Q1 2023 and Other Highlights

  • Revenues of $57.4 million, a 35% increase over Q1 2022, mainly due to greater sales quantities at a higher revenue per lb sold 1 ; Revenues per pound sold 1 of $9.14, a 5% increase over Q1 2022
  • Operating costs of $45.9 million vs. $29.0 million in Q1 2022, and cash operating costs excluding royalties per pound 1 of V 2 O 5 equivalent sold of $5.15 vs. $3.97 in Q1 2022
  • Net loss of $1.2 million vs. a net loss of $2.0 million in Q1 2022
  • Cash provided before working capital items of $8.2 million, a 42% increase over Q1 2022
  • In January 2023, the Company secured two debt facilities: a two-year debt facility of $15.0 million, bearing interest at 6.85% per annum with payments due quarterly and principal repayments starting after a grace period of 180 days, and a three-year debt facility of $10.0 million, bearing interest at 8.36% per annum with an initial fee of 0.70% and payments due semi-annually with principal repayments starting after a grace period of 360 days
  • Cash balance of $61.6 million, debt of $65.0 million and a net working capital 2 surplus of $119.3 million exiting Q1 2023
  • Total V 2 O 5 equivalent sales of 2,849 tonnes (including 245 tonnes of purchased material), a 28% increase over Q1 2022; V 2 O 5 production 2,111 tonnes (4.6 million lbs 3 ) vs. 2,441 tonnes (4.4 million lbs 3 ) in Q1 2022
  • The Company has adjusted its annual 2023 V 2 O 5 equivalent production guidance to 9,000 – 11,000 tonnes from 11,000 – 12,000 tonnes, its annual 2023 V 2 O 5 equivalent sales guidance to 8,700 – 10,700 tonnes from 10,300 – 11,300 tonnes and its cash operating cost excluding royalties per lb sold guidance to $4.85 – 5.65 from $4.85 – 5.25
  • Q1 2023 results conference call and webcast: Thursday, May 11th at 1:00 p.m. ET

Vanadium Market Update 4

  • Spot demand remained strong in Q1 2023, primarily due to higher-than-expected demand from the aerospace sector with demand in the energy storage market anticipated to increase in future quarters largely due to anticipated Chinese vanadium redox flow battery ("VRFB") deployments
  • The average benchmark price per pound of V 2 O 5 in Europe was $10.39 in Q1 2023, a 3% decrease from the average of $10.72 seen in Q1 2022; The average benchmark price per kg of ferrovanadium ("FeV") in Europe was $39.46 in Q1 2023, a 15% decrease from the average of $46.17 seen in Q1 2022, mainly due to lower spot demand from the steel sector in the quarter

Largo Inc. (" Largo " or the " Company ") ( TSX: LGO ) ( NASDAQ: LGO ) today released financial and operating results for the three months ended March 31, 2023. The Company reported quarterly vanadium pentoxide ("V 2 O 5 ") equivalent sales of 2,849 tonnes at a cash operating cost excluding royalties per pound 1 sold of $5.15.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20230510005606/en/

Largo Reports First Quarter 2023 Financial Results and Provides Update to 2023 Operational and Sales Outlook (Photo: Business Wire)

Largo Reports First Quarter 2023 Financial Results and Provides Update to 2023 Operational and Sales Outlook (Photo: Business Wire)

Daniel Tellechea, Interim CEO and Director of Largo, stated: "While first quarter results were in line with our annual 2023 guidance, we have revised our 2023 production, sales and cost guidance due to heavy rain in December causing the Company to delay its infill drilling campaign for 2023, which is required for further refinement of the Company's short-term mining model. Returning to normalized production levels remains the top priority for Largo as we work through this period of adjustment in our mining operations."

He continued: "However, we should not overlook the upcoming catalysts for the Company in 2023. We continued to progress with the construction of our ilmenite concentration plant during the first quarter and expect to complete construction in Q2 2023, with commissioning and ramp up following shortly thereafter. In addition, installation of our 6.1 megawatt-hour vanadium battery in Spain continued during Q1 2023 with final provisional acceptance scheduled for Q3 2023." He concluded: "As for the market, vanadium prices decreased approximately 6% in April 2023 as a result of lower short-term steel demand. Despite this, we believe vanadium's long-term and medium-term fundamentals remain strong, with considerable demand growth expected in the future from battery applications."

