Diamond

Mountain Province Diamonds Completes Phase One Drilling For the Hearne Northwest Extension Discovery at Gahcho Kué Mine

TSX and OTCQX: MPVD

Mountain Province Diamonds Inc. ("Mountain Province", the "Company") (TSX: MPVD) (OTC: MPVD) is pleased to provide phase one drilling results for the discovery as reported in July 2022 of the Hearne Northwest Extension at Gahcho Kué Mine. The Hearne kimberlite is one of four kimberlites being mined at Gahcho Kué Mine, which is presently ranked as 4 th in the world by annual diamond production. Mountain Province is a 49% shareholder at Gahcho Kué with joint venture partner De Beers Canada as operators.

The Hearne Northwest Extension was first visually identified in late 2021, when kimberlite measuring 25 meters across in a bench face was exposed during routine mining operations. A discovery drilling program was subsequently launched with initial results reported earlier this year ( see news release, July 18, 2022 ). Ground-based geophysics initially suggested a west-northwest direction for the extension, but a northwest direction has been confirmed from the phase one drilling.

Phase one drilling of the Hearne Northwest Extension includes 16 drillholes totaling 5,040 meters. Ten of the sixteen drillholes have significant kimberlite intersections that have been used to model this large extension. Completion of the phase one drilling and subsequent modeling of the data suggests that a significant volume of kimberlite may be present.

Mark Wall , the Company's President and Chief Executive Officer commented:

"The latest results generated with our operating partner De Beers suggest that the Hearne Northwest Extension is a significant discovery, potentially equal in volume to the Hearne orebody as it was originally defined. As the extension is only in the exposed lower benches of the open pit and plunges to the northwest, an underground operation to recover this ore is a logical pursuit, and the Gahcho Kué joint venture is actively reviewing underground options for economic recovery of this material."

A summary of all drilling results for the Hearne Northwest Extension is provided below.




Kimerlite Intersect 1,2 (m)

Initial

End of

Drill Hole

Azimuth 2

Inclination 2

From

To

Length 1

Rock ID 2

Hole 2 (m)

MPV-22-568C

355

-58

85.42

171.24

85.82

TK

201

MPV-22-569C

35

-46

82.51

154.00

71.49

TK

184

MPV-22-570C

255

-46

36.84

89.80

52.96

TK

130

MPV-22-571C

195

-55

--

--

--

--

294

MPV-22-574C 3

94

-55

--

--

--

--

250

MPV-22-577C

67

-45

183.10

224.40

41.30

TK/HK

260

MPV-22-582C

205

-46

241.90

266.25

24.35

HK

333

MPV-22-583C 3

150

-49

--

--

--

--

203

MPV-22-584C

205

-55

261.75

330.00

68.25

TK

375

MPV-22-587C

230

-60

--

--

--

--

402

MPV-22-593C

221

-65

--

--

--

--

450

MPV-22-594C

40

-61

260.29

374.80

114.51

TK

405

MPV-22-595C

80

-64

407.00

476.28

69.28

TK/HK

512




487.60

502.26

14.66

HK


MPV-22-596C

70

-66

308.75

325.00

16.25

TK/HK

389




325.00

329.00

4.00

HK





329.00

331.77

2.77

TK


MPV-22-597C 4

100

-51

--

--

--

--

168 4

MPV-22-598C

100

-51

393.30

413.13

19.83

HK

484




413.13

456.00

42.87

TK


















1 Intersects are not true thicknesses. 2 Initial measurements and rock ID may change with further logging. 3 Targeted on geophysics west-northwest of the geological trend of the extension. 4 Terminated early due to technical problems. HK = hypabyssal kimberlite; TK = fragmental kimberlite; TK/HK = intervals of both HK and TK.

A plan view image showing drillhole locations and traces for the phase one drilling is provided in the first images. For clarity, the drillhole names summarized in the table are reduced to their three-digit identifiers in the plan image. The yellow dashed line on the right image is the approximate contact of the exposure in the Hearne open pit. The blue arrow indicates the 3D sectional view in the next image.

Mountain Province Diamonds Completes Phase One Drilling For the Hearne Northwest Extension Discovery at Gahcho Kué Mine - Image 1 (CNW Group/Mountain Province Diamonds Inc.)

A 3D sectional model looking northeast is provided in the second image, with brown shading indicating the Hearne pit as of September 2022 . On the image MPV-22-598C marked for reference to the plan image. The internal geology of Hearne before discovery of the Northwest Extension is shown in solid colors, with blue indicating hypabyssal kimberlite (HK) and yellow and green indicating fragmental kimberlite (TK). The Northwest Extension is conceptually modeled with the same colors in faded format and based on the limited drilling completed to date.

Note that the outer contacts and internal geology for the Northwest Extension are speculative at this time, and will be adjusted as more data are collected.

Further logging, petrography, mineral chemistry and microdiamond analysis is also underway to properly define the internal HK and TK lithologies in the extension and their relationship to the main Hearne kimberlite. A second phase of drilling will be required to define the volume and depth extent of the Northwest Extension and its economic viability for extraction by underground mining methods.

