TSXV:FWZ

Fireweed Intersects 4.42% Zinc over 212.70 m Including 25.58% Zinc over 5.81 m at Boundary Zone

Fireweed Zinc LTD. ("Fireweed") (TSXV: FWZ) is pleased to announce the first results from the 2020 drilling at the Macmillan Pass Project in Yukon, Canada. These results are from Boundary Zone, located 15 road kilometres west of the Tom-Jason deposits (see Map 1).

Highlights

  • Significant assays over wide sections have been received from the first two diamond drill holes, NB20-001 and NB20-002, drilled in the central Boundary Zone area.
  • Hole NB20-002 intersected 4.42% Zinc, 0.08% Lead and 10.7 g/t Silver over 212.70 m, including 25.58% Zinc, 0.14% Lead and 44.0 g/t Silver over 5.81 m.
  • Hole NB20-001 intersected 2.60% Zinc, 0.06% Lead and 5.9 g/t Silver over 246.68 m from surface including 23.62% Zinc, 0.22% Lead and 53.7 g/t Silver over 4.95 m.
  • Assays from other holes including the new discovery at Boundary Zone West are pending.


Table 1: Highlights of initial 2020 results from central Boundary Zone (length and density weighted average assays).

Drill Hole From (m) To (m) Interval (m) Zinc (%) Lead (%) Silver (g/t) Bulk Density (t/m 3 )
NB20-001 2.20 248.88 246.68 2.60 0.06 5.9 2.96
>including 4.87 7.00 2.13 10.09 0.02 7.7 3.05
>and 47.74 49.74 2.00 12.08 0.02 10.5 3.33
>and 57.76 58.73 0.97 32.40 0.09 42.0 3.20
>and 74.99 77.00 2.01 10.41 0.01 6.6 3.00
>and 136.15 173.00 36.85 6.75 0.04 14.9 2.89
>>including 136.15 141.10 4.95 23.62 0.22 53.7 3.15
>>and 149.05 150.20 1.15 17.57 0.08 36.1 3.18
>>and 156.42 157.70 1.28 14.96 0.01 26.4 2.95
>>and 171.00 173.00 2.00 10.63 0.05 27.3 2.84
NB20-002 48.30 261.00 212.70 4.42 0.08 10.7 2.87
>including 48.30 52.00 3.70 12.05 0.10 15.1 3.54
>and 70.16 76.00 5.84 15.49 0.06 31.7 3.16
>and 153.00 192.55 39.55 7.69 0.26 24.5 2.87
>>including 160.00 171.00 11.00 11.46 0.25 33.7 2.89
>>and 189.84 192.55 2.71 39.46 1.07 120.5 3.41
>including 204.00 205.00 1.00 8.49 0.24 25.1 2.90
and 227.00 260.00 33.00 8.38 0.04 14.7 2.88
>including 228.19 234.00 5.81 25.58 0.14 44.0 3.15
>and 239.00 250.00 11.00 8.20 0.01 14.2 2.87

CEO Statement
Brandon Macdonald, CEO, stated "These first assays have been a long time coming due to slow turn around at the lab while they operate under COVID-19 limitations. The assays reported here are from the first two holes drilled in the central Boundary Zone area in 2020. We are pleased to see more good grades extending this wide zone of mineralization with very high-grade sections to depth in the central Boundary Zone area. Overall a belated but great start to the 2020 drill assays."

2020 Drill Results
The 2020 drill program was completed in October, but these are the first assays to be announced due to slow turn around at the lab operating under COVID-19 limitations. Infill and step-out drilling at Boundary Zone (Map 2) has successfully encountered wide zones of zinc-lead mineralization, significantly expanding the extent of the known mineralization. Drill hole NB20-002, reported in this news release, was drilled obliquely, and in the opposite direction to previous drilling and extends central Boundary Zone 150 m beyond previously drilled mineralization in this direction. This 150 m extension includes high-grade zinc mineralization, such as the 33 m intersection of 8.38% Zinc (227-260 m) that includes 5.81 m of 25.58% Zinc (Table 1). Central Boundary Zone now extends from surface down to 300 m. The zone remains open at depth as hole NB20-002 was terminated in mineralization due to drilling difficulties and would otherwise have been drilled deeper.