Financial Results

(thousands of U.S. dollars ($), except for basic (loss)
per share and diluted (loss) per share)

Three months ended

March 31, 2023

March 31, 2022

Revenues

57,421

42,688

Operating costs

(45,931)

(28,958)

Direct mine and production costs

(28,419)

(17,560)

Net income before tax

715

814

Income tax (expense)

(333)

(602)

Deferred income tax (expense)

(1,589)

(2,166)

Net (loss)

(1,207)

(1,954)

Basic (loss) per share

($0.02)

($0.03)

Diluted (loss) per share

($0.02)

($0.03)

Cash provided before working capital items

8,150

$5,751

Net cash provided by (used in) operating activities

4,953

(4,050)

Net cash provided by financing activities

25,305

385

Net cash (used in) investing activities

(23,406)

(4,268)

Net change in cash

7,104

(5,396)

As at

March 31,
2023

December 31,
2022

Cash

61,575

54,471

Debt

65,000

40,000

Working capital surplus 2

119,345

115,171

Maracás Menchen Mine Operational and Sales Results

Q1 2023

Q1 2022

Total Ore Mined (tonnes)

341,967

303,652

Ore Grade Mined - Effective Grade 5 (%)

0.81

1.27

Concentrate Produced (tonnes)

78,695

92,324

Grade of Concentrate (%)

2.99

3.21

Global Recovery 6 (%)

83.0

77.5

V 2 O 5 Produced (Flake + Powder) (tonnes)

2,111

2,442

V 2 O 5 produced (equivalent pounds 3 )

4,653,953

5,383,682

V 2 O 5 Equivalent Sold (tonnes)

2,849

2,232

Produced V 2 O 5 equivalent sold (tonnes)

2,604

2,153

Purchased V 2 O 5 equivalent sold (tonnes)

245

79

Cash Operating Costs Excluding Royalties per pound ($/lb) 1

5.15

3.97

Revenues per pound sold ($/lb) 1

9.14

8.67

Q1 2023 Financial Highlights

  • During Q1 2023, the Company recognized revenues of $57.4 million from sales of 2,849 tonnes of V 2 O 5 equivalent (Q1 2022 – 2,232 tonnes). This represents a 35% increase in revenues over Q1 2022 ($42.7 million) and is mainly due to greater sales quantities at a higher revenue per lb sold 1 .
  • Operating costs of $45.9 million in Q1 2023 (Q1 2022 – $29.0 million) include direct mine and production costs of $28.4 million (Q1 2022 – $17.6 million), conversion costs of $1.9 million (Q1 2022 – $1.8 million), product acquisition costs of $4.2 million (Q1 2022 – $1.6 million), royalties of $2.4 million (Q1 2022 – $2.0 million), distribution costs of $1.4 million (Q1 2022 – $1.4 million), depreciation and amortization of $7.3 million (Q1 2022 – $4.3 million) and iron ore costs of $0.3 million (Q1 2022 - $0.2 million). The increase in direct mine and production costs is attributable to low ore availability due in part to the heavy rains in December 2022, as well as a shutdown for the completion of the planned maintenance and refractory refurbishment in the kiln. Higher mining costs, the lack of production stability and the ramp up following the shutdown negatively impacted costs in Q1 2023. In addition, as compared with Q1 2022, the Company experienced cost increases in critical consumables, including sodium carbonate, as well as increased consumption of ammonium sulfate.
  • Cash operating costs excluding royalties per pound 1 sold were $5.15 in Q1 2023, compared with $3.97 in Q1 2022. The increase seen in Q1 2023 compared with Q1 2022 is largely due to the reasons noted above for operating costs, with the previously noted plant shutdowns negatively impacting operational and financial performance for the quarter.
  • Professional, consulting and management fees were $5.5 million in Q1 2023, compared with $5.9 million in Q1 2022, representing a 6% decrease. The decrease is primarily due to lower costs incurred for Largo Physical Vanadium Corp. ("LPV") in Q1 2023 than in the previous comparative quarter.
  • Other general and administrative expenses were $3.3 million in Q1 2023, compared with $1.7 million in Q1 2022. The increase is primarily attributable to increased depreciation in Q1 2023 from the Company's software intangible asset, as well as increased IT related costs in support of the Company's enterprise resource planning ("ERP") software implementation. The Company also saw increased costs at LCE, which are primarily related to increased travel costs arising from its battery installation activities in Spain.
  • Share-based payments in Q1 2023 decreased from Q1 2022 by 266% to an expense recovery of $1.3 million. The decrease was attributable to the reversal of share-based payment expenditures on forfeited unvested stock options and restricted share units ("RSUs") as well as a reduced number of stock options and RSUs granted in Q1 2023, as compared with Q1 2022.
  • Finance costs were $1.4 million in Q1 2023, compared with $0.2 million in Q1 2022. The increase is attributable to increased debt, as well as an initial financing fee on the Company's new debt facilities.
  • Technology start-up costs were $2.8 million in Q1 2023, representing a 7% decrease over Q1 2022. These costs relate to activities at LCE focussed on the deployment of its initial VCHARGE VRFB system in Spain with the quarter seeing increased activity by the field service team and higher transportation and installation costs.
  • Cash provided by financing activities in Q1 2023 increased from cash provided by financing activities in Q1 2022 by $24.9 million. The movement is primarily due to the receipt of debt of $25.0 million.
  • Cash used in investing activities in Q1 2023 of $23.4 million is an increase from the $4.3 million seen in Q1 2022. This is primarily due to capital expenditures for the ilmenite project and purchases of vanadium assets by LPV of $8.6 million.