Mountain Province Diamonds Completes Phase One Drilling For the Hearne Northwest Extension Discovery at Gahcho Kué Mine - Image 2 (CNW Group/Mountain Province Diamonds Inc.)

About the Company

Mountain Province Diamonds is a 49% participant with De Beers Canada in the Gahcho Kué diamond mine located in Canada's Northwest Territories . The Gahcho Kué Joint Venture consists of several kimberlites that are actively being mined, developed, and explored for future development. The Company also controls over 113,000 hectares of highly prospective mineral claims and leases surrounding the Gahcho Kué Mine that include an Indicated mineral resource for the Kelvin kimberlite and Inferred mineral resources for the Faraday kimberlites. Kelvin is estimated to contain 13.62 million carats (Mct) in 8.50 million tonnes (Mt) at a grade of 1.60 carats/tonne and value of US$63 /carat. Faraday 2 is estimated to contain 5.45Mct in 2.07Mt at a grade of 2.63 carats/tonne and value of US$140 /ct. Faraday 1-3 is estimated to contain 1.90Mct in 1.87Mt at a grade of 1.04 carats/tonne and value of US$75 /carat. All resource estimations are based on a 1mm diamond size bottom cut-off.

For further information on Mountain Province Diamonds and to receive news releases by email, visit the Company's website at www.mountainprovince.com .

Qualified Person

The disclosure in this news release of scientific and technical information regarding Mountain Province's mineral properties has been reviewed and approved by Matthew MacPhail , P.Eng., MBA, and Tom E. McCandless , Ph.D., P.Geo., both employees of Mountain Province Diamonds and Qualified Persons as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects.

Caution Regarding Forward Looking Information

This news release contains certain "forward-looking statements" and "forward-looking information" under applicable Canadian and United States securities laws concerning the business, operations and financial performance and condition of Mountain Province Diamonds Inc. Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to operational hazards, including possible disruption due to pandemic such as COVID-19, its impact on travel, self-isolation protocols and business and operations, estimated production and mine life of the project of Mountain Province ; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; the future price of diamonds; the estimation of mineral reserves and resources; the ability to manage debt; capital expenditures; the ability to obtain permits for operations; liquidity; tax rates; and currency exchange rate fluctuations.  Except for statements of historical fact relating to Mountain Province , certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as "anticipates," "may," "can," "plans," "believes," "estimates," "expects," "projects," "targets," "intends," "likely," "will," "should," "to be", "potential" and other similar words, or statements that certain events or conditions "may", "should" or "will" occur.  Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements.  Many of these assumptions are based on factors and events that are not within the control of Mountain Province and there is no assurance they will prove to be correct.

Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include the development of operation hazards which could arise in relation to COVID-19, including, but not limited to protocols which may be adopted to reduce the spread of COVID-19 and any impact of such protocols on Mountain Province's business and operations, variations in ore grade or recovery rates, changes in market conditions, changes in project parameters, mine sequencing; production rates; cash flow; risks relating to the availability and timeliness of permitting and governmental approvals; supply of, and demand for, diamonds; fluctuating commodity prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated.

These factors are discussed in greater detail in Mountain Province's most recent Annual Information Form and in the most recent MD&A filed on SEDAR, which also provide additional general assumptions in connection with these statements. Mountain Province cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Mountain Province believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this news release should not be unduly relied upon. These statements speak only as of the date of this news release.

Although Mountain Province has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended.  There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Mountain Province undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered as the property is developed.

Further, Mountain Province may make changes to its business plans that could affect its results. The principal assets of Mountain Province are administered pursuant to a joint venture under which Mountain Province is not the operator. Mountain Province is exposed to actions taken or omissions made by the operator within its prerogative and/or determinations made by the joint venture under its terms. Such actions or omissions may impact the future performance of Mountain Province . Under its current note and revolving credit facilities Mountain Province is subject to certain limitations on its ability to pay dividends on common stock. The declaration of dividends is at the discretion of Mountain Province's Board of Directors, subject to the limitations under the Company's debt facilities, and will depend on Mountain Province's financial results, cash requirements, future prospects, and other factors deemed relevant by the Board

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/mountain-province-diamonds-completes-phase-one-drilling-for-the-hearne-northwest-extension-discovery-at-gahcho-kue-mine-301690660.html

SOURCE Mountain Province Diamonds Inc.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/November2022/30/c4934.html

News Provided by Canada Newswire via QuoteMedia

MPVD:CA,MPVDF

LUCARA 2022 YEAR END RESULTS TO BE RELEASED TUESDAY, FEBRUARY 21, 2023

TSX: LUC), (BSE: LUC), (Nasdaq Stockholm: LUC) Lucara Diamond Corp. ("Lucara" or the "Company") announces that it will be publishing its 2022 Year End Results on Tuesday, February 21, 2023 after market close in North America.