At central Boundary Zone, Fireweed drill holes from 2020 (NB20-001 and NB20-002), and 2019 (NB19-001 and NB19-002) were all drilled at different azimuths or dips (see Map 2 and Section 1) to test whether vein orientations are biasing grades in drill holes oriented near-parallel to the veins. Consistent average zinc grades throughout all four holes suggest that there is not a significant grade bias that is dependent on drill orientation and that the mineralization comprises an approximately 230-250 m thick stratabound sequence with vein stockworks, breccias and replacement-style zinc mineralization. True widths of individual cm- to m-scale veins intersected in NB20-001 and NB20-002 vary greatly from 20% to 95% of intersected thicknesses but the overall true thickness of central Boundary Zone is 230-250 m.

A total of nine holes were drilled at Boundary Zone this season for 2,948 m (Map 2 and Table 4). Additional 2020 drill holes targeted a ground-gravity high anomaly surveyed in 2020 and resulted in the discovery of new wide sections of pyrite-sphalerite-galena mineralization, extending Boundary Zone at least 360 m to the west in a new discovery named Boundary Zone West. Assays for the discovery holes at Boundary Zone West are pending and descriptions of all holes drilled in the 2020 season are in Table 5.

Boundary Zone Potential
There is no mineral resource for Boundary Zone yet and the zone is not included in the current mineral resource estimate for the property (described in Fireweed news release dated January 10, 2018). Boundary Zone has potential to be mined in an open pit with a low strip ratio and to be upgraded through low cost, preconcentration ore sorting processes (see Fireweed news release dated July 31, 2019). Recent drill results at Boundary Zone along with Tom North Zone and End Zone (see Fireweed news releases dated August 20 and September 10, 2019, and November 15 and 29, 2018) represent potential for expansion of the large current mineral resources and improvement of Macmillan Pass project economics described in the current Preliminary Economic Assessment( PEA) (see Fireweed news release dated May 23, 2018).

Boundary Zone Background
Boundary Zone mineralization consists of sphalerite-siderite-pyrite and minor galena in veins, stockworks, disseminations, and as replacement of matrix and clasts within coarse clastic rocks. Drilling in 2020 at Boundary Zone West also identified stratiform mineralized sequences similar to the Tom and Jason deposits (see news release dated November 24, 2020).

Historical exploration work at Boundary Zone included geochemical and geophysical surveys as well as 24 drill holes that defined a central 200 x 800 m mineralized zone of zinc (-lead-silver) mineralization within a broader system over 2 km in strike length. Historical length-weighted average intersections 1 such as 224.0 m of 2.50% zinc and 0.30% lead, including 4.5 m of 16.40% zinc, are consistent with recent Fireweed drilling and demonstrated potential for bulk tonnage open pit mineralization.

In 2019, Fireweed drilled two holes into the central part of the known Boundary Zone mineralization. Both holes intersected wide zones of high-grade replacement-style and vein- and breccia-hosted zinc mineralization, including 100.0 m (true width) of 8.73% zinc from surface including 6.4 m of 43.53% zinc within 230.0 m of 4.51% zinc (see Tables 6A, 6B and Fireweed news release dated November 5 th , 2019).

Notes on sampling, assaying, and data aggregation:

The diamond drill core logging and sampling program was carried out under a rigorous quality assurance / quality control program using industry best practices. Drill intersections in this release are all HQ3 (split tube) size core (61.1mm / 2.4-inch diameter) with recoveries typically above 85%. After drilling, core was logged for geology, structure and geotechnical characteristics, marked for sampling, and photographed on site. The cores for analyses were marked for sampling based on geological intervals with individual samples 1.5 metres or less in length. Drill core from the Boundary Zone was cut lengthwise in half with a core saw; half-core was sent for assays reported in this news release, and the other half is stored on site for reference. Bulk density was determined on site for the entire length of each sample assayed by measurement of mass in air and mass in water. Sample duplicate bulk density determinations and in-house bulk density standard determinations were each made at a rate of 5%. Since 2017, four in-house bulk density standards (mineralized drill core from the Tom deposit that span a range of densities) have been used and show an acceptable long-term precision. Certified standard masses are used to calibrate the scale balance used for bulk density determinations.