Additional Corporate Updates

  • Q1 2023 Production Overview: Production of 2,111 tonnes of V 2 O 5 in Q1 2023 was 14% lower than the 2,442 tonnes of V 2 O 5 produced in Q1 2022. In Q1 2023, the Company experienced reduced massive ore inventory arising from the heavy rainfall in December 2022. The planned kiln maintenance and refractory refurbishment initially scheduled for February was completed in January during the stoppage in operations. In Q1 2023, the transition in mining contractor was completed and 341,967 tonnes of ore were mined with an effective grade 5 of 0.81% of V 2 O 5 . The ore mined in Q1 2023 was 13% higher than in Q1 2022. The Company produced 78,695 tonnes of concentrate with an effective grade 5 of 2.99%. The global recovery 6 achieved in Q1 2023 was 83.0%, an increase of 7.1% from the 77.5% achieved in Q1 2022 and 11.1% higher than the 74.7% achieved in Q4 2022. The global recovery 6 in January was 83.1%, with 82.9% achieved in February and 82.7% achieved in March. Subsequent to Q1 2023, production in April 2023 was 676 tonnes of V 2 O 5 equivalent.
  • Q1 2023 High Purity Production: In Q1 2023, the Company produced 1,041 V 2 O 5 equivalent tonnes of high purity products, including 813 tonnes of high purity V 2 O 5 and 228 tonnes of high purity vanadium trioxide ("V 2 O 3 "). This represented 49% of the total quarterly production.
  • Q1 2023 Sales Overview and Outlook: In Q1 2023, the Company sold 2,849 tonnes of V 2 O 5 equivalent (Q1 2022 – 2,232 tonnes), including 245 tonnes of purchased products (Q1 2022 – 79 tonnes). Logistical challenges and transport costs have eased from their highs and the Company expects further improvements in the coming quarters and the Company continued to deliver on all its commercial commitments. The Company has also committed to the purchase of 60 tonnes per month of V 2 O 5 from third parties for the remainder of the year. Subsequent to Q1 2023, sales in April 2023 were 1,101 tonnes of V 2 O 5 equivalent, including 78 tonnes of purchased material.
  • Stack Manufacturing Facility Improvements at LCE: All building improvements at Largo Clean Energy's ("LCE") facility in Wilmington, Massachusetts were completed during Q1 2023. Stack manufacturing has moved into its final location and LCE will now begin the process of restarting and scaling up the capacity to 12.5 megawatts ("MW") by the end of the year, with an ultimate capacity of 100 MW by the end of 2025. The sub-scale and chemistry teams have moved into their new lab, which, following an upgrade over the next two quarters, will increase the material and core technology testing capacity to support new vendors and performance improvements.
  • Promotion of Paul Vollant to Chief Commercial Officer: Effective May 9, 2023, Largo has promoted Paul Vollant to Chief Commercial Officer in order to oversee all sales and strategic business development efforts related to the commodity division of the Company. His promotion reflects an unwavering commitment and support of the Company's sales efforts to date, including the establishment and oversight of Largo's sales and trading department. Mr. Vollant is highly experienced in the sales and marketing of metals and minerals and has specialized in strategic metals, particularly vanadium and titanium. Mr. Vollant joined Largo in 2019 as Director of Sales and Trading and was subsequently promoted to Vice President of Commercial in 2021.

Update of 2023 Production and Sales Strategy Outlook

The Company is in the process of reviewing its short-term mine model to incorporate on-going infill drilling at the Campbell Pit. Based on results to date and expected future results, the Company has adjusted its annual 2023 production, sales and cash cost guidance.

Revised 2023 Production, Sales and Cost Guidance

Tonnes V 2 O 5

Q2

Q3

Q4

2023

Low

High

Low

High

Low

High

Low

High

Production

2,200

2,400

2,400

3,300

2,400

3,300

9,000

11,000

Sales 1

1,900

2,300

2,000

2,600

2,200

3,300

8,700

10,700

  1. The revised annual 2023 sales guidance does not include purchased material.

Cash Operating Cost Excluding Royalties ($/lb sold) 1

$4.85 – 5.65

Q1 2023 Webcast and Conference Call Information

To join the conference call without operator assistance, you may register and enter your phone number at https://emportal.ink/40oF5sO to receive an instant automated call back.

You can also dial direct to be entered to the call by an Operator via dial-in details below.