Please view PDF version.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

STAR DIAMOND CORPORATION ANNOUNCES FEBRUARY IS DIAMOND MONTH

TSX : DIAM

Star Diamond Corporation ("Star Diamond" or the "Company") is excited to announce that during the month of February, Star will be revealing each day on our social media platforms and website, one of the vast array of stunning diamonds recovered from the Fort à la Corne Project ("FALC").  Each diamond revealed will be named and the provenance of the stone will be disclosed.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

LUCARA DIAMOND CORP. ANNOUNCES 2023 RETAIL MARKETING ROADSHOW IN STOCKHOLM

 (TSX: LUC), (BSE: LUC), (NASDAQ STOCKHOLM: LUC) Lucara Diamond Corp. ("Lucara" or the "Company") is pleased to announce its 2023 marketing roadshow in Stockholm, Sweden . The Company is scheduled to host a retail investor presentation on Wednesday, February 1, 2023 at 6:00pm Central European Time at World Trade Center, Klarabergsviadukten 70 in Stockholm (Room: Casablanca ). View PDF version .

Please RSVP to reriksson@rive6.ch to confirm your attendance.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Mountain Province Diamonds Announces Fourth Quarter 2022 Production and Sales Results, and Guidance for 2023

TSX and OTC: MPVD

Mountain Province Diamonds Inc. ("Mountain Province", the "Company") (TSX: MPVD) (OTC: MPVD) today announces production and sales results for the fourth quarter ended December 31, 2022 ("the Quarter" or "Q4 2022") from the Gahcho Kué Diamond Mine ("GK Mine"). All figures are expressed in Canadian dollars unless otherwise noted.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

STAR DIAMOND CORPORATION ANNOUNCES ATTENDANCE AT 2023 PROSPECTORS & DEVELOPERS CONVENTION

TSX: DIAM

Star Diamond Corporation ("Star Diamond" or the "Company") is pleased to announce that the Company will be attending the 2023 Prospectors & Developers Association of Canada ("PDAC") Convention on March 5-8, 2023 in Toronto, Ontario Canada. Our technical team will be in attendance to discuss the Fort à la Corne Project ("FALC") and the diamonds that have been recovered from it, at Booth #2550.

Star Diamond Corporation Logo (CNW Group/Star Diamond Corporation)

In addition, on Monday, March 6, 2023 , for one day only our technical team, along with our Diamond Pricing Consultant, will be exhibiting a stunning display of high-quality diamonds that have been recovered from FALC at our PDAC booth. These stones will range from rough uncut diamonds through polished stones to finished jewelry product. The Company has recovered more than 160,000 individual diamonds to date from the Project and this is a great opportunity to see some of these attractive Saskatchewan diamonds up close.

About Star Diamond Corporation

Star Diamond is a Canadian-based corporation engaged in the acquisition, exploration and development of mineral properties. Shares of Star Diamond trade on the Toronto Stock Exchange under the trading symbol "DIAM". Star Diamond's most significant asset is its interest in the Fort à la Corne property in central Saskatchewan. These kimberlites are located in close proximity to established infrastructure, including paved highways and the electrical power grid, which provide significant advantages for future mine development.

Caution Regarding Forward-looking Statements

This press release contains "forward-looking statements" and/or "forward-looking information" (collectively, "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, are forward-looking statements. Forward-looking statements in this press release include, but are not limited to, Star Diamond's attendance and availability of diamonds to be exhibited at the 2023 PDAC.

These forward-looking statements are based on Star Diamond's current beliefs as well as assumptions made by and information currently available to Star Diamond and involve inherent risks and uncertainties, both general and specific. Risks exist that forward-looking statements will not be achieved due to a number of factors including, but not limited to, developments in world diamond markets, changes in diamond prices, risks relating to fluctuations in the Canadian dollar and other currencies relative to the US dollar, changes in exploration, development or mining plans due to exploration results and changing budget priorities of Rio Tinto or Star Diamond , the impact of changes in the laws and regulations regulating mining exploration, development, closure, judicial or regulatory judgments and legal proceedings, operational and infrastructure risks and the additional risks described in Star Diamond's most recently filed Annual Information Form, annual and interim MDA.

SOURCE Star Diamond Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/January2023/18/c0975.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

STAR DIAMOND CORPORATION MANAGEMENT CHANGES

TSX: DIAM

Star Diamond Corporation ("Star Diamond" or the "Company") announces today that, effective January 1, 2023 Ewan Mason will assume the role of Interim Chief Executive Officer of Star Diamond .  Mr. Mason has been a director of Star Diamond since September 2017 and also serves as Chair of the Board of the Company.  Mr. Mason is currently the owner of several private corporations and prior to this was a Managing Director at several mining investment banks both in Canada and abroad as well as an exploration geologist.  Mr. Mason has served as a director and chair of numerous mining and exploration companies.  His appointment as Interim Chief Executive Officer follows the previously announced retirement of Ken MacNeill as Star Diamond's President and Chief Executive Officer effective December 31, 2022 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×