A total of 5% assay standards or blanks and 5% core duplicates are included in the sample stream as a quality control measure and are reviewed after analyses are received. Standards and blanks in 2020 drill results to date have been approved as acceptable. Duplicate data add to the long-term estimates of precision for assay data on the project and precision for drill results reported is deemed to be within acceptable levels. Samples were sent to the Bureau Veritas preparation laboratory in Whitehorse, Yukon, where the samples were crushed and a 500 g split was sent to the Bureau Veritas laboratory in Vancouver, B.C to be pulverized to 85% passing 200 mesh size pulps. Clean crush material was passed through the crusher and clean silica was pulverized between each sample. The pulps were analyzed by 1:1:1 Aqua Regia digestion followed by Inductively Coupled Plasma Mass Spectrometry (ICP-ES/ICP-MS) multi-element analyses (BV Code AQ270). All samples were also analyzed for multiple elements by lithium borate fusion and Xray fluorescence analysis (XRF) finish (BV Code LF725). Over-limit Pb (>25.0%) and Zn (>24.0%) were analyzed by lithium borate fusion with XRF finish (BV Code LF726). Silver is reported in this news release by method AQ270, and zinc and lead are reported by LF725 or LF726. Bureau Veritas (Vancouver) is an independent, international ISO/IEC 17025:2005 accredited laboratory.

Results in this news release are length and bulk-density weighted averages as would be used in a Mineral Resource estimate. Readers are cautioned that in Fireweed news releases in prior years, only length weighted assay averages were reported which may result in slightly lower (under reported) average values. To allow comparison of 2019 Boundary Zone drilling with 2020 results, 2019 intersections from holes NB19-001 and NB19-002 have been re-stated in Tables 6A and 6B as length and bulk-density weighted averages (originally reported in Fireweed news releases dated 16 th October and 5 th November 2019). Length and bulk-density weighted averages have been reported as these most accurately represent the average metal-content of the intersections.

Qualified Person Statement
Technical information in this news release has been approved by Gilles Dessureau, P.Geo, Vice President Exploration and a ‘Qualified Person' as defined under Canadian National Instrument 43101.

About Fireweed Zinc Ltd. (TSXV: FWZ): Fireweed Zinc is a public mineral exploration company focused on zinc and managed by a veteran team of mining industry professionals. The Company is advancing its district-scale 940 km 2 Macmillan Pass Project in Yukon, Canada, which is host to the 100% owned Tom and Jason zinc-lead-silver deposits with current Mineral Resources and a PEA economic study (see Fireweed news releases dated January 10, 2018, and May 23, 2018, respectively, and reports filed on www.sedar.com for details) as well as the Boundary Zone, Tom North Zone and End Zone which have significant zinc-lead-silver mineralization drilled but not yet classified as mineral resources. The project also includes large blocks of adjacent claims (MAC, MC, MP, Jerry, BR, NS, Oro, Sol, Ben, and Stump) which cover exploration targets in the district where previous and recent work identified zinc, lead and silver prospects, and geophysical and geochemical anomalies in prospective host geology.

Additional information about Fireweed Zinc and its Macmillan Pass Zinc Project including maps and drill sections can be found on the Company's website at www.FireweedZinc.com and at www.sedar.com .

ON BEHALF OF Fireweed Zinc LTD.

" Brandon Macdonald "

CEO & Director

Contact:
Brandon Macdonald
Phone: 604-646-8361

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements
This news release may contain "forward-looking" statements and information relating to the Company and the Macmillan Pass Project that are based on the beliefs of Company management, as well as assumptions made by and information currently available to Company management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, general economic conditions, changes in financial markets, the ability to properly and efficiently staff the Company's operations, the sufficiency of working capital and funding for continued operations, title matters, First Nations relations, operating hazards, political and economic factors, competitive factors, metal prices, relationships with vendors and strategic partners, governmental regulations and oversight, permitting, seasonality and weather, technological change, industry practices, and one-time events. Additional risks are set out in the Company's prospectus dated May 9, 2017, and filed under the Company's profile on SEDAR at www.sedar.com . Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.

Footnotes:

  1. Historic results for the Boundary Zone reported in this news release are taken from historic reports prepared by previous operators. Neither the Company or the Qualified Person has done sufficient work to verify these results and therefore these results should not be relied upon. The Company is including them for information purposes to explain the basis for the exploration target and reasons for drilling.


Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/06f98a10-3cdf-40a9-93a6-1f28eb4c331d

https://www.globenewswire.com/NewsRoom/AttachmentNg/a348cbb7-ae75-44af-a43f-1332010bcc5c

https://www.globenewswire.com/NewsRoom/AttachmentNg/375b0cc2-762a-4336-b623-dd77c55e051e


Table 2: Boundary Zone drill hole NB20-001 detailed results.

Drill Hole From (m) To (m) Interval (m) Zinc (%) Lead (%) Silver (g/t) Bulk Density (t/m3)
NB20-001 2.20 248.88 246.68 2.60 0.06 5.9 2.96
>including 4.87 174.00 169.13 3.13 0.02 5.9 2.97
>>including 4.87 7.00 2.13 10.09 0.02 7.7 3.05
>>and 47.74 49.74 2.00 12.08 0.02 10.5 3.33
>>and 57.76 58.73 0.97 32.40 0.09 42.0 3.20
>>and 74.99 77.00 2.01 10.41 0.01 6.6 3.00
>>and 82.48 83.38 0.90 10.26 0.02 14.2 2.82
>>and 136.15 173.00 36.85 6.75 0.04 14.9 2.89
>>>including 136.15 141.10 4.95 23.62 0.22 53.7 3.15
>>>and 149.05 150.20 1.15 17.57 0.08 36.1 3.18
>>>and 156.42 157.70 1.28 14.96 0.01 26.4 2.95
>>>and 166.00 167.00 1.00 10.58 0.04 24.5 2.73
>>>and 171.00 173.00 2.00 10.63 0.05 27.3 2.84
>and 174.00 202.40 28.40 0.50 0.02 1.7 2.77
>and 202.40 220.00 17.60 2.02 0.21 11.1 3.06
>and 220.00 233.00 13.00 0.56 0.41 7.5 3.11
>and 233.00 248.88 15.88 3.07 0.09 6.5 3.01
268.54 278.25 9.71 1.63 0.14 4.6 3.00


Table 3: Boundary Zone drill hole NB20-002 detailed results.

Drill Hole From (m) To (m) Interval (m) Zinc (%) Lead (%) Silver (g/t) Bulk Density (t/m3)
NB20-002 48.30 261.00 212.70 4.42 0.08 10.7 2.87
>including 48.30 192.55 144.25 4.38 0.10 11.6 2.90
>>including 48.30 52.00 3.70 12.05 0.10 15.1 3.54
>>and 70.16 76.00 5.84 15.49 0.06 31.7 3.16
>>and 153.00 192.55 39.55 7.69 0.26 24.5 2.87
>>>including 160.00 171.00 11.00 11.46 0.25 33.7 2.89
>>>and 189.84 192.55 2.71 39.46 1.07 120.5 3.41
>and 192.55 227.00 34.45 0.72 0.02 3.0 2.77
>>including 204.00 205.00 1.00 8.49 0.24 25.1 2.90
>and 227.00 260.00 33.00 8.38 0.04 14.7 2.88
>>including 228.19 234.00 5.81 25.58 0.14 44.0 3.15
>>and 239.00 250.00 11.00 8.20 0.01 14.2 2.87
277.00 309.00 32.00 1.72 0.01 1.8 2.89
>including 282.00 283.00 1.00 5.98 0.001 3.8 2.97
>and 293.00 296.00 3.00 4.26 0.002 4.4 2.98
>and 304.00 307.00 3.00 4.12 0.003 1.5 2.92


Table 4: 2020 drill hole collar data.

Diamond Drill Hole Collars

Drill Hole Length (m) Zone Easting* Northing* Elevation (m) Dip (°) Grid Azimuth (°)
NB20-001 303.5 Boundary Zone 422440 7010418 1164 -54 270
NB20-002 320.0 Boundary Zone 422336 7010329 1132 -50 020
NB20-003 152.0 Boundary Zone 421557 7010456 1200 -50 185
NB20-004 333.0 Boundary Zone 422049 7010614 1218 -50 215
NB20-005 143.0 Boundary Zone 422277 7010313 1129 -50 215
NB20-006 203.0 Boundary Zone 422277 7010313 1129 -80 215
NB20-007 90.0 Boundary Zone 421951 7010538 1200 -70 215
NB20-008 324.0 Boundary Zone 422216 7010354 1139 -50 215
NB20-009 447.2 Boundary Zone 421951 7010538 1200 -75 215
MP20-001 632.0 240 Mile 438698 7003094 1311 -60 295