Conference Call Details

Date:

Thursday, May 11, 2023

Time:

1:00 p.m. ET

Dial-in Number:

Local: +1 (416) 764-8650

North American Toll Free: +1 (888) 664-6383

Conference ID:

09350530

Webcast Registration Link:

https://app.webinar.net/NxAb5Ek3Yjp

RapidConnect Link

https://emportal.ink/40oF5sO

Replay Number:

Local / International: + 1 (416) 764-8677

North American Toll Free: +1 (888) 390-0541

Replay Passcode: 350530#

Website:

To view press releases or any additional financial information, please visit the Investor Resources section of the Company's website at: www.largoinc.com/English/investor-resources

A playback recording will be available on the Company's website for a period of 60-days following the conference call.

The information provided within this release should be read in conjunction with Largo's unaudited condensed interim financial statements for the three months ended March 31, 2023 and 2022 and its management's discussion and analysis for the three months ended March 31, 2023 which are available on our website at www.largoinc.com or on the Company's respective profiles at www.sedar.com and www.sec.gov .

About Largo

Largo has a long and successful history as one of the world's preferred vanadium companies through the supply of its VPURE TM and VPURE+ TM products, which are sourced from one of the world's highest-grade vanadium deposits at the Company's Maracás Menchen Mine in Brazil. Aiming to enhance value creation at Largo, the Company is in the process of implementing an ilmenite concentration plant using feedstock sourced from its existing operations in addition to advancing its U.S.-based clean energy division with its VCHARGE vanadium batteries. Largo's VCHARGE vanadium batteries contain a variety of innovations, enabling an efficient, safe and ESG-aligned long duration solution that is fully recyclable at the end of its 25+ year lifespan. Producing some of the world's highest quality vanadium, Largo's strategic business plan is based on two pillars: 1.) leading vanadium supplier with an outlined growth plan and 2.) U.S.-based energy storage business support a low carbon future.

Largo's common shares trade on the Nasdaq Stock Market and on the Toronto Stock Exchange under the symbol "LGO". For more information, please visit www.largoinc.com .

Cautionary Statement Regarding Forward-looking Information:

This press release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation. Forward looking information in this press release includes, but is not limited to, statements with respect to the timing and amount of estimated future production and sales; the future price of commodities; costs of future activities and operations, including, without limitation, the effect of inflation and exchange rates; the effect of unforeseen equipment maintenance or repairs on production; timing of ilmenite production; the ability to produce high purity V2O5 and V2O3 according to customer specifications; the extent of capital and operating expenditures; the ability of the Company to make improvements on its current short-term mine plan; the impact of global delays and related price increases on the Company's global supply chain and future sales of vanadium products. Forward looking information in this press release also includes, but is not limited to, statements with respect to our ability to build, finance and successfully operate a VRFB business, the projected timing and cost of the completion of the EGPE project; our ability to protect and develop our technology, our ability to maintain our IP, the competitiveness of our product in an evolving market, our ability to market, sell and deliver our VCHARGE batteries on specification and at a competitive price, our ability to successfully deploy our VCHARGE batteries in foreign jurisdictions; our ability to negotiate and enter into a joint venture with Ansaldo Green Tech on terms satisfactory to the Company and the success of such joint venture; the receipt of necessary governmental permits and approvals on a timely basis, our ability to secure the required resources to build and deploy our VCHARGE batteries, and the adoption of VRFB technology generally in the market.

The following are some of the assumptions upon which forward-looking information is based: that general business and economic conditions will not change in a material adverse manner; demand for, and stable or improving price of V2O5 and other vanadium commodities; receipt of regulatory and governmental approvals, permits and renewals in a timely manner; that the Company will not experience any material accident, labour dispute or failure of plant or equipment or other material disruption in the Company's operations at the Maracás Menchen Mine or relating to Largo Clean Energy, specially in respect of the installation and commissioning of the EGPE project; the availability of financing for operations and development; the availability of funding for future capital expenditures; the ability to replace current funding on terms satisfactory to the Company; the ability to mitigate the impact of heavy rainfall; the Company's ability to procure equipment, services and operating supplies in sufficient quantities and on a timely basis; that the estimates of the resources and reserves at the Maracás Menchen Mine are within reasonable bounds of accuracy (including with respect to size, grade and recovery and the operational and price assumptions on which such estimates are based); the accuracy of the Company's mine plan at the Maracás Menchen Mine, the competitiveness of the Company's VRFB technology; the ability to obtain funding through government grants and awards for the Green Energy sector, the accuracy of cost estimates and assumptions on future variations of VCHARGE battery system design, that the Company's current plans for ilmenite and VRFBs can be achieved; the Company's "two-pillar" business strategy will be successful; the Company's sales and trading arrangements will not be affected by the evolving sanctions against Russia; and the Company's ability to attract and retain skilled personnel and directors; the ability of management to execute strategic goals.

Forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". All information contained in this news release, other than statements of current and historical fact, is forward looking information. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Largo or Largo Clean Energy to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Largo and in its public documents filed on www.sedar.com and available on www.sec.gov from time to time. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Although management of Largo has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Largo does not undertake to update any forward-looking statements, except in accordance with applicable securities laws. Readers should also review the risks and uncertainties sections of Largo's annual and interim MD&As which also apply.

Trademarks are owned by Largo Inc.

Q1 2023 Net Income Reconciliation

Q1 2023

Total V 2 O 5 equivalent sold

000s lbs

6,281

A

tonnes 1

2,849

Produced V 2 O 5 equivalent sold

000s lbs

5,741

B

tonnes 1

2,604

Revenues per pound sold

$/lb

$

9.14

C

Cash operating costs per pound

$/lb

$

5.58

D

  1. Conversion of tonnes to pounds, 1 tonne = 2,204.62 pounds or lbs.

Q1 2023

Revenues

$

57,421

A x C

2,849 tonnes of V 2 O 5 equivalent sold (Q1 2022 - 2,232 tonnes), with revenues per pound sold of $9.14 (Q1 2021 - $8.67)

Cash operating costs

(32,017)

B x D

Global recovery of 83.0% (Q1 2022 - 77.5%), impact of shutdowns and cost and consumption increases for critical consumables, including HFO, ammonium sulfate and sodium carbonate

Other operating costs

Conversion costs

(costs incurred in converting V 2 O 5 to FeV that are recognized on the sale of FeV)

(1,918)

Note 19

568 tonnes of FeV sold

Product acquisition costs

(costs incurred in purchasing products from 3rd parties that are recognized on the sale of those products)

(4,178)

Note 19

245 tonnes of V 2 O 5 equivalent of purchased products sold, compared with 79 tonnes in Q1 2022 with a cost of $1,550

Distribution costs

(1,447)

Note 19

Depreciation

(7,251)

Note 19

Increase in legal provisions

(119)

See "other general and administrative expenses" section on page 5 of the Q1 2023 MD&A

Iron ore costs

(273)

Note 19

(15,186)

Commercial & Corporate costs

Professional, consulting and management fees

(2,133)

Note 15 (Sales & trading plus Corporate)

Other general and administrative expenses

(1,389)

Share-based payments

1,342

(2,180)

Largo Clean Energy

(6,602)

Note 15 (excluding finance costs and foreign exchange)

2023 guidance between $13,500 and $14,500

Largo Physical Vanadium

(80)

Note 15 (excluding finance costs and foreign exchange)

Titanium project

(105)

Note 15 - "other"

Foreign exchange loss

417

Finance costs

(1,426)

Interest income

712

Exploration and evaluation costs

(239)

Net income before tax

715

Income tax expense

(333)

Deferred income tax expense

(1,589)

Net income (loss)

$

(1,207)

Non-GAAP Measures

The Company uses certain non-GAAP measures in its press release, which are described in the following section. Non-GAAP financial measures and non-GAAP ratios are not standardized financial measures under IFRS, the Company's GAAP, and might not be comparable to similar financial measures disclosed by other issuers. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Revenues Per Pound

The Company's press release refers to revenues per pound sold, V 2 O 5 revenues per pound of V 2 O 5 sold and FeV revenues per kg of FeV sold, which are non-GAAP financial measures that are used to provide investors with information about a key measure used by management to monitor performance of the Company.

These measures, along with cash operating costs, are considered to be key indicators of the Company's ability to generate operating earnings and cash flow from its Maracás Menchen Mine and sales activities. These measures differ from measures determined in accordance with IFRS, and are not necessarily indicative of net earnings or cash flow from operating activities as determined under IFRS.

The following table provides a reconciliation of revenues per pound sold, V2O5 revenues per pound of V2O5 sold and FeV revenues per kg of FeV sold to revenues and the revenue information presented in note 18 as per the Q1 2023 unaudited condensed interim consolidated financial statements.

Three months ended

March 31,
2023

March 31,
2022

Revenues - V 2 O 5 produced i

$

34,526

21,814

V 2 O 5 sold - produced (000s lb)

3,798

2,694

V 2 O 5 revenues per pound of V 2 O 5 sold - produced ($/lb)

$

9.09

8.10

Revenues - V 2 O 5 purchased i

$

2,528

386

V 2 O 5 sold - purchased (000s lb)

309

44

V 2 O 5 revenues per pound of V 2 O 5 sold - purchased ($/lb)

$

8.18

8.77

Revenues - V 2 O 5 i

$

37,054

22,200

V 2 O 5 sold (000s lb)

4,107

2,738

V 2 O 5 revenues per pound of V 2 O 5 sold ($/lb)

$

9.02

8.11

Revenues - V 2 O 3 produced i

$

1,483

-

V 2 O 3 sold - produced (000s lb)

134

-

V 2 O 3 revenues per pound of V 2 O 3 sold - produced ($/lb)

