eldona

Magna Mining Announces Winter Exploration Program at the Shakespeare Project and Results of Recent Borehole Electromagnetic Survey

Program to Focus on Follow-Up Drilling at the P-4 Discovery and Near Surface Copper Mineralization at the Past Producing Spanish River Copper Mine

Magna Mining Inc. (TSXV: NICU) ("Magna" or the "Company") is pleased to announce that following the completion of a $3.14 million flow through financing on Nov 3rd, the next phase of exploration at the Shakespeare Ni-Cu-PGM Project will commence in early January. The initial winter exploration program will consist of 4,500m of drilling, which will target the new P-4 nickel discovery and the past producing Spanish River Copper Mine. The P-4 Discovery and Spanish River Copper Mine are both located approximately 5 km from the Shakespeare Mine and could potentially represent satellite deposits to feed a future mill at Shakespeare. Magna has secured a diamond drilling contractor to commence drilling in early January 2022.

A borehole electromagnetic (EM) survey was recently completed which extends the electromagnetic anomaly 230 m below the deepest mineralized intersection. The interpreted EM plate is electromagnetically open at depth and the data indicates that conductivity is increasing at depth. The higher conductivity could be attributed to higher concentration of sulphides, thicker width or both. The surveys were completed on holes MP4-21-01 and MP4-21-02, which were the P-4 nickel discovery holes as reported on September 14, 2021 (see News Release). The drill program in January will prioritize the testing of the depth extent of this EM plate, and also test the eastern EM plate (see Figures 1 and 2).

Jason Jessup, Chief Executive Officer of Magna, stated, "The results of these new downhole electromagnetic surveys at our P-4 discovery indicate that there is a conductive zone extending to depth, well below the mineralized intersections in the first discovery holes that we reported in September of this year. It is particularly encouraging to have the conductivity increasing at depth. We are prioritizing our drilling in January to test some significant step-outs from the previous drilling and see how big this system gets at depth and along strike. The EM survey results are exactly the sort of indications you would expect to see in semi-massive or massive sulphide nickel and copper discoveries in the Sudbury region."

The winter diamond drilling program will also aim to test new targets at the Spanish River Copper Mine, located approximately 1 km south of the P-4 Discovery (see Figure 3). Magna has the option to earn-in to 100% ownership on the 7 claims comprising the historic Spanish River Copper Mine. The proposed diamond drill program at Spanish River Copper is designed to test high conductance EM plates that have been modelled from surface EM surveys that were completed earlier this year. Zones of chalcopyrite dominated mineralization associated with a deformation corridor have been mapped on surface along a 300 m strike length (see Figure 3). The drilling that is now scheduled is believed to be the first diamond drilling program at this particular location in over 50 years.

Jason Jessup added: "Our drilling at the P-4 target and early exploration work at the Spanish River Copper Mine comprise the first significant regional exploration program outside the Shakespeare mine site in over 15 years. Our early exploration successes support our thesis that our 180km2 exploration land package surrounding the Shakespeare Mine is high prospective for nickel and copper discoveries. Ultimately, we believe that new regional discoveries such as P-4 point to the potential for Magna to build a hub and spoke production model with our already permitted Shakespeare Mine as the core to the operation."

2021 Shakespeare Project Drilling Results Update

Magna is awaiting approximately 550 assay results from 11 drill holes from our 2021 program, including 3 holes from the Gap Zone area. It is anticipated that all assays will be received by mid-January.



Figure 1: Simplified longitudinal section looking NW showing high conductance EM plates and exploration potential along the strike (for location see Figure 3)

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/8002/105968_a2a19f18b459aa1b_002full.jpg



Figure 2: Simplified interpreted cross section showing lithologies and BHEM plate (for location see Fig. 1 & 3)

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/8002/105968_a2a19f18b459aa1b_007full.jpg



Figure 3: Map of Spanish River Copper Mine exploration target showing lithologies, deformation corridor and relationship to P-4 Discovery

To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/8002/105968_a2a19f18b459aa1b_008full.jpg

Qualified Person

The technical information in this press release has been reviewed and approved by Mynyr Hoxha, Ph.D., P.Geo., the Company's Vice President of Exploration. Dr. Hoxha is a qualified person under Canadian National Instrument 43-101.

About Magna Mining Inc.

Magna Mining is an exploration and development company focused on nickel, copper and PGM projects in the Sudbury Region of Ontario, Canada. The Company's flagship asset is the past producing Shakespeare Mine which has major permits for the construction of a 4500 tonne per day open pit mine, processing plant and tailings storage facility and is surrounded by a contiguous 180km2 prospective land package. Additional information about the Company is available on SEDAR (www.sedar.com) and on the Company's website (www.magnamining.com).