*UTM Zone 9 NAD83


Reverse Circulation (RC) Drill Hole Collars

Drill Hole Length (m) Zone Easting* Northing* Elevation (m) Dip (°) Grid Azimuth (°)
TRC20-001 7.6 Tom West 442065 7003667 1547 -50 066
TRC20-002 82.3 Tom West 442071 7003663 1547 -80 066
TRC20-003 64.0 Tom West 442071 7003663 1547 -55 066
TRC20-004 64.0 Tom West 442071 7003663 1547 -70 089
TRC20-005 47.2 Tom West 442071 7003663 1547 -55 129
TRC20-006 36.6 Tom West 442049 7003678 1545 -80 065
TRC20-007 98.45 Tom North 441654 7004507 1422 -51 076
JRC20-001 47.24 Jason Main 436437 7002774 1298 -50 027
JRC20-002 59.44 Jason Main 436533 7002772 1300 -65 011

*UTM Zone 9 NAD83


Table 5: 2020 drill hole results and observations.
Diamond Drill Hole Descriptions – assays pending where noted.

Drill Hole Length (m) Zone Target Results and Observations
NB20-001 303.5 Boundary Zone BZ core infill Wide zone encountered. Results reported in this news release.
NB20-002 320.0 Boundary Zone BZ core infill/step-out Wide zone encountered. Hole abandoned at 320 m in mineralization due to drilling problems. Results reported in this news release.
NB20-003 152.0 Boundary Zone Gravity high anomaly ~800 m west of BZ No significant mineralization. Gravity anomaly explained by dense sedimentary rock unit
NB20-004 333.0 Boundary Zone Gravity high anomaly 360 m west of BZ Wide zone encountered. Assays pending.
NB20-005 143.0 Boundary Zone BZ step-out to south No significant mineralization.
NB20-006 203.0 Boundary Zone BZ step-out to south Minor mineralization encountered.
NB20-007 90.0 Boundary Zone Gravity high 360 m W of BZ Hole abandoned due to drilling problems and re-drilled as NB20-009.
NB20-008 324.0 Boundary Zone Gravity high anomaly 200 m west of BZ and step-out 80 m west of previous drilling Wide zone encountered. Assays pending.
NB20-009 447.2 Boundary Zone Gravity high anomaly 360 m W of BZ Wide zone encountered. Assays pending.
MP20-001 632.0 240 Mile Target Gravity high anomaly between the Tom and Jason deposits Hole suspended before reaching target horizon; casing left in place to allow resumption of drilling next season.


Reverse Circulation (RC) Drill Hole Descriptions – assays pending.

Drill Hole Length (m) Zone Target Results and Observations
TRC20-001 7.6 Tom West Infill Hole abandoned at casing due to drilling problems
TRC20-002 82.3 Tom West Infill Tom West zone intersected. Assays pending.
TRC20-003 64.0 Tom West Infill Tom West zone intersected Assays pending.
TRC20-004 64.0 Tom West Twin of historic hole Successful twin with good recovery. Assays pending.
TRC20-005 47.2 Tom West Step-out Hole abandoned before target depth due to drilling problems
TRC20-006 36.6 Tom West Infill Hole abandoned before target depth due to drilling problems
TRC20-007 98.45 Tom North Infill Tom North zone intersected. Assays pending.
JRC20-001 47.24 Jason Main Infill Jason Main zone intersected. Assays pending.
JRC20-002 59.44 Jason Main Infill Jason Main zone intersected. Hole abandoned in mineralization. Assays pending.


Table 6A: 2019 drill results from hole NB19-001 reported as length and bulk density weighted averages.