$

11.07

-

Revenues - V 2 O 3 purchased i

$

1,155

-

V 2 O 3 sold - purchased (000s lb)

88

-

V 2 O 3 revenues per pound of V 2 O 3 sold – purchased ($/lb)

$

13.13

-

Revenues - V 2 O 3 i

$

2,637

-

V 2 O 3 sold - purchased (000s lb)

223

-

V 2 O 3 revenues per pound of V 2 O 3 sold ($/lb)

$

11.83

-

Revenues - FeV produced i

$

17,428

19,028

FeV sold - produced (000s kg)

568

632

FeV revenues per kg of FeV sold - produced ($/lb)

$

30.68

30.11

Revenues - FeV purchased i

$

301

1,460

FeV sold - purchased (000s kg)

10

40

FeV revenues per kg of FeV sold - purchased ($/lb)

$

30.10

36.50

Revenues – FeV i

$

17,730

20,488

FeV sold (000s kg)

578

672

FeV revenues per kg of FeV sold ($/lb)

$

30.67

30.49

Revenues i

$

57,421

42,688

V 2 O 5 equivalent sold (000s lb)

6,281

4,921

Revenues per pound sold ($/lb)

$

9.14

8.67

  1. As per note 18 in the Company's Q1 2023 unaudited condensed interim consolidated financial statements.

Cash Operating Costs and Cash Operating Costs Excluding Royalties

The Company's press release refers to cash operating costs per pound and cash operating costs excluding royalties per pound, which are non-GAAP ratios based on cash operating costs and cash operating costs excluding royalties, which are non-GAAP financial measures, in order to provide investors with information about a key measure used by management to monitor performance. This information is used to assess how well the Maracás Menchen Mine is performing compared to plan and prior periods, and also to assess its overall effectiveness and efficiency.

Cash operating costs includes mine site operating costs such as mining costs, plant and maintenance costs, sustainability costs, mine and plant administration costs, royalties and sales, general and administrative costs (all for the Mine properties segment), but excludes depreciation and amortization, share-based payments, foreign exchange gains or losses, commissions, reclamation, capital expenditures and exploration and evaluation costs. Operating costs not attributable to the Mine properties segment are also excluded, including conversion costs, product acquisition costs, distribution costs and inventory write-downs.

Cash operating costs excluding royalties is calculated as cash operating costs less royalties.

Cash operating costs per pound and cash operating costs excluding royalties per pound are obtained by dividing cash operating costs and cash operating costs excluding royalties, respectively, by the pounds of vanadium equivalent sold that were produced by the Maracás Menchen Mine.

Cash operating costs, cash operating costs excluding royalties, cash operating costs per pound and cash operating costs excluding royalties per pound, along with revenues, are considered to be key indicators of the Company's ability to generate operating earnings and cash flow from its Maracás Menchen Mine. These measures differ from measures determined in accordance with IFRS, and are not necessarily indicative of net earnings or cash flow from operating activities as determined under IFRS.

The following table provides a reconciliation of cash operating costs and cash operating costs excluding royalties, cash operating costs per pound and cash operating costs excluding royalties per pound for the Maracás Menchen Mine to operating costs as per the Q1 2023 unaudited condensed interim consolidated financial statements.

Three months ended

March 31, 2022

March 31, 2022

Operating costs i

$

45,931

$

28,958

Professional, consulting and management fees ii

844

1,036

Other general and administrative expenses iii

309

267

Add: insurance proceeds i

Less: iron ore costs i

(273)

(215)

Less: conversion costs i

(1,918)

(1,847)

Less: product acquisition costs i

(4,178)

(1,550)

Less: inventory write-down i

(1,447)

(1,455)

Less: depreciation and amortization expense i

(7,251)

(4,305)

Cash operating costs

32,017

20,889

Less: royalties i

(2,445)

(2,026)

Cash operating costs excluding royalties

29,572

18,863

Produced V 2 O 5 sold (000s lb)

5,741

4,747

Cash operating costs per pound ($/lb)

$

5,58

$

4.40

Cash operating costs excluding royalties per pound ($/lb)

$

5.15

$

3.97

  1. As per note 19 in the Company's Q1 2023 unaudited condensed interim consolidated financial statements.
  2. As per the Mine properties segment in note 15 in the Company's Q1 2023 unaudited condensed interim consolidated financial statements.
  3. As per the Mine properties segment in note 15 less the increase in legal provisions of $0.1 million (Q1 2023) as noted in the "other general and administrative expenses" on page 5 of the Company's Q1 2023 management's discussion and analysis.