For further information, please contact:
Jason Jessup
Chief Executive Officer
or
Paul Fowler, CFA
Senior Vice President
Email: info@magnamining.com

Cautionary Statement

This press release contains certain forward-looking information or forward-looking statements as defined in applicable securities laws. Forward-looking statements are not historical facts and are subject to several risks and uncertainties beyond the Company's control, including statements regarding plans to complete exploration programs, potential mineralization, exploration results and statements regarding beliefs, plans, expectations or intentions of the Company. Resource exploration and development is highly speculative, characterized by several significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. All forward-looking statements herein are qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements whether as a result of new information or future events or otherwise, except as may be required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/105968

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Empire Metals

Empire Metals Limited Announces Drilling Outlines Large, High-Grade Zone

Empire Metals Limited, theAIM-quoted and OTCQB-tradedexploration and development company,is pleased to report outstanding assay results from its latest drilling campaign at the Pitfield Project in Western Australia ('Pitfield' or the 'Project'). This programme, focused on the in-situ weathered cap at the Thomas Prospect, has delivered some of the highest titanium dioxide ('TiO₂') grades recorded to date and will underpin the Company's maiden JORC-compliant Mineral Resource Estimate ('MRE').

Highlights

Keep reading...Show less
 Adam Woolridge, CEO of Cobre.

Cobre Unveils Maiden Resource at Comet, Targets Low-cost In-situ Copper Recovery

Highlighting the first mineral resource estimate (MRE) at Comet within the Ngami copper project in Botswana, Cobre (ASX:CBE) CEO Adam Woolridge outlines a path toward low-cost, scalable in-situ copper recovery, backed by significant exploration upside.

“You're looking at an exploration target of 200 million to 300 million tonnes at around 0.4 percent copper,” Woolridge said.

“When you start looking at this as an in-situ copper recovery process, you have really good grade continuity. And this has been reflected in the MRE. And it's also come out from just looking at this deposit from a geometry point of view — it's got a really simple geometry, a lot of great continuity, and it's been relatively cost effective to move each tonne of contained copper into category.”

Keep reading...Show less
"Welcome to Arizona" sign with sunburst design against a blue sky background.

Hudbay Secures US$600 Million Mitsubishi Partnership for Arizona Copper Project

Hudbay Minerals (TSX:HBM,NYSE:HBM) has struck a US$600 million deal with automobile giant Mitsubishi (TSE:8058) for a 30 percent stake in its Copper World project in Arizona, marking one of the largest foreign investments in the US copper sector in recent years.

Announced Tuesday (August 12), the agreement will see Mitsubishi pay US$420 million on closing and a further US$180 million within 18 months.Mitsubishi will also fund its 30 percent share of future capital contributions as the mine moves toward full construction.

Keep reading...Show less
Copper bars with weight stamps, stock market chart background.

What Was the Highest Price for Copper?

Strong demand in the face of looming supply shortages has pushed copper to new heights in recent years.

With a wide range of applications in nearly every sector, copper is by far the most industrious of the base metals. In fact, for decades, the copper price has been a key indicator of global economic health, earning the red metal the moniker “Dr. Copper.” Rising prices tend to signal a strong global economy, while a significant longer-term drop in the price of copper is often a symptom of economic instability.

After bottoming out at US$2.17 per pound, or US$5,203.58 per metric ton (MT), in mid-March 2020, copper has largely been on an upward trajectory.

Keep reading...Show less
Map of Argentina with the Chilean flag placed in central Argentina.

Codelco Seeks Partial Restart at El Teniente Mine After Fatal Collapse

Chile’s state-owned copper giant Codelco is seeking approval to restart parts of its flagship El Teniente mine less than a week after a deadly collapse killed six workers and forced a full suspension of operations, according to sources familiar with the matter.

The accident, triggered by a 4.2-magnitude seismic event last Thursday (July 31), halted production at the world’s largest underground copper mine.

Keep reading...Show less
Smartphone with Anglo American logo on screen in front of a laptop showing a stock chart.

Anglo American’s Losses Widen with Diamond Slump, Trade Tensions Mounting

Anglo American (LSE:AAL,OTC Pink:AAUKF) reported a sharp US$1.9 billion net loss for the first half of 2025, deepening from US$672 million a year earlier, as the global miner pushed forward with a sweeping corporate overhaul aimed at focusing on copper and iron ore.

The London-based group’s latest results saw revenue dropping by 7 percent year-on-year to US$8.95 billion, falling short of analyst expectations, while underlying EBITDA fell 20 percent to US$3 billion.

“By focusing on our exceptional copper, premium iron ore and crop nutrients resource endowments, each with significant value-accretive growth options, we are unlocking material value for our shareholders,” Chief Executive Duncan Wanblad assured in the company’s recent performance report.

Keep reading...Show less

Latest Press Releases

Related News

×