Drill Hole 3 From (m) To (m) Interval (m) Estimated True Width (m) Zinc (%) Lead (%) Silver (g/t) Bulk Density (t/m 3 )
NB19-001 6.00 278.45 272.45 230 3.72 0.47 13.1 3.08
>including 6.00 117.00 111.00 97.3 6.08 0.05 10.4 3.08
>>including 93.69 117.00 23.31 20.4 17.63 0.10 30.4 3.19
>>>including 93.69 98.54 4.85 4.3 31.94 0.14 39.6 3.49
>>>>including 94.84 95.85 1.01 0.9 47.70 0.21 50.2 3.57
>>>and 111.40 117.00 5.60 4.9 29.95 0.20 65.9 3.40
>>>>including 113.54 117.00 3.46 3.0 36.39 0.27 83.0 3.62
>and 226.20 238.05 11.85 Undetermined 9.37 4.91 77.0 3.43
>>including 230.30 236.00 5.70 Undetermined 12.13 7.92 118.3 3.45
>>>including 230.30 233.22 2.92 Undetermined 19.00 3.01 74.9 3.27
>>>and 233.88 236.00 2.12 Undetermined 6.34 15.07 190.4 3.84


Table 6B: 2019 drill results from hole NB19-002 reported as length and bulk density weighted averages.

Drill Hole From (m) To (m) Interval (m) Estimated True Width (m) Zinc (%) Lead (%) Silver (g/t) Bulk Density (t/m 3 )
NB19-002 8.00 330.00 322.00 230 4.51 0.33 10.6 3.07
>including 8.00 150.30 142.30 100 8.73 0.11 12.0 3.08
>>including 8.00 14.00 6.00 4.2 5.60 0.02 5.4 3.44
>>and 27.80 40.10 12.30 8.7 9.37 0.04 11.8 3.34
>>and 82.35 83.13 0.78 0.6 41.00 0.91 72.2 3.38
>>and 115.81 127.00 11.19 7.9 19.30 0.09 38.6 3.07
>>>including 115.81 116.19 0.38 0.3 31.60 0.06 44.8 3.29
>>>and 120.64 127.00 6.36 4.5 29.65 0.14 60.0 3.29
>>>>including 122.80 124.94 2.14 1.5 44.32 0.27 94.0 3.60
>and 139.35 148.42 9.07 6.4 43.53 0.72 42.5 3.79
>>including 140.48 142.52 2.04 1.4 55.18 1.81 79.4 3.42
>>and 145.65 146.53 0.88 0.6 61.67 0.20 61.2 3.93
>and 150.30 330.00 179.70 130 1.15 0.50 9.5 3.06
>>including 289.81 307.70 17.89 undetermined 3.16 1.92 31.2 3.59
>>>including 289.81 291.98 2.17 undetermined 6.30 4.97 73.0 4.24
>>and 304.65 307.70 3.05 undetermined 5.67 4.19 64.3 3.53



Primary Logo

News Provided by GlobeNewswire via QuoteMedia

Fireweed Metals

Fireweed Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Fireweed Metals (TSXV:FWZ)

Fireweed Metals


Keep reading...Show less
Ramp Metals Inc.  Opens the Market

Ramp Metals Inc. Opens the Market

Jordan Black Chief Executive Officer and Director, Ramp Metals Inc. (TSXV: RAMP) ("Ramp Metals" or the "Company"), and his team joined Omar Khafagy Manager, Corporate Access, Toronto Stock Exchange (TSX), to open the market and celebrate the Company's listing to TSX Venture Exchange (TSXV).

Ramp Metals is a battery and base metal exploration company with two flagship properties located in northern Saskatchewan and one property in Nye County, Nevada .

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/ramp-metals-inc-tsxv-ramp-opens-the-market-302127855.html

SOURCE Toronto Stock Exchange

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/25/c9697.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Canadian North Resources Inc. Reports Operational and Financial Results for the Year Ended December 31, 2023

Canadian North Resources Inc. Reports Operational and Financial Results for the Year Ended December 31, 2023

2023 Operational and Project Highlights:

  • The Company raised over $17 million for exploration, with cash and cash equivalents of $5,540,312 at the year end
  • Completed aggressive exploration programs with 21,126 meters in 47 holes drilled in 2023.
  • Adding results of 39,270 meters in 145 holes of new diamond drilling to the project database for the updated Mineral Resources estimation reported in Q1 2024, which includes:

    • A 172% increase of Indicated Mineral Resources to 66.1 million tonnes (Mt) containing 1,093 million pounds (Mlb) copper at 0.75%, 678Mlb nickel at 0.47%, 79Mlb cobalt at 0.05%, 2.34 million ounces (Moz) palladium at 1.10 g/t and 0.42Moz platinum at 0.19 g/t.
    • 80% of the Indicated Mineral Resources is Open Pit with 52.7Mt at 0.65% Cu, 0.43% Ni, 0.05% Co, 0.97g/t Pd and 0.17% Pt.
    • Inferred Mineral Resources of 25.9Mt containing 558Mlb copper at 0.98%, 333Mlb nickel at 0.58%, 40Mlb cobalt at 0.07%, 1.12Moz palladium at 1.43 g/t and 0.21Moz platinum at 0.25 g/t.