________________________________________
1
Revenues per pound sold and cash operating costs are non-GAAP financial measures, and cash operating costs per pound and cash operating costs excluding royalties per pound are non-GAAP ratios with no standard meaning under IFRS, and may not be comparable to similar financial measures disclosed by other issuers. Refer to the "Non-GAAP Measures" section of this press release.
2 Defined as current assets less current liabilities per the consolidated statements of financial position.
3 Conversion of tonnes to pounds, 1 tonne = 2,204.62 pounds or lbs.
4 Fastmarkets Metal Bulletin.
5 Effective grade represents the percentage of magnetic material mined multiplied by the percentage of V 2 O 5 in the magnetic concentrate.
6 Global recovery is the product of crushing recovery, milling recovery, kiln recovery, leaching recovery and chemical plant recovery.

For further information, please contact:

Investor Relations
Alex Guthrie
Senior Manager, External Relations
+1.416.861.9778
aguthrie@largoinc.com

News Provided by Business Wire via QuoteMedia

LGO:CC
The Conversation (0)

Largo Reports Fourth Quarter and Full Year 2023 Financial Results; Continued Focus on Operational Improvements and Cost Reduction to Offset Depressed Vanadium Prices

All dollar amounts expressed are in thousands of U.S. dollars unless otherwise indicated.

Q4, Full Year 2023 and Other Highlights

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo Announces a Proposed Joint Venture with Stryten Energy to Bring Innovation and Scale to North American Vanadium Flow Battery Market

New Relationship Would Establish Integrated Supply Chain for Vanadium and Vanadium Electrolyte Manufacturing; Support Growing Demand For Long-duration Energy Storage Solutions

Largo Inc. (TSX: LGO) (NASDAQ: LGO) is pleased to announce the signing of a non-binding letter of intent with Stryten Energy LLC (" Stryten ") to establish a 50:50 joint venture that would combine the Company's wholly owned subsidiary, Largo Clean Energy Corp. (" LCE ") with Stryten's vanadium redox flow battery (" VRFB ") business (the " Proposed Transaction "). This announcement comes in concert with Enel Green Power España and LCE's go-live of a 5.5-megawatt hour VRFB in Spain, the deployment of one of the largest utility scale vanadium system in Europe.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo to Release its Fourth Quarter and Annual 2023 Financial Results on March 21, 2024

Largo Inc. ("Largo" or the "Company") (TSX: LGO) (NASDAQ: LGO) will release its fourth quarter and annual 2023 financial results on Thursday, March 21, 2024 after the close of market trading. Additionally, the Company will host a conference call to discuss its fourth quarter, annual 2023 results and other updates on Friday, March 22 at 1:00 p.m. ET.

To join the conference call without operator assistance, you may register and enter your phone number at https://emportal.ink/48drhVN to receive an instant automated call back.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo Identifies Significant Platinum-Palladium Grades from Sampling of the Non-Magnetic Tailings Ponds at its Maracás Menchen Mine; Commences Further Analysis of Platinum Group Metals as Part of its Ongoing Exploration Program

Largo Inc. (" Largo " or the " Company ") ( TSX: LGO ) ( NASDAQ: LGO ) today announces it has identified significant platinum group metals (" PGMs ") grades in its non-magnetic tailings ponds and ilmenite stockpile from ongoing exploration work at its Maracás Menchen Mine, including a total of 28 vertical auger drill holes and 83 samples. The Company has also initiated a review of its past geology and assay database to establish the existence of PGMs in deposits surrounding its Campbell Pit.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240305463049/en/

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Largo Reports Fourth Quarter and Full Year 2023 Operational and Sales Results Highlighted by Record Quarterly High Purity V2O5 Production; Provides 2024 Guidance

All amounts expressed are in U.S. dollars, denominated by "$"

Q4 and FY 2023 Highlights

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Lithium ION Energy Announces Warrant Extension

Lithium ION Energy Announces Warrant Extension

Lithium ION Energy Ltd (TSXV: ION) (OTCQB: IONGF) (FSE: ZA4) ("ION" or the "Company") announces today that it intends to extend the expiry date of an aggregate 11,500,000 outstanding common share purchase warrants of the Company (the "April Warrants") by 12 months to April 12, 2025 and an aggregate 4,000,000 outstanding common share purchase warrants of the Company (the "July Warrants" and collectively with the April Warrants, the "Warrants") by 12 months to July 20, 2025 (collectively with the extension of April Warrants, the "Extension").

The April Warrants were issued pursuant to a public offering which closed on April 13, 2021 and are set to expire on April 12, 2024. The April Warrants were issued pursuant to a warrant indenture dated April 13, 2021 between the Company and TSX Trust and each April Warrant entitles the holder thereof to acquire one common share of the Company at a price of CAD $0.70. The July Warrants were issued pursuant to a non-brokered private placement which closed on July 20, 2023 and are set to expire on July 20, 2024. Each July Warrant entitles the holder thereof to acquire one common share of the Company at a price of CAD $0.40.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Government of Canada Announces Funding to Support Domestic Critical Minerals Value Chains and Create Good Jobs in the Northwest Territories

Government of Canada Announces Funding to Support Domestic Critical Minerals Value Chains and Create Good Jobs in the Northwest Territories

Canada is committed to supporting strong domestic value chains for critical minerals and the clean technologies and energy sources they enable. The Government of Canada is focused on increasing mineral and energy security, creating good jobs and supporting economic opportunities across critical mineral value chains, from upstream exploration and extraction to downstream processing, manufacturing and recycling.

