Ivanhoe Mines Reports Kipushi Mine Produced a Record 25,677 Tonnes of Zinc in May, Equivalent to 308,000 Tonnes of Zinc Annualized

Ivanhoe Mines Reports Kipushi Mine Produced a Record 25,677 Tonnes of Zinc in May, Equivalent to 308,000 Tonnes of Zinc Annualized

Production record achieved as zinc prices near four-year highs

Kipushi Mine set to become world's fourth largest zinc producer in 2026

Ivanhoe Mines (TSX: IVN,OTC:IVPAF) (OTCQX: IVPAF) Executive Co-Chairman Robert Friedland and President and Chief Executive Officer Marna Cloete announced today that the Kipushi Mine in the Democratic Republic of the Congo (DRC) achieved a monthly production record of 25,677 tonnes of zinc in concentrate in May.

During the month, the concentrators milled a record 72,003 tonnes of ore at an average recovery of 93%, with an average plant feed grade of 36.2% zinc. The production record is 12% higher than the previous record of 22,968 tonnes of zinc, which was set in January 2026.

Year-to-date zinc production totals approximately 110,000 tonnes of zinc. Annualized, this is equivalent to approximately the mid-point of the 2026 production guidance range of 240,000 to 290,000 tonnes of zinc.

During May, 85,811 tonnes of ore were mined and hoisted to the surface. At the end of May, approximately 12,000 tonnes of ore were stored in surface, high-grade run-of-mine (ROM) stockpiles, at a grade of approximately 37% zinc. The lower-grade stockpiles contain 254,000 tonnes of ore with an average grade of approximately 22% zinc.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/300131_ivanhoe2.jpg

Aerial view over the Kipushi Mine. The concentrator production record achieved in May is equivalent to an annualized rate of 308,000 tonnes of zinc in concentrate. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/300131_ivanhoe2en.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/300131_ivanhoe1.jpg

Figure 1. World's top 10 zinc mines by contained zinc production in 2025 ('000 tonnes), with head grade (% zinc). Kipushi is on track to meet 2026 production guidance, placing it among the top 4 zinc mining operations.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/300131_ivanhoe1en.jpg

Source: S&P Capital IQ, 2025. Production for Kipushi is 2026 guidance range as disclosed on January 14, 2026
Notes: 2025 paid zinc production and head grade per Capital IQ estimates. Lanping Jinding excluded.
*2024 actual zinc head grade due to unavailability of 2025 estimates

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/300131_38a5f0fcb434db23_004.jpg

Figure 2. Three-year zinc price chart ($ per pound of payable zinc), overlaid with Kipushi's 2024 and 2025 actual cash costs (C1) and the 2026 cash costs (C1) guidance range.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/300131_38a5f0fcb434db23_004full.jpg

Source: Bloomberg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/300131_ivanhoe4.jpg

Aerial view of the Kipushi Mine's tailings storage facilities. A new facility is under construction (bottom) adjacent to the existing storage facility (top). The first deposit of tailings is expected in October 2026. Kipushi has the smallest tailings storage facility of any major base metal mine, globally.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/300131_ivanhoe4en.jpg

Construction of Kipushi's tailings storage facility expansion is nearing completion.

Construction of the Kipushi Mine's second tailings storage facility (TSF) is over 90% complete, with the first deposit of tailings expected from October 2026. Lining of the new TSF's paddock 2B extension, along with the existing TSF, are designed to be compliant with Global Industry Standard on Tailings Management (GISTM).

About Ivanhoe Mines

Ivanhoe Mines is a Canadian mining company focused on advancing its three principal operations in Southern Africa; the Kamoa-Kakula Copper Complex in the DRC, the ultra-high-grade Kipushi zinc-copper-germanium-silver mine, also in the DRC; and the tier-one Platreef platinum-palladium-nickel-rhodium-gold-copper mine in South Africa.

Ivanhoe Mines is exploring for copper in its highly prospective, 54-100% owned exploration licences in the Western Forelands, covering an area over six times larger than the adjacent Kamoa-Kakula Copper Complex, including the high- grade discoveries in the Makoko District. Ivanhoe is also exploring for new sedimentary copper discoveries in new horizons including Angola, Kazakhstan, and Zambia.

Information contact

Follow Robert Friedland (@robert_ivanhoe) and Ivanhoe Mines (@IvanhoeMines_) on X.

Investors

Tommy Horton +44 7866 913 207 (London)

Eric Zurmuehle +1 203 451 5834 (New York)

Media

Tanya Todd +1 604 331 9834 (Vancouver)

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/300131

News Provided by TMX Newsfile via QuoteMedia

IVN:CC
The Conversation (0)
Ivanhoe Mines

Ivanhoe Mines

Ivanhoe Mines Ltd is a mineral exploration and development company. The company, together with its subsidiaries, explores, develops, and recovers minerals and precious gems from its property interests located in Africa. The group explores platinum, nickel, copper, gold, silver, cobalt, iron, vanadium, and chrome. It operates in four segments: Platreef property, Kamoa Holding joint venture, Kipushi properties, and the Company's treasury offices.

Ivanhoe Mines Ltd is a mineral exploration and development company. The company, together with its subsidiaries, explores, develops, and recovers minerals and precious gems from its property interests located in Africa. The group explores platinum, nickel, copper, gold, silver, cobalt, iron, vanadium, and chrome. It operates in four segments: Platreef property, Kamoa Holding joint venture,... Keep Reading...
Edward Sterck, platinum bars.

Edward Sterck: Platinum Drivers Intact, Will Price Break Out Again?

Edward Sterck, director of research at the World Platinum Investment Council, says that although the year's first quarter brought the sector's first surplus in six quarters, the platinum market is still expected to be in deficit this year. "We're expecting investment to return and recoup some of... Keep Reading...
Four platinum group metals bullion bars.

Top 5 Palladium and Platinum Producers by Country

Platinum-group metals (PGMs) include platinum, palladium, rhodium and other metals, all of which are prized for their durability, resistance to corrosion and excellent catalytic properties. However, just a handful of countries produce these precious metals.The automotive industry is the world’s... Keep Reading...
Rows of reflective platinum bars stacked closely.

WPIC: Platinum Heading for Fourth Supply Deficit in a Row

After an active first quarter, the global platinum market remains on track to record its fourth consecutive annual deficit as supply concerns bump up against resilient demand.The World Platinum Investment Council (WPIC) published its latest Platinum Quarterly report on May 18, providing a look... Keep Reading...
Commodity price board showing metal names and price changes with arrows.

The Next Safe Haven? Platinum's "Mojo" Attracting Investor Demand

Platinum may be the most undervalued precious metal, giving it plenty of upside for a catch-up trade. Platinum was the second best-performing metal last year, gaining about 120 percent in 2025. Now the market’s strong fundamentals are carrying over in 2026 with a wide range of investment... Keep Reading...
Edward Sterck, platinum bars.

Edward Sterck: Platinum Records Biggest Deficit Ever in 2025, What's Next?

Edward Sterck, director of research at the World Platinum Investment Council, breaks down platinum supply, demand and price dynamics in 2026. While this year's platinum market deficit is expected to be much smaller than 2025's record shortfall, many of the precious metal's key drivers are still... Keep Reading...
Stacks of shiny platinum bars.

WPIC: Platinum Market Heading for Fourth Straight Deficit in 2026

The global platinum market is expected to remain in deficit for a fourth consecutive year in 2026, even as supply begins to stabilize and demand moderates following a sharp rally in the metal’s price.New projections from the World Platinum Investment Council (WPIC) show a deficit of about... Keep Reading...

Interactive Chart

Latest Press Releases

Related News