Canadian North Resources Inc. ("the Company", TSXV: CNRI; OTCQX: CNRSF; FSE: EO0 (E-O-zero)) is pleased to announce the operational and financial results for the year ended December 31, 2023.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Aston Bay Holdings Announces Non-Brokered Private Placement

Aston Bay Holdings Announces Non-Brokered Private Placement

(NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.)

Aston Bay Holdings Ltd. (TSX-V:BAY)(OTCQB:ATBHF) ("Aston Bay" or the "Company") is pleased to announce that it will conduct a non-brokered private placement (the "Offering"), subject to acceptance by the TSX Venture Exchange (the "Exchange"), for aggregate gross proceeds of up to $5,000,000. The Offering will consist of non-flow through units (the "Units") at a price of $0.12 per Unit (the "LIFE Offering"), and flow-through shares (the "FT Shares") at a price of $0.15 per FT Share

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Aston Bay Signs Definitive Agreement to Option the Epworth Sediment Hosted Copper-Silver-Zinc-Cobalt Project, Nunavut, Canada; Dr. Elizabeth Turner Joins Advisory Board

Aston Bay Signs Definitive Agreement to Option the Epworth Sediment Hosted Copper-Silver-Zinc-Cobalt Project, Nunavut, Canada; Dr. Elizabeth Turner Joins Advisory Board

Expanding Aston Bay's large-scale high-grade copper portfolio

Aston Bay Holdings Ltd. (TSX-V:BAY)(OTCQB:ATBHF) (the "Company" or "Aston Bay") is pleased to announce that on April 23, 2024, it entered into a definitive agreement (the "Agreement") with Emerald Geological Services ("EGS") pursuant to which it has been granted an option (the "Option") to acquire an undivided 80% beneficial interest in a property owned by EGS in Nunavut, Canada (the "Property") (see March 1, 2024 Aston Bay press release). In addition, the Company is excited to announce the appointment of Dr. Elizabeth Turner to the Company's Technical Advisory Board

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Atico Produces 3.34 Million Pounds of Cu and 2,156 Ounces of Au in First Quarter 2024

Atico Produces 3.34 Million Pounds of Cu and 2,156 Ounces of Au in First Quarter 2024

Atico Mining Corporation (the "Company" or "Atico") (TSX.V: ATY | OTCQX: ATCMF) announces its operating results for the three months ended March 31, 2024 from its El Roble mine. Production for the quarter totaled 3.34 million pounds of copper and 2,156 ounces of gold in concentrates, an increase of 44% for copper and a decrease of 16% for gold, respectively, over the same period in 2023.

"The El Roble mine operated in line with set expectations for this quarter as we improved on almost all metrics over the same period last year," said Fernando E. Ganoza, CEO. "For the remainder of the year, the team will be focused on optimizing production to take advantage of the higher metal price environment and to deliver on this year's set guidance. In parallel, we continue to drill new high-grade resources in the mine vicinity target areas. These new areas will be incorporated into our mine plan as well as the new resource update which is planned to be published imminently."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Canada Nickel Announces Exercise of Mann Property Option with Noble

Canada Nickel Announces Exercise of Mann Property Option with Noble

Highlights

  • Canada Nickel acquiring an 80% interest in Mann Property (~11,000 hectares)

  • Includes Mann Northwest, Central and Southeast properties that cover a combined 25 km strike length of nickel-bearing ultramafic rocks

  • Northwest and Central will advance to resource delineation programs while Southeast will be drilled for the first time, all during the 2024 exploration program

Canada Nickel Company Inc. (" Canada Nickel " or the " Company ") (TSXV: CNC) (OTCQX: CNIKF) is pleased to announce that it is exercising its option to acquire an 80% interest in the Mann Nickel Property from Noble Mineral Exploration Inc. ("Noble") as Canada Nickel consolidates its interests in bulk tonnage nickel projects east of Timmins, Ontario .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Fireweed Metals

Fireweed Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×