Today, the Honourable Jonathan Wilkinson, Minister of Energy and Natural Resources, announced a $714,500 investment in Fortune Minerals Limited (Fortune Minerals) to enhance the production of cobalt sulphate and bismuth ingot products from the company's planned mine in the Northwest Territories and refinery in Alberta to increase the supply of critical battery metals that are essential to the development of a domestic electric vehicle value chain. This will be achieved through a pilot-scale hydrometallurgical program designed to optimize processing conditions while ensuring that residues from the process are stable for safe disposal.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Brunswick Exploration Expands Its Exceptional Grassroot Portfolio Across Quebec, Canada and Greenland

Brunswick Exploration Expands Its Exceptional Grassroot Portfolio Across Quebec, Canada and Greenland

Brunswick Exploration Inc. (" BRW " or the " Company ") is pleased to announce that, pursuant to its aggressive and innovative grassroot exploration campaign which led to three new discoveries including the flagship Mirage Project, it has expanded its portfolio of targets and map-staked over 215 outcropping, mapped andor interpreted, untested S-type pegmatites, measuring between 500 and 8,800 metres in strike length. These new targets are located in areas that have seen minimal or no current lithium exploration in Quebec, Labrador and, for the first time, Greenland. The newly acquired pegmatites were identified following extensive compilation work by BRW and most are located near existing roads, power infrastructure andor tidal water.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
South Star Battery Metals Announces Commencement of Preliminary Economic Assessment for the BamaStar Graphite Project in Coosa County, Alabama, USA

South Star Battery Metals Announces Commencement of Preliminary Economic Assessment for the BamaStar Graphite Project in Coosa County, Alabama, USA

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE UNITED STATES

South Star Battery Metals Corp. ("South Star" or the "Company") (TSXV:STS)(OTCQB:STSBF), is pleased to announce that it has awarded contracts for the National Instrument 43-101 ("NI43-101") Preliminary Economic Assessment(" PEA" or the "Study") for the BamaStar Graphite Project ("BamaStar"). The interdisciplinary team of consultants, engineers and scientists is co-led by Dorfner ANZAPLAN GmbH and Lycopodium Limited. The PEA is anticipated to be completed and published in July 2024. With the recent mineral lease and surface rights extensions, South Star has successfully completed all the other requirements for BamaStar's option agreement, and preparing the PEA is the final milestone that will give the Company the right to acquire an undivided 75% legal and beneficial interest in and to the minerals, mining rights and the underlying agreements for the mine

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Odessa Minerals (ASX:ODE)

Drilling Approvals Received for Gascoyne East Project

Odessa Minerals Limited (ASX:ODE) (“Odessa” or the “Company”) is pleased to provide an update on its Gascoyne East Project (“Project”) in the Gascoyne region of Western Australia.

Highlights:

Keep reading...Show less
ALX Resources Corp. Intersects Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

ALX Resources Corp. Intersects Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

alx resources corp. (TSXV: AL) (FSE: 6LLN) (OTC: ALXEF) ("ALX" or the "Company") is pleased to announce an update on the 2024 winter drilling program at its 100%-owned Gibbons Creek Uranium Project ("Gibbons Creek", or the "Project") located in the northern Athabasca Basin near the community of Stony Rapids, Saskatchewan. The second and third holes of the planned 6-hole program have intersected narrow intervals of uranium mineralization at or near the unconformity, based upon hand-held scintillometer readings on drill core, downhole gamma probe results, and visual observation of uranium minerals by ALX's geological team.

Hole GC24-02 (180 degree azimuth / -75 degree dip) was drilled at the intersection of east-west and north-northwest faults interpreted from the 2023 ground magnetic survey and intersected fracture-controlled and disseminated blebs of uranium mineralization at 0.8 metres below the unconformity, which was reached at a depth of 108.4 metres. An Exploranium GR-135 handheld scintillometer measured radioactivity of 220 counts per second ("cps") and a Mount Sopris 2PGA-1000 downhole gamma probe measured a radiometric peak of 3,321 cps within a 0.6 metre interval of anomalous radioactivity from 108.9 to 109.5 metres. Drill hole GC24-02 represents an approximately 470-metre step-out to the west of ALX's historical hole GC15-03 (0.143% U3O8 assay over 0.23 metres) and was collared approximately 350 metres to the southwest of Eldorado Nuclear's ("Eldorado") 1979 hole GC-15 (1,520 parts per million ("ppm") uranium over 0.13 metres) (see Figure 1).

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×