

In this segment Mr. Trimble reviews some of the best high grade intersected mineralization at the Maverick East Zone of the Moore Uranium Project with Drill Results of 2.54% U3O8 over 6.0m including 6.80% U3O8 over 2.0m; with more assays pending and drilling to continue.

To listen to the Interview, please visit:
https://www.abnnewswire.net/press/en/107023/syh

To view the full press release, please visit:
https://abnnewswire.net/lnk/OE46A9FJ



About Skyharbour Resources Ltd.:

Skyharbour Resources (CVE:SYH) (OTCMKTS:SYHBF) holds an extensive portfolio of uranium and thorium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with six drill-ready projects. In July 2016, Skyharbour acquired an option from Denison Mines, a large strategic shareholder of the Company, to acquire 100% of the Moore Uranium Project which is located approximately 15 kilometres east of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced stage uranium exploration project with high grade uranium mineralization at the Maverick Zone. Drill results have returned up to 6.0% U3O8 over 5.9 metres, including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. Skyharbour has signed option agreements with Orano Canada Inc. and Azincourt Energy whereby Orano and Azincourt can earn in up to 70% of specific segments of the Preston Project through a combined $9,800,000 in total exploration expenditures, as well as $1,700,000 in total cash payments and Azincourt shares. Preston is a large, geologically prospective property proximal to Fission Uranium's Triple R deposit as well as NexGen Energy's Arrow deposit. The Company also owns a 100% interest in the Falcon Point Uranium Project which hosts a high-grade surface showing with up to 68% U3O8 in grab samples from a massive pitchblende vein, the source of which has yet to be discovered. The Company's 100% owned Mann Lake Uranium project on the east side of the Basin is strategically located adjacent to the Mann Lake Joint Venture operated by Cameco, where high-grade uranium mineralization has been identified. Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.



Source:
Skyharbour Resources Ltd.



Contact:
Riley Trimble
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-416-2978
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com
www.skyharbourltd.com

News Provided by ABN Newswire via QuoteMedia

Skyharbour Resources

Skyharbour Resources


Keep reading...Show less
Virginia Energy Shareholders Approve Plan of Arrangement

Virginia Energy Shareholders Approve Plan of Arrangement

Virginia Energy Resources Inc. (TSXV: VUI) (" Virginia Energy " or the " Company ") is pleased to report that, at its special meeting of shareholders (the " Meeting ") held today, shareholders approved the Company's previously announced acquisition by Consolidated Uranium Inc. ( TSXV: CUR, OTCQB: CURUF ) (" Consolidated Uranium ").

As previously announced on November 15, 2022 , the acquisition will be implemented by way of a plan of arrangement under the Business Corporations Act ( British Columbia ) involving, among others, the Company and Consolidated Uranium (the " Arrangement "). Under the terms of the Arrangement, Virginia Energy shareholders will receive 0.26 (the " Exchange Ratio ") of a common share of Consolidated Uranium (each whole share, a " CUR Share ") for each common share of Virginia Energy (each, a " Virginia Energy Share ") held (the " Consideration "). Outstanding Virginia Energy stock options will be exchanged for replacement options to acquire CUR Shares adjusted based on the Exchange Ratio and outstanding Virginia Energy restricted share units (each, an " RSU ") will vest and be settled for Virginia Energy Shares and then be exchanged for the Consideration under the Arrangement.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Cosa Resources Acquires Extension to Ursa Uranium Property

Cosa Resources Acquires Extension to Ursa Uranium Property

(TheNewswire)

Cosa Resources Corp.

Cosa Resources Corp. (CSE:COSA) (" Cosa Resources " or the "Company") is pleased to announce it has acquired an additional 41,119 ha of highly prospective uranium exploration ground along the Cable Bay Shear Zone in the Eastern Athabasca Basin of Northern Saskatchewan.  The newly acquired claims are contiguous with the Company's Ursa property ("Ursa" or the "Property"), which now boasts over 60 km of strike length and 57,000 ha of coverage over the Cable Bay Shear Zone, a large and fertile structural corridor with known uranium occurrences. Historical drilling on the newly acquired claims has intersected anomalous uranium mineralization that was never adequately followed up, with the vast majority of the corridor completely untested.  The additional claims were acquired via low-cost staking and cash consideration paid to an arm's-length property vendor, with total acquisition costs of approximately $53,000

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
CanAlaska Acquires New Project Along Prolific Mineralized Corridor In Eastern Athabasca Basin

CanAlaska Acquires New Project Along Prolific Mineralized Corridor In Eastern Athabasca Basin

25 Kilometres of Roughrider Mineralized Corridor Staked

Highly Anomalous Lake Sediment Sample Identified

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Purepoint Uranium Begins Drill Program at Red Willow

Purepoint Uranium Begins Drill Program at Red Willow

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the commencement of drilling at its 100%-owned Red Willow project within the eastern uranium mine district of the Athabasca Basin, Saskatchewan, Canada.

"At our Osprey Zone and the nearby Radon Lake Zone, we are continuing to follow-up on significant uranium signatures identified across much greater strike length than we typically see elsewhere," said Chris Frostad, President and CEO of Purepoint. "We anticipate drilling numerous holes this winter since we are located on the shallow eastern edge of the Athabasca Basin and our target depths are less than 200 metres."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Purepoint Uranium Begins Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Begins Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today that drilling has commenced at the Hook Lake Joint Venture located on the southwestern edge of Canada's Athabasca Basin. The Hook Lake Project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and lies on trend with high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

"Our drill program will test numerous electromagnetic targets along the Carter Corridor where we are anxious to see how results compare to the neighbouring Patterson Corridor," said Chris Frostad, President and CEO of Purepoint. "It will be a busy winter for us with our second drill program starting soon on the Eastern side of the Basin."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Drilling Resumes at Forum's Wollaston Uranium Project

Drilling Resumes at Forum's Wollaston Uranium Project

Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) ("Forum" or "the Company") is pleased to announce that drilling has resumed after the Christmas break on its 100% owned Wollaston uranium project, located 10km south of Cameco's Rabbit Lake Uranium Mill and 30km south of OranoDenison's McClean Lake Uranium Mill in the Northeastern Athabasca Basin (Figure 1). Three holes were completed in December totaling 855.5 metres and 95 samples were collected for geochemical analysis at SRC Geoanalytical Laboratories in Saskatoon, Saskatchewan. Forum has budgeted for a further 3000 metres to be drilled during this drill campaign.

Gravity crews are on site to conduct surveys over priority targets identified by an airborne time domain electromagnetic survey completed last year (Figure 2). Approximately 3700 gravity stations are to be collected over the main conductive trends at a 100x100m station spacing.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×